2 0 1 4
Head Office
Synergy Building Lt.15 No.5
Jl. Jalur Sutera Barat No.17
Alam Sutera – Tangerang
Telp. : +62 – 21 – 3044 8286
Fax. : +62 – 21 – 3044 8285
Website : www.multikaryaengineering.com
E-mail : office@multikaryaengineering.com
Factory
Jln. Raya Trans Sumatera – Bakauheni
Km 27 Desa Pardasuka Kec. Katibung
Lampung Selatan – Lampung
Telp.
Fax. : +62 – 721 – 370079
Website : www.multikaryaengineering.com
E-mail : office@multikaryaengineering.com
: +62 – 721 – 370008, +62 – 721 – 370089
+62 – 721 – 370099
SUN
MON
TUE
WED
THU
FRI
SAT
J A N U A R Y
NOTE :
Picture Name Area Capacity Production Content AreaPT.Multi Karya Engineering Office & Workshop Lampung 1.1 Hectare
2.400 Ton / Year
Fabrication area, Blasting Painting Area, Stock Yard Area, office Area
: : : :
SUN
MON
TUE
WED
THU
FRI
SAT
F E B R U A R Y
NOTE :
Project Name Item Work Scope Of Work Client Location Periode: Tarahan Port Expansion Phase 5 PT.Bukit Asam : SS Conveyor and Mechanical
: Fabrication, Erection,
: Join PT. Krakatau Engineering – China Huadian Engineering CO.LTD
: Lampung : 2013 Jan –Present
“Success does not depend on your aptitude or your altitude.
It depends on your attitude."
SUN
MON
TUE
WED
THU
FRI
SAT
M A R C H
NOTE :
Project Name Item Work Scope Of Work Client Location Periode: PLTU Tenayan Riau 2 x 110 MW : Fabrication & Installation Platform & Inner Flue
: Erection,Fabrication & Instalation Work : PT.Teknik Lancar Mandiri
: PLTU Tenayan, Tenayan Raya,Riau : april 2013-December 2013
“Try to be yourself, because mimics other people make
ourselves uncomfortable."
SUN
MON
TUE
WED
THU
FRI
SAT
A P R I L
NOTE :
Project Name Item Work Scope Of Work Client Location Periode: Integrated Steel Mill Project,Posco : SMP & CCP Bulding
: Fabrication ,Erection : PT.POSCO E & C Indonesia : Proyek Krakatau Posco,Cilegon : 2012 January – 2013 December
SUN
MON
TUE
WED
THU
FRI
SAT
M A Y
NOTE :
Project Name Item Work Scope Of Work Client Location Periode: Indonesia Intergrated Steel Mill Plant, Steel Making Plant & Continuose Casting Plant : Blasting & Painting
: Blasting & Painting : PT POSCO E&C Indonesia : Cilegon, Banten : 2012 – 2013
"You will achieve a success quickly when in good feelings, good thoughts,
and urge all those good things."
SUN
MON
TUE
WED
THU
FRI
SAT
J U N E
NOTE :
Project Name Item Work Scope Of Work Client Location Periode: Simple Part Fabrication Work : Fabrication
: Fabrication, Blasting Painting : PT. Tekniko Indonesia : Lampung
: Des 2012 – April 2013
SUN
MON
TUE
WED
THU
FRI
SAT
J U L Y
NOTE :
Project Name Item Work Scope Of Work Client Location Periode: Merak Power Plant 2 x 60 MW : Turbin,Cool Bungker, BOP Structure : Erection
: PT.Waskita Karya : Merak Banten : 2011 August – 2012 April
“Do not waste your time to think in a long time.
Act immediately and prioritize for goodness."
SUN
MON
TUE
WED
THU
FRI
SAT
A G U S T U S
NOTE :
Project Name Item Work Scope Of Work Client Location Periode : HTM Factory Project-K5 : Civil & Architecture: Engineering, Fabrication & Construction : PT KMK Global Sport
: Cikupa,Tangerang : 2011 January – 2011 May
SUN
MON
TUE
WED
THU
FRI
SAT
S E P T E M B E R
NOTE :
Project Name Item Work Scope Of Work Client Location Periode: Instalasi Jembatan Jalur Khusus Batubara : Civil & Steel Structure
: Construction
: PT Nugraha Adi Taruna Jo. PT Bakrie Metal Industries : Muara Enim, South Sumatera : 2011 June – 2011 November
“If you want to start a new beginning, make a peace with your past."
SUN
MON
TUE
WED
THU
FRI
SAT
O C T O B E R
NOTE :
Project Name Item Work Scope Of Work Client Location Periode : PLTU Lampung 2 x 100 MW: Water Treatment Plant Mechanical & Electrical : Fabrication & Installation
: Doshin Veolia Water Solution PTE LTD : PLTU Lampung
: 2010 August – 2011 August
SUN
MON
TUE
WED
THU
FRI
SAT
N O V E M B E R
NOTE :
Project Name Item Work Scope Of Work Client Location Periode: Cirebon Coal Steam Fired Power Plant Project 1 x 660 MW : Turbin & WTP Roofing & Siding : Installation (Construction) : PT Doosan Indonesia : PLTU Cirebon, West Java : 2010 September – 2012 March
SUN
MON
TUE
WED
THU
FRI
SAT
D E C E M B E R
NOTE :
Project Name Item Work Scope Of Work Client Location Periode: Cirebon Coal Steam Fired Power Plant Project 1 x 660 MW
: Electrical (Construction) : Installation
: PT Doosan Indonesia : PLTU Cirebon, West Java : 2009 June – 2011 Maret