DRAFT GENERAL PLAN OF ELECTRICITY (RUKN) 2012 -

2031

MINISTRY OF ENERGY AND MINERAL RESOURCES

DIRECTORAT GENERAL OF ELECTRICITY

Jakarta, 7 Februari 2013

PRESENTED BY

:

Hasril Nuzahar

Director of Electricity Program Supervision

on

:

(2)

ESDM untuk Kesejahteraan Rakyat

Legal Basis

 Law No. 30 Year 2009 on electricity:

Article 7 : RUKN is prepared based on national energy policy and set by

Government after consulting with Parliament. RUKN prepared together with

local government and further the RUKN becomes base for preparation of

General Plan for Local Government (RUKD)

 Government Regulation No. 14 Year 2012 on Power Supply Business Activity :

Article 8: power supply business for public need is carried out in line with

General Plan of Electricity and Power Supply Business Plan (RUPTL), where

RUPTL prepared by power supply business stakeholders that apply for power

supply business license (applicant) must concern on General Plan of Electricity

(3)

ESDM untuk Kesejahteraan Rakyat

Consideration of Changes of RUKN

 New regulation that arranges electricity sector (Law No. 30/2009 concerning

electricity, PP. No. 14/2012 on Power Supply Business Activity, PP. No. 42/

2012 on Cross Country Power Trade, and PP No. 62/2012 on Power Supporting

Business Services ).

 Progress of development achievement of 10,0000 MW Phase I. .

 Progress of the implementation of 10.000 MW Phase II.

 The implementation of Masterplan Acceleration and Expansion of Indonesia

Economy Development (MP3EI).

(4)

Direction for Power Supply Development

 Development of power plant capacity in term of :

− To Support MP3EI

− To finish the shortage of power supply

− To increase reserves by mostly using local energy source and also to limit the plan for

development of oil fuel power plant.

 Development of power plant for peak load by using gas and PLTA (pump storage or

ordinary type of damp), so fuel oil power plant development is minimized

.

 To support other power plants that use new renewable energy, in addition to fulfill power

need, in reducing CO2 emission level by giving interesting investment scheme and more

ocmpetitive selling price of power

(5)

Mix Primary Energy Policy for Power Generation

 Primary energy source should be used optimally in line with National Energy Policy (KEN)

to guarantee sustainable power supply, and its utilization prioritized from new renewable

energy source

 As for deduction of oil fuel dependency, Government guarantees coal supply for power

generation through DMO policy and supports domestic gas use for power plants.

 The utilization of new energy source such as nuclear energy is last option after optimizing

the use of renewbale nergy source and other new energy source potency. .

Oil fuel 15.02% Coal 51.08% Gas 22.60% Geotherma l 4.75% Water 6.44% others 0.12% Oil fuel 0.8% coal 62.8% Gas 18.8% Geothermal 11.0% Water 6.5% others 0.1%

2012

2021

(6)

Rural Electricity Program Policy and Electrification

Ratio

 Handling of social mission meant to hep less fortunate society group, and electrify the

whole area of Indonesia conits of underprevilaged area, remote area, and rural electricity

development .

 National electrification ratio targets 80% by the end of 2014, it is expected to become

around 99% by the end of 2020.

75.30 77.65 80.00 83.18 86.37 89.56 92.76 95.98 99.20 99.26 99.33 99.40 99.47 99.54 99.61 99.69 99.76 99.84 99.92 100.00 70 75 80 85 90 95 100 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031

%

(7)

ESDM untuk Kesejahteraan Rakyat

start

Historical Data

(Input)

Regression Analysis

(Model)

stop

Electricity energy Need Prediction

(Output)

Additional Power Need

(MW)

Flow Chart Projection of Power Demand dan

Supply

(8)

No.

Uraian

2011 - 2014

2015 - 2031

1.

Economy Growth Assumption

*)

6,4% - 7,0%

8,0%

2.

Inflation Assumption

*)

6,5%

turun menjadi 3,0%

pada tahun 2025

3.

Annual Population Growth

Assumption

**)

- Jawa - Bali

- Out side Jawa - Bali

- Indonesia

rata-rata 1,3 %

rata-rata 2,1 %

rata-rata 1,7 %

4.

Annual Prediction of Electricity

Energy Need growth

- Jawa - Bali

- Out side Jawa - Bali

- Indonesia

rata-rata 8,6 %

rata-rata 13,5 %

rata-rata 10,1 %

*) refers to MP3EI

**) In line with BPS Census 2010

Assumption and Projection of Draft RUKN

2012 - 2031

(9)

Projection Result of Draft RUKN 2012 - 2031

System

Description

Unit

2012

2021

2031

Jawa-Bali

Needs

TWh

130

274

621

Peak Load

GW

23

46

102

Additional Power Plants

capacity

GW

5

41

119

Out side of

Jawa-Bali

Needs

TWh

41

115

454

Peak load

GW

8

23

87

Additional Power Plant

capacity

GW

4

26

118

Indonesia

Needs

TWh

171

389

1.075

Peak Load

GW

31

69

189

Additional power plant

capacity

(10)

Projection of Jawa – Bali

TWh

2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 Kebutuhan tambahan daya (GW) **) 5 8 11 14 18 22 27 31 36 41 46 52 58 65 72 80 88 97 108 119 Kapasitas exsisting (GW) *) 25 24 23 23 22 22 21 21 20 20 19 19 18 18 17 17 16 16 16 15 Kapasitas tahun berjalan (rencana) (GW) 30 32 34 37 41 44 48 52 56 60 65 70 75 81 88 95 103 112 122 133

Beban Puncak (GW) 23 24 26 29 31 34 37 40 43 46 50 54 58 63 68 73 79 86 94 102

Kebutuhan Energi Listrik (TWh) 130 141 153 166 181 197 214 233 253 274 295 319 345 374 405 440 478 521 568 621 0 200 400 600 800 1,000 1,200 0 50 100 150 200 250 300

GW

Additional power need (GW)

Existing capacity (GW)

On going capacity (plan) (GW)

Peak Load (GW)

Electricity energy need

Additional power need per year (20 years)

Average 5.821 MW

Additional power need per year (10 year)

Average 3.827 MW

*) Installed capacity year 2011 experience derating) **) Acumulation

(11)

Projection Out of Jawa – Bali

TWh

2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 Kebutuhan tambahan daya (GW) **) 4 6 7 9 11 13 16 19 23 26 30 35 41 47 55 63 74 86 101 118

Kapasitas exsisting (GW) *) 8 7 7 7 7 7 7 6 6 6 6 6 6 5 5 5 5 5 5 5

Kapasitas tahun berjalan (rencana) (GW) 12 13 14 16 18 20 23 25 29 32 36 40 46 52 59 68 78 90 104 121

Beban Puncak (GW) 8 9 10 11 13 14 16 18 20 23 26 29 33 37 42 48 56 64 74 87

Kebutuhan Energi Listrik (TWh) 41 45 50 56 63 71 80 91 103 115 130 147 167 190 218 250 289 335 389 454 0 200 400 600 800 1,000 1,200 0 50 100 150 200 250 300

GW

Additional power need per year (20 years)

(20 thn)

rata-rata 5.889 MW

Additional power need per year (10 thn)

rata-rata 2.619 MW

*) Kapasitas terpasang tahun 2011 yang mengalami penurunan kemampuan (derating) **) Akumulasi

(12)

*) Kapasitas terpasang tahun 2011 yang mengalami penurunan kemampuan (derating) **) Akumulasi

Additional power need per year (20 thn)

11.710 MW

Average

Additional power need per year (10 thn)

Average 6.447 MW

Projection Indonesia

TWh

2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 Kebutuhan tambahan daya (GW) **) 9 13 18 23 29 36 43 50 59 67 77 87 99 112 126 143 162 183 208 237 Kapasitas exsisting (GW) *) 32 32 31 30 29 28 28 27 26 26 25 24 24 23 23 22 22 21 20 20 Kapasitas tahun berjalan (rencana) (GW) 41 45 49 53 58 64 70 77 85 92 101 110 121 133 147 163 181 202 226 254 Beban Puncak (GW) 31 34 37 40 44 48 53 58 64 69 76 83 91 100 110 122 135 150 168 189 Kebutuhan Energi Listrik (TWh) 171 186 203 223 244 268 294 324 356 389 425 466 512 564 623 690 767 855 957 1,075

0 200 400 600 800 1,000 1,200 0 50 100 150 200 250 300

GW

(13)

ESDM untuk Kesejahteraan Rakyat

Compaarison of Projection Result

2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 RUKN 2008-2027 140 153 166 182 198 217 237 260 285 312 342 376 413 454 499 549 605 667 736 813 Draft RUKN 2010-2029 145 157 169 183 198 215 233 253 274 298 325 353 385 419 458 500 546 597 653 716 Draft RUKN 2012-2031 171 186 203 223 244 268 294 324 356 389 425 466 512 564 623 690 767 855 957 1,075 Realisasi Konsumsi 129 134 147 158 171 0 200 400 600 800 1,000 1,200

El

e

ct

ri

ci

ty

En

e

rg

y

Nee

d

(

TW

h

)

RUKN 2008-2027 Draft RUKN 2010-2029 Draft RUKN 2012-2031 Realisasi Konsumsi

(14)

ESDM untuk Kesejahteraan Rakyat

TWh

Growth (%)

Jenis

BOE

Setara TWh

2012

195

6.9

Batubara

148,356.06

Juta Ton

454,696,488,294

741,756

2013

212

8.5

Gas Bumi

153.38

TSCF

27,547,048

45

2014

231

8.8

Minyak Bumi

7,732.28

Juta Barel

7,732,280,000

12,614

2015

253

9.6

Panas Bumi

29,215.00

Mwe

2,353,215,663

3,839

2016

277

9.6

Air

12,411.20

MW

333,233,273

544

2017

304

9.6

CBM

453.30

TCF

81,412,680

133

2018

333

9.7

2019

366

9.8

2020

402

9.9

2021

438

9.1

2022

479

9.3

2023

524

9.5

2024

575

9.7

2025

633

10.0

2026

698

10.3

2027

773

10.7

2028

858

11.0

2029

955

11.4

2030

1,068

11.8

2031

1,198

12.2

Total

10,769

9.9

465,224,176,958

758,930

Potensi Energi Primer

Tahun

Satuan Asli

Produksi Energi Listrik

Electricity Energy Need vs Primary Energy Potency

*) *)

*) for 20 years and after keep producing power

Year

Year

*) For 20 years and after keep producing power

Electricity Energy

production

Primary Energy Potency

Primary Energy Potency

batubara-coal

Gas bumi-gas

Panas bumi-

geothermal

Air- hydro

CBM

(15)

ESDM untuk Kesejahteraan Rakyat

Referensi

Dokumen terkait

These unwanted (and yet inevitable) scars are the proud automobile owner´s nightmare, but can be easily remedied by way of the talents of a professional auto detailer.. Those long

PENGADAAN PERALATAN JARINGAN KOMPUTER SEKRETARIAT DPRD KOTA MEDAN PADA SEKRETARIAT DEWAN PERWAKILAN DAERAH KOTA

[r]

Berdasarkan hal di atas, terkait tentang penilaian guru terhadap hasil belajar siswa dalam proses pembelajaran matematika sesuai dengan temuan masalah yang ada di

problem in Sidney Sheldon’s If Tomorrow Comes using a feminist perspective. In

Terhadap 3 (tiga) Rekanan dengan Harga Penawaran Terkoreksi terendah akan dilanjutkan dengan Evaluasi Dokumen Penawaran dan Evaluasi Dokumen Kualifikasi.. 250.000.000,00

[r]

[r]