The Sales Plan
of groups of asset components of
STOCZNIA GDYNIA
S.A.
Drawn
up
accordingto the
rulingsof
Article77
and78 of
theAct dated
19th December 2008 concerningcompensation proc6edings
in
undertakingsof
particular importancefor the
Polish
shipbuilding industry(Journal of Laws 233, item 1569).
ll.
Sois tre6cil.
Introduction
On 6th January 2009, the Act of 19th December concerning compensation proceedings
of
particular importance forthe
Polish Shipbuilding industry (hereinafter referredto
asthe ,,Act"), came into being. The Act is a detailed description of the rules, conditions and procedure of the compensation proceedings, the objective of which is the sale of assets
of
Stocznia Gdynia S.A.
(Gdynia Shipyard) (hereinafter referredto
as
'Company","shipyard" or "shipyard"), in order to secure the claims of the Shipyard's creditors. The
Act
also
regulatesthe
rules,
conditionsand procedure
of
protectingthe
rights
ofShipyard employees.
In accordance with the content of the Act, the body supervising the initiation and course
of
the
compensation proceedings
is
the
State Treasury Minister,
who
is
alsoresponsible for appointing an observer, with the approval of the European Commission.
The observer is responsible for monitoring the process.
The
executive body,in
accordancewith the Act, is the
Chairmanof the
Agency ofIndustrial
DevelopmentS.A.,
who among other things, initiates
the
compensationproceedings,
appoints
a
Provisional Administrator,confirms
the
sales plan
of
thecomponents
of
the
shipyard assets
and
issues
the
decision concerning
thediscontinuation or ending of the compensation proceedings.
On 6th
January 2009, dueto the
submitting ofthe
motion concerning compensationproceedings by
the
Shipyard the same day,the
Chairman of the Agencyof
IndustrialDevelopment
S.A,
issuedthe
decision
concerningthe
Provisional Administrator ofStocznia Gdynia S.A. (Gdynia Shipyard) and appointed Mr Roman Nojszewski.
In reply to the motion of Stocznia Gdynia S.A. (Gdynia Shipyard), in connection with the
compliance
of the
Shipyardwith all formal
requirements describedin the Act, on
7thJanuary
2009
the
Chairman
of
ARP S.A.
issued
a
decision concerning
thecompensation proceedings
in
relationto
Stocznia Gdynia S.A. (Gdynia Shipyard), and at the same time, summoned an initial assembly of Shipyard Creditors. The subject of the deliberations was the selection of members for the Creditors' Committee as well asthe appointment of the Compensation Administrator. The decision also summoned the
Shipyard
creditorsto
submit liabilities
in
writing
to
the
Chairman
of the
IndustrialDevelopment Agency S.A. no later than by 16th February 2009.
On
20th January 2009
an
initial assembly
of
Shipyard Creditors was held.
TheCreditors' Committee was chosen and
'Bud
Bank Leasing" Sp.z
o.o.company
wasappointed
as
the
CompensationAdministrator
of
Stocznia Gdynia
S.A.
(GdyniaShipyard)(hereinafter
refened
to as
the
'Compensation
Administrato/'
or"compensation administrator").
In
accordancewith
the
Act, from
the
moment theCompensation Administrator
was
appointed,
the
Board
of
Stocznia Gdynia
S.A.(Gdynia Shipyard) lost the right to board the Shipyard and disposition of the Shipyard's property.
Following
the
decision
of
the
European Commissionand
in
accordancewith
theregulations
of
the Act
concerning compensation
proceedings,the
compensationadministrator, on
the
basisof
entries in trade books, compileda
list of components of shipyard assets and conducted a valuation of these components in conditions of forcedll.
SPis tre6cisale,inordertoprotecttheinterestsoftheShipyardcreditorsandemployeerights.The
property of the
shipi"ro,"
*
sold willu" pr"r"nt"o
on an lnternet website' especially
designed
for
this
."r"".
The
documeriation reflecting
the
legal
state
of
eachcomponentofthepropertywi|luestoredseparatelyforeachgroupcomponentand
made avaitaure
to
lir
interesteo parties uvti"
"tproyees
of
the
shipyard'All
partiesinterested
wi'
be
giventhe
possibility otuititing
and inspecting
the
shipyard property, ;fjT::#r
Gdynia Shipyard,in
accordancewith
resurationsof the Act'
shall besord
in the form of an
open,tr"nrp"r"ntl'un"onon,on"l,
non-discriminatory' unlimited
tenderconductedin"o,npti"n.ewiththerulesoffaircompetition'Thetendershal|be
conducted
in
the form
of
tender with
th;
application
of the
lnternet website'
Thetechnical activities connected with the
"rn"",*t"
of the tender will be conducted by a
subject specialised in providing
.u"h ."riices,
possessing experience in the realization
oftendersforStateShareho|ding"o,no"n""'nuaranteeingthehigheststandardsoflT
security.
ln the
sales process,tn"
prop"rtv'i ,n"
Shipyard
shall be
sold offfree
ofencumbrancesand-ctaimsofShipyardcreditors'inc|udingpreviousstateaidgivento
.
::""::il:::Til1.e
resurations ofAficre
78 of theAct
datedleth
December 2008
concerning"o''"n,",,on-proceeoing"in,no".t"t.ingsofparticu|arimportanceforthe
Polishshipbuildingindustry(Journalotuaws'Rrtictezsg'point.1569the..Act,,),once
the
examinationof the fiiancial
report,tne
compitationof the
proiectof
division ofShipyardassetsintogroupsofcomponen""J*Lva|uationofthemarketvalueofthe
shipyard,s
""."r",'i"'.ompteteo
as
in
Article76 item 1 of the Act' the
compensation Administratorst,"it
compitethe sales
Pl;;:;;""er
no
later than within2
months ofthe initiation of compensation proceedings;
.
The sales Plan shallinclude:1)AdescriptionofgroupsofassetcomponentsoftheShipyardsubjectto
sate;
2)Adetaileddescriptionoftheprocedureanddesignationoftimelimitsforthe
sale of particular groups of asset components of
the shipyard;
3)Apreliminaryestimateofcostsandexpensesconcerningtherealizationof
the sales Plan'
Detailsconcerningthecarryingoutofthesalesprocedureoftheassetcomponentsof
Stocznia Gdynia
s.A.
(Gdynia shipyard)areo"i"rtin"o
by the regulations of the Act as
well as the records of this document':
Theimplementationoftheaboveprocedureshal|berea|izedinthefo||owingstages:
-issuingadecisionbytheChairmanoflndustria|Deve|opmentAgencyS.A.
concerningthesalesptan,wnicnshallincludeadetai|edprocedureofthe
tender'
-
the
realizationof the
statutory duty
of
publishing 'announcementsabout
tendersinnationalandlocalpror,"noadditionallyplacingtheoffersin
other forms' including the Internet website'
- the two-stage tender offer' conducted by
the
Compensation Administrator' by
way
ot'in"
lnternet Website'
with
the
assistance
of
a
companyprofessionally specializing in organizing tenders'
- auction in cases indicated in the Act
ll.
Spis tre6ci - the selection of the most favourable offer by the compensation administrator,- issuing a decision by the Chairman of the Industrial Development Agency S.A.
the case
of
group components including real estate assets, with referenceto which
the
Board of the Marine Port of Gdynia S.A. as well asthe
StateTreasury are entitled
to
preferential or pre-emptive rights-
the conclusionof
preliminary conditional agreements,
and
next
in
the
case
of
notexercising preferential
or
pre-emptive
rights
by the
entitled
subjects,concluding pledged agreements transferring
the
ownership
of
assetcomponents.
In
press advertisements, appropriate information concerningnon-negotiable
clauses shall
be
found. Such clauses,
including thoseresulting
from
preferentialand
pre-emptiverights
reservedfor the
StateTreasury and
the
Boardof
MarinePort of
Gdynia S.A. shall befound
in particular agreements.In reference to
the
sold off groupsof
asset components, consistingof
realestate
havinginappropriate
accessto
public roads, and real estate through which
transmissionnetworks
run,
appropriate easementsshall be
established-
enablingthe
maximumpossible
use
of
full,
technical infrastructure
of the
real
estate
by the
potentialpurchasers.
The
saleof
Stocznia Gdynia S.A. (Gdynia Shipyard)assets maytake
placeby
means of sellingoff
divided groupsof
asset components andmay be
preceded bythe
lease ofthe
assetsfor a
limitedtime
period.The
dateof
endingthe
sales procedure shall beestablished
by
the
European
Commissionby
31"t May 2009.
This
date may
beprolonged by another 3 months if it is thought
to
be essential for the attainment of the proceedings' objectives, with the approval of the European Commission'll.
Spis tre6cill.
Gontents
l.
Introduction...
...2
ll.
Contents
...s
lff.
Groups of Shipyard Assets Subject to
Sa|e...
...2
(A)Asset components subject to sale located
in
S4rmbark, Stgzyca gmina, describedin
detailbelow
...23(B) Asset components of the shipyard subject to sale constituting financial assets in the form
of
shares for the followingsubjects:...
... 23(C)Other asset components of the shipyard subject to sale located in Gdynia described in detail below and divided into 6 subgroups
i.e.:...
...26lV. The detailed procedure and designation
of time limits for the
sale
of
particular groups of
asset
components of
the
shipyard...
...2g
V.
Attachments
...
...3S
Attachment no.
A
-
Map entifled
,,thedivision
of
assets
of
stocznia Gdynia
s.A. (Gdynia Shipyard)" comprising land real estate constituting ownership ofihe
State Treasury located on the site of the shipyardin
(what is referredto
in polish law as) perpetual usufruct of theshipyard...
...SS Attachment no. 1-A
detailed listing of asset components constituting Group 1 (area 1)...36Attachment no. 2
-A
detailed listing of asset components constituting Group 2 (area2)...37Attachment no. 3 - A detailed listing of asset components constituting Group 3 (area 4)...33
Attachment no. 4
-
A detailed listing of asset components constituting Group 4 (area 5)...39Attachment no. 5 - A detailed listing of asset components constituting Group 5 (area 6)...40
Attachment no. 6 - A detailed listing of asset components constituting Group 6 (area T)) ....41
Attachment no. 7 - A detailed listing of asset components constituting Group 7 (area B)...42
Attachment no. 8 - A detailed listing of asset components constituting Group 8 (area 9)...43
Attachment
no. 9
-
A
detailed listingof
asset components constituting Group9
(area10)
...44 Attachment no. 10 - A detailed listing of asset components constituting Group 10 (area11)
Attachment no. 12)
Attachment no. 13)
Attachment no. 14)
Attachment no. 15)
Attachment no. 16)
Attachment no. 17)
Attachment no. 18)
Attachment no. 1e)
Attachment no.
20)
11 - A detailed listing of asset components constituting Group 11 (area
12 -
A
detailed listing of asset components constituting Group 12 (areail
.1*il
i:::::
"
asset components constitutins Group 13 (area
14 -
A
detaited tistins",
;r;",
;;;;;.";,.
;;;r;,;,;;;
;;;r;
;;;;";
tt
15 - A detailed listing of asset components constituting Group 15 (area
il
.i
*ii:
i"::::
"
asset components constitutins Group 16 (area
17 - A detaited tistins
";
"""",
;";r**;;
;;;ro*r,
"n
o',.J;
;;";""
tt
il
1l*il:
i'::::::1:::::::T::l"ts
consritutins Group 18 (area19 - A detailed listing of asset components
"on.o,u,'nn
;;;;";";
u'
45
46
47
49
50
52
Attachment no' 20 - A detailed listing of asset components constituting Group
20
(area
21)
...55Attachment no. 21 -
A
detailed listing of asset components constituting Group2,1
(area
5A)
...56Attachment
no.22
- A detailed listing of asset components constituting Group 22(area
no'6A)
...s7 Attachment no. 23 - A detaired risting of asset components constituting Group 23...5g
Attachment no. 24
-
A detaired risting of asset components constituting Group37
......59
lll.
Groups of Shipyard Assets Subject to
Sale
In accordance with Article 78 item 1 of the Act,
the
Compensation Administrator specifiedthe
following groupsof
shipyard assets subjectto
sale (the numberof
each group ofassets
correspondsto
the tender numbers detailed
in
Chapter
lV
-
The
DetailedMethod
And
Designationof
Time Limits Dates ForThe Sale Of
Particular Groups OtAsset Gomponents of The Shipyard):
A. Shipyard assets subject to sale located
in
Gdynia described
in
detail below
and
divided into
22 areas
in accordance
with
the
map
found
in attachment
A of
this
document
Group
1-
constitutes area No.1, which includes land located onthe
premises of StoczniaGdynia S.A. (Gdynia Shipyard), which is the property of the State Treasury and which is
on
(whatis
referredto in
Polish Lawas)
'perpetual usufruct'to
Stocznia Gdynia S.A.(Gdynia Shipyard), and
for
whichthe
District Courtin
Gdynia maintainsthe
Land andMortgage Register No. KA/ 22785, having a surface area
of
130 201m2,aswell
as 31buifdings standing on said land, having a total area of
64
309.42m2, and45
structures together with 1341 movables, all the separate property of Stocznia Gdynia S.A. (GdyniaShipyard) and included
in the
group, togetherwith a right of
percentage sharein
theperpetual usufruct given
to
Stocznia Gdynia
S.A.
(Gdynia Shipyard)
on the
landconstituting internal roads.
.
The area which
constitutes Groupt
has been
outlinedin detail in
Aftachment 1attached to this report.
Area No.1
-
Hull prefabrication zone..
This area - taking into consideration its location, existing buildings, production plant and equipment, employee facilities and access roads for the movement of materials-
is
intendedfor the
complete prefabricationof
ship hulls andthe
prefabrication of other flat and spatial steel sections..
The
production processis
basedon a
flow-line method (initial processingof
steelplate and
a
line
for the
prefabricationof
flat
sections) and
on
a
cell
method(machinery
for
thermal cuftingof
plate, machinesfor forming
platesand
profiles,work
stationsfor
initial prefabricationof
hull elements,work
stationsfor
assemblyand welding of sections).
.
Overhead cranes (witha
lifting capacityof
upto
120Mt), roller conveyors and selfpropelled rail cars are used
for
the
transportationof
materialsto
and
betweenseparate installations and workplaces.
.
The production processes carried out in this area include:-
receiving and placement of feedstock into storage, initial processing of raw-steelplates and profiles (mechanical stress relieving, cleaning, de-scaling and shot-blasting, if needed, hydrodynamic painting and drying),
-
thermal cutting of plates,-
forming of plates and profiles,-
fabrication of flat and composite spatial sections..
Characteristics of main buildings and technological installations:Feedstock storage area
-
hard surfacedwith a
bearing capacityof
upto
13MUm2and having
a
useablearea
of
14 590
m'.
The
storagearea
is
servicedby
8#overhead cranes (giving loading capacities of 8-16 Mt) with both magnetic and hook lifting gear which move on overpasses which create 4 passages for storing,
Line for initial preparation of feedstock (Gutmann descaling and shot blasting plant;
Via-Nova painting and drying plant), roller conveyors for transportation of materials. Maximum handling size of plates: 16 x 3.6 m, thickness up to 45 mm,
Plate cufting machinery (11 machines including autogenic cutters, plasma cutters
and
6
pantographsfor the
cuttingof
small
elements).One
autogeniccutter
hastriple nozzles
to
allow plateto
be chamfered into "K". Plasma cutters are equippedwith dual
chamber water tablesthat can be
connectedif the
need arisesto
burncuts
in
long sectionsof
plate. Maximum sizesof
platesfor
autogenic cutting: 16 x3.6 m, up to a thickness of 150 mm. Maximum sizes of plates for plasma cutting: 25
x 3.6 m, up to a thickness
of
1Smm Plate and profile bending machinery:-
rollers 2000Mt, rolling length 12.9 m-
presses: 1000 Mt portalpress,700
Mtjib press450 Mt,
bending press 350Mt, 700Mt frame press and 350Mt, 200Mt double sided hydraulic press.-
equipment for the fabrication of welded T beamsLine for the prefabrication of stiffened flat sections up
to
16m in width with a stiffener depth of 110-350mm,Workspaces (cells)
for the
fabricationof
spatial
sections-
situatedin
enclosedproduction halls and on open assembly sites. These workspaces are placed under
overhead cranes
and on
hard-standing areaswith
a
maximum allowable bearing capacity of 10MVm2.Main high capacity buildings: All main high capacity building structures have access
to
mains utilities
(electricity,water, technical gases
-
oxygen,
acetylene, CO2,compressed air and process steam).
obpCi
woirlng
LenganwuiniNumoii-
tiumoeroi
rrlaxloading
Distance tosurface
i
ofbays
overhead
capacityof
head ofarea
cranes
":",r*"""0
1:inffi3,.iru"
height)G-502
I bay
lm2l
61 00
193,7
31,7tm1
21,9t12
21,9t12
22t16
tMq
t-l
t-1
lml lml
fffff
8350G-08
1314043,3
30,4
97
89,7:97,6
73,11G-06
8600G-sos
*'
7120120
100 194
128
10
8 3
'z
Gdynia: 11 march 2009
13
.
Facilities incorporated in Area No 1 include employee facilities - changing roomsfor
around 800 employees, canteens and administrative offices.
.
Forthe
purposeof
securing loan facilities and subjectto
an
agreement made on18th December 2008 between Stocznia Gdynia S.A. (Gdynia Shipyard)
of
Gdyniaand Unitrans Sp. z o.o. of Gdynia, Stocznia Gdynia S.A. (Gdynia Shipyard) the title
to
the cranes
referredto
below have been
transferredto
UnitransSp.
z
o.o.ofGdynia:
Double girder overhead crane
with
hook lifting gear
(lnventorynumber: 64600005500)
Tower crane
28
751100 (lnventory number: 64200007500)..
In accordance with Article5
of the Agreement to Transfer Titleto
secure said loanfacility, the transferred assets have remained in
the
possession of Stocznia GdyniaS.A
(Gdynia Shipyard)of
Gdyniawhich
usesthem
on loan.
ln
accordance withArticle
3
item 1 of the
agreementto
transfertitle
to
said
assetsto
secure loanrepayment
has taken effect
barring termination clausewhich
meansthat
should Stocznia Gdynia S.A. (Gdynia Shipyard) of Gdynia repay its debt on time, which hasbeen
securedby the
agreementthe transfer of title shall
becomenull
and voidwithout
any
need
for
the
parties
to
this
agreement
to
make
any
additionalrepresentations. At the time of seftlement of its liabilities, which have been specified
in the
agreement madeon
18 December 2008,by
Stocznia GdyniaS.A
(GdyniaShipyard) in favour of Unitrans Sp.
z
o.o, the title of the above listed cranes will betransferred back
to
Stocznia Gdynia S.A. (Gdynia Shipyard)of
Gdynia without anyadditional representation requiring
to
be
madeat the time
ofthe
liabilities having been settled in full. The Compensation Administrator acting on its own behalf but forStocznia Gdynia S.A (Gdynia Shipyard) hereby
representsthat
the
Council
ofCreditors,
on
11 March 2009, passeda
resolutionNo
11l20og which approved theCompensation Administrator's recommendation
to
settle
the
liabilities owed
to Unitrans Sp. z o.o. in the sum of PLN 1.070.800, in accordance with the above saidagreement dated 18 December 2008, by 13 March 2009. Hence when a successful
bidder enters
into a
contractto
buyArea
No.1,the
above mentioned cranes willbecome subject to that contract and title
to
them shall henceforth be transferred to the buyer.Group
2-
constitutes area No.2, wtrich includes land located on the premises of StoczniaGdynia S.A. (Gdynia Shipyard), which is
the
property ofthe
State and heldin
(what isreferred
to in
Polish law as)
,,perpetual usufruct"to
Stocznia Gdynia S.A.
(GdyniaShipyard), and for which the District Court in Gdynia maintains the Land and Mortgage
Register No.
KW
22785, havinga
surface areaof
140 837m',
as well as5
buildingsstanding
on
said land, having a total areaof 10
221.15m2, and 38 structures togetherwith
1545 movables,
all the
separate property
of
Stocznia Gdynia S.A.
(GdyniaShipyard) and included in the group, together with the right to a percentage share in the
(what
is
referredto in
Polish law as) perpetual usufruct givento
Stocznia Gdynia S.A. (Gdynia Shipyard) on the land constituting internal roads..
The area which constitutes Group 2 is outlined in detail in Attachment 2 aftached tothis report.
Area No.2
-
Ship assembly zone:Symbol
of
the;antry crane Sp an
Lifting height
Iotal
liftinE:apacity
\,lumber o )ars
-ifting
capacitlrf cars
Notes
lml lml iMq I Mq
Btl
153
70 | 000
-500
ll
-300
ilt - 300)ead
field from
therxis-
6.3
[m]
fron
roth sides
.
The main production facility of Area no. 2 is a dry dock having dimensions of380
x 70 m and the depth of 8 m, serviced by a 1000 Mt gantry crane having the following specification:4# cranes with a lifting capacity: 150 -20Mt (lifting height 50 m),
Adjacent hard-surfaced assembly yards
with an
allowable bearing capacityof
160 Mt/m2, are-
depending on their location-
serviced by dock gantry crane and dock cranes or analogue cranes with the lifting capacity 150-
20 Mt.There
is the
potentialto
subdividethe dock in two
placeswith the use
of
steelbarriers
(Ihe
shipyard do not have these barriers made)The
whole
area hasfull
accessto
mains utilities (electricity and water) aswell
asoxygen, acetylene, CO2, compressed air and steam.
ln the building wtrich is located in Area No. 2 there are complete employee facilities
and administrative offices for supervisory staff. There is also a canteen with related supporting facilities.
For
the
purposeof
securinga
loanfacility
and subjectto an
agreement made on18th December 2008 between Stocznia Gdynia S.A. (Gdynia Shipyard)
of
Gdyniaand Unitrans Sp.
z
o.o.in
Gdynia, Stocznia Gdynia S.A. (Gdynia Shipyard) title tothe cranes referred to below have been transferred to Unitrans Sp. z o.o. of Gdynia:
-
Tower crane derrick (lnventory number: 64200002800),-
Tower cranederrick
(lnventory number: 64200002900),.
In accordance with Article 5 of the agreement to transfer title to secure saidloan facility, the
transferredassets have
remainedin
the
possession ofStocznia Gdynia S.A (Gdynia Shipyard) which uses them
on
loan.
lnaccordance with Article
3 item 1
ofthe
agreementto
transfertitle to
said assets to secure loan repayment has taken effect barring termination clausewhich means that should Stocznia Gdynia S.A. (Gdynia Shipyard) in Gdynia
repay its debt on time, which has been secured by the
agreement, thetransfer
of title
shall becomenull
and void without needfor the
parties tothis
agreementto
make
any
additional
representation.At
the
time
ofsettlement
of its
liabilities,which have been
specifiedin
the
agreement made on 18 December 2008, by Stocznia Gdynia S.A (Gdynia Shipyard) infavour
of
Unitrans Sp.
z
o.o,
title
to
the
above listed cranes
will
betransferred back
to
StoczniaGdynia S.A. (Gdynia
Shipyard)of
Gdyniawithout any additional representation having
to
be made at the time of the liabilities having been settled in full. The Compensation Administrator actingon its own behalf but
actingfor
Stocznia GdyniaS.A
(Gdynia Shipyard)hereby represents that the Council of Creditors, on 11 March 2009, passed
a
resolution No 1112009 which approvedthe
Compensation Administrator'srecommendation
to
settlethe
liabilities owedto
Unitrans Sp.z
o.o.in
thesum of PLN 1.070.800, in accordance with the above said agreement dated
18
December 2008,by 13
March2009.
Hencewhen a
successful bidderenters
into a
contractto
buyArea
No.2,the
above mentioned cranes willbecome subject
to
that contract and
title
to
them shall
henceforth betransferred to the buyer.
.
For the
purposeof
securinga
loanfacility and
subjectto
an
agreementmade on 29th June 2001 between Stocznia Gdynia S.A. (Gdynia Shipyard)
of
Gdyniaand
PowszechnyBank
KredytowyS.A. of
Warsaw (PBK S.A),Stocznia Gdynia S.A. (Gdynia Shipyard) of Gdynia title to the goliath gantry
crane
referred
to
below
has
been
transferred
to
Powszechny
Bank^*i*":ii;
"]r
""ne,
(r nventory Num ber: 646000 1 4400).
In an agreement made
on
15 June 2005 PBK S.A. transferred the debts of Stocznia Gdynia S.A. (Gdynia Shipyard) together withall
securitiesto
Ray Car Carriers with offices in Douglas, lsle of Man (RCC). On the basis of this agreement RCC took title, among other securities, to the crane referred to above.r
In accordance with Article 5 item 2 of the agreement totransfer
title
to
securesaid loan facility dated 29 June
2001the
transferredasset
has
remained
in
the
possession
of
Stocznia Gdynia
S.A.
(GdyniaShipyard) who, under the terms of the agreement, is authorized to use it for its
intended use. In accordance with Article 3 item 3 of the agreement made on 29
June 2001
to
transfertitle to
said assetto
secureloan
repayment has takeneffect barring termination clause which means that should Stocznia Gdynia S.A.
(Gdynia
Shipyard)repay
its
debt
on time, which has been
securedby
theagreement, the transfer of title shall become null and void. At the time of settling its liabilities, in favour
of
Ray Car Carriers Limited, title to the crane listed abovewill
be transferred backto
Stocznia Gdynia S.A. (Gdynia Shipyard) without anyadditional representations having
to
be made at the time of the liabilities havingbeen settled in full..
The
Compensation Administrator actingon
its own behalfbut
acting
on
behalf
of
Stocznia
Gdynia
S.A
(Gdynia Shipyard),
herebyrepresents that the Council of Creditors, on 11 March 2009, passed a resolution
No
11l20lg which
approved
the
Compensation
Administrator'srecommendation to settle the liabilities owed
to
Ray Car Carriers Limited. in thesum
of
PLN 4.975.577.73gr,
in
accordancewith the above said
agreementdated
29
June 2001,by
such dateas
shall constitutethe
closing datefor
bidregistering.
The
registrationof
bids is
to
be made in writing by
bidders and passed to the Compensation Administrator and this is a specific condition uponwhich
biddersare
allowedto
participatein
accordancewith
Article82 of
theAct..
Hence whena
successful bidder enters intoa
contractto
buy Area No.2,the
above mentioned cranewill
become subjectto that
contract and titleto
itshall henceforth be transferred to the buyer.
Group
3-
constitutes Area No 4 which includes:a.
the
rightto
(whatis
referredto in
Polish law as) perpetualusufruct given
to
Stocznia Gdynia S.A. (Gdynia Shipyard),and for which the District Court
in
Gdynia maintains theLand and Mortgage Register No.
KW
22785, having
asurface
area
of
43.969
m'
as
well
as
14
structurestogether with
46
movables
all
the
separate property
ofStocznia
Gdynia S.A. (Gdynia
Shipyard)and
inctuded in the group,a share in
the
rightto
(what is referred toin
Polish law as)perpetual usufruct given
to
Stocznia Gdynia S.A. (GdyniaShipyard) on
the
land including dock NoVll for
which theDistrict Court
in
Gdynia maintainsthe
Land and MortgageRegister No.
KW
22785, havinga
surface areaof
96.157m'.
a share in
the
rightto
(what is referredto in
Polish law as)perpetual usufruct given
to
Stocznia Gdynia S.A. (Gdynia Shipyard) on the land constituting internal roads..
The area which constitutes Group 3 is outlined in detail in Attachment 3 attached tothis report
Area No.4 - Ship assembly zone
'
The main production facility of Area No.4
is a dry dock with dimensionsof
240 m x40 m and
depthof 8 m,
whichis
servicedby
a
500 Mt
gantry crane having thefollowing specification:
4# cranes with lifting capacities: 80=10 Mt ((lifting height 40 m)
Adjacent hard-surface assembly yards having
an
allowable bearing capacityof
13Mt/mz,
and which are serviced by
a
dock gantry crane and dock
cranes. The equipment includes a traversable weather roof, jigs and assembly plates.The whole area has
full
access to mains utilities (electricity and water) together with oxygen, acetylene, CO2, compressed air and process steamFor
the
purposeof
securinga
loanfacility
and subjectto an
agreement made on 18th December 2008 between Stocznia GdyniaS.A.
(Gdynia Shipyard)of
Gdyniaand
Unitranssp.
z
o.o. in
Gdynia,title
to
the crane
referredto
belowhas
beentransferred to Unitrans Sp. z o.o.in Gdynia:
-
Electrically driven double girder overhead crane (lnventory number: 64600005200),ln
accordance with Article 5 of the Agreementto
Transfer Titleto
secure said loanfacility, the transferred assets have remained in the possession
of
Stocznia Gdynias.A
(Gdyniashipyard)
of
Gdyniawhich
usesthem
on
toan.In
accordance withArticle
3
item 1 of the
agreementto
transfertitle
to
said
assetsto
secure loanb.
c.
Symbol of the gantry crane
Sp an
Lifting height
Totallifting
capacity
Number ol cars
Lifting capacity of cars
Notes
lml tml tMq t-1 tMtl
BI
45,5
41 500 2 t- 250
lt - 250 auxiliary crane
-30
Dead field from the axis- 3
[m]from
bothsides
repayment
has taken effect
barring termination clausewhich
meansthat
should Stocznia Gdynia S.A. (Gdynia Shipyard) of Gdynia repay its debt on time, which hasbeen
securedby the
agreementthe transfer of title shall
becomenull
and voidwithout
any
need
for
the
parties
to
this
agreement
to
make
any
additionalrepresentations. At the time of settlement of its liabilities, which have been specified
in the
agreement madeon
18th December 2008,by
Stocznia Gdynia S.A (GdyniaShipyard)
in favour
of
UnitransSp.
z
o.o,title of the
abovelisted
craneswill
betransferred back
to
Stocznia Gdynia S.A. (Gdynia Shipyard)of
Gdynia without anyadditional representation requiring
to
be
madeat the time of the
liabilities having been settled in full. The Compensation Administrator acting on its own behalf but forStocznia Gdynia S.A
(GdyniaShipyard) hereby
representsthat
the
Council
ofCreditors,
on
11th March 2009, passed a resolution No 11/2009 which approved theCompensation Administrator's recommendation
to
settle
the
liabilities owed
to Unitrans Sp.z
o.o. in the sum of PLN 1.070.800, in accordance with the above saidagreement
dated
18
December 2008,
by
13thMarch 2009. Hence when
asuccessful bidder enters
into a
contractto
buy Area
No.3,the
above mentionedcranes
will
become subjectto that
contract andtitle to them
shall henceforth be transferred to the buyer.Group
4-
constituting area 5, which includes:a.
The rightto
(what is referredto in
Polish law as) perpetualusufruct given
to
Stocznia Gdynia S.A. (Gdynia Shipyard),and for which the District Court
in
Gdynia maintains theLand and Mortgage Register No.
KW
22785, having
asurface area
of
26 660. m2 aswell
as6
buildings with anarea
of
18
033.46 m2 togetherwith 9
structureswith
174 movables all the separate property of Stocznia Gdynia S.A. (Gdynia Shipyard) and included in the group,b.
a share inthe
rightto
(what is referredto
in Polish law as)perpetual usufruct given
to
Stocznia Gdynia S.A. (GdyniaShipyard) on
the
land includingdock
NoVll
for which theDistrict Court
in
Gdynia maintainsthe
Land and MortgageRegister
No. l(A/
22785, havinga
surface areaof 96
157 m2c.
a share inthe
rightto
(what is referredto in
Polish law as)perpetual usufruct given
to
Stocznia Gdynia S.A. (Gdynia Shipyard) on the land constituting internal roads.
The area which constitutes Group4
is outlined in detail in Attachment 4 attached tothis report.
Area No.5
-
Prefabrication of ship fittings and pipe sections:.
The main building situated in Area No. 5 is a production facility withI
bays with thefollowing specifi cation:
)bjecl
Working area Leng
th
Nidth Bay number
Number of overhead
cranes
Max lifting capacity of the
rverhead cranes
Distance to head of
overhead crane rail (working height)
[m']
lml lml t-1 t-I tMq lmlj
I
l
Ga-30 12600 10,3 137 8 13 30 8,94/5,97
.
Equippedwith basic
machinesfor tooling metal:
guillotine shears, press brakes,post and pillar
drills, welding stations. Eachbay of the
productionhall
has entrygates at front and rear of the building.
.
The whole area hasfull
accessto
mains utilities (electric and water) together with oxygen, acetylene, CO2, compressed air and process steam.
There
is
comprehensive employeefacility
for
500 people as well as
offices forsupervisory
staff
in the
building.There
is
also
a
canteen with related
support facilities.Group
5-
constituting area No 6, which includes:a.
the right
to
(what
is
referredto in
Polish law)
as
"perpetualusufruct' given
toStocznia Gdynia S.A. (Gdynia Shipyard), and for which
the
District Court in Gdynia maintains the Land and Mortgage Register No. KA/ 22785 and KW 28075, having asurface
area
of
69.030 m2 aswell
as
34
buildingon said
landwith an
area of38618.16
m2
and
19
structurestogether
with
989 movables
all the
separateproperty of Stocznia Gdynia S.A. (Gdynia Shipyard) and included in the group.
b.
a share in the rightto
(what is referredto
in Polish law as) perpetual usufruct givento
Stocznia GdyniaS.A.
(Gdynia Shipyard)on the
land including dock NoVll for
which
the
District Courtin
Gdynia maintainsthe
Land and Mortgage Register No. KrtU 22785, having a surface areaof
96.157 m2."
a share in the rightto
(what is referred to in Polish law as) perpetual usufruct givento
Stocznia Gdynia S.A. (Gdynia Shipyard)on the land
includingdock
NoVl for
which
the
District Courtin
Gdynia maintainsthe
Land and Mortgage Register No. lQt
22785 and KW 28075, having a surface areaof
129 213 m2'd.
a
share in the rightto
(what is referred to in Polish law as) perpetual usufruct givento Stocznia Gdynia S.A. (Gdynia Shipyard) on the land constituting internal roads.
.
The area which constitutes Group 5 is outlined in detail in Attachment 5 attached tothis report.
Area No. 6
-
Ship fit-out zone:.
The main production facilities in Area No.6 are two fit-out quays with a total lengthof
950m
andan
average water depthof 7,3 m
andwith
adjacent storage yards.The
quays area
servicedby
16+50Mt
cranes (lifting height 42+50m).The
quays are serviced by road transport, and one of them by a rail head..
Within
the
area there
is
a
light-fittings
prefabricationyard
equipped with
thenecessary production equipment (guillotine shears, triple rollers, press brakes, post
and pillar drills, drills, etc) together with a two-storey facility for the prefabrication of
power, hydraulic and steering systems and preparation
of
machineryfor
on-board assembly..
Both production facilities are serviced by overhead cranes 15:5MG..
The whole
areahas
accessto
mains utilities (electricity and water) together Wthoxygen, acetylene, compressed air and process steam.
.
A
two-storey warehouse located withinArea
no.6 allows deliveriesto be
received both by road and rail transport..
Buildings located withinArea
no.6 havefull
employee facilitiesfor
800 people and offices for supervisory staff. There is also a canteen with related support facilities.Group
6-
constituting area 7, which includes:a.
The
right
to
land located
on
the
premises
of
Stocznia Gdynia S.A.
(GdyniaShipyard), which is the property of the State and which is on (what is refened to as)
perpetual usufruct
to
Stocznia GdyniaS.A.
(Gdynia Shipyard), andfor
which theDistrict Court in Gdynia maintains the Land and Mortgage Register No. 1(\A/ 22785,
having a surface area of
7
871m2, as well as6
structures, all the separate propertyof Stocznia Gdynia S.A. (Gdynia Shipyard) and included in the group'
b.
a
share in the rightto
(what is referredto
in Polish law as) perpetual usufruct givento
Stocznia GdyniaS.A.
(Gdynia Shipyard)on the
land including dock NoVll for
which
the
District Courtin
Gdynia maintainsthe
Land and Mortgage Register No.l{I\t
22785, having a surface area of 96.157 m2.c.
a share inthe
right to (what is referred to in Polish law as) perpetual usufruct givento
Stocznia GdyniaS.A.
(Gdynia Shipyard)on the land
includingdock
NoVl for
which
the
District Courtin
Gdynia maintainsthe
Land and Mortgage Register No.KcI\t 22785 and
l(A/
28075, having a surface areaof
129'213 m2,d.
a
share inthe
rightto
(what is referredto
in Polish law as) perpetual usufruct givento Stocznia Gdynia S.A. (Gdynia Shipyard) on the land constituting internal roads.
The area which constitutes Group 6 is outlined in detail in Attachment 6 attached to this
report.
Area No. 7
-
Spatial structures prefabrication zoneAn
open, surfaced lot serviced on each side of the quay with 50mt cranes andoptionally
by
a
floating
crane.The zone has
full
accessto
electrical
infrastructureoutside of the permanent COz installation.
In accordance with the agreement to transfer of title
to
secure loan repaymentdated December 18th 2008, entered into
by
Stocznia Gdynia S.A. (Gdynia Shipyard) inGdynia and by Unitrans Sp.
z
o.o. of Gdynia-
Stocznia Gdynia S.A. (Gdynia Shipyard) has transferred the title to the following overhead cranes to Unitrans Sp. z o'o.:-
electrically powered double-girder crane (inventory no. 64600005000)In
accordance with Article5
ofthe
agreementto
transferthe
titleto
secure aloan repayment, the transferred assets have remained under the ownership of Stocznia
Gdynia S.A.
(Gdynia Shypyard)of
Gdynia,who are
usingthem
on
a
lend
basis. lnaccordance
with
Article 3 item 1 of the agreement to transfer the titleto
secure a loanrepayment,
the transfer
of
title
to
the above said assents has taken effect
barringtermination clause which means that should Stocznia Gdynia S.A. (Gdynia Shipyard) of
Gdynia repay its debt on time, which has been secured by
the
agreement, the transferof title
shall
becomenull and void without any further need
for
the
partiesto
thisagreement to make any additional representations. At the time of settling of its liabilities,
which have
been specifiedin the
agreementto
transfertitle dated
December lEth of2008,
by
Stocznia Gdynia S.A. (Gdynia Shipyard) infavor of
Unitrans Sp.z o'o'
, thetitle to the
above listed overhead cranes shall be transferred backto
Stocznia GdyniaS.A.
(Gdynia Shipyard)of
Gdynia, without any additional representations havingto
bemade
-
at
the time
of the
liabilitieshaving been settled
in
full. The
ReceivershipAdministrator, acting
on its own
behalf,but
actingfor
Stocznia GdyniaS.A.
(GdyniaShipyard), hereby represents that the Council of Creditors, on March 11th of 2009 have
adopted
a
Motion
No.
11/2009which approved
the
Compensation Administrator'srecommendation to settle the liabilities owed to Unitrans Sp. z o.o. in the amount of PLN
1 070
800,
in
accordancewith
the
above
said
agreement
to
transfer
title
datedDecember 18th
of
2008,by
March 13thof
2009. Hence whena
bidder enters into thecontract
to
buy Area
7,
the above
mentionedoverhead cranes shall also
becomesubject to that contract and the title to them shall be henceforth transferred to the buyer.
Group
7-
comprising area 8, which includes:a.
the
right
to
a
(whatis
referredto in
Polish law
as)
perpetual usufructheld
byStocznia Gdynia S.A. (Gdynia Shipyard)
to
landas
maintainedin a
Mortgage and Land Register no.l(A/
22785, by the Gdynia District Court, of surface area of 31916 m2 and to 19 buildings found on the land, of a total area of27
52232
m2,as well asto
8 structures and 314 movables that are a part of the group, all separate propertyof Stocznia Gdynia S.A. (Gdynia Shipyard).
b.
stake in the rightto
(what is referredto in
Polish law as) perpetual usufruct held byStocznia Gdynia S.A.
to
land
includingthe wet dock no
Vl
as
maintainedin
aMortgage and Land Register by
the
Gdynia District Courtno.
|i('IU 22785 and KW 28075, of a total surface areaof
129 213 m2.c.
stake inthe
rightto
(what is referred toin
Polish law as) perpetual usufruct held by Stocznia Gdynia S.A. (Gdynia Shipyard) to land constituting internal roads..
The area comprising Group 7 has been outlined in detail in Attachment 7 to this report.Area No. 8
-
Spatial sections and hardware prefabrication zone.
Includes both
manufacturing warehouses,the
most basic ones
of
wttichpossess the following parameters:
Object Working surface
area
Length
width
Number of baysNumber of
overhead cranes
Max. hoisting capacity
of
overhead crane
Distance to head of crane
rail
lm'l
lml [m] t-l I-I lmtl lmlGa-16 2540 74.4 43.4 2 3 12 7.3
G-2028 2170 74.1 36.6 1 5 32 12.7
-
as well as open assembly stands with access to quay-
Open zone-
equipped with jigs and assembly plates serviced by 7mt craneand
-if
needed
-
by a floating crane.-
The whole zone has
accessto
power
infrastructure (electricity,water,
oxygen,acetylene, compressed air, process steam).
Group
8-
constitutes area No. 9, which includes land located on the premises of StoczniaGdynia S.A. (Gdynia Shipyard), which is property of
the
State, heldin
(what is referredto in
Polishlaw as)
,,perpetual usufruct"to
StoczniaGdynia S.A.
(Gdynia Shipyard),and
for whichthe
District Courtin
Gdynia maintainsthe
Land and Mortgage Registerno. KW
227E5and l(A/
35886,of
surface areaof
34186m2,as well as 30
buildingsstanding on
the
said land,of
a total areaof
30366.06m2, and 27 structures along with2907 movables,
all the
separate propertyof
Stocznia Gdynia S.A. (Gdynia Shipyard) and included in the group, together with a percentage share in the (what is referred to inPolish law as) perpetual usufruct given
to
Stocznia Gdynia S.A. (Gdynia Shipyard) onthe land constituting internal roads.
.
The area which
constitutesGroup
I
has been outlined
in
detail in
Attachment 8attached with this report.
Area No. 9
-
Warehouse Services and Administration Zone-
Includes permanent warehouse bays (including a warehouse bayfor
high storage) as well as 6 and 1O-storey office buildings.-
In the zone there
is
a
vehicle weighingscale 60 mt, fully
monitored,one of
the1 1gkv substations and a fresh water well.
A
spare compressor room is also locatedhere.
Group
9- constitutes area No. 10, which includes land located on the premises of StoczniaGdynia S.A. (Gdynia Shipyard), which is property of
the
State, heldin
(what is referredto in
Polishlaw
as) ,,perpetual usufruct"to
StoczniaGdynia S.A.
(Gdynia Shipyard)'and
for whichthe
District Courtin
Gdynia maintainsthe
Land and Mortgage Registerno. l(\A/
22785and
KA/
gg284,of
surfacearea
of
9722m2,as well as
2
buildingsstanding
on the
said land,of a
total areaof
1351.9m2, and4
structures alongwith
2movables,
all the
separate propertyof
Stocznia GdyniaS.A.
(Gdynia Shipyard) and included in the group..
The area wtrich constitutes Groupt
has been outlined in detail in Attachment 9 aftachedwith this report.
Area No. 10 - Spatial sections prefabrication zone
Located outside
of the
confined perimetersof the
Shipyard,
includesan
openmanufacturing yard, serviced by
a
10 mt overhead crane. Fitted with jigs; does not possess a permanent industrial gases and compressed air systems.Group
10
-
constitutesarea No. 11, which
includesland located on
the
premises ofStocznia Gdynia S.A. (Gdynia Shipyard), which is property of the State, held in (what is
referred
to in
Polishlaw as)
,,perpetual usufruct"to
Stocznia Gdynia S.A.
(GdyniaShipyard), and
for which the District Court in Gdynia maintains the Land and MortgageRegister
no.
l(A/
22785and KW
65706,of
surfacearea
of
18366m2, aswell as
80buildings standing
on the
saidland, of a total area of
5036.70m2,and
10 structuresalong
with 16
movables,all the
separate propertyof
Stocznia GdyniaS.A.
(Gdynia Shipyard) and included in the group..
The area which constitutes Group 10 has been outlined in detail in Attachment 10 attached with this rePort.Area No. 11
-
Plant and vehicle maintenance and service zone-
Includes garagespace,
motorvehicle
parking spaces,and
a
gas filling
station.There is
a
manufacturing bayin the
areafor the making
of
hardware elements(useable
surface area
of
970m2,fitted with
5
mt
overhead cranes)and
a
steelstructures prefabrication yard, serviced by
a
10 mt gantry crane, fitted with jigs. The above listed prefabrication bay possesses its own employee facilities.Group
11
-
constitutesarea No. 12, which
includesland located on the
premises ofStocznia Gdynia S.A. (Gdynia Shipyard), which is property of the State, held in (what is
referred
to in
Polishlaw as) ,perpetual
usufruct"to
Stocznia Gdynia S.A.
(GdyniaShipyard), and
for which the District Court in Gdynia maintains the Land and MortgageRegister
no.
K\A/ 22785and l(W 65706,
of
surfacearea
of
19209m2,as well as
6 buifdings standing on the said land, of a total area of 2066.7m2, and 10 structures..
The area which constitutes Group 11 has been outlined in detail in Attachment 11attached with this report.
Area No. 12
-
Auxiliary operations zoneLocated outside the confined perimeters of the Shipyard, contains an industrial gasses production works (acetylene, oxygen, argon CO2, nitrogen, etc.), that
supplies the Shipyard.
Possesses convenient roadway and railway access to the surrounding areas. At the present time, this property is being leased by Eurogaz-Gdynia Sp. z o.o.
Group
12
-
constitutesarea No. 13, which
includesland located on
the
premises ofStocznia Gdynia S.A. (Gdynia Shipyard), which is property of the State, held in (what is
referred
to in
Polishlaw as)
,,perpetual usufruct"to
Stocznia Gdynia S.A.
(GdyniaShipyard), and
for which the District Court in Gdynia maintains the Land and MortgageRegister no.
l(A/
22785, of surface areaof
8453m2, as well as4
buildings standing onthe said land, of a total area
of
3770.7m2, and 3 structures alongwith
10 movables, allthe
separate propertyof
Stocznia Gdynia S.A. (Gdynia Shipyard) and includedin
the group.The area which constitutes Group 12 has been outlined in detail in Attachment 't2 attached with this report.
Area No. 13
-
Training zone-
Includes three lecture rooms, including two practice rooms of a surface area of around 35m2 each, with the third room being approximately 100m2 in size.-
The zone also contains a welding bay of a surface area of approximately 860m2, 2teaching rooms with fitted to enable teaching of all welding techniques, and a warehouse/training yard of approximately 400m2 in size.
-
The zone is conveniently located as part of a training complex right next to the Shipbuilding Schools Complex.Group
13
-
constitutesarea No. 14, which
includesland located on
the
premises ofStocznia Gdynia S.A. (Gdynia Shipyard), which is property of the State, held in (what is
referred
to in
Polishlaw as)
,,perpetual usufruct"to
Stocznia Gdynia S.A.
(GdyniaShipyard), and
for vuhich the District Court in Gdynia maintains the Land and MortgageRegister no.
l(A/
22785, of surface areaof
17628m2, as well as 2 buildings standing onthe said land, of a total area of 909.8m2, and 3 structures along with 2 movables, all the separate property of Stocznia Gdynia S.A. (Gdynia Shipyard) and included in the group.
.
The area which constitutes Group 13 has been outlined in detail in Attachment 13 attached with this report.Area No. 14
-Vehicle
parking zone. The zone includes:-
590 parking spaces and an administrative building sitting on a partially surfaced lot-
The property additionally houses a railway ramp.Group
14
-
constitutesarea No. 15, which
includesland located on
the
premises ofStocznia Gdynia S.A. (Gdynia Shipyard), which is property of the State, held in (what is
referred
to in
Polishlaw as)
,,perpetual usufruct"to
Stocznia Gdynia S.A.
(GdyniaShipyard), and
for which the District Court in Gdynia maintains the Land and MortgageRegister no.
l(W
22785and
l(A/
39284,of
surface area
of
6777m2,as well as
2structures
and
1
movable
standingon
the
said land,
all the
separate
property ofStocznia Gdynia S.A. (Gdynia Shipyard) and included in the group.
.
The area which constitutes Group 14 has been outlined in detail in Attachment 14 attached with this report.Area No. 15
-
Vehicle parking zone. The zone includes:-
220 parking spacesl I
1
Group
15
-
constitutesarea No. 16, which
includesland located on
the
premises of Stocznia Gdynia S.A. (Gdynia Shipyard), wlrich is property of the State, hetd in (what isreferred
to in
Polishlaw as)
,,perpetual usufruct"to
stocznia Gdynia
s.A.
(GdyniaShipyard), and
for which the District Court in Gdynia maintains the Land and MortgageRegister
no.
l(A/
22785and
KW
39284,of
surfacearea
of
1712sm2,as well as
3structures along with 5 movables standing on the said land,
allthe
separate property of Stocznia Gdynia S.A. (Gdynia Shipyard) and included in the group.'
The area which constitutes Group 15 has been outlined in detail in Attachment 15 attached with this report.Area No. 16
-
Prefabricated units storage zoneThe area
includesopen
storage-
pickingand
packingyards,
servicedby
lightoverhead cranes and mounted cranes, and light-weight umbrella roof warehouses. One fresh water well is also located in this area.
The area also includes access to a railway siding.
Group
16
-
constitutesarea No. 17, which
includesland located on
the
premises ofStocznia Gdynia S.A. (Gdynia Shipyard), which is property of the State, held in (what is
referred
to in
Polishlaw as)
,,perpetualusufruct'
to
Stocznia Gdynia S.A.
(GdyniaShipyard), and
for which the District Court in Gdynia maintains the Land and MortgageRegister
no.
l(N
22785, 1(/
39284, andl(A/
45122,of
surface areaof
22284m2, aswell as 9 structures standing on the said land.
.
The area which constitutes Group 16 has been outlined in detail in Attachment 16 attached with this report.Area 17
-
Traffic zone-
a
roadfor the
heavy transportfor
arriving, external shipments andfor
internal traffic, that connects both gates of the Shipyard, which may-
once madepublicly available
-
form an
alternative routeto
Janka Wi6niewskiego streetin
Gdynia.May constitute a convenient pathway for the port's traffic.
Group
17- constitutes area No. 18, which includes land located
on the
premises ofStocznia Gdynia S.A. (Gdynia Shipyard), which is property of the State, held in (what is
referred
to in
Polishlaw as)
,,perpetual usufruct"to
Stocznia Gdynia S.A.
(GdyniaShipyard), and
for which the District Court in Gdynia maintains the Land and MortgageRegister no. l(\A/ 22785, of surface area
of
6141m2, as well as 3 buildings standing onthe said land, of a total area of 1280.49m2, and
l
structure along with 14 movables, allthe
separate propertyof
Stocznia Gdynia S.A. (Gdynia Shipyard) and includedin
the group..
The area which constitutes Group 17 has been outlined in detail in Attachment 17 attached with this report.Area No. 18
-
Prefabricated units storage zone-
The area
includesopen
storage-
picking and
packingyards,
servicedby light
weight overhead cranes
and
mounted cranes,
and
light-weight umbrella
roofwarehouses.
-
The area also possesses access to a railway siding.Group
18
-
constitutesarea No. 19, which
includesland located on
the
premises ofStocznia Gdynia S.A. (Gdynia Shipyard), which is property of the State, held in (what is
referred
to in
Polishlaw as)
,,perpetual usufruct"to
Stocznia Gdynia S.A.
(GdyniaShipyard), and
for which the District Court in Gdynia maintains the Land and MortgageRegister
no.
l(A/
22785,K /
39284, andl(A/
45122,of
surface areaof
34186m2, aswell as 1 building standing on the said land, of a total area of 283.56m2, and 1 structure
along with
2
movables,all the
separate propertyof
Stocznia Gdynia S.A.
(GdyniaShipyard) and included in the group.
.
The area which constitutes Group 18 has been outlined in detail in Attachment 18 attached with this report.Area No. 19 - Prefabricated units storage zone
-
The area
includesopen
storage-
pickingand
packingyards,
servicedby
light-weight overhead cranes
and
mounted cranes,
and
light-weight umbrella
roofwarehouses.
-
The area also includes one of the fresh water wells.-
The area also includes access to a railway siding.Group
19
-
constitutesarea No. 20, which
includesland located on the
premises ofStocznia Gdynia S.A. (Gdynia Shipyard), which is property of the State, held in (what is
referred
to in
Polishlaw as)
,,perpetual usufruct"to
Stocznia Gdynia S.A.
(GdyniaShipyard), and
for which the Distric{ Court in Gdynia maintains the Land and MortgageRegister no.
l(A/
22785, of surface areaof
10216m2, as well as 2 buildings standing onthe
said land, of a total area of 2900.8m2, and6
structures along with 70 movables, allthe
separate propertyof
Stocznia Gdynia S.A. (Gdynia Shipyard) and includedin
the group..
The area which constitutes Group 19 has been outlined in detail in Attachment 19 attached with this report.Area No. 20
-
Auxiliary operations zone-
Includes a central air compressors station and a 100kW power supply station.-
A
compressors unit madeup of 4
compressors operates here,with a
capacity ofapproximately 450 m3/min and TMPa pressure,
of
which twoare
equippedwith
a heat recuperation module, which in turn ensures appropriate heating of tap water foraround 700 staff.
Group
20
-
constitutesarea
No.21,
which
includesland located on the
premises ofStocznia Gdynia S.A. (Gdynia Shipyard), which is property of the State, held in (what is
referred
to in
Polishlaw as)
,,perpetual usufruct"to
Stocznia Gdynia S.A.
(GdyniaShipyard), and
for which the District Court in Gdynia maintains the Land and MortgageRegister
no.
l(W
22785and l(W 65706,
of
surfacearea
of
17699m2,as well as
4 structures standing on the said land..
The area which constitutes Group 20 has been outlined in detail in Attachment 20 attached with this report.Area No. 21
-Iraffic
zone-
transit rail tracks with sidingGroup
21
-
constitutesarea no. 5A, which
includesland located on the
premises ofStocznia Gdynia S.A. (Gdynia Shipyard), which is property of the State, held in (what is
referred
to in
Polishlaw as)
,,perpetualusufruct'
to
Stocznia Gdynia S.A.
(GdyniaShipyard), and
for which the District Court in Gdynia maintains the Land and MortgageRegister no.
KW 22785,1(
/
33553, of surface area of 33997m2, as well as 9 buildingsstanding
on the
said land,of
a total areaof
10159.7m2,and 15
structures along with135 movables,
all
separate propertyof
Stocznia GdyniaS.A.
(Gdynia Shipyard) andincluded
in the
group, togetherwith a
percentageshare in the
(whatis
referredto
inPolish law as perpetual usufruct) given
to
Stocznia Gdynia S.A. (Gdynia Shipyard) onland constituting internal roads.
.
The area which constitutes Group 21 has been outlined in detail in Attachment 21attached with this report.
-
Grounds that usedto
belong to a now derelict power engineering plant constitute asigniflcant section of
the
area: furnace-housing building,coal
storage yard. These buildings are presently being used to a very small extentfor
auxiliary purposes and as packing and picking yards.-
Stocznia GdyniaS.A.
(Gdynia Shipyard)has not found
worthwhile usefor
these facilities.Group
22
-
constitutesarea no. 6A, wtrich
includesland located on
the
premises ofStocznia Gdynia S.A. (Gdynia Shipyard), which is property of the State, held in (what is
referred
to in
Polishlaw as)
,,perpetual usufruct"to
Stocznia Gdynia S.A.
(GdyniaShipyard), and
for which the District Court in Gdynia maintains the Land and MortgageRegister
no.
l(A/
22785,of
surface areaof
308m2, aswell as 1
structure standing onthe said land, along with a percentage share in the (what is referred to in Polish law as)
perpetual usufruct given
to
Stocznia Gdynia
S.A.
(Gdynia Shipyard)
on the
landconstituting internal roads.
.
The area which constitutes Group 22has been outlined in detail in Attachment 22 attached with this report.(A)
Asset components subject
to
sale located
in
Szymbark,
Stq2yca gmina,
described
in
detail below
Group
23-
constitutes an area of real estate land owned by the State Treasury, in (what inPolish
law
is
referred
to
as) perpetual usufruct
of
Stocznia Gdynia
S.A.
(GdyniaShipyard), located in Szymbark, Stg2yca gmina, for which
the
District Courtin
Kartuzyconducts a land and mortgage register KW number 32495 and KW number 16399. The area of the land totals 81 .471 m2 as well as 48 buildings of an area of 3.525.09 m2 and
also 17 structures together with 119 moveable properties constituting a group, which is
the
personal property
of
StoczniaGdynia S.A. (Gdynia
Shipyard), organisedas
aleisure centre.
The area constituting Group 23 is described in detail in Attachment no. 23 of this document.
(B)
Asset
components
of
the shipyard subject
to
sale constituting
financial
assets
in
the form
of shares
for
the
following subjects:
Grupa
24-
15.135 shares in the company"EUROMOS' with its headquarters in Gdynia of
a
total
nominalvalue of
7.567.500,00PLN
representinga
100%share in the
initialcapital of the company and the number of votes in the General Meeting of Shareholders of ,,EUROMOS" Sp. z o.o., with its headquarters in Gdynia
being constructed and the sea service of ships
restructurization
of
Stocznia Gdynia
S.A. (Gdynia Shipyard),
inheritingmany years
of
experience
in
the field
of
sea
service and
technicalpreservation of ships in construction and in repair
floating
crane DOR 100
tonnes; warping; mooring; diving;
pontoontransport; ventilation
and
heating;
wiring,
commandeering
andboatswaining
Group
25
-
1.900 shares
in
the
company