• Tidak ada hasil yang ditemukan

DRPLN-JM dan DRPPHLN

N/A
N/A
Protected

Academic year: 2017

Membagikan "DRPLN-JM dan DRPPHLN"

Copied!
379
0
0

Teks penuh

(1)

   

         

 

 

L

L

i

i

s

s

t

t

 

 

o

o

f

f

 P

 

P

r

r

i

i

o

o

r

r

i

i

t

t

y

y

 

 

E

Ex

xt

te

er

rn

na

al

l

 L

 

Lo

o

an

a

ns

s

 a

 

an

n

d

d

 G

 

Gr

ra

an

nt

ts

s

 

 

(

(

D

D

R

R

P

P

P

P

H

H

L

L

N

N

)

)

 

 

2

2

0

0

0

0

8

8

  

 

 

 

 

 

 

 

 

 

 

M

Miinniissttrryy  ooff  NNaattiioonnaall  DeDevveellooppmmeenntt  PlPlaannnniinngg//   N

(2)
(3)

Foreword

 

 

In

 

the

 

context

 

of

 

endeavours

 

to

 

increase

 

efficiency

 

and

 

effectiveness

 

of

 

the

 

utilization

 

of

 

External

 

Loans

 

and

 

Grants,

 

the

 

government

 

of

 

Indonesia

 

has

 

initiated

 

various

 

reforms

 

in

 

the

 

process

 

of

 

the

 

planning

 

and

 

preparation

 

of

 

projects

 

that

 

are

 

funded

 

by

 

External

 

Loans

 

and

 

Grants.

 

One

 

of

 

such

 

reforms

 

is

 

the

 

annual

 

compilation

 

of

 

the

 

List

 

of

 

Planned

 

Priority

 

External

 

Loans

 

and

 

Grants

 

known

 

(DRPPHLN),

 

and

 

also

 

known

 

as

 

the

 

Green

 

Book.

 

The

 

Green

 

Book

 

is

 

one

 

of

 

the

 

planning

 

documents

 

in

 

the

 

process

 

of

 

planning

 

projects

 

that

 

are

 

funded

 

by

 

external

 

loans/grants,

 

that

 

comprise

 

RKPLN

 

(Borrowing

 

Strategy),

 

the

 

DRPHLN

JM

 

(List

 

of

 

Project

 

Proposal

 

funded

 

by

 

External

 

Loans/Grants

 

for

 

Medium

Term),

 

the

 

DRPPHLN,

 

and

 

the

 

RPK

PHLN

 

(Planned

 

Implementation

 

of

 

External

 

Loans/Grants

 

Activities).

 

The

 

Green

 

Book

 

contains

 

the

 

list

 

of

 

proposed

 

projects

 

that

 

are

 

eligible

 

for

 

being

 

funded

 

by

 

external

 

loans

 

and/or

 

grants.

 

Thereby,

 

the

 

projects

 

in

 

the

 

Green

 

Book

 

are

 

the

 

projects

 

that

 

are

 

contained

 

in

 

the

 

DRPHLN

JM,

 

that

 

have

 

already

 

met

 

most

 

of

 

the

 

readiness

 

criteria

 

and

 

that

 

have

 

already

 

obtained

 

the

 

indicated

 

commitment

 

from

 

the

 

prospective

 

development

 

partners.

 

The

 

DRPPHLN

 

is

 

to

 

become

 

the

 

guideline

 

for

 

preparing

 

the

 

subsequent

 

Annual

 

Government

 

Work

 

Plan.

 

The

 

2008

 

Green

 

Book

 

contains

 

139

 

proposed

 

projects

 

in

 

the

 

total

 

amount

 

of

 

USD

 

4.97

 

billion,

 

consisting

 

of

 

56

 

proposed

 

projects

 

totalling

 

USD

 

4.59

 

billion

 

and

 

83

 

proposed

 

technical

 

assistance

 

projects

 

totalling

 

USD

 

0.38

 

billion.

 

These

 

proposals

 

originate

 

from

 

ministries/government

 

agencies

 

(128

 

projects),

 

regional

 

governments

 

(5

 

projects),

 

and

 

state

owned

 

enterprises

 

(6

 

projects).

 

The

 

prospective

 

development

 

partners

 

that

 

have

 

already

 

indicated

 

their

 

funding

 

commitment

 

comprise

 

23

 

prospective

 

development

 

partners,

 

consisting

 

of

 

7

 

prospective

 

multilateral

 

development

 

partners,

 

and

 

16

 

prospective

 

bilateral

 

development

 

partners.

 

(4)

‐ ii ‐ 

planning

 

material,

 

specifically

 

for

 

activities

 

that

 

are

 

funded

 

by

 

external

 

loans/grants.

 

Thereby,

 

it

 

can

 

optimise

 

the

 

utilization

 

of

 

various

 

development

 

funds

 

that

 

can

 

thus

 

enhance

 

the

 

welfare

 

of

 

the

 

people.

 

 

State

 

Minister

 

for

 

National

 

Development

 

Planning/

 

Chairman

 

of

 

the

 

National

 

Development

 

Planning

 

Agency.

 

 

Paskah

 

Suzetta

 

(5)

LIST

 

OF

 

PROJECT

 

ASSISTANCE

 

 

Indonesian

 

Maritime

 

Safety

 

and

  

Security

 

Agency

1. The Development of Command Center Base on Global Maritime Distress Safety 

System (GMDSS) ...3

National

 

Disaster

 

Management

 

Agency

  

(NDMA)

2. Procurement of Equipment for Emergency Phase and Post Disaster Phase ...7

National

 

Narcotic

 

Board

3. One Stop Center for Therapy and Rehabilitation for Drug Abuser ...11

Statistics

 

Indonesia

 

Agency

 

(BPS)

4. Statistical Capacity Building Program (STATCAP) for Indonesia ...17

National

 

Search

 

and

 

Rescue

 

(SAR)

 

Agency

 

(BASARNAS)

5. Procurement of Search and Rescue Aircraft Project ...21

Ministry

 

of

 

Home

 

Affairs

6. National Programme for Community Empowerment in Rural Areas Project (IFAD  Support to PNPM) ...25

7. National Programme for Community Empowerment in Rural Areas Project (PNPM  Rural) ...27

8. Simeuleu Physical Infrastructure ...29

Ministry

 

of

 

Marine

 

Affairs

 

and

 

Fisheries

9. Development of the Inspection Boat System for Indonesian Fisheries (Phase I)...33

Ministry

 

of

 

Health

10. Improvement of H. Adam Malik Hospital ...37

11. Strengthening of Teaching Hospitals in Indonesia...39

(6)

‐ iv ‐ 

13. Indonesia Infrastructure Financing Facility (IIFF)...45

14. Project for Indonesian Tax Administration Reform (PINTAR) ...47

Ministry

 

of

 

Public

 

Works

Directorate General of Highways 15. Additional Loan for Suramadu Brigde Construction Project...51

16. Padang By Pass Capacity Expansion...52

17. National Programme for Community Empowerment in Urban Areas Project (PNPM  Urban)...54

Directorate General of Human Settlements 18. Regional Solid Waste Development for Maminasata, South Sulawesi ...57

19. Rural Infrastructure Support for National Programme for Community Empowerment  Project (RIS‐PNPM) ...59

20. National Programme for Community Empowerment in Urban Areas Project (Support  to PNPM)...61

21. Urban Water Supply and Sanitation Project...63

Directorate General of Water of Water Resources 22. Countermeasure for Sediment in Wonogiri Multipurpose Dam Reservoir ...65

23. Dam Operation and Safety Improvement Project ...67

24. Integrated Citarum Water Resources Management Program (Trance I)...69

25. Non Structural Measures and Urgent Mitigation for Jakarta Flood Control ...71

26. Urban Flood Control System Improvement in Selected Cities ...73

Ministry

 

of

 

National

 

Education

27. Development and Upgrading of Sebelas Maret University (UNS) Project, Surakarta ...77

28. Development and Upgrading of State University of Semarang (UNNES) Project ...79

29. Development and Upgrading of State University of Yogyakarta ...81

30. Development of Bandung Institute of Technology ...83

31. Development of Centers for Medical Education and Medical Research in the Faculty  of Medicine University of Indonesia ...85

(7)

Ministry

 

of

 

Transportation

Directorate General of Sea Transportation

33. Belawan Port Development ...91

34. Improvement of Port Security System...93

35. Indonesia Ship Reporting System ...94

36. Vessel Traffic Services (VTS) System...96

Directorate General of Civil Aviation 37. Procurement of Airport Rescue and Fire Fighting Equipment ...98

Directorate General of Railway 38. Procurement of Railway Track Construction and Maintenance Machinery ...100

39. Procurement of 1000 km Track Material and 200 Units Turn Out...101

40. Railway Double Tracking on Java South Line Project (Phase II‐Stage III)...103

Ministry

 

of

 

Defense

41. Improvement of Aeromedical Hospital ...107

42. Procurement of Mobile Hospital and Hospital Equipment...110

Ministry

 

of

 

Agricultural

43. Combating Avian Influenza in the Field of Veterinary Medicine ...115

44. Drip Irrigation Development for Horticultural Production through Shallow  Groundwater ...117

Indonesian

 

National

 

Police

45. Integrated Trunking Radio Communication for Indonesian National Police...121

46. Procurement of Hospital Equipment and Mobile Hospital...123

Indonesian

 

Institute

 

of

 

Science

47. Animal Husbandry Technology and Practice Improvement to Accelerate Meat and  Milk Production (Meat‐Milk Pro) ...127

(8)

‐ vi ‐ 

49. Construction of Jakarta Mass Rapid Transit Project Phase I ...137

Local

 

Government

 

of

 

Riau

 

Province

50. Southern Pekanbaru Water Supply Development Project ...141

State

 

Electricity

 

Company

  

(PT.

 

PLN)

51. Additional Loan for Labuan Angin Coal Fired Power Plant 2x115 MW North  Sumatera ...145

52. Java Sumatera Transmission Line ‐ Engineering and Supervision Services ...146

53. Kusan Hydro Electric Power Plant 63 MW ...147

54. Parit Baru Steam Power Plant ...148

55. Takalar Steam Coal Power Plant (2 x 100 MW) in South Sulawesi ...150

(9)

LIST

 

OF

 

TECHNICAL

 

ASSISTANCE

 

 

National

 

Disaster

 

Management

 

Agency

 

(NDMA)

1. Disaster Information Sharing System for Emergency Response ... 155

2. Emergency, and Humanitarian Program (E&HP)... 157

3. Enhanced Humanitarian Response ... 159

Assessment

 

and

 

Aplication

 

of

 

Technology

 

Agency

 

(BPPT)

4. Microturbine Cogeneration Technology Application Project... 163

Statistics

 

Indonesia

 

Agency

 

(BPS)

5. Capacity Building on Dissemination and Use of Small Area Statistics for 2010 

Population Cencus in Indonesia ... 167

Ministry

 

of

 

Religius

 

Affair

6. Supporting Islamic Leadership through Islamic Institutions of Higher Education 

(SILE)... 171

Ministry

 

of

 

Home

 

Affairs

7. Support for Community Facilitator PNPM... 177

8. Support for PNPM Generasi ... 179

Ministry

 

of

 

Energy

 

and

 

Mineral

 

Resources

9. Barrier Removal to the Cost Effective Development and Implementation of Energy  Efficiency Standards and Labeling Project ... 183

10. Development of Electrical Technician Competency Standards and Guidelines ... 185

11. Energy Conservation and Efficiency Improvement... 187

12. The System Design and Establisment of Distribution Control System for 

Optimizing Management in Semarang and Bekasi (Phase II) ... 188

Ministry

 

of

 

Forestry

13. Comprehensive Approach for Conservation and Restoration of Ecosystems in 

Protected Areas ... 193

14. Strategy for Strengthening Biodiversity Conservation through Appropriate 

(10)

‐ viii ‐ 

15. Assistance for Small and Medium Entreprises (SMEs) in Fish and Shrimp Industry...199

16. Sustainable Indonesia Fisheries Product Competitiveness ...201

Ministry

 

of

 

Health

17. Health Policy Advisor ...205

18. Policy Analysis and Formulation in the Health Sector ...206

19. Strengthening Surveillance and Response to Avian and Pandemic Influenza ...208

Ministry

 

of

 

Finance

20. Long Term Training (Tax Administration and Financial Accounting)...213

21. Practical Knowledge of Foreign Affairs and International Cooperation ...214

Ministry

 

of

 

Communication

 

and

 

Information

 

Technology

22. IT Expert Advisory Mission...217

23. Support PNPM Communication Strategy ...218

Ministry

 

of

 

Public

 

Works

Agency for Research and Development

24. Capacity Development for River Basin Organizations (RBOs) in Practical Water 

Resources Management and Technology ...223

Directorate General for Highways

25. Road Policy Advisor ...225

Directorate General for Water Resources

26. Integrated Disaster Mitigation Management for Banjir Bandang...226

27. Integrated Water Resources Management in Jabodetabek and Its Surrounding Area ...228

28. Water Resources Policy Advisor ...230

Ministry

 

of

 

National

 

Education

29. Delivering Better Education...235

30. Enhancement of Global Carbon Sequestration Potential from Indonesian Tropical 

Forest (Phase II) ...237

(11)

 

Ministry

 

of

 

Trade

32. Increasing the Capability of Mastering Chinese Language for Small and Medium 

Enterprises (SMEs) and Government Officials ... 243

33. Multi Donor Facility (MDF) for Trade and Business Climate... 244

34. Trade and Support Programme II ... 246

Ministry

 

of

 

Transportation

Directorate General of Land Transportation 35. Integrated Public Transportation Master Plan for the Bandung Metropolitan Area... 251

36. Program for Improvement of Transport System in Medium‐Sized Cities... 253

Directorate General of Sea Transportation 37. New Public Private Partnership Strategy for Port Developmnet and Management ... 254

38. Port Security Management Project (Phase II)... 256

39. Port Security System Improvement Project (Phase II) ... 258

40. Project for Improvement of Maritime Transport Safety ... 259

41. Project for Shipping and Sea Transportation Improvement (Phase‐2) ... 261

42. Strengthening Maritime Safety and Security Especially for Anti Piracy and Anti  Maritime Terrorism ... 263

Directorate General of Civil Aviation 43. Introduction of New CNS/ATM System... 264

44. Project for Strengthening Capacity on Ensuring Safe and Efficient Aircraft  Operations ... 265

Directorate General of Railways 45. Bandung Urban Railway Transport Development, Electrification Padalarang ‐  Cicalengka Line (Phase I: Engineering Services)... 266

46. Improvement of Railway Safety Management (Phase II)... 268

(12)

‐ x ‐ 

48. Assesment of Indonesia Shipbuilding Industry...273

49. Centre of Excellence for Food and Beverages Industry Development...274

50. Cooperation in Welding Sector ...275

51. Enhancing Capabiity of Mould and Dies Center ...277

52. Enhancing SME Competitiveness through Implementation of SME Product  Standardization ...279

53. Implementing One Village One Product (OVOP) ...281

54. Strengthening Cluster of Small and Medium Enterprise in Indonesia ...283

55. Support for Standardization of Electronic Products...284

Ministry

 

of

 

Agriculture

56. Improvement of Contermeasure on the Productive Diseases of Dairy Cattle ...289

57. Strengthening Plant Varietas Protection in Indonesia...291

Indonesian

 

National

 

Police

58. Project for Support Program for Reform of Indonesian National Police ...295

Indonesian

 

Institute

 

of

 

Science

59. Assistance in Establishing Research Laboratory for Energy, Environment, and  Natural Substances ...299

Policy

 

Agency

 

for

 

Government

 

Good/Service

 

Procurement

 

(LKPP)

60. Electronic Government Procurement Infrastructure Development Technical  Advisory...303

(13)

 

Ministry

 

of

 

National

 

Development

 

Planning/

 

National

 

Development

 

Planning

 

Agency

 

(BAPPENAS)

62. Aid Information Management System ... 311

63. Capacity Building in Trade Liberazation Analysis ... 313

64. Decentralization Support Facility (DSF)... 315

65. Delivery Improvement and Local Governance (DIALOG)... 317

66. Enhancing Capacity for Better Aid Management (ECBAM)... 319

67. Environmental Governance and Sustainable Livehoods Programme in Sulawesi,  Indonesia... 321

68. Indonesia Slum Alleviation Policy and Action Plan (SAPOLA) ... 323

69. Indonesia Water and Sanitation Policy and Action Planning Facility (Phase III) ... 325

70. Innovation Policy Framework for Small and Medium Enterprises ... 327

71. Long Term Finance Security for National Backbone Infrastructure Development ... 330

72. Monitoring and Evaluation System ... 332

73. Planning and Bugeting Reform ... 334

74. Rice Fortification for the Poor ... 336

75. Strengthening Capacity to Improve Aid Effectiveness... 338

76. Support to Delivering Services to Poor Community ... 340

77. Support for Management Information System (MIS) PNPM ... 342

78. Support on Implementation of Medium Term Expenditure Framework and  Performance Based Budgeting... 344

79. Support to Bappenas in Mainstreaming Climate Change Issue into Development  Plan... 346

80. Support to Election 2009 ... 348

Local

 

Government

 

of

 

Maluku

 

Province

81. Technical Support for Strengthening the Regional Based Education Management ... 355

Local

 

Government

 

of

  

South

 

Sulawesi

 

Province

82. Regional Development Policy Advisor in Sulawesi Region ... 359

(14)
(15)
(16)
(17)

 

Indonesian

 

Maritime

 

Safety

 

and

  

Security

 

Agency

 

(18)
(19)

 

GB ID :  GBP1‐07‐10601‐0800‐072001 

1. Project Title  :  The Development of Command Center Base on Global Maritime  Distress Safety System (GMDSS) 

2. Project Type  :  Project Assistance 

3. Executing Agency  :  Indonesian Maritime Safety and Security (BAKORKAMLA)  4. Implementing Agency  :  Indonesian Maritime Safety and Security 

5. Duration  :  24 months 

6. Location  :  DKI Jakarta 

 

7. Objectives 

The development of maritime surveillance integration goal for enhancing capability of maritime  surveillance, safety and control system in Indonesia throughout:  

a. Upgrading National Picture Compilation (NPC) command center Bakorkamla through  integration all kind of maritime communication; 

b. Collecting rescue signal from shipwreck via regional coast station at Bakorkamla NPC  Command Center in Jakarta; 

c. Commanding the strategic operation to concerned maritime authorities for immediate  rescue action; 

d. More effective utilization of national facilities/property (vessel, communication system etc).  As well as know how diffused maritime authorities in Indonesia; 

e. Formulating regulation and know how on more effective and efficient rescue operations; 

f. Development of human resources capability on handling of integration maritime safety  handling in Indonesia 

 

8. Scope of Projects 

The development of the integrated maritime surveillance system consist : gathering of maritime  intelligence such as detecting and monitoring of all vessels in certain area monitoring of  previous vessels that have been detected, protecting marine resources, detecting of piracy, and  take  an action against piracy,  detect and monitoring illegal fishing, illegal  immigration,  monitoring activity of foreign state port and execute certain action , detect and monitor oil spill 

b. Coordination with other related agencies  c. Project implementation training 

(20)

P‐4   

10. Funding Source 

Implementing Agency  Foreign Funding(US $ 000)  Local Funding(US $ 000)  Total of Funding (US $ 000)  Remarks 

Secretariate of Indonesian  Maritime Security  Coordinating Board 

18,000  ‐  18,000  Japan  (JICA) 

Total  18,000  ‐  18,000   

 

11. Disbursement Plan 

Disbursement Plan (US $ 000) 

1st  2nd  3rd  4th  5th  Total 

10,000  8,000        18,000 

 

12. Funding Allocations 

Categories (US $ 000)  Detail of Activities 

Services  Construct‐

ions  Goods  Trainings  Others 

a. Study      3,000 

b. Coordination with other  agencies 

3,000         

c. Project implementation  training 

      2,000   

d. Procurement      7,000     

Total  3,000    7,000  2,000  3,000 

 

13. Project References : 

BB 2006 ‐ 2009 ID: P1‐07‐10601‐0202‐072001   

(21)

 

(22)
(23)

 

GB ID :  GBP1‐03‐10301‐0800‐077004 

1. Project Title  :  Procurement of Equipment for Emergency Phase and Post Disaster  Phase 

2. Project Type  :  Project Assistance 

3. Executing Agency  :  National Disaster Management Agency (NDMA)  4. Implementing Agency  :  National Disaster Management Agency 

5. Duration  :  48 months 

Procurement of equipment   

9. Activities 

Activities  Implementation Locations  Project Implementation Units 

a. Need Assessment 

b. Procurement of equipment 

c. Training 

d. Monitoring and evaluation 

Central and Province  NDMA 

 

10. Funding Source 

Implementing 

11. Disbursement Plan 

Disbursement Plan (US $ 000) 

1st  2nd  3rd  4th  5th  Total 

1,500  3,500  3,500  1,500    10,000 

 

12. Funding Allocations 

Categories (US $ 000)  Detail of Activities 

Services  Constructions Goods  Trainings  Others 

(24)
(25)

   

(26)
(27)

 

GB ID :  GBP1‐05‐06600‐0700‐062013 

1. Project Title  :  One Stop Center for Therapy and Rehabilitation for Drug Abuser 

2. Project Type  :  Project Assistance 

3. Executing Agency  :  National Narcotic Board  4. Implementing Agency  :  National Narcotic Board 

5. Duration  :  24 months 

d. To increasing staff knowledge and skill about treatment and rehabilitation; 

e. To increasing efficiency and effectiveness of treatment and rehabilitation services as follow  of treatment and rehabilitation trend; 

f. To actualize a free Indonesia from drug abuse and illegal distribution at 2015.  Development of Center of Rehabilitation adopts treatment and rehabilitation methods to solve  the nature and behavior Drug Abuser from substantial perspective, treatment method and  victim age classification. 

 

9. Activities 

Activities  Implementation Locations 

Project  Implementation 

Units 

a. Supply of Mini‐Lab. Equipment 

b. Narcotics laboratory Information System,  BNN Head quarter data center & 17 Sites 

c. NLIS software system 

d. NLIS Web system Construction 

e. NLIS Hardware system    

BNN Headquarter, Jakarta,  Surabaya, Medan, 

Semarang, Bandung,  Makassar, Manado,  Denpasar, Batam, Jayapura,  Ambon, Banjarmasin,  Pontianak, Samarinda  Palembang, Banda Aceh 

(28)

P‐12   

Activities  Implementation Locations 

Project  Implementation 

Units 

g. Development of security system whish  consist of  connectivity monitoring center  between INP and BNN 

National  Narcotic Board  and Indonesian  National Police 

h. Centralized Operation Center 

i. Backbone networks 

j. Desktop PCs  including completion report 

o. Assisting the Project Management Unit 

p. Supervision & other consulting services 

Nation Wide 

BNN Headquarter, Jakarta,  Surabaya, Medan, 

Semarang, Bandung,  Makassar, Manado,  Denpasar, Batam, Jayapura,  Ambon, Banjarmasin,  Pontianak, Samarinda  Palembang, Banda Aceh 

National  Narcotic Board 

 

10. Funding Source 

Implementing 

11. Disbursement Plan 

Disbursement Plan (US $ 000) 

1st  2nd  3rd  4th  5th  Total 

4,500  6,650  5,500      16,650 

 

12. Funding Allocations 

Categories (US $ 000)  Detail of Activities 

Services  Construct

ions  Goods  Trainings  Others 

a. Procurement of medical  equipment , security and  operation system 

    10,847     

b. Project management :  Management support and  Factory inspection 

2,286         

(29)

 

GB ID :  GBP1‐05‐06600‐0700‐062013   

Categories (US $ 000)  Detail of Activities 

Services  Construct

ions  Goods  Trainings  Others 

c. Installation & Training :  System installation and  Training 

      1,553   

d. Operation & Maintenance  support : 2 years operation and  maintenance support 

    1,439     

e. Consultant fee, contingency  cost, Service charge 

        525 

Total  2,286    12,286  1,553  525 

 

13. Project References : 

(30)
(31)

 

Statistics

 

Indonesia

 

Agency

 

(BPS)

 

(32)
(33)

 

GB ID :  GBP1‐03‐05401‐0800‐074009 

1. Project Title  :  Statistical Capacity Building Program (STATCAP) for Indonesia 

2. Project Type  :  Technical Assistance 

3. Executing Agency  :  Statistics Indonesia Agency (BPS)  4. Implementing Agency  :  Statistics Indonesia Agency 

5. Duration  :  60 months 

6. Location  :  Nation Wide 

 

7. Objectives 

a. To improve the accuracy of statistics produced by BPS; 

b. To improve data consistency between collections; 

c. To improve the confidence of users in the statistics produced by BPS; 

d. To improve the productivity of BPS staff through better information and communication  technology; 

e. To improve the skills and professionals of BPS staff.   

8. Scope of Projects  

a. Improvement of data collection, compilation and dissemination. 

b. Investment in ICT infrastructure and information management. 

c. Human resource capacity development. 

d. Project management and administration support.   

a. Improving Statistical Quality 

b. Analysis, Quality Assurance and  Methodological Innovations 

c. Dissemination, User Engagement and  Communication Strategy 

d. Data Warehouse Development and Network  Improvement 

e. Aplication of Geospatial Technology 

f. Corporate Information Systems Management 

g. Upgrading of ICT Capabilities in Selected  Model BPS Field Offices 

h. Technical Training on Human Resource  Capacity Development 

i. Building Profesional Exxelence 

j. Project Management and Adminsitration  Support 

Nation Wide  Statistical Indonesia  Agency (BPS) 

(34)

P‐18 

11. Disbursement Plan 

Disbursement Plan (US $ 000) 

1st  2nd  3rd  4th  5th  Total 

9,409.5  9,663.0  11,028.8  13,147.2  10,386.5  53,635 

 

12. Funding Allocations 

Categories (US $ 000)  Detail of Activities 

Services  Constructions Goods  Trainings  Others 

a. Improving Statistical Quality  6,824.2  ‐  630.5  746.0  1,160.4 

b. Analysis, Quality Assurance  and Methodological  Innovations 

1,624.5  ‐  ‐  ‐  927.5 

c. Data warehouse 

development and network  improvement 

85.0  ‐  ‐  38.7  21‐ 

d. Data Warehouse 

Development and Network  Improvement 

2,762.8  ‐  18,057.0  267.9  ‐ 

e. Aplication of Geospatial  Technology 

463.4  ‐  4,03‐  328.9  ‐ 

f. Corporate Information  Systems Management 

735.0  ‐  ‐  ‐  ‐ 

g. Upgrading of ICT  Capabilities in Selected  Model BPS Field Offices 

1,865.7  ‐  1,00‐  ‐  ‐ 

h. Technical Training on  Human Resource Capacity  Development 

1,024.4  ‐  ‐  4,375.0  ‐ 

i. Building Profesional  Exxelence 

832.0  ‐  466.7  ‐  663.5 

(35)

 

(36)
(37)

  operations for flight and shipping accidents with a sufficient equipments. 

b. To strengthen the skill and capability of the rescue team in operating the aircraft and  helicopter for the rescue operation.   

 

8. Scope of Projects  

Procurement of aircraft and helicopter   

9. Activities  

Activities  Implementation Locations  Project Implementation Units  Procurement of aircraft and 

helicopter 

DKI Jakarta  National Search and Rescue  (SAR) Agency (BASARNAS)   

10. Funding Source 

Implementing  BASARNAS  42,500  7,500  50,000  Commercial 

Loan 

Total  42,500  7,500  50,000   

 

11. Disbursement Plan 

Disbursement Plan (US $ 000) 

1st  2nd  3rd  4th  5th  Total 

20,000  30,000        50,000 

 

12. Funding Allocations  

Categories (US $ 000)  Detail of Activities 

Services  Constructions Goods  Trainings  Others  Procurement of aircraft and 

(38)
(39)

 

Ministry

 

of

 

Home

 

Affairs

 

(40)
(41)

 

4. Implementing Agency  :  Directorate General of Community and Village Empowerment,  Ministry of Home Affairs 

To empower Indonesia’s diverse rural communities to be actively participated in development  through identifying their own needs and how to fulfill them with the resources they have to  improve their welfare. 

 

8. Scope of Projects  

a. To  support  the  National  Program  for  Community  Empowerment  (PNPM)‐rural  in  community development, local institutional building and gender. 

b. To develop analytical capacity for formulation of pro‐poor policies and approaches in the  implementing agency. 

c. To support livelihood improvement and facilitation in Papua and West Papua   

9. Activities 

Activities  Implementation Locations  Project Implementation Units 

a. Provision of block grant to  the community  

Central and districts level 

b. Community Empowerment  and provision of facilitators 

All kecamatans 

Central and provincial level 

c. Goods, consultants services,  training, & workshops 

All level (central, province, districts, & subdistricts) 

Central level 

 

10. Funding Source 

Implementing Agency Foreign Funding (US $ 000) 

11. Disbursement Plan 

Disbursement Plan (US $ 000) 

(42)

P‐26   

12. Funding Allocations 

Categories (US $ 000)  Detail of Activities 

Services  Construct

ions  Goods  Trainings  Others 

a. Provision of block grant to the  community 

  21,161.1       

b. Community Empowerment and  provision of facilitators 

29,896.2         

c. Goods, consultants services,  training, & workshops 

      17,073.7   

d. Increamental operating costs      400.0 

Total  29,896.2  21,161.1    17,073.7  400.0 

 

13. Project References : 

BB 2006 ‐ 2009 ID: P1‐01‐01005‐1190‐073011    

(43)

 

4. Implementing Agency  :  Directorate General of Community and Village Empowerment,  Ministry of Home Affairs 

5. Duration  :  24 months 

6. Location  :  Nation Wide 

 

7. Objectives 

To empower Indonesia’s diverse rural communities to be actively participated in development  through identifying their own needs and how to fulfill them with the resources they have to  improve their welfare. 

 

8. Scope of Projects  

a. To promote community participation in development planning and management. 

b. To fill infrastructure gap as well as to promote more efficient delivery of services to the  rural communities. 

c. To develop local government capacities in the formulation and implementation of pro‐poor  policies and approaches. 

 

9. Activities 

Activities  Implementation Locations  Project Implementation Units 

a. Provision of block grant to  the community  

Central and districts level 

b. Community Empowerment  and provision of facilitators 

All kecamatans 

Central and provincial level 

c. Goods, consultants services,  training, & workshops 

All level (central, province, districts, & subdistricts) 

Central level 

 

10. Funding Source 

Implementing Agency Foreign Funding (US $ 000) 

11. Disbursement Plan 

Disbursement Plan (US $ 000) 

(44)

P‐28   

12. Funding Allocations *) 

Categories (US $ 000)  Detail of Activities 

Services  Construct

ions  Goods  Trainings  Others 

a. Provision of block grant to the  community 

         

b. Community Empowerment and  provision of facilitators 

         

c. Goods, consultants services,  training, & workshops 

         

d. Increamental operating costs       

Total           

*) Data not available   

13. Project References : 

BB 2006 ‐ 2009 ID: P1‐01‐01005‐1190‐073011    

(45)

 

GB‐ID : GBP1‐03‐01002‐0800‐067490 

1. Project Title  :  Simeuleu Physical Infrastructure 

2. Project Type  :  Project Assistance 

3. Executing Agency  :  Ministry of Home Affairs (MoHA) 4. Implementing Agency  :  Local Government of Simeulue District 

5. Duration  :  36  months 

6. Location  :  Simeuleu, Nangroe Aceh Darussalam

 

7. Objectives 

a. To increase human resources mastering general knowledge and technology for plantation  farmer community. 

b. To  increase  the  facilities  and  infrastructure  as  the  motivator  for  the  growth  of  plantation/agriculture and trading sector. 

c. To strengthen the structure of plantation/agriculture and trading sector in order to boost  the economic growth. 

d. To create the business atmosphere conducive in the development of plantation/agriculture  and trading sector. 

1) Palm Plantation 

2) Palm Oil Factory 

b. Equipment for palm oil factory 

c. Furniture 

d. Consultancy (Project Design Supervision Consultant/PDSC and Financial Auditor) 

e. PMU 

Simeulue District, NAD  Province 

Local Government of  Simeulue District 

(46)

P‐30   

10. Funding Source 

Implementing 

of Simeulue District 

15,000  ‐  15,000  IDB 

Total  15,000  ‐  15,000   

 

11. Disbursement Plan 

Disbursement Plan (US $ 000) 

1st  2nd  3rd  4th  5th  Total 

2,084  6,105  5,447      13,636 

 

12. Funding Allocations 

Categories (US $ 000)  Detail of Activities 

Services  Constructions Goods  Trainings  Others 

(47)

 

Ministry

 

of

 

Marine

 

Affairs

 

and

 

Fisheries

 

(48)
(49)

 

4. Implementing Agency  :  Directorate General for Marine and Fisheries Resources  Surveillance and Controlling, Ministry of Marine Affairs and  Fisheries 

5. Duration  :  24 months 

6. Location  :  Nation Wide 

 

7. Objectives 

a. To  establish the  facilities  and  infrastructures for surveillance  and  control  of marine  resources and fisheries (fishing inspection vessels which have the capability to support law  enforcement in fishery) ; 

b. To optimize surveillance and control of marine resources and fisheries; 

c. To improve endeavor of combating Illegal, Unreported, and Unregulated (IUU) fishing  effectively. 

e. Technology transfer to local shipyard 

f. Project administration   

a. Survey, analysis data and information 

b. Development of 12 units inspection boats type A 

c. Supervisor 

d. Training 

e. Technology transfer to local shipyard 

f. Project administration 

DKI Jakarta  Directorate of   Surveillance Facility  and Infrastructure 

(50)

P‐34   

10. Funding Source 

Implementing 

77,000  10,000  87,000  Commercial  Loan 

Total  77,000  10,000  87,000   

 

11. Disbursement Plan 

Disbursement Plan (US $ 000) 

1st  2nd  3rd  4th  5th  Total 

21,000  57,000        78,000 

 

12. Funding Allocations 

Categories (US $ 000)  Detail of Activities 

Services  Construct

(51)

 

Ministry

 

of

 

Health

  

(52)
(53)

 

a. Building construction 

b. Procurement of hospital equipment   

b. Procurement of hospital equipment 

RSUP H. Adam Malik  Medan 

RSUP H. Adam Malik  Medan 

 

10. Funding Source 

Implementing 

11. Disbursement Plan 

Disbursement Plan (US $ 000) 

1st  2nd  3rd  4th  5th  Total 

18,901   18,901        37,802 

 

12. Funding Allocations  

Categories (US $ 000)  Detail of Activities 

Services  Constructions  Goods  Trainings  Others 

a. Consultant employee  710         

b. Medical equipment      20,912     

c. Installation of medical  equipment 

  1,098       

d. Non medical equipment      5,000     

e. Training of medical equipment        1,083   

(54)

P‐38   

Categories (US $ 000)  Detail of Activities 

Services  Constructions  Goods  Trainings  Others 

g. Operation and maintenance      300 

h. Construction of building    4,400       

i. Tax and duties      2,982 

j. Contigency      1,166 

k. Service charge      30 

Total  830  5,498  25,912  1,083  4,478 

       

13. Project References : 

(55)

 

a. Dr.Zainoel Abidin Hospital, Aceh,  

b. H. Adam Malik Hospital, Medan,  

c. Dr. Mohammad Hoesin Hospital,  Palembang,  

d. RSAB Harapan Kita, Jakarta,  

e. Jantung Harapan Kita Hospital, Jakarta, 

f. Persahabatan Hospital, Jakarta,  

g. Dr. Ciptomangunkusumo Hospital,  Jakarta,  

h. Dr. Soeradji Tirtonegoro Hospital,  Klaten,  

i. Sanglah Hospital, Denpasar,  

j. Dr. Prof. R.D. Kandou Hospital,  improving targeted hospitals in Indonesia. The scope consists of the following:  

a. procurement of equipment and materials, installation of the equipment and materials,  testing and commissioning  

b. training;  

c. operation and maintenance;    

a. Procurement of medical equipment ,installation  of the equipment and materials, testing and  commissioning 

b. Training 

c. Operation and maintenance; 

11 Teaching 

10. Funding Source 

(56)

P‐40   

11. Disbursement Plan 

Disbursement Plan (US $ 000) 

1st  2nd  3rd  4th  5th  Total 

10,000  4,000  3,500      17,500 

 

12. Funding Allocations 

Categories (US $ 000)  Detail of Activities 

Services  Constructions  Goods  Trainings  Others 

a. Procurements of   Medical Equipment 

    12,600     

b. Renovation of  Hospital Facilities 

  3,500       

c. Trainings program        560   

d. Maintenances  840         

Total  840  3,500  12,600  560   

 

13. Project References : 

(57)

  hospital for North Sulawesi province and its surrounding provinces. Specifically, to upgrade  central medical unit to Manado hospital to perform its capability as appropriate class B referral 

a. Building construction 

b. Procurement of medical and non medical equipment   

9. Activities 

Activities  Implementation Locations  Project Implementation  Units 

10. Funding Source 

Implementing 

11. Disbursement Plan 

Disbursement Plan (US $ 000) 

1st  2nd  3rd  4th  5th  Total 

11.751  17.531  7.321      36,603 

(58)

P‐42   

12. Funding Allocations 

Categories (US $ 000)  Detail of Activities 

Services  Constructions Goods  Trainings  Others 

a. Consulting  750         

b. Medical equipment      18,001     

c. Installation of medical  equipment 

  1,768       

d. Non medical equipment     5,750     

e. Training of medical  equipment 

      1,450   

f. Project Management  294         

g. Operation and  Maintenance 

        578 

h. Construction    4,100       

i. Tax and Duties      2,731 

j. Contigency      1,152 

k. Service charge      29 

Total  1,044  5,868  23,751  1,450  4,490 

 

13. Project References : 

(59)

 

Ministry

 

of

 

Finance

 

(60)
(61)

 

GB‐ID : GBP1‐02‐01510‐0800‐074015 

1. Project Title  :  Indonesia Infrastructure Financing Facility (IIFF) 

2. Project Type  :  Project Assistance 

3. Executing Agency  :  Ministry of Finance 

4. Implementing Agency  :  Directorate of State Asset Management, Ministry of Finance 

5. Duration  :  12 months 

6. Location  :  DKI Jakarta 

 

7. Objectives 

a. Offer particular financial products and advisory services; 

b. Overcome the current gaps in the financial sector; 

c. Undertake risk analysis and classify and allocate risk appropriately; 

d. Complement the role of the existing non‐bank financial institutions and banks; 

e. Attract private long term funds into infrastructure project; 

f. Apply an allocation and evaluation system that is transparent, consistent, and efficient; 

g. Promote the development of long term local bond market; 

h. Develop expertise in a structured infrastructure financing; 

i. Develop  partnership  between  the  Government  and private sector  in ownership and  management; 

j. Assist the Government in undertaking policy reforms; 

k. Create a pool of talent that is specialized in infrastructure financing; 

l. Catalyze private sector financing to commercially viable infrastructure project.   

8. Scope of Projects  

The IIFF is a financing institution established particularly for financing commercially viable  infrastructure projects.  Various types of financing that can be done by IIFF include: 

a. Loan and debt financing; 

b. Re‐financing; 

c. Credit enhancement; 

d. Subordinated debt; 

e. Swap facilities; 

f. Equity financing. Project and policy advisory services; 

g. Other activities maybe necessary and demanded by the market.   

9. Activities 

Activities  Implementation Locations  Project Implementation Units  Sub ordinated Loan  DKI Jakarta  Directorate of State Asset Management   

10. Funding Source 

(62)

P‐46   

11. Disbursement Plan 

Disbursement Plan (US $ 000) 

1st  2nd  3rd  4th  5th  Total 

200,000      200,000 

 

12. Funding Allocations 

Categories (US $ 000)  Detail of Activities 

Services  Constructions Goods  Trainings  Others 

Sub ordinated Loan  200,000         

Total  200,000         

 

13. Project References : 

(63)

 

GB‐ID : GBP1‐02‐01504‐0800‐074016 

1. Project Title  :  Project for Indonesian Tax Administration Reform (PINTAR) 

2. Project Type  :  Project Assistance 

3. Executing Agency  :  Ministry of Finance 

4. Implementing Agency  :  Directorate of State Asset Management, Ministry of Finance 

5. Duration  :  24 months 

6. Location  :  DKI Jakarta 

 

7. Objectives 

Enhanced the effectiveness of tax collection administration/overall DGT productivity, increase  the accuracy of data collected and reported to MOF, increase revenue, strengthen complienced  and widen the tax base. 

 

8. Scope of Projects  

The Project for Indonesian Tax Administration Reform (PINTAR) is a four years enhancement  designed  to  enhance  taxpayer  services,  increase  revenue  by  improving  on  Registration,  electronically auditing  all  inbound tax  returns,  improving accountability and accounting  performance by incorporating a national tax ledger, improve electronic document handiling,  implementing  a  completely  automated  audit  subsystem  capable  of  improving  taxpayer  compliance  and  accountability,  and  enhancing  enforced  collections.  Human  resources  management and the ability to manage, train, provide incentives, promote, and improve  individual accountability shall be a key component of the continued modernization of the tax  system. The DGT shall build an internal capability for continued business process and system  improvement, in order to respond quickly to change. This will allow tax administration to  position the organization to take advantage of technological advanced, without having to  require large protected investment and project improvement plans spread over years. 

  improved compliance techniques 

c. The  Strategic  Project  –  PINTAR,  which  has  four  major  components:  A.  Core  Tax  Administration Enhancement (composed of Registration, Return Processing, Document  Management,  Accounts  and  Infrastructure  enhancements),  B.  Human  Resource  Management  (personnel,  payroll,  and  training  enhancements),  C.  Compliance  Enhancements (composed of audit and collection automation) and D. Oversight and  improving systems management 

 

9. Activities 

Activities  Implementation Locations  Project Implementation  Units 

a. PINTAR Strategic Project  Activities 

DKI Jakarta  DGT  Project 

(64)

P‐48 

 

10. Funding Source 

Implementing  Agency 

Foreign Funding (US $ 000) 

Counterpart Funding (US $ 000) 

Total of Funding 

(US $ 000)  Remarks  DGT  147,961  2,500  150,461  World Bank 

Total  147,961  2,500  150,461   

   

11. Disbursement Plan 

Disbursement Plan (US $ 000) 

1st  2nd  3rd  4th  5th  Total  452  30,585  81,466  29,820  3,474  145,797   

12. Funding Allocations 

Categories (US $ 000)  Detail of Activities 

Services  Constructions Goods  Trainings  Others 

GOI  36,448         

IBRD  37,270    48,506  6,544   

Total  73,718    48,506  6,544   

 

13. Project References : 

(65)

 

(66)

Referensi

Garis besar

Dokumen terkait

maka kami Unit Layanan Pengadaan, Pokja Jasa Konsultan di lingkungan Pemerintah Kabupaten Bone Bolango, mengundang saudara untuk megikuti acara seperti tersebut pada Perihal diatas

Sebagai dasar dari tujuan partikular adalah selain panggilan menjadi murid Yesus, lebih dari itu ialah usaha untuk umat lokal mengahayati Yesus dengan cara hidup,

Pimpinan Teknik dengan membawa tanda pengenal dan berkas asli perusahaan, bagi yang tidak. menghadiri Klarifikasi hasil evaluasi ini dianggap menerima seluruh hasil keputusan

Then the theory is mentioned in theoritical framework by Geoffrey Leech (1981), the data is analyzed to explain the types of figurative language in Victor Hugo’s

Hubungan fungsional pada frase menunjukkan lagi pada contoh (39) adalah kata menunjukkan yang berkategori verba berfungsi sebagai unsur inti dan kata lagi yang

Dari hasil Q hitung = 3,90 > Q tabel = 3,34 pada α = 0,05, dapat disimpulkan bahwa hasil belajar Bahasa Inggris mahasiswa yang memiliki kecerdasan

Sehubungan dengan hal tersebut diatas, dengan ini kami meminta kepada peserta pelelangan untuk Paket Pekerjaan Pembangunan Cold Storage, agar memperpanjang masa

Dalam dunia pendidikan terdapat beberapa jenis media yang dapat di manfaatkan dalam proses pembelajaran, diantaranya adalah media auditif yaitu media yang