(1)

PENTING : DOKUMEN MEJA INI HANYA UNTUK RUJUKAN DAN TIDAK DIANGGAP SEBAGAI DOKUMEN SEBUTHARGA

JABATAN PENGAIRAN DAN SALIRAN NEGERI SELANGOR

Sebutharga Untuk Kerja Bahagian Perkhidmatan Mekanikal Dan Elektrikal

KERJA-KERJA MENAIKTARAF SISTEM MEKANIKAL DAN ELEKTRIKAL

DI LIMA (5) BUAH RUMAH PAM, JABATAN PENGAIRAN DAN SALIRAN

NEGERI SELANGOR

JPS/N/ME/P(07)/09/2017(SH)

1/7

Bil Perkara Unit Kuantiti Kadar

(RM) Harga (RM) A KERJA-KERJA AWALAN

1. Menyediakan insurans perlindungan pekerja dan tanggungan awam serta lain-lain yang berkaitan

2. Mengadakan tenaga pekerja, jentera dan

pengangkutan untuk perlaksanaan kerja

termasuk kerja pembersihan dan pembuangan sampah

3. Kerja-kerja membuka, menghimpun,

menghantar dan memunggah peralatan lama atau bahagian yang telah rosak ke tempat seperti diarahkan oleh Pegawai Penguasa atau wakilnya

4. Penyediaan laporan bergambar kemajuan kerja sebelum, semasa dan selepas siap. (Soft Copy & Hard Copy)

L/s

L/s

L/s

Set 3

(2)

PENTING : DOKUMEN MEJA INI HANYA UNTUK RUJUKAN DAN TIDAK DIANGGAP SEBAGAI DOKUMEN SEBUTHARGA

JABATAN PENGAIRAN DAN SALIRAN NEGERI SELANGOR

Sebutharga Untuk Kerja Bahagian Perkhidmatan Mekanikal Dan Elektrikal

KERJA-KERJA MENAIKTARAF SISTEM MEKANIKAL DAN ELEKTRIKAL

DI LIMA (5) BUAH RUMAH PAM, JABATAN PENGAIRAN DAN SALIRAN

NEGERI SELANGOR

JPS/N/ME/P(07)/09/2017(SH)

2/7

Bil Perkara Unit Kuantiti Kadar

(RM) Harga (RM) B KERJA-KERJA MEKANIKAL DAN ELEKTRIKAL

No.1 Rumah Pam KTM Batu 3, Petaling

Menyediakan tenaga mahir,peralatan dan mesin serta kelengkapan khas bagi membekal, menghantar dan memasang Panel Kawalan Elektrik termasuk kerja-kerja yang berkaitan:

1.1 Floor standing Control Panel weather proof panel

IP55.Incoming 300A TPN.

c/w all electrical accessories for 2 sets

Electrical Submersible Pump with Auto Trans Starter

set 1

1.2 Floor standing TNB Metering Panel weather proof

panel IP55 c/w 350A switch gear and all electrical accessories

set 1

1.3 Floor standing Feeder Pillar Panel weather proof

panel IP55. Incoming 60A TPN.

Feeder Pillar Compound Lighting system. c/w all electrical accessories

set 1

1.4 Wall mounting weather proof panel IP55.

Terminal block connection Junction box.

Complete with 1 lot Power control Terminal block.

set 1

1.5 Junction Box weather proof panel IP55 for pump level

operation control complete with stainless steel rod and Terminal block.

set 1

1.6 Membekal dan memasang bumbung jenis zink

lengkap dengan kerangka keluli berukuran 3 meter x 4 meter

lot 1

1.7 Membekal dan memasang Floodlight berkadaran

400 Watt lengkap dengan pendawaian dan tiang jenis Hot Dip Street Lighting Pole (panjang 4 meter)

(3)

PENTING : DOKUMEN MEJA INI HANYA UNTUK RUJUKAN DAN TIDAK DIANGGAP SEBAGAI DOKUMEN SEBUTHARGA

JABATAN PENGAIRAN DAN SALIRAN NEGERI SELANGOR

Sebutharga Untuk Kerja Bahagian Perkhidmatan Mekanikal Dan Elektrikal

KERJA-KERJA MENAIKTARAF SISTEM MEKANIKAL DAN ELEKTRIKAL

DI LIMA (5) BUAH RUMAH PAM, JABATAN PENGAIRAN DAN SALIRAN

NEGERI SELANGOR

JPS/N/ME/P(07)/09/2017(SH)

3/7

Bil Perkara Unit Kuantiti Kadar

(RM) Harga (RM)

1.8 Membekal dan memasang Lightning Arrester lengkap

dengan Street Lighting Pole (10 meter), Hard Drawn Copper Tape, Copper Rod c/w Earth Clamp, Coupling Earth Chamber serta memastikan bacaan tidak melebihi 10 ohm setelah diuji dengan menggunakan Earth Tester.

set 1

1.9 Membekal dan memasang Earthing System

lengkap dengan Copper Main Bar (10 way), Hard Drawn Copper Tape dan Copper Rod c/w Earth

Clamp, Coupling dan Earth Chamber serta

memastikan bacaan tidak melebihi 10 ohm setelah diuji dengan menggunakan Earth Tester

set 1

No. 2 Rumah Pam Tmn. Saujana Indah, Petaling

2.1 To supply and install new galvanized wire rope for

existing 3.2ton hoist

set 1

2.2 To supply push button complete with pendant cable set 1

2.3 To supply new electrical panel box with contactors,

MCB and transformer

set 1

2.4 To supply new hoist motor complete with brake set 1

2.5 To supply new cross motor complete with brake set 1

2.6 To supply and install canopy for the hoist and cross

motor for existing hoist

set 1

No. 3 Rumah Pam Tmn. TTDI Jaya, Petaling

3.1 To supply and install new galvanized wire rope for

existing 3.2ton hoist

set 1

3.2 To supply push button complete with pendant cable set 1

3.3 To supply new electrical panel box with contactors,

MCB and transformer

set 1

3.4 To supply new hoist motor complete with brake set 1

(4)

PENTING : DOKUMEN MEJA INI HANYA UNTUK RUJUKAN DAN TIDAK DIANGGAP SEBAGAI DOKUMEN SEBUTHARGA

JABATAN PENGAIRAN DAN SALIRAN NEGERI SELANGOR

Sebutharga Untuk Kerja Bahagian Perkhidmatan Mekanikal Dan Elektrikal

KERJA-KERJA MENAIKTARAF SISTEM MEKANIKAL DAN ELEKTRIKAL

DI LIMA (5) BUAH RUMAH PAM, JABATAN PENGAIRAN DAN SALIRAN

NEGERI SELANGOR

JPS/N/ME/P(07)/09/2017(SH)

4/7

Bil Perkara Unit Kuantiti Kadar

(RM) Harga (RM)

3.6 To supply and install canopy for the hoist and cross

motor for existing hoist

set 1

No. 4 Rumah Pam Tmn. Mesra, Petaling

4.1 To supply and install new galvanized wire rope for

existing 3.2ton hoist

set 1

4.2 To supply push button complete with pendant cable set 1

4.3 To supply new electrical panel box with contactors,

MCB and transformer

set 1

4.4 To supply new hoist motor complete with brake set 1

4.5 To supply new cross motor complete with brake set 1

4.6 To supply and install canopy for the hoist and cross

motor for existing hoist

set 1

No. 5 Rumah Pam Kg. Kebun Bunga, Petaling

5.1 To supply and install new galvanized wire rope for

existing 3.2ton hoist

set 1

5.2 To supply push button complete with pendant cable set 1

5.3 To supply new electrical panel box with contactors,

MCB and transformer

set 1

5.4 To supply new hoist motor complete with brake set 1

5.5 To supply new cross motor complete with brake set 1

5.6 To supply and install canopy for the hoist and cross

motor for existing hoist

(5)

PENTING : DOKUMEN MEJA INI HANYA UNTUK RUJUKAN DAN TIDAK DIANGGAP SEBAGAI DOKUMEN SEBUTHARGA

JABATAN PENGAIRAN DAN SALIRAN NEGERI SELANGOR

Sebutharga Untuk Kerja Bahagian Perkhidmatan Mekanikal Dan Elektrikal

KERJA-KERJA MENAIKTARAF SISTEM MEKANIKAL DAN ELEKTRIKAL

DI LIMA (5) BUAH RUMAH PAM, JABATAN PENGAIRAN DAN SALIRAN

NEGERI SELANGOR

JPS/N/ME/P(07)/09/2017(SH)

5/7

Bil Perkara Unit Kuantiti Kadar

(RM) Harga (RM) C LAIN-LAIN KERJA YANG BERKAITAN

1. Testing and Commisioning (T&C) L.s

Jumlah Keseluruhan (RM)

Catatan :

Jika ada butiran dikehendaki dalam Spesifikasi dan Skop Kerja tidak termasuk di dalam Ringkasan Sebutharga ini, harga butiran tersebut hendaklah dimasukkan ke dalam salah satu butiran dalam Ringkasan Sebutharga.

( Ringgit Malaysia ) :

... ... Tempoh kerja disiapkan : ...12... Minggu.

(6)

PENTING : DOKUMEN MEJA INI HANYA UNTUK RUJUKAN DAN TIDAK DIANGGAP SEBAGAI DOKUMEN SEBUTHARGA

JABATAN PENGAIRAN DAN SALIRAN NEGERI SELANGOR

Sebutharga Untuk Kerja Bahagian Perkhidmatan Mekanikal Dan Elektrikal

KERJA-KERJA MENAIKTARAF SISTEM MEKANIKAL DAN ELEKTRIKAL

DI LIMA (5) BUAH RUMAH PAM, JABATAN PENGAIRAN DAN SALIRAN

NEGERI SELANGOR

JPS/N/ME/P(07)/09/2017(SH)

6/7

SCHEDULE OF TECHNICAL DATA

Bil.

Question

Answer To Be Complated By Tenderer

1.0

Control Panel

a)

300A TPN MCCB 50KA cw

shunt trip & handle lock

b)

Amp/ Volt metering CPT

c)

IDMT EF/OC cw 5P10 CTS

300/5A

d)

SPD 65KA 415V cw 100A TPN

MCCB 50KA

e)

55kw Auto Trans Starter cw

Copper Type Auto Trans 56kw

f)

150A TPN MCCB 50KA cw

shunt trip & handle lock

g)

ELR Control cw ZCT 60mm

h)

Amp metering cw sel-sw

i)

A/O/M sel-sw, p/lamp, p/button,

timer relay & hour run meter

j)

30KVA 440V Cap Bank & 60A

TPN MCCB 30KA

k)

Heavy duty type 6” cooling fan

cw fan filter

l)

Stepping rotation controller cw

float ball sensor controller 5 nos

AC24V High Level Alarm

m)

Control relay timer for control

interlock

n)

Panel heater 80W cw temp

controller & SP MCB 6A

(7)

PENTING : DOKUMEN MEJA INI HANYA UNTUK RUJUKAN DAN TIDAK DIANGGAP SEBAGAI DOKUMEN SEBUTHARGA

JABATAN PENGAIRAN DAN SALIRAN NEGERI SELANGOR

Sebutharga Untuk Kerja Bahagian Perkhidmatan Mekanikal Dan Elektrikal

KERJA-KERJA MENAIKTARAF SISTEM MEKANIKAL DAN ELEKTRIKAL

DI LIMA (5) BUAH RUMAH PAM, JABATAN PENGAIRAN DAN SALIRAN

NEGERI SELANGOR

JPS/N/ME/P(07)/09/2017(SH)

7/7

2.0

Overhead Crane

a)

Wire Rope

Name of manufacturer :

Strenght :

Safety Factor :

b)

Hoist Motor

Name of manufacturer :

Country of manufacturer :

Model :

c)

Cross Travel Motor

Name of manufacturer :

Country of manufacturer :

Model :

d)

The Quotationer must provide

catalogue for evaluation

(compulsory)

………. ………

(Tandatangan Penyebutharga) (Tandatangan Saksi)

Nama Penuh :……….. Nama Penuh :………

No. K/P :……….……... No. K/P :………...…... Alamat :……….….… Alamat :………..………. ………..……. ………... ………..……. ……….. Atas sifat :………. ……… Meteri atau Cop Syarikat

Referensi

Dokumen terkait

Selanjutnya, dilihat dari nilai pvalue yaitu sebesar 0,015, karena nilai pvalue 0,015 < 0,05 berarti dapatlah disimpulkan ada pengaruh yang positif dan

Strategi komunikasi dalam pelaksanaan PNPM Mandiri Perdesaan di Kecamatan Konawe dilakukan melalui empat cara, yaitu mengenal khalayak, menyusun pesan, menetapkan metode,

No Tahap Kegiatan Unit Penyelesaian Arsiparis/ Penata Arsip di Subdit Penyimpanan Arsip Media Baru Para Kasie di Subdit Penyimpanan Arsip Media Baru Kasubdit Penyimpanan

Bila pada salinan sketsa peta blok sensus jumlah rumah tangga di setiap segmennya tidak diketahui, maka untuk memperkirakan jumlah rumah tangga untuk masing-masing segmen

Substansi dari perda nomor 10 tahun 2001 tentang larangan pelacuran di Kabupaten Demak adalah melarang semua bentuk pelacuran untuk mencegah perbuatan yang

Setelah kegiatan evaluasi, kegiatan selanjutnya adalah menyampaikan materi yang akan diajarkan pada pertemuan minggu selanjutnya. Setelah itu, dilanjutkan dengan doa bersama

Kesimpulannya, strategi coping merupakan suatu upaya indivdu untuk menanggulangi situasi stres yang menekan akibat masalah yang dihadapinya dengan cara melakukan perubahan