• Tidak ada hasil yang ditemukan

S TE 1102780 Bibliography

N/A
N/A
Protected

Academic year: 2017

Membagikan "S TE 1102780 Bibliography"

Copied!
3
0
0

Teks penuh

(1)

48

Eki Nandang Supriatna, 2016

PENJADWALAN EKONOMIS PEMBANGKIT TERMAL DENGAN MEMPERHITUNGKAN RUGI-RUGI TRANSMISI MENGGUNAKAN PATTERN SEARCH

Universitas Pendidikan Indonesia | repository.upi.edu| perpustakaan.upi.edu

DAFTAR PUSTAKA

Abido, M. A. (2006). Multiobjective Evolutionary Algorithms for Electric Power Dispatch Problem. IEEE Transactions on Evolutionary Computation, 10(3), 315–329.

Abu-jasser, A. (2011). Solving the Unit Commitment Problem Using Fuzzy Logic. International Journal of Computer and Electrical Engineering, 3(6), 824–829.

Adefarati, T., Oluwole, A. S., & Sanusi, M. A. (2013). Computational Solution to Economic Operation of Power Plants. Journal Electrical and Electronic Engineering, 3(6), 139–148. http://doi.org/10.5923/j.eee.20130306.01

Al-Othman, A. K., & El-Nagger, K. M. (2007). Application of Pattern Search Method to Power System Security Constrained Economic Dispatch. International Journal of Electrical, Computer, Energetic, Electronic and Communication Engineering, 1(1), 28–33.

Alsumait, J. S., Sykulski, J. K., & Alothman, A. K. (2007). To Power System Economic Load Dispatch. Asian Conference Power And Energy System.

Butcher, K., Crown, L., & Gentry, E. J. (2006). The International System of Units ( SI ) Conversion Factors for General Use. National Institute of Standards and Technology (NIST) Special Publication 1038. Retrieved from http://www.nist.gov/pml/wmd/metric/upload/SP1038.pdf

Das, D. (2006). Electrical Power System. New Delhi: New Age International Publisher.

Dasgupta, D., & Mcgregor, D. R. (1993). Short Term Unit Commitment Using Genetic Algorithms 1 Introduction, 1–14.

Himmah, F. (2013). Penerapan Algoritma Genetika Pada Masalah Penjadwalan Operasi Sistem Pembangkit Tenaga Listrik. Universitas Jember, Jember.

Kothari, D. P., & Nagrath, I. J. (2008). Modern Power System Analysis. New Delhi: Mc-Graw Hill.

Lewis, R. M., Torczon, V., & Trosset, M. W. (2000). Direct search methods: Then and now. Journal of Computational and Applied Mathematics, 124(1-2), 191–207. http://doi.org/10.1016/S0377-0427(00)00423-4

(2)

49

Eki Nandang Supriatna, 2016

PENJADWALAN EKONOMIS PEMBANGKIT TERMAL DENGAN MEMPERHITUNGKAN RUGI-RUGI TRANSMISI MENGGUNAKAN PATTERN SEARCH

Universitas Pendidikan Indonesia | repository.upi.edu| perpustakaan.upi.edu

Commitment Problem. 15th International Conference on Sciences and Techniques of Automatic Control & Computer Engineering, 600–604.

Monice. (2013). Operasi Ekonomis ( Economic Dispatch ) Pembangkit Listrik Tenaga Sampah ( PLTSa ) Dan ( PLTG ) Dalam Menlayani Beban Puncak Kelistrikan Sumbar. Universitas Andalas, 35–39.

Parashar, A., & Swankar, K. K. (2013). Genetic algorithm using to the solution of. International Journal of Engineering Trends and Technology, 4(July), 2986– 2990.

Raja, A. K., Srivastava, A. P., & Dwivedi, M. (2006). Power Plant Engineering. New Delhi: New Age International Publisher.

Saadat, H. (1999). Power System Analysis. New York: McGraw Hill.

Safari, A., Shayanfar, H. A., & Jahani, R. (2010). Optimal Unit Commitment Of Power System Using Fast Messy Genetic Algorithm. International Journal on Technical and Physical Problems of Engineering, 2(3), 22–27.

Sharma, V., Tung, N. S., Batish, A., & Singh, H. (2013). Single Area Unit Commitment Optimization Using Pattern Search. International Journal of Advanced Research in Computer Science and Software Engineering, 3(10), 896–903.

Shobana, S., & Janani, R. (2013). Optimization of Unit Commitment Problem and Constrained Emission using Genetic Algorithm. International Journal of Emerging Technology and Advanced Engineering, 3(5), 367–371.

Sudhakaran, M., & Raj, P. A. (2010). Integrating Genetic Algorithms And Tabu Search For Unit Commitment Problem. International Journal of Engineering, Science and Technology, 2(1), 57–69.

Wood, A. J., & Bruce, F. (1996). Power Generation , Operation , And Control (2nd ed.). New York: John Wiley & Sons Inc.

Wu, T., & Sun, L. (2006). A Filter-Based Pattern Search Method for Unconstrained Optimization Framework. A Journal of Chinese Universities, 15(3), 209–216.

Yang, H., Yuan, C., & Urtiversily, C. (1997). A Parallel Genetic Algorithm Approach to Solving the Unit Commitment Problem : Implementation on the Transputer Networks. IEEE Transactions on Power System, 12(2), 661–668.

(3)

50

Eki Nandang Supriatna, 2016

PENJADWALAN EKONOMIS PEMBANGKIT TERMAL DENGAN MEMPERHITUNGKAN RUGI-RUGI TRANSMISI MENGGUNAKAN PATTERN SEARCH

Universitas Pendidikan Indonesia | repository.upi.edu| perpustakaan.upi.edu

Zhu, J. (2015). Optimization of Power Sytem Operation (2nd ed.). New Jersey: John Wiley & Sons Inc.

___. (2013). Rencana Operasi Harian (Logsheet Senin, 9 September 2013) PT. PLN (Persero). Jakarta: PT. PLN (Persero) P3B Jawa-Bali.

Referensi

Dokumen terkait

Berdasarkan hasil evaluasi administrasi, teknis, biaya dan kualifikasi pada paket pekerjaan Belanja Makanan dan Minuman Harian Pegawai, Bersama ini kami mengundang

Berdasarkan hasil evaluasi administrasi, teknis, biaya dan kualifikasi pada paket pekerjaan Pengawasan Teknis Jembatan Beton Desa Tanjung Bungo 30 M, bersama ini

[r]

Kegiatan pengolahan tcbu mcnjadi gut a di Pabrik Gula Semboro yang melibatkan tenaga kerja dibagi menjadi tenaga kerja total, tenaga kerja telap dan tenaga keJ:ja

Puji syukur kehadlirat Allah SWT, yang telah melimpahkan rahmat, taufik dan hidayah- Nya, serta sholawat dan salam, tidak lupa penulis ucapkan kepada Nabi Muhammad SAW

Sehubungan dengan Evaluasi Penawaran, Kami Panitia Pelelangan mengundang Saudara untuk dapat menghadiri Ferifikasi dan Klarifikasi terhadap Perusahaan pada Kegiatan :.

KABUPATEN OGAN ILIR

Dari temuan penelitian disimpulkan bahwa modul kendali fasa thyristor yang dibuat dalam penelitian mampu melakukan kendali fasa gelombang tegangan tiga fasa dengan