5
0
0

Teks penuh

(1)
(2)

4500

40004000 8000

3000 4500

12000

4000

8000 4000

1000

DENAH REST AREA

Scale 1 : 100

DENAH REST AREA 1:100

KP.001

001 of 005

21-Jun-23

D:\PROJECT MGP\PROJECT MGP\REST AREA\REST AREA.dwg

DWG - 001

- -

REST AREA EVOLUTION TYRES

Subang - JAwa Barat

FL. +000 FL. +000

FL. +000

Area Tempat Duduk Area

Meja

Area Tempat Duduk

Area Meja

Area Tempat Duduk Area

Meja

Area Tempat Duduk

Area Meja

(3)

3000

200 300 300

5502501000

800

800 80

200 300 300

800

200 300 300

800

80

200 300 300

800

12000

4500 3000

4500

500250 500250

2000

TAMPAK DEPAN

Scale 1 : 100 FL. +000

UNDERFLOOR

TAMPAK DEPAN 1:100

KP.002

002 of 005

21-Jun-23

D:\PROJECT MGP\PROJECT MGP\REST AREA\REST AREA.dwg

DWG - 002

- -

REST AREA EVOLUTION TYRES

Subang - JAwa Barat

Kolom Beton 1m Kolom Baja Hollow 100x100

Area Tempat Duduk Area

Tempat Duduk

(4)

Project : Pembangunan Rest Area Lokasi : PT. EVOLUZIONE TYRES Tahun : 2023

Waktu : 60 Hari Kalender

HARGA SATUAN JUMLAH HARGA

(RP.) (RP.)

I PEKERJAAN PERSIAPAN

1 Pekerjaan pembersihan dan Perataan Ls 1,00 Rp 2.500.000,00 Rp 2.500.000,00

2 Mobe Demob Alat dan tenaga Ls 1,00 Rp 2.500.000,00 Rp 2.500.000,00

3 Pemasangan Bowplang Ls 1,00 Rp 1.750.000,00 Rp 1.750.000,00

4 P3k dan Safety Harnes Ls 1,00 Rp 750.000,00 Rp 750.000,00

5 Alat bantu kerja Ls 1,00 Rp 1.750.000,00 Rp 1.750.000,00

6 Koordinasi & keamanan Ls 1,00 Rp 1.750.000,00 Rp 1.750.000,00

Sub.Total : Rp 11.000.000,00

II AREA BANGUNAN

A.1 PEKERJAAN BETON DAN STRUKTUR 1 Galian pondasi dan sloof

- Galian 80cm x 80cm x 1m Unit 12,00 Rp 378.500,00 Rp 4.542.000,00 - Galian 40cm x 30cm x 15m Ls 1,00 Rp 4.760.000,00 Rp 4.760.000,00

Sub.Total : Rp 9.302.000,00

2 Beton Pilecape/pondasi beton

- Beton setmix m3 5,18 Rp 900.000,00 Rp 4.662.000,00

- Besi ø10 btg 19,45 Rp 92.500,00 Rp 1.799.208,25

- Besi ø8 btg 11,67 Rp 76.500,00 Rp 892.796,31

- Begisting m2 7,51 Rp 90.000,00 Rp 675.990,00

Sub.Total : Rp 8.029.994,56

3 Beton sloof

- Besi ø10 btg 28,89 Rp 92.500,00 Rp 2.671.908,75

- Besi ø8 btg 15,89 Rp 76.500,00 Rp 1.215.357,41

- Beton m3 2,10 Rp 725.500,00 Rp 1.523.550,00

- Begesting m2 6,93 Rp 90.000,00 Rp 623.700,00

Sub.Total : Rp 6.034.516,16

4 Beton lantai

- Beton setmix m3 14,40 Rp 900.000,00 Rp 12.960.000,00

Sub.Total : Rp 12.960.000,00

5 Kolom Beton

- Besi ø10 btg 21,16 Rp 92.500,00 Rp 1.957.207,50

- Besi ø8 btg 11,64 Rp 76.500,00 Rp 890.264,93

- Beton m3 1,80 Rp 725.500,00 Rp 1.305.900,00

- Begesting m2 5,94 Rp 90.000,00 Rp 534.600,00

Sub.Total : Rp 4.687.972,43

4 Kolom Baja

- hollow 100x100x2mm btg 18,00 Rp 1.128.500,00 Rp 20.313.000,00

- Baut 10 bh 70,00 Rp 9.200,00 Rp 644.000,00

Sub.Total : Rp 20.957.000,00

5 Balok Baja

- hollow 80x80x2mm btg 35,00 Rp 632.750,00 Rp 22.146.250,00

- Baut 10 bh 70,00 Rp 9.200,00 Rp 644.000,00

Sub.Total : Rp 22.790.250,00

B.2 PEKERJAAN ATAP

- Spandek pasir 0.35mm m2 87,80 Rp 328.500,00 Rp 28.842.300,00

- hollow 40x40 btg 60,00 Rp 185.000,00 Rp 11.100.000,00

- sealant btl 30,00 Rp 68.500,00 Rp 2.055.000,00

- Baut 8.8 bh 70,00 Rp 5.200,00 Rp 364.000,00

Pembangunan Rest Area Baru

RENCANA ANGGARAN BIAYA ( RAB )

NO. URAIAN PEKERJAAN SAT VOLUME

Page 1

(5)

HARGA SATUAN JUMLAH HARGA

(RP.) (RP.)

NO. URAIAN PEKERJAAN SAT VOLUME

- baut roffing duz 5,00 Rp 215.200,00 Rp 1.076.000,00

Sub.Total : Rp 43.437.300,00

C.3 FINISHING

1 Pekerjaan Finishing

- Pasang batu bata tempat duduk dan meja m2 71,57 Rp 250.000,00 Rp 17.892.500,00 - Pasang batu bata saluran air m1 11,00 Rp 260.000,00 Rp 2.860.000,00 - Pasang batu bata tanggulan t.10cm m1 17,00 Rp 180.000,00 Rp 3.060.000,00

- Plester m2 68,61 Rp 47.000,00 Rp 3.224.670,00

- Aci kursi 40x40 m2 19,20 Rp 80.000,00 Rp 1.536.000,00

- Aci kursi 70x2.5 m2 19,26 Rp 80.000,00 Rp 1.540.800,00

- Aci kursi smoking area m2 30,16 Rp 80.000,00 Rp 2.412.720,00

- Aci meja m2 33,76 Rp 80.000,00 Rp 2.700.800,00

- Pasang batu alam m1 24,09 Rp 256.000,00 Rp 6.167.040,00

- Pembesian meja wiremesh m8 m2 32,08 Rp 78.500,00 Rp 2.518.280,00

- Begesting m2 7,60 Rp 90.000,00 Rp 684.000,00

- Pengecoran meja t.5cm unit 5,00 Rp 725.500,00 Rp 3.627.500,00

- Batu koral m2 87,64 Rp 45.000,00 Rp 3.943.800,00

- Plenter box tanaman unit 2,00 Rp 350.000,00 Rp 700.000,00 - Pagar besi Tinggi 70cm,finish cat unit 1,00 Rp 5.500.000,00 Rp 5.500.000,00

Sub.Total : Rp 58.368.110,00

D.4 ELEKTRIKAL

- Pemasangan jalur instalasi lampu m1 132,00 Rp 62.500,00 Rp 8.250.000,00 - Pemasangan jalur instalasi cctv m1 62,00 Rp 62.500,00 Rp 3.875.000,00 - Pemasangan fitting lampu bh 8,00 Rp 35.000,00 Rp 280.000,00

- Pemasangan Lampu bh 8,00 Rp 18.500,00 Rp 148.000,00

- CCTV unit 2,00 Rp 1.355.000,00 Rp 2.710.000,00

Sub.Total : Rp 15.263.000,00

III

1 Pembersihan akhir ls 1,00 Rp 5.000.000,00 Rp 5.000.000,00

Sub.Total : Rp 5.000.000,00

TOTAL Rp 217.830.143,15 DIBULATKAN Rp 217.000.000,00 PPN 11 % Rp 23.870.000,00 GRAND TOTAL Rp 240.870.000,00 PEKERJAAN LAIN-LAIN

Page 2

Referensi

Dokumen terkait

LUNAR Language and Art ISSN: 2541-6804 Vol 4 No 1 May 2020 Page | 123 A Descriptive Study of the Difficulties in Using Regular and Irregular Verbs in Simple Past Tense of the

Pedoman Menu ● Menu hari ke-1 Waktu makan Menu Bahan makanan segar Bahan makanan kering Bumbu Harga satuan Rp... 77.348 ● Menu hari ke-2 Waktu makan Menu Bahan makanan segar