Jam
DATA ROUTINE TRAFFIC COUNTING (RTC) VERSI BINA MARGA
PROVINSI RUAS
SUMSEL
021 I BTS. KOTA MUARA ENIM - SIMPANG SUGIH WAR Tgl Survai 14-Jun-15
Sub Total
Grand Total (N+O)
▸ Baca selengkapnya: jika suatu kabupaten yang berpenduduk 400.000 orang dan 1000 diantaranya
(2)DAFTAR BIAYA SEWA ALAT BERAT PER JAM KERJA
NO. URAIAN KO
DE HP KAP. HARGA ALAT
BIAYA SEWA ALAT PER JAM
(diluar PPN)
KET
1 ASPHALT MIXING PLANT E01 294,0 60,0 T/Jam 3.376.708.500 7.713.858,80
2 ASPHALT FINISHER E02 72,4 10,0 Ton 2.375.005.500 1.020.775,48
3 ASPHALT SPRAYER E03 4,0 850,0 Liter 93.707.700 62.116,03
4 BULLDOZER 100-150 HP E04 155,0 - 969.390.000 633.657,58
5 COMPRESSOR 4000-6500
L/M E05 60,0 5.000,0 Liter 118.481.000 198.137,19
6 CONCRETE MIXER 0.3-0.6
M3 E06 20,0 500,0 Liter 189.031.050 105.716,09
7 CRANE 10-15 TON E07 138,0 15,0 Ton 1.602.724.800 738.048,47
8 DUMP TRUCK 6-8 TON E08 130,0 8,0 Ton 320.006.410 432.592,60
9 DUMP TRUCK 10-12 TON E09 190,0 10,0 Ton 387.756.000 586.367,51
10 EXCAVATOR 80-140 E10 133,0 0,9 M3 915.535.000 566.034,15
11 FLAT BED TRUCK 3-4 M3 E11 190,0 10,0 Ton 298.464.410 565.644,33
12 GENERATOR SET E12 180,0 135,0 KVA 222.959.700 523.064,26
13 MOTOR GRADER > 100 HP E13 135,0 10.800,0 728.119.600 710.402,25
14 TRACK LOADER 75-100
HP E14 70,0 0,8 M3 583.788.200 448.462,67
15 WHEEL LOADER 1.0-1.6
M3 E15 96,0 1,5 M3 607.484.400 299.391,79
16 THREE WHEEL ROLLER
6-8 T E16 55,0 8,0 Ton 376.985.000 240.701,72
17 TANDEM ROLLER 6-8 T E17 82,0 8,1 Ton 1.287.592.268 249.902,46
18 TIRE ROLLER 8-10 T E18 100,5 9,0 Ton 969.390.000 275.355,19
19 VIBRATORY ROLLER 5-8 T E19 82,0 7.100,0 Ton 989.626.016 321.341,89
20 CONCRETE VIBRATOR E20 5,5 25,0 4.308.400 39.535,84
21 STONE CRUSHER E21 220,0 50,0 T/Jam 1.088.936.975 831.770,46
22 WATER PUMP 70-100 mm E22 6,0 - 5.385.500 36.920,57
23 WATER TANKER
3000-45000 L E23 100,0 4.000,0 Liter 113.095.500 173.486,26
24 PEDESTRIAN ROLLER E24 8,8 0,84 Ton 161.565.000 89.947,99
25 TAMPER E25 4,7 0,12 Ton 18.310.700 44.576,26
26 JACK HAMMER E26 3,0 1.330,0 37.698.500 36.566,21
27 FULVI MIXER E27 345,0 2.005,0 969.390.000 1.601.516,32
28 CONCRETE PUMP E28 100,0 8,00 M3 121.173.750 297.124,54
29 TRAILER 20 TON E29 175,0 20,00 Ton 646.260.000 598.836,06
30 PILE DRIVER + HAMMER E30 25,0 2,50 Ton 942.462.500 301.672,32
31 CRANE ON TRACK 35
TON E31 125,0 35,0 Ton 915.535.000 531.905,37
32 WELDING SET E32 40,0 250 Amp 18.849.250 124.901,02
33 BORE PILE MACHINE E33 150,0 2.000,0 Meter 2.423.475.000 921.319,85
34 ASPHALT LIQUID MIXER E34 5,0 1.000,0 Liter 16.156.500 36.954,76
35 TRONTON E35 150,0 15,0 Ton 484.695.000 633.892,89
36 COLD MILLING E36 248,0 1.000,0 m 5.326.259.500 1.892.845,31
37 ROCK DRILL BREAKER E37 3,0 - 969.390.000 318.408,88
38 COLD RECYCLER E38 900,0 2,2 M 21.003.450.000 7.164.966,66
39 HOT RECYCLER E39 400,0 3,0 M 31.505.175.000 8.349.422,99
40 AGREGAT (CHIP)
SPREADER E40 115,0 3,5 M 425.454.500 617.198,70
41 ASPHALT DISTRIBUTOR E41 115,0 4.000,0 Liter 425.454.500 422.192,24
42 SLIP FORM PAVER E42 105,0 2,5 M 1.440.236.571 610.495,83
43 CONCRETE PAN MIXER E43 134,0 600,0 Liter 1.077.100.000 752.018,22
44 CONCRETE BREAKER E44 290,0 20,0 m3/jam 969.390.000 986.921,68
45 ASPHALT TANKER E45 190,0 4.000,0 liter 538.550.000 660.352,03
46 CEMENT TANKER E46 190,0 4.000,0 liter 538.550.000 613.080,03
STASTA STA POTONGAN MEMANJANG
STA 0+000 - STA 0+300 JUMLAH GAMBAR 18 1
JUDUL GAMBAR NO GAMBAR SKALA
DISETUJUI OLEH DIGAMBAR OLEH JUDUL GAMBAR NO GAMBAR SKALA
Hor : 1:1000
Ver : 1:200 POLITEKNIK NEGERI SRIWIJAYA
JURUSAN TEKNIK SIPIL ANDI HERIUS.,ST.,MT
PERENCANAAN GEOMETRIK DAN TEBAL PERKERASAN PADA JALAN MUARA ENIM - SUBAN JERIJI - LECAH
KABUPATEN MUARA ENIM STA 0+000 - STA 6+000 PROVINSI SUMATERA SELATAN
Ir. EFFENDY SUSILO.,MT.
NIP. 195205181984031001 NIP. 197609072001121002 NIM. 061330100739
RISKI RIPAN DWI RAFIKA ALBAIS NIM. 061330100752
45,2
6
2
50,6
6
7
4
9
,7
19
5
4
,3
33
51,8
2
0
57
,4
5
0+000 0+100 0+200 0+300
3,667 %
52 58 57 56 55 54 53
45 47
41 42 43 44 46 48 49 50 51
PLV 1
PPV 1
STA = 0 + 300 ELEVASI = 57,45 LV = 38 m EV = 0,055
STASTA STA POTONGAN MEMANJANG
STA 0+300 - STA 0+600 JUMLAH GAMBAR 18 2
JUDUL GAMBAR NO GAMBAR SKALA
DISETUJUI OLEH DIGAMBAR OLEH JUDUL GAMBAR NO GAMBAR SKALA
Hor : 1:1000
Ver : 1:200 POLITEKNIK NEGERI SRIWIJAYA
JURUSAN TEKNIK SIPIL ANDI HERIUS.,ST.,MT
PERENCANAAN GEOMETRIK DAN TEBAL PERKERASAN PADA JALAN MUARA ENIM - SUBAN JERIJI - LECAH
KABUPATEN MUARA ENIM STA 0+000 - STA 6+000 PROVINSI SUMATERA SELATAN
Ir. EFFENDY SUSILO.,MT.
NIP. 195202271998022003 NIP. 197609072001121002 NIM. 061330100739
RISKI RIPAN DWI RAFIKA ALBAIS NIM. 061330100752
5
0+500 0+600
6
STA 0+400 STA 0+500
5,681 159,381
R 286 m
PI.1 SPIRAL - CIRCLE - SPIRAL
VR 60 Km/Jam
? 21,912 °
Ys 1,457 °
24,995 m
STASTA STA POTONGAN MEMANJANG
STA 0+600 - STA 0+900 JUMLAH GAMBAR 18 3
JUDUL GAMBAR NO GAMBAR SKALA
DISETUJUI OLEH DIGAMBAR OLEH JUDUL GAMBAR NO GAMBAR SKALA
Hor : 1:1000
Ver : 1:200 POLITEKNIK NEGERI SRIWIJAYA
JURUSAN TEKNIK SIPIL ANDI HERIUS.,ST.,MT
PERENCANAAN GEOMETRIK DAN TEBAL PERKERASAN PADA JALAN MUARA ENIM - SUBAN JERIJI - LECAH
KABUPATEN MUARA ENIM STA 0+000 - STA 6+000 PROVINSI SUMATERA SELATAN
Ir. EFFENDY SUSILO.,MT.
NIP. 195202271998022003 NIP. 197609072001121002 NIM. 061330100739
RISKI RIPAN DWI RAFIKA ALBAIS NIM. 061330100752
7
0+800 0+900
7 ELEVASI = 67,44 LV = 38 m EV = 0,056
PTV 2
2,5 %
STASTA STA POTONGAN MEMANJANG
STA 0+900 - STA 1+200 JUMLAH GAMBAR 18 4
JUDUL GAMBAR NO GAMBAR SKALA
DISETUJUI OLEH DIGAMBAR OLEH JUDUL GAMBAR NO GAMBAR SKALA
Hor : 1:1000
Ver : 1:200 POLITEKNIK NEGERI SRIWIJAYA
JURUSAN TEKNIK SIPIL ANDI HERIUS.,ST.,MT
PERENCANAAN GEOMETRIK DAN TEBAL PERKERASAN PADA JALAN MUARA ENIM - SUBAN JERIJI - LECAH
KABUPATEN MUARA ENIM STA 0+000 - STA 6+000 PROVINSI SUMATERA SELATAN
Ir. EFFENDY SUSILO.,MT.
NIP. 195202271998022003 NIP. 197609072001121002 NIM. 061330100739
RISKI RIPAN DWI RAFIKA ALBAIS NIM. 061330100752
6
0+900 1+000
7
1+100 1+200
65
Gorong-gorong Ø 0,8 m
STASTA STA POTONGAN MEMANJANG
STA 1+200 - STA 1+500 JUMLAH GAMBAR 18 5
JUDUL GAMBAR NO GAMBAR SKALA
DISETUJUI OLEH DIGAMBAR OLEH JUDUL GAMBAR NO GAMBAR SKALA
Hor : 1:1000
Ver : 1:200 POLITEKNIK NEGERI SRIWIJAYA
JURUSAN TEKNIK SIPIL ANDI HERIUS.,ST.,MT
PERENCANAAN GEOMETRIK DAN TEBAL PERKERASAN PADA JALAN MUARA ENIM - SUBAN JERIJI - LECAH
KABUPATEN MUARA ENIM STA 0+000 - STA 6+000 PROVINSI SUMATERA SELATAN
Ir. EFFENDY SUSILO.,MT.
NIP. 195202271998022003 NIP. 197609072001121002 NIM. 061330100739
RISKI RIPAN DWI RAFIKA ALBAIS NIM. 061330100752
STASTA STA POTONGAN MEMANJANG
STA 1+500 - STA 1+800 JUMLAH GAMBAR 18 6
JUDUL GAMBAR NO GAMBAR SKALA
DISETUJUI OLEH DIGAMBAR OLEH JUDUL GAMBAR NO GAMBAR SKALA
Hor : 1:1000
Ver : 1:200 POLITEKNIK NEGERI SRIWIJAYA
JURUSAN TEKNIK SIPIL ANDI HERIUS.,ST.,MT
PERENCANAAN GEOMETRIK DAN TEBAL PERKERASAN PADA JALAN MUARA ENIM - SUBAN JERIJI - LECAH
KABUPATEN MUARA ENIM STA 0+000 - STA 6+000 PROVINSI SUMATERA SELATAN
Ir. EFFENDY SUSILO.,MT.
NIP. 195202271998022003 NIP. 197609072001121002 NIM. 061330100739
RISKI RIPAN DWI RAFIKA ALBAIS NIM. 061330100752
7
1+500 1+600 1+700
7
PI.3 SPIRAL - SPIRAL
VR 50 Km/Jam
? 74,498 °
Ls 169,031 m
e 8,2 % 83,238 m Ts
Es
189,817
STASTA STA POTONGAN MEMANJANG
STA 1+800 - STA 2+100 JUMLAH GAMBAR 18 7
JUDUL GAMBAR NO GAMBAR SKALA
DISETUJUI OLEH DIGAMBAR OLEH JUDUL GAMBAR NO GAMBAR SKALA
Hor : 1:1000
Ver : 1:400 POLITEKNIK NEGERI SRIWIJAYA
JURUSAN TEKNIK SIPIL ANDI HERIUS.,ST.,MT
PERENCANAAN GEOMETRIK DAN TEBAL PERKERASAN PADA JALAN MUARA ENIM - SUBAN JERIJI - LECAH
KABUPATEN MUARA ENIM STA 0+000 - STA 6+000 PROVINSI SUMATERA SELATAN
Ir. EFFENDY SUSILO.,MT.
NIP. 195202271998022003 NIP. 197609072001121002 NIM. 061330100739
RISKI RIPAN DWI RAFIKA ALBAIS NIM. 061330100752
70
1+800 1+900 2+000
1
Gorong-gorong Ø 0,8 m 1,32 %
6,667 %
0 %
PPV 3
STA = 1 + 910 ELEVASI = 84,601 LV = 90 m ELEVASI = 91,167 LV = 100 m EV = 0,833
STASTA STA POTONGAN MEMANJANG
STA 2+100 - STA 2+400 JUMLAH GAMBAR 18 8
JUDUL GAMBAR NO GAMBAR SKALA
DISETUJUI OLEH DIGAMBAR OLEH JUDUL GAMBAR NO GAMBAR SKALA
Hor : 1:1000
Ver : 1:200 POLITEKNIK NEGERI SRIWIJAYA
JURUSAN TEKNIK SIPIL ANDI HERIUS.,ST.,MT
PERENCANAAN GEOMETRIK DAN TEBAL PERKERASAN PADA JALAN MUARA ENIM - SUBAN JERIJI - LECAH
KABUPATEN MUARA ENIM STA 0+000 - STA 6+000 PROVINSI SUMATERA SELATAN
Ir. EFFENDY SUSILO.,MT.
NIP. 195202271998022003 NIP. 197609072001121002 NIM. 061330100739
RISKI RIPAN DWI RAFIKA ALBAIS NIM. 061330100752
1
2+200 2+300 2+400
1 ELEVASI = 92,064 LV = 35 m EV = 0,064
STASTA STA POTONGAN MEMANJANG
STA 2+400 - STA 2+700 JUMLAH GAMBAR 18 9
JUDUL GAMBAR NO GAMBAR SKALA
DISETUJUI OLEH DIGAMBAR OLEH JUDUL GAMBAR NO GAMBAR SKALA
Hor : 1:1000
Ver : 1:200 POLITEKNIK NEGERI SRIWIJAYA
JURUSAN TEKNIK SIPIL ANDI HERIUS.,ST.,MT
PERENCANAAN GEOMETRIK DAN TEBAL PERKERASAN PADA JALAN MUARA ENIM - SUBAN JERIJI - LECAH
KABUPATEN MUARA ENIM STA 0+000 - STA 6+000 PROVINSI SUMATERA SELATAN
Ir. EFFENDY SUSILO.,MT.
NIP. 195202271998022003 NIP. 197609072001121002 NIM. 061330100739
RISKI RIPAN DWI RAFIKA ALBAIS NIM. 061330100752
8
2+500 2+600 2+700
8
PI.5 SPIRAL - CIRCLE - SPIRAL
VR 60 Km/Jam
? 31,463 °
Ys 1,457 °
24,995 m
m Ts
Es
105,658
Gorong-gorong Ø 0,8 m
1,45 %
2,833 %
PLV 6 PPV 6
STA = 2 + 600 ELEVASI = 96,56 LV = 35 m EV = 0,0604
STASTA STA POTONGAN MEMANJANG
STA 2+700 - STA 3+000 JUMLAH GAMBAR 18 10
JUDUL GAMBAR NO GAMBAR SKALA
DISETUJUI OLEH DIGAMBAR OLEH JUDUL GAMBAR NO GAMBAR SKALA
Hor : 1:1000
Ver : 1:200 POLITEKNIK NEGERI SRIWIJAYA
JURUSAN TEKNIK SIPIL ANDI HERIUS.,ST.,MT
PERENCANAAN GEOMETRIK DAN TEBAL PERKERASAN PADA JALAN MUARA ENIM - SUBAN JERIJI - LECAH
KABUPATEN MUARA ENIM STA 0+000 - STA 6+000 PROVINSI SUMATERA SELATAN
Ir. EFFENDY SUSILO.,MT.
NIP. 195202271998022003 NIP. 197609072001121002 NIM. 061330100739
RISKI RIPAN DWI RAFIKA ALBAIS NIM. 061330100752
113
2+900 3+000
1
PI.6 FULL CIRCLE
VR 60 Km/Jam
? 12,199 ° ELEVASI = 104,897 LV = 38 m EV = 0,103
STASTA STA POTONGAN MEMANJANG
STA 3+000 - STA 3+300 JUMLAH GAMBAR 18 11
JUDUL GAMBAR NO GAMBAR SKALA
DISETUJUI OLEH DIGAMBAR OLEH JUDUL GAMBAR NO GAMBAR SKALA
Hor : 1:1000
Ver : 1:200 POLITEKNIK NEGERI SRIWIJAYA
JURUSAN TEKNIK SIPIL ANDI HERIUS.,ST.,MT
PERENCANAAN GEOMETRIK DAN TEBAL PERKERASAN PADA JALAN MUARA ENIM - SUBAN JERIJI - LECAH
KABUPATEN MUARA ENIM STA 0+000 - STA 6+000 PROVINSI SUMATERA SELATAN
Ir. EFFENDY SUSILO.,MT.
NIP. 195202271998022003 NIP. 197609072001121002 NIM. 061330100739
RISKI RIPAN DWI RAFIKA ALBAIS NIM. 061330100752
1
3+200 3+300
% ELEVASI = 106,791 LV = 45 m EV = 0,209
STASTA STA POTONGAN MEMANJANG
STA 3+300 - STA 3+600 JUMLAH GAMBAR 18 12
JUDUL GAMBAR NO GAMBAR SKALA
DISETUJUI OLEH DIGAMBAR OLEH JUDUL GAMBAR NO GAMBAR SKALA
Hor : 1:1000
Ver : 1:200 POLITEKNIK NEGERI SRIWIJAYA
JURUSAN TEKNIK SIPIL ANDI HERIUS.,ST.,MT
PERENCANAAN GEOMETRIK DAN TEBAL PERKERASAN PADA JALAN MUARA ENIM - SUBAN JERIJI - LECAH
KABUPATEN MUARA ENIM STA 0+000 - STA 6+000 PROVINSI SUMATERA SELATAN
Ir. EFFENDY SUSILO.,MT.
NIP. 195202271998022003 NIP. 197609072001121002 NIM. 061330100739
RISKI RIPAN DWI RAFIKA ALBAIS NIM. 061330100752
95
3+300 3+400 9
7
Gorong-gorong Ø 0,8 m 3,043 %
0 % PLV 9 PPV 9
STA = 3 + 430 ELEVASI = 100,133 LV = 35 m EV = 0,133
STASTA STA POTONGAN MEMANJANG
STA 3+600 - STA 3+900 JUMLAH GAMBAR 18 13
JUDUL GAMBAR NO GAMBAR SKALA
DISETUJUI OLEH DIGAMBAR OLEH JUDUL GAMBAR NO GAMBAR SKALA
Hor : 1:1000
Ver : 1:200 POLITEKNIK NEGERI SRIWIJAYA
JURUSAN TEKNIK SIPIL ANDI HERIUS.,ST.,MT
PERENCANAAN GEOMETRIK DAN TEBAL PERKERASAN PADA JALAN MUARA ENIM - SUBAN JERIJI - LECAH
KABUPATEN MUARA ENIM STA 0+000 - STA 6+000 PROVINSI SUMATERA SELATAN
Ir. EFFENDY SUSILO.,MT.
NIP. 195202271998022003 NIP. 197609072001121002 NIM. 061330100739
RISKI RIPAN DWI RAFIKA ALBAIS NIM. 061330100752
9
3+600 3+700 3+800
1
STASTA STA POTONGAN MEMANJANG
STA 3+900 - STA 4+200 JUMLAH GAMBAR 18 14
JUDUL GAMBAR NO GAMBAR SKALA
DISETUJUI OLEH DIGAMBAR OLEH JUDUL GAMBAR NO GAMBAR SKALA
Hor : 1:1000
Ver : 1:200 POLITEKNIK NEGERI SRIWIJAYA
JURUSAN TEKNIK SIPIL ANDI HERIUS.,ST.,MT
PERENCANAAN GEOMETRIK DAN TEBAL PERKERASAN PADA JALAN MUARA ENIM - SUBAN JERIJI - LECAH
KABUPATEN MUARA ENIM STA 0+000 - STA 6+000 PROVINSI SUMATERA SELATAN
Ir. EFFENDY SUSILO.,MT.
NIP. 195202271998022003 NIP. 197609072001121002 NIM. 061330100739
RISKI RIPAN DWI RAFIKA ALBAIS NIM. 061330100752
100
3+900 4+000 4+100 1
0
PI.6 FULL CIRCLE
VR 60 Km/Jam
? 13,134 °
STASTA STA POTONGAN MEMANJANG
STA 4+200 - STA 4+500 JUMLAH GAMBAR 18 15
JUDUL GAMBAR NO GAMBAR SKALA
DISETUJUI OLEH DIGAMBAR OLEH JUDUL GAMBAR NO GAMBAR SKALA
Hor : 1:1000
Ver : 1:200 POLITEKNIK NEGERI SRIWIJAYA
JURUSAN TEKNIK SIPIL ANDI HERIUS.,ST.,MT
PERENCANAAN GEOMETRIK DAN TEBAL PERKERASAN PADA JALAN MUARA ENIM - SUBAN JERIJI - LECAH
KABUPATEN MUARA ENIM STA 0+000 - STA 6+000 PROVINSI SUMATERA SELATAN
Ir. EFFENDY SUSILO.,MT.
NIP. 195202271998022003 NIP. 197609072001121002 NIM. 061330100739
RISKI RIPAN DWI RAFIKA ALBAIS NIM. 061330100752
1
0
1
,9
5
3
1
0
0
,0
0
1
0
5
,0
0
1
0
0
,0
0
9
9,3
0
3
1
00
,0
0
4+300 4+400 4+500
1
0
3
,3
15
1
0
0
,0
0
4+200
% %
% %
STASTA STA POTONGAN MEMANJANG
STA 4+500 - STA 4+800 JUMLAH GAMBAR 18 16
JUDUL GAMBAR NO GAMBAR SKALA
DISETUJUI OLEH DIGAMBAR OLEH JUDUL GAMBAR NO GAMBAR SKALA
Hor : 1:1000
Ver : 1:200 POLITEKNIK NEGERI SRIWIJAYA
JURUSAN TEKNIK SIPIL ANDI HERIUS.,ST.,MT
PERENCANAAN GEOMETRIK DAN TEBAL PERKERASAN PADA JALAN MUARA ENIM - SUBAN JERIJI - LECAH
KABUPATEN MUARA ENIM STA 0+000 - STA 6+000 PROVINSI SUMATERA SELATAN
Ir. EFFENDY SUSILO.,MT.
NIP. 195202271998022003 NIP. 197609072001121002 NIM. 061330100739
RISKI RIPAN DWI RAFIKA ALBAIS NIM. 061330100752
1
4+600 4+700 4+800
9
PI.6 FULL CIRCLE
VR 60 Km/Jam
STASTA STA POTONGAN MEMANJANG
STA 4+800 - STA 5+100 JUMLAH GAMBAR 18 17
JUDUL GAMBAR NO GAMBAR SKALA
DISETUJUI OLEH DIGAMBAR OLEH JUDUL GAMBAR NO GAMBAR SKALA
Hor : 1:1000
Ver : 1:200 POLITEKNIK NEGERI SRIWIJAYA
JURUSAN TEKNIK SIPIL ANDI HERIUS.,ST.,MT
PERENCANAAN GEOMETRIK DAN TEBAL PERKERASAN PADA JALAN MUARA ENIM - SUBAN JERIJI - LECAH
KABUPATEN MUARA ENIM STA 0+000 - STA 6+000 PROVINSI SUMATERA SELATAN
Ir. EFFENDY SUSILO.,MT.
NIP. 195202271998022003 NIP. 197609072001121002 NIM. 061330100739
RISKI RIPAN DWI RAFIKA ALBAIS NIM. 061330100752
9
5+000 5+100
8
Gorong-gorong Ø 0,8 m
STA STA
POTONGAN MEMANJANG
STA 5+100 - STA 5+450,011 JUMLAH GAMBAR 18 18
JUDUL GAMBAR NO GAMBAR SKALA
DISETUJUI OLEH DIGAMBAR OLEH JUDUL GAMBAR NO GAMBAR SKALA
Hor : 1:1000
Ver : 1:200 POLITEKNIK NEGERI SRIWIJAYA
JURUSAN TEKNIK SIPIL ANDI HERIUS.,ST.,MT
PERENCANAAN GEOMETRIK DAN TEBAL PERKERASAN PADA JALAN MUARA ENIM - SUBAN JERIJI - LECAH
KABUPATEN MUARA ENIM STA 0+000 - STA 6+000 PROVINSI SUMATERA SELATAN
Ir. EFFENDY SUSILO.,MT.
NIP. 195202271998022003 NIP. 197609072001121002 NIM. 061330100739
RISKI RIPAN DWI RAFIKA ALBAIS NIM. 061330100752
1
5+100 5+200
1
5+300 5+400
1 ELEVASI = 102,79 LV = 45 m EV = 0,209
PTV 12
Gorong-gorong Ø 0,8 m 3,714 %
0+600
POLITEKNIK NEGERI SRIWIJAYA JURUSAN TEKNIK SIPIL
DISETUJUI OLEH DIGAMBAR OLEH JUDUL GAMBAR
POTONGAN MELINTANG STA 0+000 - STA 0+700
NO GAMBAR SKALA
Hor : 1:200 Ver : 1:200 JUMLAH GAMBAR
0+200
0+700
Ir. EFFENDY SUSILO.,MT. NIP. 195202271998022003
ANDI HERIUS.,ST.,MT. NIP. 197609072001121002
JARAK STA JARAK 15 0 15 STA
43 PERENCANAAN GEOMETRIK DAN TEBAL PERKERASAN
PADA JALAN MUARA ENIM - SUBAN JERIJI - LECAH KABUPATEN MUARA ENIM
STA 0+000 - STA 6+000 PROVINSI SUMATERA SELATAN
NIM. 061330100739
RISKI RIPAN DWI RAFIKA ALBAIS NIM. 061330100752
45
68,411 68,715
0+800
POLITEKNIK NEGERI SRIWIJAYA JURUSAN TEKNIK SIPIL
DISETUJUI OLEH DIGAMBAR OLEH JUDUL GAMBAR
POTONGAN MELINTANG STA 0+700 - STA 1+456,901
NO GAMBAR SKALA
Hor : 1:200 Ver : 1:200 JUMLAH GAMBAR
1+000
1+400
Ir. EFFENDY SUSILO.,MT. NIP. 195202271998022003
ANDI HERIUS.,ST.,MT. NIP. 197609072001121002
JARAK STA JARAK 15 0 15 STA
75 PERENCANAAN GEOMETRIK DAN TEBAL PERKERASAN
PADA JALAN MUARA ENIM - SUBAN JERIJI - LECAH KABUPATEN MUARA ENIM
STA 0+000 - STA 6+000 PROVINSI SUMATERA SELATAN
NIM. 061330100739
RISKI RIPAN DWI RAFIKA ALBAIS NIM. 061330100752
1+592,789
POLITEKNIK NEGERI SRIWIJAYA JURUSAN TEKNIK SIPIL
DISETUJUI OLEH DIGAMBAR OLEH JUDUL GAMBAR
POTONGAN MELINTANG STA 1+456,901 - STA 2+213,674
NO GAMBAR SKALA
Hor : 1:200 Ver : 1:200 JUMLAH GAMBAR
2+065,876
Ir. EFFENDY SUSILO.,MT.
NIP. 195202271998022003 NIP. 197609072001121002ANDI HERIUS.,ST.,MT.
JARAK STA JARAK 15 0 15 STA
83 PERENCANAAN GEOMETRIK DAN TEBAL PERKERASAN
PADA JALAN MUARA ENIM - SUBAN JERIJI - LECAH KABUPATEN MUARA ENIM
STA 0+000 - STA 6+000 PROVINSI SUMATERA SELATAN
NIM. 061330100739
RISKI RIPAN DWI RAFIKA ALBAIS NIM. 061330100752
2+300
POLITEKNIK NEGERI SRIWIJAYA JURUSAN TEKNIK SIPIL
DISETUJUI OLEH DIGAMBAR OLEH JUDUL GAMBAR
POTONGAN MELINTANG STA 2+213,674 - STA 2+933,833
NO GAMBAR SKALA
Hor : 1:200 Ver : 1:200 JUMLAH GAMBAR
2+800
Ir. EFFENDY SUSILO.,MT.
NIP. 195202271998022003 NIP. 197609072001121002ANDI HERIUS.,ST.,MT.
JARAK STA JARAK 15 0 15 STA
96 PERENCANAAN GEOMETRIK DAN TEBAL PERKERASAN
PADA JALAN MUARA ENIM - SUBAN JERIJI - LECAH KABUPATEN MUARA ENIM
STA 0+000 - STA 6+000 PROVINSI SUMATERA SELATAN
NIM. 061330100739
RISKI RIPAN DWI RAFIKA ALBAIS NIM. 061330100752
93
111,287 2+900
3+007,896
POLITEKNIK NEGERI SRIWIJAYA JURUSAN TEKNIK SIPIL
DISETUJUI OLEH DIGAMBAR OLEH JUDUL GAMBAR
POTONGAN MELINTANG STA 2+933,833 - STA 3+800
NO GAMBAR SKALA
Hor : 1:200 Ver : 1:200 JUMLAH GAMBAR
3+100
3+600
Ir. EFFENDY SUSILO.,MT.
NIP. 195202271998022003 ANDI HERIUS.,ST.,MT.NIP. 197609072001121002
JARAK STA JARAK 15 0 15 STA
100 PERENCANAAN GEOMETRIK DAN TEBAL PERKERASAN
PADA JALAN MUARA ENIM - SUBAN JERIJI - LECAH KABUPATEN MUARA ENIM
STA 0+000 - STA 6+000 PROVINSI SUMATERA SELATAN
NIM. 061330100739
RISKI RIPAN DWI RAFIKA ALBAIS NIM. 061330100752
105
96,846 98,732
3+900
100,000
99,718 100,000
100
POLITEKNIK NEGERI SRIWIJAYA JURUSAN TEKNIK SIPIL
DISETUJUI OLEH DIGAMBAR OLEH JUDUL GAMBAR
POTONGAN MELINTANG STA 3+800 - STA 5+000
NO GAMBAR SKALA
Hor : 1:200 Ver : 1:200 JUMLAH GAMBAR
4+107,274
4+699,067
Ir. EFFENDY SUSILO.,MT.
NIP. 195202271998022003 ANDI HERIUS.,ST.,MT.NIP. 197609072001121002
JARAK STA JARAK 15 0 15 STA
104 PERENCANAAN GEOMETRIK DAN TEBAL PERKERASAN
PADA JALAN MUARA ENIM - SUBAN JERIJI - LECAH KABUPATEN MUARA ENIM
STA 0+000 - STA 6+000 PROVINSI SUMATERA SELATAN
NIM. 061330100739
RISKI RIPAN DWI RAFIKA ALBAIS NIM. 061330100752
94
104 102,703
100,000
100,000 100,000
5+100
5+300
5+400
POLITEKNIK NEGERI SRIWIJAYA JURUSAN TEKNIK SIPIL
DISETUJUI OLEH DIGAMBAR OLEH JUDUL GAMBAR
POTONGAN MELINTANG STA 5+000 - STA 5+450,011
NO GAMBAR SKALA
Hor : 1:200 Ver : 1:200 JUMLAH GAMBAR
Ir. EFFENDY SUSILO.,MT.
NIP. 195202271998022003 ANDI HERIUS.,ST.,MT.NIP. 197609072001121002
JARAK STA
7
7
PERENCANAAN GEOMETRIK DAN TEBAL PERKERASAN PADA JALAN MUARA ENIM - SUBAN JERIJI - LECAH
KABUPATEN MUARA ENIM STA 0+000 - STA 6+000 PROVINSI SUMATERA SELATAN
NIM. 061330100739
RISKI RIPAN DWI RAFIKA ALBAIS NIM. 061330100752
96
104 103,06
POLITEKNIK NEGERI SRIWIJAYA JURUSAN TEKNIK SIPIL
DISETUJUI OLEH DIGAMBAR OLEH JUDUL GAMBAR
TIPIKAL PERKERASAN
NO GAMBAR SKALA
1 : 50
JUMLAH GAMBAR 1 1
2%
5% 2%
?
5%
21 cm
AC-WC
AGREGAT KELAS A
AGREGAT KELAS B
AC-BASE AC-BC
15 cm 9 cm 6 cm 4 cm
A A
Badan Jalan Bahu Jalan
7 meter 2 meter
Bahu Jalan 2 meter
LAPISAN PERKERASAN POTONGAN A-A ANDI HERIUS.,ST.,MT
PERENCANAAN GEOMETRIK DAN TEBAL PERKERASAN PADA JALAN MUARA ENIM - SUBAN JERIJI - LECAH
KABUPATEN MUARA ENIM STA 0+000 - STA 6+000 PROVINSI SUMATERA SELATAN
NIM. 061330100739 NIP. 197609072001121002
RISKI RIPAN DWI RAFIKA ALBAIS NIM. 061330100752 Ir. EFFENDY SUSILO.,MT.
DISETUJUI OLEH DIGAMBAR OLEH JUDUL GAMBAR
NETWORK PLANNING
NO GAMBAR SKALA
Hor : 1:1000
Ver : 1:100 JUMLAH GAMBAR
1 1 POLITEKNIK NEGERI SRIWIJAYA
JURUSAN TEKNIK SIPIL Ir. EFFENDY SUSILO.,MT.NIP. 195202271998022003
ANDI HERIUS.,ST.,MT NIP. 197609072001121002
Net Work Planning (NWP)
0 66 Earliest Event Time (EET) : Waktu penyelesaian paling awal
Kejadian (Event) : Urutan pekerjaan
Latest Event Time (EET) : Waktu penyelesaian paling akhir
Normal : Menunjukan mulainya pekerjaan hingga akhir pekerjaan
kegiatan semu (Dumy) : menyatakan bahwa antara kegiatan satu dengan yang lainnya
masih saling ketergantungan
karena akan menghambat waktu penyelesaian proyek secara keseluruhan. Jalur Kritis : jalur yang menunjukan pekerjaan yang tidak boleh terlambat satu haripun, Keterangan :
PERENCANAAN GEOMETRIK DAN TEBAL PERKERASAN PADA JALAN MUARA ENIM - SUBAN JERIJI - LECAH
KABUPATEN MUARA ENIM STA 0+000 - STA 6+000 PROVINSI SUMATERA SELATAN
NIM. 061330100739
RISKI RIPAN DWI RAFIKA ALBAIS NIM. 061330100752
0 0
0 3 Pek. Pembersihan 4
5 H ari
10 Hari 11 Hari 7
Pek. Timbunan Pek. Pondasi Bawah 8 9
76 Hari 18 Hari
10 21 97 115 132
115 97
21
Pek. Pondasi Atas 17 Hari
10 132
AC Base 5 Hari
1 5 10
137
137 5 Hari 12142142 14
155
4 Hari 15 162
Bahu Jalan
7 Hari 162
Tack Coat 2
5 169162
Pemasangan Batu Kali 65 Hari
2 H
No URAIAN PEKERJAAN BIAYA WAKTU BOBOT (%) Minggu I Minggu II Mingg
(Rp) (Hari Kerja) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15
I PEKERJAAN PERSIAPAN
1.1 Mobilisasi 62,250,000 10 #NAME? ### ### ### ### ### ### ### ### ### ###
1.2 Pengukuran #NAME? 5 #NAME? ### ### ### ### ###
1.3 Direksi Keet #NAME? 3 #NAME? ### ### ###
1.4 Pembersihan #NAME? 7 #NAME? ### ### ### ### ###
II PEKERJAAN TANAH
2.1 Galian #NAME? 30 #NAME?
2.2 Timbunan #NAME? 19 #NAME?
III PEKERJAAN BADAN JALAN
3.1 Pekerjaan Lapis Pondasi Bawah #NAME? 6 #NAME?
3.2 Pekerjaan Lapis Pondasi Atas #NAME? 6 #NAME?
3.3 Pekerjaan Prime Coat #NAME? 6 #NAME?
3.4 Pekerjaan Lapis AC-Base #NAME? 7 #NAME?
3.5 Pekerjaan Tack Coat #NAME? 10 #NAME?
3.6 Pekerjaan Lapis AC-BC #NAME? 6 #NAME?
3.7 Pekerjaan Lapis AC-WC #NAME? 4 #NAME?
3.8 Bahu Jalan #NAME? 2 #NAME?
IV PEKERJAAN BANGUNAN PELENGKAP
4.1 Galian Drainase #NAME? 3 #NAME?
4.2 Galian Gorong-gorong #NAME? 1 #NAME?
4.3 Pasir Urug #NAME? 1 #NAME?
4.4 Batu Bata Pengikat Gorong-gorong #NAME? 3 #NAME?
4.5 Kepala Gorong-gorong #NAME? 3 #NAME?
V PEKERJAAN FINISHING
5.1 Demobilisasi 16,500,000 7 #NAME?
#NAME? Total Kumulatif #NAME? ### ### ### ### ### ### ### ### ### ### ### ### ### ### ###
No URAIAN PEKERJAAN BIAYA WAKTU BOBOT (%) Minggu I Minggu II Mingg
(Rp) (Hari Kerja) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15
I PEKERJAAN PERSIAPAN
1.1 Mobilisasi 62,250,000 10 #NAME? ### ### ### ### ### ### ### ### ### ###
1.2 Pengukuran #NAME? 5 #NAME? ### ### ### ### ###
1.3 Direksi Keet #NAME? 3 #NAME? ### ### ###
1.4 Pembersihan #NAME? 7 #NAME? ### ### ### ### ###
II PEKERJAAN TANAH
2.1 Galian #NAME? 30 #NAME?
2.2 Timbunan #NAME? 19 #NAME?
III PEKERJAAN BADAN JALAN
3.1 Pekerjaan Lapis Pondasi Bawah #NAME? 6 #NAME?
3.2 Pekerjaan Lapis Pondasi Atas #NAME? 6 #NAME?
3.3 Pekerjaan Prime Coat #NAME? 6 #NAME?
3.4 Pekerjaan Lapis AC-Base #NAME? 7 #NAME?
3.5 Pekerjaan Tack Coat #NAME? 10 #NAME?
3.6 Pekerjaan Lapis AC-BC #NAME? 6 #NAME?
3.7 Pekerjaan Lapis AC-WC #NAME? 4 #NAME?
3.8 Bahu Jalan #NAME? 2 #NAME?
IV PEKERJAAN BANGUNAN PELENGKAP
4.1 Galian Drainase #NAME? 3 #NAME?
4.2 Galian Gorong-gorong #NAME? 1 #NAME?
4.3 Pasir Urug #NAME? 1 #NAME?
4.4 Batu Bata Pengikat Gorong-gorong #NAME? 3 #NAME?
4.5 Kepala Gorong-gorong #NAME? 3 #NAME?
V PEKERJAAN FINISHING
5.1 Demobilisasi 16,500,000 7 #NAME?
#NAME? Total Kumulatif #NAME? ### ### ### ### ### ### ### ### ### ### ### ### ### ### ###
nggu III Minggu IV Minggu V Minggu VI Minggu VII
16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44
### ###
### ### ### ### ### ### ### ### ### ### ###
### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ###
### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ###
### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ###
nggu III Minggu IV Minggu V Minggu VI Minggu VII
16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44
### ###
### ### ### ### ### ### ### ### ### ### ###
### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ###
### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ###
### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ###
Minggu VIII Minggu IX Minggu X Minggu XI Minggu XII
45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72 73
### ### ###
### ### ###
### ### ### ### ### ###
### ### ### ### ### ###
### ### ### ### ### ###
### ### ### ### ### ### ###
### ### ### ### ### ###
###
### ### ### ### ### ###
###
### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ###
Minggu VIII Minggu IX Minggu X Minggu XI Minggu XII
45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72 73
### ### ###
### ### ###
### ### ### ### ### ###
### ### ### ### ### ###
### ### ### ### ### ###
### ### ### ### ### ### ###
### ### ### ### ### ###
###
### ### ### ### ### ###
###
### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ###
Minggu XIII Minggu XIV Minggu XV Minggu XVI Minggu XVII
74 75 76 77 78 79 80 81 82 83 84 85 86 87 88 89 90 91 92 93 94 95 96 97 98 99 100
### ### ###
### ### ###
### ###
### ### ###
###
###
### ### ###
### ### ###
### ### ### ### ### ### ###
### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ###
Minggu XIII Minggu XIV Minggu XV Minggu XVI
74 75 76 77 78 79 80 81 82 83 84 85 86 87 88 89 90 91 92 93 94 95 96
### ### ###
### ### ###
### ###
### ### ###
###
###
### ### ###
### ### ###
### ### ### ### ### ### ###
### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ###
k. Pekerjaan Box Culvert
N0 URAIAN
I ASUMSI
1. Menggunakan alat berat (cara mekanik)
2. Lokasi pekerjaan : Titik Perencanaan Box culvert
3. Kondisi Jalan : Sedang / Baik
4. Jam kerja Efektif per hari
5. Kadar semen minimum
6. Perbandingan air / semen maksimum
7. Jarak rata - rata Base Camp ke lokasi pekerjaan
8. Perbandingan Camp :
- Semen
- Pasir
- Agregat Kasar
- Semen = Sm/ (Wcr + sm + Ps + Kr) x D1 x 1000
- Pasir = Ps / (Wcr + sm + Ps + Kr) x D1 x 1000
- Agregat Kasar= Kr / (Wcr + sm + Ps + Kr) x D1 x 1000
- Air = Wcr / (Wcr + sm + Ps + Kr) x D1 x 1000
13. Berat isi :
- Beton
- Semen
- Pasir
- Agregat Kasar
- Superplasticizer
14. Faktor Kehilangan
- Semen
- Pasir dan Agregat Kasar
- Superplasticizer
II URUTAN KERJA
1.Semen, Pasir, Batu kerikil dan AIr dicampur dan diaduk menjadi beton dengan mengunakan concrete Mixer.
2. Beton di Cor ke dalam Bekisting yang telah disiapkan.
3. Peyelesaian dan perapihan setelah pemasangan
III. PEMAKAIAN BAHAN, ALAT DAN TENAGA
1. BAHAN
- Semen = Sm x Fh1
Kayu perancah dan/atau bekisting
Paku Air
2. ALAT
2.a WATER TANK TRUCK
Volume tanki air
Kapasitas pompa air Faktor efesiensi alat
11. Berat per m3 beton :11. Berat per m3 beton :
- Pasir Beton = Ps / (D3 x 1000) x Fh2- Pasir Beton = Ps / (D3 x 1000) x Fh2
- Agregat Kasar = Kr / (D3 x 1000) x Fh2- Agregat Kasar = Kr / (D3 x 1000) x Fh2
Kebutuhan air /m3 beton Kebutuhan air /m3 beton
1000 x Wc
2.b CONCRETE TRUCK MIXER Kapasitas drum
Faktor efisiensi alat
Kecepatan rata-rata isi Kecepatan rata-rata kosong Waktu Siklus :
- Waktu tempuh isi = (V : Q1) x 60 menit - Waktu mengangkut = (L : v1) x 60 menit - Waktu kembali = (L : v2) x 60 menit
- Lain-lain (termasuk dumping setempat-setempat)
Ts1
2.c Concrete Vibrator
Kebutuhan alat per m3 Lama pemadatan
Kap. Prod. / jam = V x 60 Ts
2.d CONCRETE PAN MIXER Kapasita alat
Faktor Efisiensi alat
Kap. Produksi Batching Plant
Kap. Produksi / jam = q x Fa
3 ALAT BANTU
Diperlukan alat - alat bantu kecil
- Concrete Cuter - Sendok Semen - Pacul
- Ember Cor - Sekop
4 TENAGA
Produksi menentukan : CONCRETE PAN MIXER Produksi Timbunan / Hari = TK x Q2
Kebutuhan Tenaga : Pekerja Tukang Mandor
Pekerja = (TK x P ) : Qt
Tukang = (TK x T ) : Qt
Koefisien Alat / M3
= 1 : Q1
Kap. Prod. / jam = V x Fa x 60
Koefisien Alat / M3
= 1 : Q2
Koefisien Alat / M3 = 1 : Q3
Koefisien Alat / M3
= 1 : Q4
Mandor = (TK x M ) : Qt
pondasi bawah
NO KOMPONEN UNIT KOEFISIEN
A TENAGA
1 Mandor Jam 0.00837 14,285.71 120
2 Pekerja Jam 0.03347 10,714.29 359
B MATERIAL -
1 Sirtu 1.18 355,300.00 419,254
C PERALATAN -
1 Motor Grader Jam 0.00837 421,713.02 3,530
2 Tandem Roller Jam 0.01062 421,350.74 4,475
3 Dump Truk Jam 0.15099 328,903.75 49,661
4 Water Tank Jam 0.00837 240,319.39 2,011
D TOTAL HARGA TENAGA, MATERIAL, & PERALATAN 479,409
E OVERHEAD DAN LABA (10% x D) 47,941
F HARGA SATUAN DILUAR PPN (D + E) 527,350
168.089 6.701 25
211.116 11.2180 19
Pondasi atas
NO KOMPONEN UNIT KOEFISIEN
A TENAGA
1 Mandor Jam 0.09371 14,285.71 1,339
2 Pekerja Jam 0.37483 10,714.29 4,016
B MATERIAL -
1 Agregat Kasar 0.71 320,000.00 227,200
2 Agregat Halus 0.4 701,060.29 280,424
C PERALATAN -
1 Motor Grader Jam 0.01171 421,713.02 4,938
2 Tandem Roller Jam 0.01489 421,350.74 6,274
3 Dump Truk Jam 0.15099 328,903.75 49,661
4 Water Tank Jam 0.01171 240,319.39 2,814
D TOTAL HARGA TENAGA, MATERIAL, & PERALATAN 576,666
E OVERHEAD DAN LABA (10% x D) 57,667
F HARGA SATUAN DILUAR PPN (D + E) 634,333
ac-base
HARGA SATUAN (Rp)
TOTAL HARGA PERSATUAN
(RP)
M3
HARGA SATUAN (Rp)
TOTAL HARGA PERSATUAN
(RP)
M3M3
NO KOMPONEN UNIT KOEFISIEN
A TENAGA
1 Mandor Jam 0.00835 14,285.71 119.29
2 Pekerja Jam 0.03338 10,714.29 357.64
B MATERIAL -
1 Agregat Kasar 0.688 320,000.00 220,160.000
2 Agregat Halus 0.524 701,060.29 367,355.592
3 Aspal Kg 12 13,381.52 160,578.240
4 Filler Kg 17.3 1,326.68 22,951.564
C PERALATAN -
1 Aspal Finisher Jam 0.00487 604,185.70 2,942.384
2 Pn. Tire Roller Jam 0.02509 398,851.08 10,007.174
3 Tandem Roller Jam 0.02723 421,350.74 11,473.381
4 Dump Truk Jam 2.73157 328,903.75 898,423.616
5 Water Tank Truck Jam 0.19524 240,319.39 46,919.958
6 AMP Jam 0.00835 2,464,914.54 20,582.036
D TOTAL HARGA TENAGA, MATERIAL, & PERALATAN 1,761,870.874
E OVERHEAD DAN LABA (10% x D) 176,187.087
F HARGA SATUAN DILUAR PPN (D + E) 1,938,057.961
ac-bc
NO KOMPONEN UNIT KOEFISIEN
A TENAGA
1 Mandor Jam 0.00835 14,285.71 119
2 Pekerja Jam 0.03338 10,714.29 358
B MATERIAL -
1 Agregat Kasar 0.756 320,000.00 241,920
2 Agregat Halus 0.5 701,060.29 350,530
3 Aspal 6.3 13,168.20 82,960
4 Filler 22.3 2,058.97 45,915
C PERALATAN -
1 Aspal Finisher Jam 0.01096 604,185.70 6,622
2 Pn. Tire Roller Jam 0.00746 398,851.08 2,975
3 Tandem Roller Jam 0.06162 421,350.74 25,964
4 Dump Truk Jam 2.73157 328,903.75 898,424
5 Water Tank Truck Jam 0.19523 240,319.39 46,918
6 AMP Jam 0.00834 2,464,914.54 20,557
D TOTAL HARGA TENAGA, MATERIAL, & PERALATAN 1,723,261
E OVERHEAD DAN LABA (10% x D) 172,326
F HARGA SATUAN DILUAR PPN (D + E) 1,895,587
ac-wc
HARGA SATUAN (Rp)
TOTAL HARGA PERSATUAN
(RP)
M3
M3
HARGA SATUAN (Rp)
TOTAL HARGA PERSATUAN
(RP)
M3M3
M3M3
M3M3
NO KOMPONEN UNIT KOEFISIEN
A TENAGA
1 Mandor Jam 0.00835 14,285.71 119
2 Pekerja Jam 0.03338 10,714.29 358
B MATERIAL -
1 Agregat Kasar 0.756 320,000.00 241,920
2 Agregat Halus 0.454 701,060.29 318,281
3 Aspal Kg 21.3 13,168.20 280,483
4 Filler Kg 7.4 2,058.97 15,236
C PERALATAN -
1 Aspal Finisher Jam 0.02466 604,185.70 14,899
2 Pn. Tire Roller Jam 0.12706 398,851.08 50,678
3 Tandem Roller Jam 0.20012 421,350.74 84,321
4 Dump Truk Jam 2.73157 328,903.75 898,424
5 Water Tank Truck Jam 0.19523 240,319.39 46,918
6 AMP Jam 0.00835 2,464,914.54 20,582
D TOTAL HARGA TENAGA, MATERIAL, & PERALATAN 1,972,218
E OVERHEAD DAN LABA (10% x D) 197,222
F HARGA SATUAN DILUAR PPN (D + E) 2,169,440
prime coat
NO KOMPONEN UNIT KOEFISIEN
A TENAGA
1 Mandor Jam 0.92269 14,285.71 13,181
2 Pekerja Jam 3.69076 10,714.29 39,544
B MATERIAL -
1 Aspal Kg 88.9 13,168.20 1,170,653
2 Minyak Tanah Liter 0.253 9,650.00 2,441
C PERALATAN -
1 Aspal Sprayer Jam 0.92269 49,480.47 45,655
D TOTAL HARGA TENAGA, MATERIAL, & PERALATAN 1,271,475
E OVERHEAD DAN LABA (10% x D) 127,147
F HARGA SATUAN DILUAR PPN (D + E) 1,398,622
tack coat
NO KOMPONEN UNIT KOEFISIEN
A TENAGA
1 Mandor Jam 0.83797 14,285.71 11,971
2 Pekerja Jam 3.35189 10,714.29 35,913
B MATERIAL -
HARGA SATUAN (Rp)
TOTAL HARGA PERSATUAN
(RP)
M3M3
M3M3
HARGA SATUAN (Rp)
TOTAL HARGA PERSATUAN
(RP)
HARGA SATUAN (Rp)
TOTAL HARGA PERSATUAN
1 Aspal Kg 88.9 13,168.20 1,170,653
2 Minyak Tanah Liter 0.253 9,650.00 2,441
C PERALATAN -
1 Aspal Sprayer Jam 0.92269 49,480.47 45,655
D TOTAL HARGA TENAGA, MATERIAL, & PERALATAN 1,266,634
E OVERHEAD DAN LABA (10% x D) 126,663
F HARGA SATUAN DILUAR PPN (D + E) 1,393,297
bahu jalan
NO KOMPONEN UNIT KOEFISIENARGA SATUAN (Rp)
A TENAGA
1 Mandor Jam 0.01171 14,285.71 167
2 Pekerja Jam 0.04685 10,714.29 502
B MATERIAL -
1 Agregat Kelas B 1.18 80,000.00 94,400
C PERALATAN -
1 Motor Grader Jam 0.01171 421,713.02 4,938
2 Water Tank Jam 0.01171 240,319.39 2,814
3 Dump Truck Jam 0.15099 328,903.75 49,661
4 Tandem Roller Jam 0.01062 421,350.74 4,475
D TOTAL HARGA TENAGA, MATERIAL, & PERALATAN 156,958
E OVERHEAD DAN LABA (10% x D) 15,696
F HARGA SATUAN DILUAR PPN (D + E) 172,653
galian drainase
No. Komponen Sat Koefisien Harga Satuan (Rp)
A TENAGA :
1 Mandor Jam 0.00469 19,438.57 91
2 Pekerja Jam 0.01873 17,294.57 324
-
B MATERIAL : -
- - -
-
C PERALATAN : -
1 Excavator Jam 0.00468 452,342.50 2,117
2 Dump Truck Jam 0.15099 328,903.75 49,661
3 Jam 0.0061 505,126.18 3,081
D
TOTAL HARGA TENAGA, MATERIAL, &
55,275 PERALATAN
E OVERHEAD DAN LABA (10% x D) 5,527
F HARGA SATUAN DILUAR PPN (D + E) 60,802
saluran drainase
No KOMPONEN UNIT KOEFISIEN
HARGA SATUAN (Rp)
TOTAL PERSATU
M3
Biaya Total/m³ (Rp)
Bulldozer
TOTAL HARGA PERSATUAN
A BURUH
1 Mandor Jam 0.00218 14,285.71 31
2 Pekerja Jam 0.04369 10,714.29 468
3 Kepala Tukang Jam 0.00175 13,571.43 24
4 Tukang Batu Jam 0.01748 14,292.86 250
B MATERIAL : -
1 Batu Kali 0.256 338,000.00 86,528
2 Semen Portland Kg 38 1,326.28 50,371
3 Pasir Pasang 0.121 172,600.00 20,885
D TOTAL HARGA TENAGA, MATERIAL, & PERALATAN 158,556
E OVERHEAD DAN LABA (10% x D) 15,856
F HARGA SATUAN DILUAR PPN (D + E) 174,412
galian gorong-gorong
No KOMPONEN UNIT KOEFISIEN
HARGA SATUAN (Rp)
A TENAGA
1 Mandor Jam 0.00468 14,285.71 67
2 Pekerja Jam 0.01873 10,714.29 201
B MATERIAL -
1 - - -
-C PERALATAN -
1 Exavator Jam 0.00468 452,342.50 2,117
2 Dump Truck Jam 0.15099 328,903.75 49,661
D TOTAL HARGA TENAGA, MATERIAL, & PERALATAN 52,046
E OVERHEAD DAN LABA (10% x D) 5,205
F HARGA SATUAN DILUAR PPN (D + E) 57,250
pasir urug gorong-gorong
NO KOMPONEN UNIT KOEFISIENARGA SATUAN (Rp)
A TENAGA
1 Mandor Jam 0.00468 14,285.71 67
2 Pekerja Jam 0.01873 10,714.29 201
B MATERIAL -
1 Pasir Urug 1.17 172,600.00 201,942
M3
M3
TOTAL HARGA PERSATUAN
(RP)
TOTAL HARGA PERSATUAN
(RP)
C PERALATAN
1 excavator Jam 0.00468 452,342.50 2,117
2 -
3 Dump Truck Jam 0.15099 328,903.75 49,661
4 -
5 -
D TOTAL HARGA TENAGA, MATERIAL, & PERALATAN 253,988
E OVERHEAD DAN LABA (10% x D) 25,399
F HARGA SATUAN DILUAR PPN (D + E) 279,386
timbunan gorong-gorong
No KOMPONEN UNIT KOEFISIENARGA SATUAN (Rp)
A TENAGA
1 Mandor Jam 0.01757 14,285.71 251
2 Pekerja Jam 0.07028 10,714.29 753
B MATERIAL -
1 Bahan Timbunan M³ 1.17 90,800 106,236
C PERALATAN -
1 Exavator Jam 0.00467 452,342.50 2,112
2 Dump Truck Jam 0.15093 328,903.75 49,641
3 Motor Grader Jam 0.01757 421,713.02 7,409
4 Vibrator Roller Jam 0.0061 366,501.12 2,236
5 Water Tank Jam 0.01757 240,319.39 4,222
D TOTAL HARGA TENAGA, MATERIAL, & PERALATAN 172,861
E OVERHEAD DAN LABA (10% x D) 17,286
F HARGA SATUAN DILUAR PPN (D + E) 190,148
TOTAL HARGA PERSATUAN
KODE KOEF SATUAN
TK 8.00 Jam
Ks 340.00
Wcr 0.50
-L 3.00 Km
Sm 1.00
-Ps 2.25
-Kr 3.25
-Sm 321.43 Kg
Ps 723.21 Kg
Kr 1,044.64 Kg
Air 160.71 Kg
D1 2.25
D2 1.44
D3 1.80
D4 1.80
D5 1.20 Kg/liter
F1 1.020
F2 1.100
F3 1.020
M12 327.86 kg
M01a 0.442
M03 0.638
M19 0.15
M18 1.20 kg
0.20
(E23)
V 5.00
Wc 0.20
Pa 100.00 liter/menit
Fa 0.83
Q1 24.90
Kg/m3Kg/m3
ton / m3
ton / m3
ton / m3
ton / m3
m3m3
m3m3
m3m3
m3m3
m3m3
m3m3
Q1 24.90
0.0402 Jam
(E47)
V 5.00
Fa 0.83
V1 20.00 Km/jam
V2 40.00 Km/jam
T1 12.05 menit
T2 9.00 menit
T3 4.50 menit
T4 5.00 menit
Ts1 30.55 menit
Q2 8.15
0.1227 Jam
(E20)
V 2.00 buah
180.00 detik
Ts 3.00 menit
Q3 40.00
0.0250 Jam
(E43)
V 600.00 liter
Fa 0.83
-q 36.00
Q4 29.88
0.0335 Jam
Ls 2
4 2 8 2
Q2 8.15
Qt 65.2
P 5.00 Orang
T 3.00 Orang
M 1.00 Orang
(L01) 0.6135 Jam
(L02) 0.3681 Jam
m3/Jamm3/Jam
m3
m3/Jam
m3/Jam
m3/Jam
m3/Jam
m3/Jam
UAN (Rp)
Analisa Harga Satuan Pekerjaan Pembersihan
NO KOMPONEN UNIT
A TENAGA
1 Mandor Jam 0.0061 14,285.71
2 Pekerja Jam 0.02441 10,714.29
B MATERIAL
1 - - -
-2 - - -
-C PERALATAN
1 Buldozer Jam 0.0061 505,126.18
2 Wheel Loader Jam 0.00602 323,374.48
3 Dump Truk Jam 0.15093 328,903.75
D TOTAL HARGA TENAGA, MATERIAL, & PERALA
E OVERHEAD DAN LABA (10% x D)
F HARGA SATUAN DILUAR PPN (D + E)
Tabel 4.32 Analisa Harga Satuan Pekerjaan Galian
NO KOMPONEN UNIT
A TENAGA
1 Mandor Jam 0.00468 14,285.71
2 Pekerja Jam 0.01873 10,714.29
B MATERIAL
1 - - -
-KOEFISI EN
HARGA SATUAN
(Rp)
KOEFISI EN
HARGA SATUAN
2 - - -
-C PERALATAN
1 Buldozer Jam 0.0061 505,126.18
2 Excavator Jam 0.00468 452,342.50
3 Dump Truk Jam 0.15098 328,903.75
D TOTAL HARGA TENAGA, MATERIAL, & PERALA
E OVERHEAD DAN LABA (10% x D)
F HARGA SATUAN DILUAR PPN (D + E)
Analisa Harga Satuan Pekerjaan Timbunan
NO KOMPONEN UNIT
A TENAGA
1 Mandor Jam 0.0061 14,285.71
2 Pekerja Jam 0.02441 10,714.29
B MATERIAL
1 Tanah Timbunan 1.25 25,000.00
C PERALATAN
1 Jam 0.0061
505,126.18
2 Whell Loader Jam 0.00602 323,374.48
3 Dump Truck Jam 0.15093 328,903.75
D TOTAL HARGA TENAGA, MATERIAL, & PERALA
E OVERHEAD DAN LABA (10% x D)
F HARGA SATUAN DILUAR PPN (D + E)
KOEFISI EN
HARGA SATUAN
(Rp)
m3m3
87.142831 261.5358189
3081.269698 1946.7143696 49641.4429875
55,018.11 5,501.81 60,519.92
66.8571228 200.6786517
BIAYA
TOTAL/M3
(Rp)BIAYA
TOTAL/M3
(Rp)BIAYA
TOTAL/M3 (Rp)
BIAYA
TOTAL/M3
(Rp)BIAYA
TOTAL/M3
3081.269698 2116.9629 49657.888175
55,123.66 5,512 60,636.02
87.142831 261.5358189
0 31250
0 3081.269698
1946.7143696 49641.4429875
86,268.11 8,626.81 94,894.92
BIAYA
TOTAL/M3
(Rp)BIAYA
No URAIAN PEKERJAAN BIAYA WAKTU BOBOT (%) Minggu I Minggu II Minggu III (Rp) (Hari Kerja) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
I PEKERJAAN PERSIAPAN
1.1 Mobilisasi 15,000,000 10 0.0170666539 0.00171 0.00171 0.00171 0.00171 0.00171 0.00171 0.00171 0.00171 0.00171 0.00171 1.2 Pengukuran 5,840,010 5 0.0066446286 0.00133 0.00133 0.00133 0.00133 0.00133
1.3 Direksi Keet 80,808,450.90 3 0.0919419911 0.03065 0.03065 0.03065
1.4 Pembersihan 798,862,894.84 11 0.9089277715 0.08263 0.08263 0.08263 0.08263 0.08263 0.08263 0.08263 0.08263 II PEKERJAAN TANAH
2.1 Galian 15,019,439,011.90 73 17.0887712 2.2 Timbunan 37,723,578,344.48 76 42.921017135 III PEKERJAAN BADAN JALAN
3.1 Pekerjaan Lapis Pondasi Bawah 8,624,707,758 18 9.8129935099 3.2 Pekerjaan Lapis Pondasi Atas 6,970,685,250 17 7.9310848599 3.3 Pekerjaan Prime Coat 46,993,706 5 0.0534683541 3.4 Pekerjaan Lapis AC-Base 8,131,703,593 5 9.2520647453 3.5 Pekerjaan Tack Coat 93,629,562 10 0.1065295554 3.6 Pekerjaan Lapis AC-BC 5,302,337,035 4 6.0328767509 3.7 Pekerjaan Lapis AC-WC 4,045,572,351 4 4.6029588872 3.8 Bahu Jalan 745,862,380.92 7 0.8486250095 IV BANGUNAN PELENGKAP
4.1 Galian Drainase 0.00 2 0
4.2 Pasangan Batu kali 197,980,204.47 65.00 0.2252573091 4.3 Pekerjaan Gorong-gorong 72,689,981.32 3.00 0.0827049838
V PEKERJAAN FINSHING
5.1 Demobilisasi 15,000,000 7 0.0170666539
III Minggu IV Minggu V Minggu VI Minggu VII Minggu VIII Minggu IX Minggu X Mi
19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72 73
0.08263 0.08263 0.08263
0.23409 0.23409 0.23409 0.23409 0.23409 0.23409 0.23409 0.23409 0.23409 0.23409 0.23409 0.23409 0.23409 0.23409 0.23409 0.23409 0.23409 0.23409 0.23409 0.23409 0.23409 0.23409 0.23409 0.23409 0.23409 0.23409 0.23409 0.23409 0.23409 0.23409 0.23409 0.23409 0.23409 0.23409 0.23409 0.23409 0.23409 0.23409 0.23409 0.23409 0.23409 0.23409 0.23409 0.23409 0.23409 0.23409 0.23409 0.23409 0.23409 0.23409 0.23409 0.23409 0.56475 0.56475 0.56475 0.56475 0.56475 0.56475 0.56475 0.56475 0.56475 0.56475 0.56475 0.56475 0.56475 0.56475 0.56475 0.56475 0.56475 0.56475 0.56475 0.56475 0.56475 0.56475 0.56475 0.56475 0.56475 0.56475 0.56475 0.56475 0.56475 0.56475 0.56475 0.56475 0.56475 0.56475 0.56475 0.56475 0.56475 0.56475 0.56475 0.56475 0.56475 0.56475 0.56475 0.56475 0.56475 0.56475 0.56475 0.56475 0.56475 0.56475 0.56475 0.56475
Minggu XI Minggu XII Minggu XIII Minggu XIV Minggu XV Minggu XVI XVII Minggu XVIII
74 75 76 77 78 79 80 81 82 83 84 85 86 87 88 89 90 91 92 93 94 95 96 97 98 99 100 101 102 103 104 105 106 107 108 109 110 111 112 113 114 115 116 117 118 119 120 121 122 123 124 125 126 127 128
0.23409 0.23409 0.23409 0.23409 0.23409 0.23409 0.23409 0.23409 0.23409 0.23409 0.23409 0.23409 0.23409 0.23409 0.23409 0.23409 0.23409 0.23409 0.23409 0.23409 0.23409
0.56475 0.56475 0.56475 0.56475 0.56475 0.56475 0.56475 0.56475 0.56475 0.56475 0.56475 0.56475 0.56475 0.56475 0.56475 0.56475 0.56475 0.56475 0.56475 0.56475 0.56475 0.56475 0.56475 0.56475
0.54517 0.54517 0.54517 0.54517 0.54517 0.54517 0.54517 0.54517 0.54517 0.54517 0.54517 0.54517 0.54517 0.54517 0.54517 0.54517 0.54517 0.54517
0.46653 0.46653 0.46653 0.46653 0.46653 0.46653 0.46653 0.46653 0.46653 0.46653 0.46653 0.4665 0.4665
0 0
0.00347 0.00347 0.00347 0.00347 0.00347 0.00347 0.00347 0.00347 0.00347 0.00347 0.00347 0.00347 0.00347 0.00347 0.00347 0.00347 0.00347 0.00347 0.00347 0.00347 0.00347 0.00347 0.00347 0.00347 0.00347 0.00347 0.00347 0.0035 0.0035 0.02757 0.02757 0.02757
Minggu XIX Minggu XX Minggu XXI Minggu XXII Minggu XXIII Minggu XXIV
129 130 131 132 133 134 135 136 137 138 139 140 141 142 143 144 145 146 147 148 149 150 151 152 153 154 155 156 157 158 159 160 161 162 163 164 165 166 167 168 169
0.46653 0.46653 0.46653 0.46653
0.01069 0.01069 0.01069 0.01069 0.01069 1.85041 1.85041 1.85041 1.85041 1.85041
0.01065 0.01065 0.01065 0.01065 0.01065 0.01065 0.01065 0.01065 0.010653 0.010653 1.50822 1.50822 1.50822 1.50822
1.15074 1.15074 1.15074 1.15074
0.121232 0.121232 0.121232 0.121232 0.121232 0.121232 0.121232
0.00347 0.00347 0.00347 0.00347 0.00347 0.00347 0.00347 0.00347 0.00347 0.00347 0.00347 0.00347 0.00347 0.00347 0.00347 0.00347 0.00347 0.00347 0.00347 0.00347 0.00347 0.003465 0.003465 0.003465 0.003465 0.003465 0.003465 0.003465 0.003465 0.003465 0.003465 0.003465 0.003465 0.003465 0.003465 0.003465
Rekapitulasi Biaya
No. Uraian Volume Sat Harga Satuan (Rp)
I Pekerjaan Persiapan
1 Mobilisasi 1 Ls 15,000,000.00
2 Pengukuran 6 km 973,335.00
3 Pembersihan 13,200 m³ 60,519.92
4 Direksi Keet 30 m² 2,693,615.03
Total
II Pekerjaan Tanah
1 Galian 247,698 m³ 60,636.02
2 Timbunan 397,530 m³ 94,894.92
Total
III Pekerjaan Badan Jalan
1 Lapis Pondasi Agregat B 16,355 m³ 527,350.24
2 Lapis Pondasi Agregat A 10,989 m³ 634,332.99
3 Lapis AC-Base 4,196 m³ 1,938,057.96
4 Lapis AC-BC 2,797 m³ 1,895,587.39
5 Lapis AC-WC 1,865 m³ 2,169,440.34
6 Agregat Kelas B ( Bahu Jalan) 4,320 m³ 172,653.33
7 Prime Coat 34 m³ 1,398,622.19
8 Take Coat 67 m³ 1,393,297.05
Total
IV Pekerjaan Drainase
1 Galian Drainase 3,155 m³
2 Pasangan Batu Kali 1,134 m³ 174,521.85
3 Gorong-gorong 99 buah 573,443.75
4 Galian Gorong-gorong 99 m³ 57,250.24
5 Pasir Urug 10 m³ 279,386.44
6 Timbunan Gorong-gorong 39 m³ 190,147.59
Total
V Pekerjaan Finishing
2 Demobilisasi 1 Ls 15,000,000.00
Total
No Uraian Total Biaya (Rp)
1 Pekerjaan Persiapan 900,511,356
2 Pekerjaan Tanah 52,743,017,356
3 Pekerjaan Badan Jalan 33,961,491,636
4 Pekerjaan Bangunan Pelengkap 270,670,186
5 Pekerjaan Finishing 15,000,000
A Jumlah total pekerjaan 87,890,690,534
B PPN = (10%) * A 8,789,069,053
C TOTAL BIAYA 96,679,759,587
Dibulatkan
Biaya Total/m³ (Rp)
15,000,000 396,269,630.90
5,840,010 45,538,700.00
798,862,895 3,088,163,471.06
80,808,451 13,002,874.50
900,511,356 3501969846.46
358,578,387.93
15,019,439,012 2,272,437,403.71
37,723,578,344
52,743,017,356
2,227,505,787.85
8,624,707,758 1,312,049,032.63
6,970,685,250 8,131,703,593
5,302,337,035 3,094,197,032.69
4,045,572,351 745,862,381
46,993,706 4,671,188,808.00
93,629,562
33,961,491,636
18,315,883,618.56
- 197,980,204
56,770,931 72,689,981.32
5,667,774 7,011,235.75
2,765,926 13,035,644.64
7,485,350 91,755,539.84
270,670,186 30,592,962.40
142,395,382.62
15,000,000
15,000,000 20,000,000.00