NO KONTRAK SISA LELANG NAMA REKANAN FISIK KET
DANA ( RUPIAH ) ( % ) (RUPIAH) ( % ) ( RUPIAH )
Honor Panitia Pelaksana Kegiatan 15,403,000 100 13,727,000 1,676,000
Belanja Alat Tulis Kantor 4,145,600 100 4,145,000 100 600
Belanja Penggandaan 8,000,000 100 7,999,550 100 450
Belanja Makan dan Minum Rapat 2,750,000 30,298,600 100 1,762,500 64 987,500
Perencanaan Teknis
-- Perencanaan Teknis Paket I 45,000,000 44,720,000 280,000 PT. UTA ENGINEERING 100 44,720,000 100 280,000 - Perencanaan Teknis Paket II 45,000,000 44,550,000 450,000 CV. WINILA KARYA 100 44,550,000 100 450,000 - Penyusunan RISPAM 150,000,000 141,548,000 8,452,000 PT. UTA ENGINEERING 100 141,548,000 100 8,452,000
Pengawasan Teknis
-- Pengawasan Teknis Paket I 40,000,000 39,627,000 373,000 CV. KARSA PRAWIRA 100 39,627,000 100 373,000 - Pengawasan Teknis Paket II 40,000,000 39,765,000 235,000 PT. ILMAKON PURNAKRAMA 100 39,765,000 100 235,000 Pembangunan Air Bersih (DAK)
1 Distribusi Air Bersih Dsn Mangunan Kec. Dlingo 1 Unit DAK 75,000,000 74,559,000 441,000 CV. HYDRO KARYA 100 74,559,000 100 441,000 2 Distribusi Air Bersih Dsn Sanansari Piyungan Kec. Piyungan 1 Unit DAK 75,000,000 74,148,000 852,000 CV. MADYA KARYA 100 74,148,000 100 852,000 3 Distribusi Air Bersih Dsn TPI Depok Kec. Kretek 1 Unit DAK 75,000,000 74,233,000 767,000 CV. AIR INDONESIA 100 74,233,000 100 767,000 4 Distribusi Air Bersih Dsn Kuwaru Srandakan Kec. Srandakan 1 Unit DAK 75,000,000 74,281,000 719,000 CV. ARCHIMEDES 100 74,281,000 100 719,000 5 Sharing IKK Piyungan Kec. Piyungan 1 Unit DAK 1,426,648,000 1,378,160,000 48,488,000 PB. SARANA JAYA 100 1,378,160,000 100 48,488,000
Pembangunan Air Bersih (DAU)
-1 Pemasangan Air Bersih Seloharjo Pundong Kec. Pundong 1 Unit DAU 310,000,000 297,882,000 12,118,000 PB. SETIA JAYA 100 297,882,000 100 12,118,000 2 Pembangunan SIPAS Kasihan Kec. Kasihan 1 Unit DAU 200,000,000 198,000,000 2,000,000 PB. HARMONIYASA 100 198,000,000 100 2,000,000 3 Pembangunan SIPAS Umbulsari Piyungan Kec. Piyungan 1 Unit DAU 200,000,000 192,960,000 7,040,000 PB. KESUMA JAYA 100 192,960,000 100 7,040,000 4 Pembangunan SIPAS Ngajaran Sidomulyo BLPR Kec. Bambanglipuro 1 Unit DAU 200,000,000 194,277,000 5,723,000 CV. SRIKANDI MATARAM 100 194,277,000 100 5,723,000
2,986,946,600
2,899,008,600 87,938,000 100 2,896,344,050 96.97 90,602,550
PENGEMBANGAN KINERJA PENGELOLAAN AIR MINUM DAN AIR LIMBAH
REHABILITASI / PEMELIHARAAN SARANA DAN PRASARANA AIR MINUM
2012
JUMLAH =
TARGET / SUMBER ANGGARAN REALISASI SISA
ANGGARAN
NAMA KEGIATAN / PEKERJAAN LOKASI KEUANGAN