RENCANA ANGGARAN BIAYA ( RAB )

PEKERJAAN PEMINDAHAN TIANG LISTRIK KM 2 - KM 7 PENAJAM

LOKASI KECAMATAN PENAJAM

NO URAIAN PEKERJAAN Harga Jumlah

Satuan Volume Satuan (Rp) Harga (Rp)

A. PEMINDAHAN TIANG LISTRIK

I MATERIAL UTAMA

1 Tiang Beton 13 m Batang 85.00 10,470,000.00 889,950,000.00

2 Tiang Beton 11 m Batang 3.00 8,350,000.00 25,050,000.00

3 Tiang Beton 9 m Batang 57.00 6,972,467.00 397,430,619.00

4 Kawat AAACS 70 mm Meter 13,032.00 23,700.00 308,858,400.00

5 Kabel NYY 120 mm Meter 88.00 195,900.00 17,239,200.00

6 Kabel NYY 90 mm Meter 132.00 118,980.00 15,705,360.00

7 Kabel Twisteed AL 3x70 + 1x50 mm Meter 7,763.00 46,904.00 364,115,752.00

JUMLAH A 2,018,349,331.00

II MATERIAL NON UTAMA

1 Trafers UNP 8x2x200 cm Lengkap Buah 22.00 682,800.00 15,021,600.00

2 Trafers UNP 8x185 cm Buah 79.00 204,000.00 16,116,000.00

3 Pin Post Isolator 20 KV Buah 270.00 273,000.00 73,710,000.00

4 Strain Isolator Set 33.00 510,000.00 16,830,000.00

5 Arm Tie Buah 101.00 81,120.00 8,193,120.00

6 Material Trec Score Set 22.00 582,000.00 12,804,000.00

7 Material Druc Score Set 3.00 490,485.00 1,471,455.00

8 CCO 5T5 Buah 73.00 70,320.00 5,133,360.00

9 Fix And Dead Assy Buah 30.00 80,419.00 2,412,570.00

10 Suspension Assy Buah 125.00 50,578.00 6,322,250.00

11 Stainless Steel Strip Meter 84.00 12,898.00 1,083,432.00

12 Kabel Twisteed AL 2x10 mm Meter 2,300.00 3,654.00 8,404,200.00

13 CCO 1T1 Buah 312.00 12,100.00 3,775,200.00

14 Service Wadge Clamp Buah 312.00 3,850.00 1,201,200.00

15 Pole Breacket 7 In untuk Tiang Beton Set 69.00 16,830.00 1,161,270.00

16 Transport Material Ls 1.00 25,000,000.00 25,000,000.00

198,639,657.00

III UPAH KERJA

1 Mendirikan Tiang 13 mtr / Pembongkaran Batang 85.00 616,860.00 52,433,100.00 2 Mendirikan Tiang 11 mtr / Pembongkaran Batang 3.00 565,000.00

3 Mendirikan Tiang 9 mtr / Pembongkaran Batang 57.00 495,000.00 28,215,000.00 4 Pasang Trafers UNP / Pembongkaran Buah 101.00 47,790.00 4,826,790.00 5 Pasang Pin Post Isolator / Pembongkaran Buah 270.00 31,625.00 8,538,750.00 6 Pasang Strain Isolator / Pembongkaran Buah 33.00 35,625.00 1,175,625.00 7 Pasang Arm Tie / Pembongkaran Buah 101.00 21,000.00 2,121,000.00 8 Pasang Material Trec Scoer / Pembongkaran Buah 22.00 152,310.00 3,350,820.00 9 Pasang Material Druc Scoer / Pembongkaran Buah 3.00 158,860.00 476,580.00 10 Pasang Kontramask / Pembongkaran Buah 1.00 211,309.00 211,309.00 11 Pasang SUTM AAACS 150 mm / Pembongkaran Gawang 86.00 173,505.00 14,921,430.00 12 Pasang Twisteed AL 2x70 + 1x50 mm / PembongkaranGawang 142.00 114,359.00 16,238,978.00

13 Pengepresan Buah 385.00 30,000.00 11,550,000.00

14 Pemasangan Accessorir SUTR Buah 112.00 75,600.00

15 Pemasangan / Pembongkaran SR Buah 156.00 85,608.00 13,354,848.00 16 Biaya Serah Terima Operasi (Commisioning Test) Ls 1.00 25,000,000.00 25,000,000.00

182,414,230.00

SUB JUMLAH A 2,399,403,218.00

B. PEMINDAHAN GARDU DISTRIBUSI

I MATERIAL UTAMA

1 Lighting Arrester 24 KV 10 A Buah 9.00 3,067,920.00 27,611,280.00

(2)

3 Kabel NYFGBY 4 x 95 mm Meter 200.00 686,400.00 137,280,000.00

4 Tiang Beton 11 meter Batang 3.00 8,350,000.00 25,050,000.00

JUMLAH A 222,106,380.00

II MATERIAL NON UTAMA

1 Fuse Link 6 A - 20 KV Buah 9.00 44,580.00 401,220.00

2 Bordesk Trafo Tiang Tunggal Set 1.00 2,975,000.00 2,975,000.00

3 Bordesk Trafo Tiang Ganda Set 2.00 4,380,000.00 8,760,000.00

4 Trafers UNP 6,5x240 cm untuk Cut Out Buah 8.00 281,700.00 2,253,600.00

5 LV Bord 2 Jurusan 400 Amper Set 1.00 7,260,000.00 7,260,000.00

6 LV Bord 4 Jurusan 630 Amper Set 2.00 12,632,400.00 25,264,800.00

7 Trafers UNP 6,5x240 cm untuk LV Bord Buah 6.00 281,700.00 1,690,200.00

8 Kabel NYY 120 mm Meter 132.00 195,900.00 25,858,800.00

9 Kabel NYY 95 mm Meter 220.00 118,980.00 26,175,600.00

10 Pipa Galvanize 3 inchi lengkap inporing Batang 3.00 789,900.00 2,369,700.00 11 Pipa Galvanize 2,5 inchi lengkap inporing Batang 5.00 604,930.00 3,024,650.00 12 Arm Tie PPI lengkap Klam / Bolt Set 6.00 81,120.00 486,720.00 13 Material Grounding / Arde 2,75 mtr Set 3.00 905,880.00 2,717,640.00 14 Material Grounding / Arde 5,50 mtr Set 3.00 1,305,000.00 3,915,000.00

15 Perlengkapan LV Bord Set 2.00 635,000.00

16 Pondasi Trafo Tiang Tunggal Buah 1.00 514,800.00 514,800.00

17 Pondasi Trafo Tiang Ganda Buah 2.00 574,560.00 1,149,120.00

18 Comp Conector AL 70 mm / (CCO 5T5) Buah 12.00 70,319.00 843,828.00 19 Sambungan AL / CU 5T5 70/95 mm Buah 28.00 52,710.00 1,475,880.00

20 Plat Tanda Bahaya Buah 3.00 78,000.00 234,000.00

21 Sepatu Kabel 120 mm Buah 12.00 54,340.00 652,080.00

22 Sepatu Kabel 95 mm Buah 32.00 51,700.00 1,654,400.00

23 Papan Ulin 3/4 inchi Lembar 30.00 66,000.00 1,980,000.00

24 Stainless Steel Strip Meter 30.00 13,700.00 411,000.00

25 Kabel Twisteed AL 2x10 mm Meter 2,300.00 3,654.00 8,404,200.00

26 CCO 1T1 Buah 216.00 12,100.00 2,613,600.00

27 Service Wadge Clamp Buah 108.00 3,850.00 415,800.00

28 Pole Breacket 7 inchi untuk Tiang Beton Set 42.00 16,830.00 706,860.00

29 Transport Material Ls 1.00 20,000,000.00 20,000,000.00

154,208,498.00

III UPAH KERJA

1 Pasang Sepatu Kabel / Pembongkaran Buah 308.00 17,500.00 5,390,000.00 2 Pasang Bordesk Trafo Tiang Tunggal / Bongkar Buah 1.00 274,755.00 274,755.00 3 Pasang Bordesk Trafo Tiang Ganda / Bongkar Buah 2.00 461,585.00 923,170.00 4 Pasang Cut Out / Pembongkaran Buah 9.00 227,700.00 2,049,300.00 5 Pasang Lighting Arrester / Pembongkaran Buah 9.00 227,700.00 2,049,300.00

6 Pasang Arde Buah 6.00 50,310.00 301,860.00

7 Pasang Perlengkapan LV Bord / Bongkar Buah 3.00 498,185.00 1,494,555.00

8 Pengepresan Buah 115.00 30,000.00 3,450,000.00

9 Pemasangan Kabel Ponding Buah 10.00 414,170.00 4,141,700.00

10 Bongkar Pasang Pondasi Trafo Buah 3.00 50,310.00 150,930.00

11 Bongkar Pasang Trafo Buah 3.00 976,040.00 2,928,120.00

12 Upah Pemasangan Kabel Tanah Meter 216.00 48,000.00 10,368,000.00

13 Transport Material Ls 1.00 17,500,000.00 17,500,000.00

14 Biaya Serah Terima Operasi (Commisining Test) Ls 1.00 20,000,000.00 20,000,000.00

71,021,690.00 SUB JUMLAH B 447,336,568.00 JUMLAH A + B 2,846,739,786.00 PPN 10% 284,673,978.60 TOTAL JUMLAH 3,131,413,764.60 3,131,413,000.00 OE

(3)

Harga Satuan (Rp) 8,950,000.00 7,600,000.00 623,400.00 593,100.00 JUMLAH A

(4)
(5)

HARGA PERKIRAAN SENDIRI (HPS)

PEKERJAAN PEMINDAHAN TIANG LISTRIK KM 2 - KM 7 PENAJAM

LOKASI KECAMATAN PENAJAM

NO URAIAN PEKERJAAN Harga Jumlah

Satuan Volume Satuan (Rp) Harga (Rp)

A. PEMASANGAN DAN PENGADAAN TIANG LISTRIK

I MATERIAL UTAMA

1 Tiang Beton 13 m Batang 85.00

2 Tiang Beton 9 m Batang 57.00

3 Kawat AAACS 70 mm Meter 13,032.00

4 Kabel Twisteed AL 3x70 + 1x50 mm Meter 7,763.00

JUMLAH A

-II MATERIAL NON UTAMA

1 Trafers UNP 8x2x200 cm Lengkap Buah 22.00

2 Trafers UNP 8x185 cm Buah 79.00

3 Pin Post Isolator 20 KV Buah 270.00

4 Strain Isolator Set 33.00

5 Arm Tie Buah 101.00

6 Material Trec Score Set 22.00

7 Material Druc Score Set 3.00

8 CCO 5T5 Buah 73.00

9 Fix And Dead Assy Buah 30.00

10 Suspension Assy Buah 125.00

11 Stainless Steel Strip Meter 84.00

12 Kabel Twisteed AL 2x10 mm Meter 2,300.00

13 CCO 1T1 Buah 312.00

14 Service Wadge Clamp Buah 312.00

15 Pole Breacket 7 In untuk Tiang Beton Set 69.00

16 Transport Material Ls 1.00

III UPAH KERJA

1 Mendirikan Tiang 13 mtr / Pembongkaran Batang 85.00

2 Mendirikan Tiang 9 mtr / Pembongkaran Batang 57.00

3 Pasang Trafers UNP / Pembongkaran Buah 101.00

4 Pasang Pin Post Isolator / Pembongkaran Buah 270.00

5 Pasang Strain Isolator / Pembongkaran Buah 33.00

6 Pasang Arm Tie / Pembongkaran Buah 101.00

7 Pasang Material Trec Scoer / Pembongkaran Buah 22.00 8 Pasang Material Druc Scoer / Pembongkaran Buah 3.00

9 Pasang Kontramask / Pembongkaran Buah 1.00

10 Pasang SUTM AAACS 150 mm / Pembongkaran Gawang 86.00 11 Pasang Twisteed AL 2x70 + 1x50 mm / PembongkaranGawang 142.00

12 Pengepresan Buah 385.00

13 Pemasangan / Pembongkaran SR Buah 156.00

SUB JUMLAH A

-B. PEMASANGAN DAN PENGADAAN GARDU DISTRIBUSI

I MATERIAL UTAMA

1 Lighting Arrester 24 KV 10 A Buah 9.00

2 Open Disk Cut Out 3-6 A Buah 9.00

3 Kabel NYFGBY 4 x 95 mm Meter 200.00

4 Tiang Beton 11 meter Batang 3.00

(6)

-II MATERIAL NON UTAMA

1 Fuse Link 6 A - 20 KV Buah 9.00

2 Bordesk Trafo Tiang Tunggal Set 1.00

3 Bordesk Trafo Tiang Ganda Set 2.00

4 Trafers UNP 6,5x240 cm untuk Cut Out Buah 8.00

5 LV Bord 2 Jurusan 400 Amper Set 1.00

6 LV Bord 4 Jurusan 630 Amper Set 2.00

7 Trafers UNP 6,5x240 cm untuk LV Bord Buah 6.00

8 Kabel NYY 120 mm Meter 132.00

9 Kabel NYY 95 mm Meter 220.00

10 Pipa Galvanize 3 inchi lengkap inporing Batang 3.00 11 Pipa Galvanize 2,5 inchi lengkap inporing Batang 5.00

12 Arm Tie PPI lengkap Klam / Bolt Set 6.00

13 Material Grounding / Arde 2,75 mtr Set 3.00

14 Material Grounding / Arde 5,50 mtr Set 3.00

15 Pondasi Trafo Tiang Tunggal Buah 1.00

16 Pondasi Trafo Tiang Ganda Buah 2.00

17 Comp Conector AL 70 mm / (CCO 5T5) Buah 12.00

18 Sambungan AL / CU 5T5 70/95 mm Buah 28.00

19 Plat Tanda Bahaya Buah 3.00

20 Sepatu Kabel 120 mm Buah 12.00

21 Sepatu Kabel 95 mm Buah 32.00

22 Papan Ulin 3/4 inchi Lembar 30.00

23 Stainless Steel Strip Meter 30.00

III UPAH KERJA

1 Pasang Sepatu Kabel / Pembongkaran Buah 308.00

2 Pasang Bordesk Trafo Tiang Tunggal / Bongkar Buah 1.00 3 Pasang Bordesk Trafo Tiang Ganda / Bongkar Buah 2.00

4 Pasang Cut Out / Pembongkaran Buah 9.00

5 Pasang Lighting Arrester / Pembongkaran Buah 9.00

6 Pasang Arde Buah 6.00

7 Pasang Perlengkapan LV Bord / Bongkar Buah 3.00

8 Pengepresan Buah 115.00

9 Pemasangan Kabel Ponding Buah 10.00

10 Bongkar Pasang Pondasi Trafo Buah 3.00

11 Bongkar Pasang Trafo Buah 3.00

12 Upah Pemasangan Kabel Tanah Meter 216.00

13 Biaya Serah Terima Operasi (Commisining Test) Ls 1.00

(7)

-Harga Satuan (Rp) 10,470,000.00 6,972,467.00 23,700.00 46,904.00 JUMLAH A 682,800.00 204,000.00 273,000.00 510,000.00 81,120.00 582,000.00 490,485.00 70,320.00 80,419.00 50,578.00 12,898.00 3,654.00 12,100.00 3,850.00 16,830.00 25,000,000.00 616,860.00 495,000.00 47,790.00 31,625.00 35,625.00 21,000.00 152,310.00 158,860.00 211,309.00 173,505.00 114,359.00 30,000.00 85,608.00 25,000,000.00 3,067,920.00 3,573,900.00 686,400.00 8,350,000.00 JUMLAH A

(8)

44,580.00 2,975,000.00 4,380,000.00 281,700.00 7,260,000.00 12,632,400.00 281,700.00 195,900.00 118,980.00 789,900.00 604,930.00 81,120.00 905,880.00 1,305,000.00 514,800.00 574,560.00 70,319.00 52,710.00 78,000.00 54,340.00 51,700.00 66,000.00 13,700.00 17,500.00 274,755.00 461,585.00 227,700.00 227,700.00 50,310.00 498,185.00 30,000.00 414,170.00 50,310.00 976,040.00 48,000.00 20,000,000.00

(9)

REKAPITULASI

HARGA PERKIRAAN SENDIRI (HPS)

PEKERJAAN PEMINDAHAN TIANG LISTRIK KM 2 - KM 7 PENAJAM

LOKASI KECAMATAN PENAJAM

NO

JUMLAH HARGA (RP)

A

PEMASANGAN DAN PENGADAAN

1 Material Utama

2 Material Non Utama

3 Upah Kerja

B

PEMASANGAN DAN PEMASANGAN GARDU DISTRIBUSI

1 Material Utama

2 Material Non Utama

3 Upah Kerja

TOTAL

-PPN 10%

-JUMLAH TOTAL

-TOTAL DIBULATKAN

-Terbilang :

Dibuat oleh:

URAIAN

Derektur/dekektris

PT/CV...

Referensi

Dokumen terkait

TEMPAT PENGUMPUL SEMENTARA (GUDANG BUAH). NO URAIAN PEKERJAAN VOL SAT HARGA UPAH

No Uraian Pekerjaan Volume Satuan Harga Satuan/m Jumlah Harga. 1 Roller Blind

KODE REKENING PROGRAM, KEGIATAN, URAIAN PEKERJAAN VOLUME SATUAN HARGA JUMLAH LOKASI.. Revitalisasi Pasar Desa Bakti

NO KEGIATAN URAIAN PEKERJAAN Lokasi Perusahaan NPWP Alamat Nama Jabatan HPS Harga Negosiasi Pelaksanaa Masa n..

DINAS PENDIDIKAN KABUPATEN TASIKMALAYA TAHUN 2012.. No Uraian Pekerjaan Jumlah

PEKERJAAN : PEMELIHARAAN DAERAH IRIGASI MENU LOKASI : DESA MENU, KECAMATAN NUNKOLO TAHUN ANGGARAN : 2013. Jarak Angkut Biaya Lain Harga Satuan ( Km ) Lain ( Rp ) (

DI LOKASI BUMI PALIR SEJAHTERA PERUM PERUMNAS CABANG SEMARANG I URAIAN PEKERJAAN

EVOLUZIONE TYRES Tahun : 2023 Waktu : 60 Hari Kalender HARGA SATUAN JUMLAH HARGA RP.. URAIAN PEKERJAAN SAT VOLUME Page