REKAPITULASI
RINCIAN PENAWARAN BIAYA
DINAS : DINAS PERHUBUNGAN, KOMUNIKASI DAN INFORMATIKA PROVINSI KALIMANTAN TENGAH
PROGRAM : PEMBANGUNAN PRASARANA DAN FASILITAS PERHUBUNGAN
KEGIATAN : FS PEMBANGUNAN DERMAGA DI KECAMATAN LAHUNG TUHUP KABUPATEN MURUNG RAYA
LOKASI : KABUPATEN MURUNG RAYA
SUMBER DANA : APBD KABUPATEN MURUNG RAYA PROVINSI KALIMANTAN TENGAH
TAHUN ANGGARAN : 2016
NO URAIAN BIAYA JUMLAH BIAYA (Rp)
I BIAYA LANGSUNG PERSONIL (BLP)
A TENAGA AHLI 136,000,000.00 B TENAGA PENDUKUNG : 157,250,000.00 SUB TOTAL (I) 293,250,000.00
II BIAYA LANGSUNG NON PERSONIL (BLNP)
A TRANSPORTASI, AKOMODASI, DAN TUNJANGAN PERJALANAN 132,450,000.00 B PERLENGKAPAN DAN PERALATAN KANTOR 19,200,000.00 C PELAPORAN DAN PRESENTASE 55,100,000.00 SUB TOTAL (II ) 206,750,000.00
TOTAL BIAYA ( I+ II ) 500,000,000.00
DIBULATKAN 500,000,000.00
TERBILANG : /// Empat Ratus Delapan Puluh Juta Rupiah ///
Penawar,
REKAPITULASI
RINCIAN PENAWARAN BIAYA
JUMLAH BIAYA (Rp) 136,000,000.00 157,250,000.00 293,250,000.00 132,450,000.00 19,200,000.00 55,100,000.00 206,750,000.00 500,000,000.00 500,000,000.00
TERBILANG : /// Empat Ratus Delapan Puluh Juta Rupiah /// HPS
Penawar,
RINCIAN PENAWARAN BIAYA
DINAS : DINAS PERHUBUNGAN, KOMUNIKASI DAN INFORMATIKA PROVINSI KALIMANTAN TENGAH
PROGRAM : PEMBANGUNAN PRASARANA DAN FASILITAS PERHUBUNGAN
KEGIATAN : FS PEMBANGUNAN DERMAGA DI KECAMATAN LAHUNG TUHUP KABUPATEN MURUNG RAYA
LOKASI : KABUPATEN MURUNG RAYA
SUMBER DANA : APBD KABUPATEN MURUNG RAYA PROVINSI KALIMANTAN TENGAH
TAHUN ANGGARAN : 2016
I.
BIAYA LANGSUNG PERSONIL (BLP)
NO KUALIFIKASI PERSONIL SATUAN VOL
A. TENAGA AHLI
1 Ketua Tim/Team Leader 1.00 org x 6.00 bln OB 6.00 2 Ahli Teknik Lingkungan 1.00 org x 4.00 bln OB 4.00 3 Ahli Arsitektur 1.00 org x 4.00 bln OB 4.00 4 Ahli Hidrologi/Hidrolika 1.00 org x 4.00 bln OB 4.00 5 Ahli Struktur 1.00 org x 4.00 bln OB 4.00 6 Ahli Sosial Ekonomi 1.00 org x 4.00 bln OB 4.00 6.00 26.00 26.00
B TENAGA PENDUKUNG :
1 Surveyor Hidrologi 2.00 org x 5.00 bln OB 10.00 2 Surveyor Mekanika Tanah 7.00 org x 3.00 bln OB 21.00 3 Drafter 2.00 org x 5.00 bln OB 10.00 4 Admintrasi dan Keuangan 1.00 org x 5.00 bln OB 5.00 12.00 18.00 46.00 TOTAL BIAYA LANGSUNG PERSONIL ( BLP )
RINCIAN PENAWARAN BIAYA
HARGA SATUAN (Rp) 6,000,000 36,000,000 5,000,000 20,000,000 5,000,000 20,000,000 5,000,000 20,000,000 5,000,000 20,000,000 5,000,000 20,000,000 Sub Total (A) 136,000,000 3,500,000 35,000,000 3,500,000 73,500,000 3,500,000 35,000,000 2,750,000 13,750,000 Sub Total (C) 157,250,000 293,250,000 TOTAL BIAYA (Rp)II.
BIAYA LANGSUNG NON PERSONIL (BLNP)
A. TRANSPORTASI, AKOMODASI, DAN TUNJANGAN PERJALANAN
NO U R A I A N SATUAN VOL
A.1 MOBILISASI
1 Perjalanan Palangka Raya - Murung Raya
- Profesional staff 6.00 org x 2.00 trip OT 12.00 - Sub profesional staff 11.00 org x 2.00 trip OT 22.00 17.00 4.00 34.00 A.2 AKOMODASI
1 Tunjangan Perumahan Profesional Staf
Ketua Tim/Team Leader 1.00 org x 6.00 bln OB 6.00 Ahli Teknik Lingkungan 1.00 org x 4.00 bln OB 4.00 Ahli Arsitektur 1.00 org x 4.00 bln OB 4.00 Ahli Hidrologi/Hidrolika 1.00 org x 4.00 bln OB 4.00 Ahli Struktur 1.00 org x 4.00 bln OB 4.00 Ahli Sosial Ekonomi 1.00 org x 4.00 bln OB 4.00 6.00 26.00 26.00 A.3 TUNJANGAN PERJALANAN
1 Perjalanan dinas
- Profesional staff 6.00 org x 2.00 trip OT 12.00 - Sub profesional staff 11.00 org x 2.00 trip OT 22.00 17.00 2.00 12.00 A.4 BIAYA SURVEY LAPANGAN
1 SURVEY PENDAHULUAN
A. TRANSPORTASI
- Profesional staff 1.00 kali x 2.00 org x 2.00 trip OT 4.00 B. TUNJANGAN PERJALANAN
- Profesional staff 1.00 kali x 2.00 org x 3.00 hari OH 6.00 C. PERALATAN DAN BAHAN SURVEY
- Data skunder LS 1.00
- Pita ukur BH 1.00
- Perlengkapan lapangan LS 1.00
NO U R A I A N SATUAN VOL
2 SURVEY PENGUKURAN / TOPOGRAFI-BATHIMETRI
A. TRANSPORTASI
- Profesional staff 1.00 kali x 1.00 org x 2.00 trip OT 2.00 - Surveyor 1.00 kali x 2.00 org x 2.00 trip OT 4.00 B. TUNJANGAN PERJALANAN
- Profesional staff 1.00 kali x 1.00 org x 3.00 hari OT 3.00 - Surveyor 1.00 kali x 2.00 org x 3.00 hari OH 6.00 - Tenaga lokal 1.00 kali x 5.00 org x 3.00 hari OH 15.00 C. PERALATAN DAN BAHAN SURVEY
- Pita ukur 50 Meter BH 3.00
- Buku ukur LS 3.00
- Sewa Theodolite T2 2.00 unit x 3.00 hari UNIT/HARI 6.00 - Sewa Theodolite T0 2.00 unit x 3.00 hari UNIT/HARI 6.00 - Sewa Waterpass 2.00 unit x 3.00 hari UNIT/HARI 6.00 - Sewa echousounder + GPS 2.00 unit x 3.00 hari UNIT/HARI 6.00
- Patok Pengukuran (BM dan CP) LS 3.00
- Patok Kayu LS 3.00
- Sewa Perahu 2.00 unit x 3.00 hari BH 6.00
- Perlengkapan lapangan LS 1.00
4.00 20.00 26.00 71.00
3 SURVEY PENYELIDIKAN TANAH
A. TRANSPORTASI
- Profesional staff 1.00 kali x 1.00 org x 2.00 trip OT 2.00 - Surveyor 1.00 kali x 4.00 org x 2.00 trip OT 8.00 B. TUNJANGAN PERJALANAN
- Profesional staff 1.00 kali x 1.00 org x 7.00 hari OT 7.00 - Surveyor 1.00 kali x 4.00 org x 7.00 hari OH 28.00 C. PERALATAN DAN BAHAN SURVEY
- Pita ukur 50 Meter BH 3.00
- Sewa Bor Mesin 5.00 ttk x 7.00 hari hari 35.00
- Perlengkapan lapangan LS 3.00
- Biaya angkut sample LS 3.00
- Biaya laboratorium SPL 20.00
107.00
4 SURVEY HIDROLOGI
A. TRANSPORTASI
- Profesional staff 1.00 kali x 1.00 org x 2.00 trip OT 2.00 - Surveyor 1.00 kali x 2.00 org x 2.00 trip OT 4.00
B. TUNJANGAN PERJALANAN
- Surveyor 1.00 kali x 2.00 org x 3.00 hari OH 6.00 - Tenaga Lokal 1.00 kali x 5.00 org x 3.00 hari OB 15.00 - Tenaga Lokal 1.00 kali x 2.00 org x 3.00 bln OB 6.00 C. PERALATAN DAN BAHAN SURVEY
- Pita ukur BH 3.00
- Patok ukur Skala tinggi air BH 2.00
- Sewa Current Meter 3.00 unit x 3.00 hari UNIT/HARI 9.00
- Stopwatch BH 3.00
- Sewa Perahu 2.00 unit x 3.00 hari BH 6.00
- Perlengkapan lapangan LS 3.00
NO U R A I A N SATUAN VOL
5 SURVEY SOSEK DAN LINGKUNGAN
A. TRANSPORTASI
- Profesional staff 2.00 keg x 1.00 org x 2.00 trip OT 4.00 B. TUNJANGAN PERJALANAN
- Profesional staff 2.00 keg x 1.00 org x 6.00 hari OH 12.00 C. PERALATAN DAN BAHAN SURVEY
- Perlengkapan lapangan LS 3.00
4.00 2.00 8.00 19.00 TOTAL BIAYA TRANSPORTASI, AKOMODASI, DAN TUNJANGAN PERJALANAN (A)
B. PERLENGKAPAN DAN PERALATAN KANTOR
NO U R A I A N SATUAN VOL
B.1 PERLENGKAPAN KANTOR 1 Trasportasi/kendaraan kerja :
Sewa motor 2.00 unit x 6.00 bln BLN/UNIT 12.00
2 Komunikasi (Telp, Internet, fax) BLN 6.00
3 Bahan Alat Tulis Kantor BLN 6.00
4 Keperluan Komputer BLN 6.00
2.00 30.00 B.2 PERALATAN KANTOR
1 Komputer+Printer 2.00 unit x 6.00 bln BLN/UNIT 12.00 2 Handy Cam 1.00 unit x 2.00 bln BLN/UNIT 2.00 3.00 8.00 14.00 TOTAL BIAYA PERLENGKAPAN DAN PERALATAN KANTOR (B)
C. PELAPORAN DAN PRESENTASE
NO U R A I A N SATUAN VOL
1 LAPORAN ADMINISTRASI DAN TEKNIK
Laporan Pendahuluan BUKU 3.00
Laporan Survey
- Laporan Survey pengukuran topografi/bathimetri BUKU 3.00
- Laporan survey penyelidikan tanah BUKU 3.00
- Laporan survey hidrologi BUKU 3.00
- Laporan survey sosial ekonomi BUKU 3.00
- Laporan survey lingkungan BUKU 3.00
Laporan Bulanan BUKU 3.00
Laporan Draft final BUKU 3.00
Laporan Gambar A3 BUKU 5.00
Laporan Rencana Anggaran Biaya BUKU 5.00
Laporan Spesifikasi teknis BUKU 5.00
Laporan Final/Akhir BUKU 5.00
CD Data dan Dokumentasi KEPING 5.00
2. PRESENTASE
- Ekspose/Presentase Pendahuluan Kali 1.00
- Ekspose/Presentase Laporan Interm Kali 1.00
- Ekspose/Presentase Laporan Akhir Kali 1.00
TOTAL BIAYA PELAPORAN (C)
HARGA SATUAN (Rp)
300,000 3,600,000 300,000 6,600,000 Sub total (A.1) 10,200,000
200,000 1,200,000 200,000 800,000 200,000 800,000 200,000 800,000 200,000 800,000 200,000 800,000 Sub total (A.2) 5,200,000
300,000 3,600,000 300,000 6,600,000 Sub total (A.3) 10,200,000
300,000 1,200,000
300,000 1,800,000
500,000 500,000 250,000 250,000 300,000 300,000 Sub total (A.4.1) 4,050,000 TOTAL BIAYA
HARGA SATUAN (Rp) 300,000 600,000 300,000 1,200,000 300,000 900,000 300,000 1,800,000 200,000 3,000,000 200,000 600,000 150,000 450,000 - - 300,000 1,800,000 300,000 1,800,000 250,000 1,500,000 200,000 600,000 150,000 450,000 500,000 3,000,000 300,000 300,000 Sub total (A.4.2) 18,000,000
300,000 600,000 300,000 2,400,000 200,000 1,400,000 300,000 8,400,000 300,000 900,000 1,200,000 42,000,000 300,000 900,000 650,000 1,950,000 350,000 7,000,000 Sub total (A.4.3) 65,550,000
200,000 400,000 200,000 800,000 200,000 1,200,000 150,000 2,250,000 150,000 900,000 200,000 600,000 250,000 500,000 350,000 3,150,000 150,000 450,000 500,000 3,000,000 300,000 900,000 Sub total (A.4.4) 14,150,000 TOTAL BIAYA
HARGA SATUAN (Rp)
300,000 1,200,000
200,000 2,400,000
500,000 1,500,000 Sub total (A.4.5) 5,100,000
TOTAL BIAYA TRANSPORTASI, AKOMODASI, DAN TUNJANGAN PERJALANAN (A) 132,450,000
HARGA SATUAN (Rp) 500,000 6,000,000 400,000 2,400,000 400,000 2,400,000 300,000 1,800,000 Sub total (B.1) 12,600,000 500,000 6,000,000 300,000 600,000 Sub total (B.2) 6,600,000
TOTAL BIAYA PERLENGKAPAN DAN PERALATAN KANTOR (B) 19,200,000
HARGA SATUAN (Rp) 600,000 1,800,000 600,000 1,800,000 600,000 1,800,000 600,000 1,800,000 600,000 1,800,000 600,000 1,800,000 800,000 2,400,000 800,000 2,400,000 2,000,000 10,000,000 600,000 3,000,000 600,000 3,000,000 1,200,000 6,000,000 100,000 500,000 5,500,000 5,500,000 5,500,000 5,500,000 6,000,000 6,000,000
TOTAL BIAYA PELAPORAN (C) 55,100,000
206,750,000 TOTAL BIAYA (Rp) TOTAL BIAYA (Rp) TOTAL BIAYA (Rp)