• Tidak ada hasil yang ditemukan

false false false EN-US X-NONE X-NONE

N/A
N/A
Protected

Academic year: 2021

Membagikan "false false false EN-US X-NONE X-NONE"

Copied!
13
0
0

Teks penuh

(1)

38 Proyek Infrastruktur dengan skema KPS 2015

- 6 proyek ready to offer - 8 proyek KPS prospektif - 24 proyek KPS potensial

Normal 0 false false false EN-US X-NONE X-NONE Proyek KPS Ready to Offer:

1. Pembangunan Kereta Api Barang dan Penumpang Bandara Internasional Soekarno    Hatta-Halim.

2. Light Rail Transit (LRT) Bandung, Jawa Barat.

3. Kereta Api Barang dan Penumpang Tanjung Enim-Tanjung Api-Api Sumatera Selatan. 4. Proyek Air Minum Kota Semarang Barat.

5. Air Minum Pondok Gede, Bekasi. 6. Air Minum Kota Pekanbaru, Riau.

Normal 0 false false false EN-US X-NONE X-NONE Proyek KPS Prospektif:

(2)

10. Jalan Tol Akses Tanjung Priok. 11. Jalan Tol Balikpapan-Samarinda

12. Jalan Tol Cileunyi - Sumedang, Dawuan 13. Jalan Tol Pandaan - Malang

14. Pembangunan Listrik Tenaga Air Karama, Sulawesi Barat.

Normal 0 false false false EN-US X-NONE X-NONE

Normal 0 false false false EN-US X-NONE X-NONE /* Style Definitions */ table.MsoNormalTable {mso-style-name:"Table Normal"; mso-tstyle-rowband-size:0; mso-tstyle-colband-size:0; mso-style-noshow:yes; mso-style-priority:99; mso-style-parent:""; mso-padding-alt:0in 5.4pt 0in 5.4pt;

mso-para-margin-top:0in; mso-para-margin-right:0in; mso-para-margin-bottom:8.0pt;

mso-para-margin-left:0in; line-height:107%; mso-pagination:widow-orphan; font-size:11.0pt; font-family:"Calibri","sans-serif"; mso-ascii-font-family:Calibri;

mso-ascii-theme-font:minor-latin; mso-hansi-font-family:Calibri;

mso-hansi-theme-font:minor-latin; mso-bidi-font-family:"Times New Roman"; mso-bidi-theme-font:minor-bidi;} Proyek KPS Potensial:

15. Pembangunan Pelabuhan Internasional Maloy, Kalimantan Timur. 16. Pengembangan Pelabuhan Kabil, Batam, Kepulauan Riau.

17. Pembangunan Pelabuhan Hub Internasional Kuala Tanjung, Sumatera Utara. 18. Pembangunan Pelabuhan Hub Internasional Bitung, Sulawesi Utara.

19. Pembangunan Pelabuhan Makassar New Port, Sulawesi Selatan. 20. Pembangunan Pelabuhan Baubau, Sulawesi Tenggara.

21. Pembangunan Pelabuhan Garongkong, Sulawesi Selatan. 22. Pembangunan Bandara Bali Baru.

23. Bandara Internasional Kulon Progo, Yogyakarta. 24. Bandara Mutiara, Sulawesi Tengah.

25. Bandara Komodo, Nusa Tenggara Timur. 26. Bandara Raden Inten II, Lampung.

27. Bandara Juwata, Kalimantan Utara. 28. Bandara Sentani, Papua.

29. Bandara Tjilik Riwut, Kalimantan Tengah. 30. Bandara Fatmawati Soekarno, Bengkulu. 31. Bandara Hananjoeddin, Bangka Belitung. 32. Bandara Matahora, Sulawesi Tenggara. 33. Bandara Sultan Babullah, Maluku Utara.

(3)

34. Proyek pembangunan Kereta Api Barang dan Penumpang Batam, Kepulauan Riau. 35. Pembangunan Kereta Api Barang dan Penumpang Pulau Baai-Muara Enim,

Bengkulu-Sumatera Selatan.

36. Jalan Tol Batu Ampar-Muka Kuning-Hang Nadim. 37. Proyek Pengelolaan Air Limbah DKI Jakarta.

38. Proyek PLTU Tebo 2 X 200 MW Jambi. - KPS atau Public-Private Partnership (PPP).

...  

 

- Review and Assesment of Japan-ASEAN Solidarity Fund

- Management Consulting Services for jakarta Mass Rapid Transit System Project, Scope of Work :

1. Previous or on-going related study results and data 2. Institutional Development

3. Efficient operation planning of MRT system 4. Business planning

5. Financial Planning

6. Organization and human resources development 7. Strategy on PDCA (Plan-Do-Check-Action) cycle 8. Legal base

9. Technical Transfer

Proyek PPP di Kota Bekasi :

(4)

2. Penataan dan Pengendalian Menara Telekomunikasi Kota Bekasi

 

PUBLIC PRIVATE PARTNERSHIPS

Infrastructure Projects Plan in Indonesia

PPP BOOK 2011

Normal 0 false false false EN-GB X-NONE X-NONE

READY FOR OFFER PROJECTS

Air Transportation

1.  South Banten Airport, Pandeglang, Banten

Normal 0 false false false EN-GB X-NONE X-NONE

(5)

1.  Expansion of Tanjung Priok Port, Kalibaru, DKI Jakarta

2.  Tanah Ampo Cruise Terminal, Karangasem, Bali

Toll Road

1.  Medan – Kualanamu – Tebing Tinggi Toll Road, North Sumatera

2.  Strategic Infrastructure and Regional Development of Sunda Strait, Lampung – Banten

Water Supply

1. Bandar Lampung Municipal Water Supply, Lampung

2. DKI Jakarta – Bekasi – Karawang Water Supply (Jatiluhur), DKI Jakarta – West Java

3. Pondok Gede Water Supply, Bekasi, West Java

4. Surakarta Water Supply, Central Java

(6)

6. Maros Regency Water Supply, South Sulawesi

Solid Waste and Sanitation

Normal 0 false false false EN-GB X-NONE X-NONE

1. Solid Waste Management Improvement Bandung Municipal, West Java

2. Solid Waste Final Disposal and Treatment Facility – Putri Cempo Mojosongo, Surakarta Municipal, Central Java

Normal 0 false false false EN-GB X-NONE X-NONE PRIORITY PROJECTS Toll Road

1. Medan – Binjai Toll Road, North Sumatera

(7)

3. Tagineneng – Babatan Toll Road, Lampung

4. Kemayoran – Kampung Melayu Toll Road, DKI Jakarta

5. Sunter – Rawa Buaya –Batu Ceper Toll Road, DKI Jakarta

6. Ulujami – Tanah Abang Toll Road, DKI Jakarta

7. Pasar Minggu – Cassablanca Toll Road, DKI Jakarta

8. Sunter – Pulo Gebang – Tambelang Toll Road

9. Duri Pulo – Kampung Melayu Toll Road, DKI Jakarta

10. Tanjung Priok ACCES Toll Road, DKI Jakarta

11. Sukabumi – Ciranjang Toll Road, West Java

12. Ciranjang – Padalarang Toll Road, West Java

(8)

14. Cileunyi – Sumedang – Dawuan Toll Road, West Java

15. Terusan Pasteur –Ujung Berung – Cileunyi – Gedebage Toll Road, West Java

16. Pandaan – Malang Toll Road, East Java

17. Nusa Dua – Bandara Ngurah Rai – Benoa Toll Road, Bali

Solid Waste and Sanitation

1. Solid Waste Final Disposal and Treatment Facility – Bogor and Depok Area, West Java

2. Solid Waste Final Disposal and Treatment Facility – Greater Bandung Area, West Java

Power

1. Jambi Coal Fired Steam Power Plant (2 x 400 MW), Jambi

2. Karama Hydro Power Plant, West Sulawesi

(9)

POTENTIAL PROJECTS Air Transportation

1. Kertajati International Airport, West Java

2. Expansion of Dewandaru Airport Karimun Jawa, Central Java

3. Kulonprogo International Airport, DI Yogyakarta

4. Development of Singkawang Airport, West Kalimantan

5. Development of New Bali Airport, Bali

6. Development of Tjilik Riwut Airport, Central Kalimantan

7. Development of New Samarinda Airport, East Kalimantan

Land Transportation

(10)

2. Development of Karya Jaya Integrated Terminal, Palembang, South Sumatera

Marine Transportation

1. Development of Bulk Terminal (Kuala Enok Port), Riau

2. Expansion of Tanjung Priok Port, Cilamaya, Karawang, West Java

3. Development of Pelaihari Port, South Kalimantan

4. Development of Maloy International Port, East Kalimantan

Railway

1. Rantau Prapat - Duri - Dumai – TL. Kuantan – Muaro Railway

2. Integrated Terminal of Gedebage (Railway), Bandung, West Java

3. Muara Tuhup – Kalipapak – Balikpapan Coal Railway and Terminal, East Kalimantan

Toll Road

(11)

1. Pekanbaru – Kandis – Dumai – Toll Road, Riau

2. Balikpapan – Samarinda Toll Road, East Kalimantan

3. Manado – Bitung Toll Road, North Sulawesi

Water Supply

1. Expansion of Padang Water Supply, West Java

2. South Pekanbaru Water Supply, Riau

3. Karian Water Supply, Banten

4. Water Treatment Plant and Distribution of Sindang Heula DAM, Serang, Banten

5. Sukabumi Regency Water Supply, West Java

6. North Bekasi Regency Water Supply, West Java

7. Jatigede Water Supply, West Java

(12)

9. West Semarang Municipal Water Supply, Central Java

10. Ungaran Water Supply, Semarang Regency, Central Java

11. Lamongan Regency Water Supply, East Java

12. Krabayan Spring Water Supply, Malang Regency, East Java

13. Metaum Water Supply, Tabanan Regency, Bali

14. Central Lombok Water Supply, West Nusa Tenggara

15. Sukadana Water Supply, North Kayong Regency, West Kalimantan

16. Pontianak Municipal Water Supply, West Kalimantan

17. East Pontianak Municipal Water Supply, West Kalimantan

18. Improvement Water Supply Palu Municipal, Central Sulawesi

Solid Waste and Sanitation

(13)

1. Padang Solid Waste Management, West Sumatera

2. Cimahi Waste Water Management, West Java

3. Solid Waste Management Improvement Project for Urban Climate Change

4. Solid Waste Management Improvement Project for CDM Program

Power

1. South Sumatera 9 – Mine Mouth Coal Fired Steam Power Plant (2 x 600 MW)

2. South Sumatera 10 - Mine Mouth Coal Fired Steam Power Plant (1 x 600 MW)

3. East Kalimantan Coal Fired Steam Power Plant (2 x 100 MW)

4.  North Sulawesi Coal Fired Steam Power Plant (2 x 55 MW)

Normal 0 false false false EN-GB X-NONE X-NONE

Referensi

Dokumen terkait

[r]

Deskripsi Singkat : Pencetakan Pita Cukai adalah kegiatan yang meliputi penyediaan bahan baku berupa kertas sekuriti, pelekatan hologram

Qur’an di MTs Al Huda Bandung. Untuk mendeskripsikan strategi guru Al- Qur’ an hadits dalam meningkatkan kemampuan kefasihan siswa dalam membaca Al- Qur’an di MTs Al

75 4.3.2 4.4 Kurva Perbandingan Karakteristik dan Efisiensi Generator Sinkron Hubung Wye dan Hubung Delta Pada Saat Beban Seimbang dan Tidak Seimbang. 81 Kurva

Penyebab siswa melakukan kesalahan dalam menyelesaikan soal-soal pada materi pokok Momentum dan Impuls adalah: (a) Penyebab kesalahan strategi: siswa kurang teliti,

berkaitan dengan pajak penghasilan pasal 21 misalnya pembayaran gaji, upah dan lain sebagainya yang dilakukan oleh perusahaan dan bertujuan untuk menentukan jumlah penghasilan kena

Tujuan dari penelitian ini adalah untuk mengetahui dan mendapatkan kajian tentang pengaruh service recovery, perceived value dan brand image terhadap

Naskah Akademik berisikan rekomendasi tentang urgensi diperlukannya kebijakan yang terkait dengan penyandang disabilitas. Proses penyusunan naskah akademik ini didahului