Environmental and Social Monitoring Report. Indonesia: Eastern Indonesia Renewable Energy Project (Phase 2)

N/A
N/A
Protected

Academic year: 2021

Membagikan "Environmental and Social Monitoring Report. Indonesia: Eastern Indonesia Renewable Energy Project (Phase 2)"

Copied!
39
0
0

Teks penuh

(1)

Project Number: 51209-002

January–December 2018

Appendix

March 2021

Indonesia: Eastern Indonesia Renewable Energy

Project (Phase 2)

Prepared by PT Infrastruktur Terbarukan Adhiguna, PT Infrastruktur Terbarukan Buana and

Infrastruktur Terbarukan Cemerlang for the Asian Development Bank.

The Environment and Social Monitoring Report is a document of the borrower. The views expressed

herein do not necessarily represent those of ADB's Board of Directors, Management, or staff, and

may be preliminary in nature. Your attention is directed to the “Terms of Use” section of this website.

In preparing any country program or strategy, financing any project, or by making any designation of

or reference to a particular territory or geographic area in this document, the Asian Development

Bank does not intend to make any judgments as to the legal or other status of any territory or area.

(2)
(3)

SgnTTFIKAT

HaSIT ANALISIS

Crx.rrrICATE

Or

ANaIYSIS

Nama

Klien

Client

Name

Address

Address

Coneming

Conceming

U.p-Afrentian ta

BFFERENSI

REtrEEEIVCES

No. Registrasi

He_qrsfralron ruo.

fanggal

Penerbitan Sertifikat

Date af

Ce4itieaE

lssuance

Jumlah Total Halaman

PT BMT

Asia Pacific lndonesia

Perkantoran Hijau

ArkadiaTower

C, P Floor

Jl: T.B. Simatupang Kav.88,

Jakarta Selatan, 12520 DKI Jakarta

Tel: (62) 21 782763s

178?!827

Fat<:

(67) 21 7827636,

Web: www.bmtasia.co.id

Divisi Laboratorium

(BMf

Lab)

Grha

BMTAsia

Paeific lndonesia

Jl. Pageran Sogiri No.61 FIT/RW 01/05

Kei. Tanah Elaru, Kec. Bogor Utara

Kota Bogor,

1615{

Jawa Barat

Tel/Fax: (62) 251 8327533

Emailr [email protected]

No. BMT-EMTL-SI"

0.19-AA67

PT

VENA ENERGY SRTNGGABAYA

5

MW)

THE

PIAA

OFFIGE

TOVVER,

5H

FLOOR

JL.

MH.

THA}'RIN KAV,28€0,

JAI(AHTA, INDONESIAlOSsO

Conshrdion

UNL UPL

Implementation

Mr.AdiNda*nadja

0067/EMTL-REGI12019

'1

1 Februari 2019

3 halaman

Halaman

1

dari3

BMT-EMTL.IV,5.1O,1.1

TedlivRevisi

:

ZO

(

03-0&2015 /

-) Sedif*at iqi

ditdbiiis

di

beah

syarat dan

ksenl€n PI

BMT Asia Pacttic

lrdoresia.

dan ddak dapat digandakan;

Salin4

seltifikal ini lersedia

suai

psmintaafl

(4)

''Wr*T

Asia

Pacific

No.

Sertifikat

No.

Registrasi

Nama

Kiien

U.p.

PT

BllT

Asia Pacific Indonesia

Perkantoran Hijau Arkadia Tower C, P Floor

Jl:

f

.B. Simatupang Kav.88,

Jakarta Selatan, 12520 DKI Jakarta

Tel: (62) 21 7827639

I

78208?7

Fax.

162)

21 7827636

!.Veb

wr'vl,,,

brriasra.c.o

i;

IruronMASI

COxTOH

BMT-EMTL,s10

1

9-0067

0067/EMTL-REGlV2019

PT.

Vena Energy

Mr.

Adi Nataatmadja

Divisi Laboratorium (Bl\/T Lab)

Grha BMT Asia Paci{ic lndonesia

Jl

Pageran Sogiri No.61 BTIEW 01,/05

Kel. Taneh

Baru, Kec. Bogor Ulara

Kota Bogor,

'1 61

54 Jawa Barat

TeliFax: (62) 251 a327533

=iralir

l:xxilaii(abi":t:ls

:i..c

icl

lj

iltrilrfi

fililiililt]fl[trffiltr]ufi

ffitE

Halaman 2 dari 3

BIVT-EN,ITL.IV,5,

] 0.1 .1 Terbit/rRevisi : 2/0 ( 03-08-2015 1'-)

(5)

Jenis Contoh

No.

Lab.

Waktu

Sampling

:

Medan Magnet dan Medan

Listrik

:

.190067-.1

:

11.20 WITA

No. Sert'fikat

Nama

Klien

U.p.

ldentitas

Contoh

Matriks

Contoh

Lokasr

Tanggai Sampling

Koordinat

:

BMT-EMTL-SI0.19-0067

:

PT.

Vena

Energy

:

Mr.

Adi Nataatmadja

:

MM

-

Area

Projek PLTS Dekat Sutel

:

Medan Magnet

& Listrik

:

Kab

Lombok Timur

'. 22Januari2O19

:

S 8"31

'09.5"t E 116'38'04.4"

MEDAN

MAGNET

DAN

MEDAN

LISTRIK

IEC

61

786:

1

998

KEIERANGAN

:

'

PerMenKes

No

70

Tahun

20 1

6

(

Tenlafg Standar dan Syarat Kesehatan Lingkungan Keria ) - BAB

ll A.d.1

.a

Tabel

1

0 (Seluruh

Tubuh

-

Tempat Kerla Umum)

LOR

:

Balas

Pelaportr

{Limit

af Repafting)

MEDAN

MAGNET DAN

MEDAN

LISTRIK

Kuat Medan

Llstrik Satis

<30

kHz

IEC

61786:1998

KETEBANGAN:LPerMenKesNo.70Tahun2016(TentangStandardanSyaralKesehatanLingkunganKerja)

BAB ll.A.d 2.a. Tabel

I1

(Tempat Kerja Tidak lebih darl

B

Jam Kerja)

LOR

:

Batas Pelaporan

(.Limii

af Repaning)

PT Bl./-- As a

=3air,a.

narane:i:

-erkartoiaf,

lljeLi

ArKaaia T.w-of C.

p

tr

col

,li:

i i

Sr[]jlrcarg

Krv

68

Jaf:aira

Seie

ian,

1252i,

[.rK]

Jekana

Ii;i

i62i

2i

7927639

i

7?J?JZ.:1

Fax

ia2)

2l

7t276-1tl

tl

visr

Latriaioriur-

iEi!4r

.ait.

Gf

ra Bll

l

Asia

iracri,a r,JJresr.l

u

tagerar:

S.giii

N.0l

P:,ri:\4

il

C5

{el

ranah

Bar-rr

(ei

EcJor

lirfa

'ricla

E.g.f

16i 54

..ja

,

.3iai

TE';ax

i62l 2a''

23215::?

tlliltl

lffi

.llllt,li}li

tffllflIii

l,IlE

Halarnan 3

dar

3

ELlr

E\l;L

tV

5

rrt

i

.l

.rc1:Pt!i:l

2,'i

i0:

03

:315i

l

(6)

Hal 1 dari 4

LAPORAN HASIL UJI

File

:

D.01.032/LHU/2019

Pelanggan

:

PT. Vena Energy (Pringgabaya 5 MW)

Alamat

:

The Plaza Office Tower, 25

th

Floor

Jl. MH. Thamrin Kav. 28-30, Jakarta

Laporan

:

- Kualitas Udara Ambien

- Kualitas Udara Ruang Kerja

Tanggal diterima

:

30 Januari 2019

Tanggal selesai

:

13 Februari 2019

PT. ITEC SOLUTION INDONESIA

Endih Saikudin

Supervisor Teknis

1. Complaints within two (2) weeks of the issuance of certificates;

2. The results of these tests are not to be duplicated and only applies to parameter mentioned;

3. The laboratory is not responsible in the process of sampling for sample sent directly from the customer.

PT. ITEC SOLUTION INDONESIA

Bogor Nirwana Residence

Jl.PadmaNirwana Raya No. 6 Bogor

P:0251-7560193, F:021-8715685

Email:

[email protected]

(7)

File

: D.01.032/LHU/2019

No. Analisis

: D.01.032.a-UA.19

Deskripsi contoh

:

Kualitas Udara Ambien

Lokasi

: Jalan Akses Stone Crusher 1

Koordinat

: S 08

0

31’35.8”; T 116

0

38’02.5”

Tanggal diterima

: 30 Januari 2019

Tanggal pengujian

: 30 Januari 2019 - 12 Februari 2019

No

Parameter

Satuan

Hasil

Analisa

Baku Mutu

Metode

1

Sulfur Dioksida (SO

2

)***

µg/Nm

3

31.85

900*

SNI 19-7119.7-2005

2

Karbon Monoksida (CO)

µg/Nm

3

1433

30000*

SNI 19-7119.10-2011

3

Nitrogen Dioksida (NO

2

)***

µg/Nm

3

9.36

400*

SNI 19-7119.2-2005

4

Ozon (O

3

)

µg/Nm

3

5.29

235*

SNI 19-7119.8-2005

5

Hidrokarbon (HC)

µg/Nm

3

8.67

160*

SNI 7119.13-2009

6

Partikel <10 μm (PM

10

)

µg/Nm

3

9.13

150*

Gravimetric

7

Partikel <2,5 μm (PM

2,5

)

µg/Nm

3

2.56

65*

Gravimetric

8

Particulate (TSP)

µg/Nm

3

14.72

230*

SNI 19-7119.3-2005

9

Timbal (Pb)

µg/Nm

3

<0.005

2*

SNI 19-7119.4-2005

10

Kebisingan***

dBA

64.0

70**

ITEC.IKM-19

(*) Baku mutu: Peraturan Pemerintah Republik Indonesia No.41 Tahun 1999

(**) Baku mutu: Keputusan Menteri Negara Lingkungan Hidup No. 48 Tahun 1996 (Kawasan Industri)

(***) Accredited parameter by KAN (ISO/IEC 17025)

<: Lebih kecil dari deteksi limit

Supporting Parameters

No.

Parameter

Hasil

Analisa

Satuan

1

Temperatur

32.4

o

C

2

Kelembaban

59.3

%

3

Tekanan

750.8

MmHg

4

Kecepatan Angin

0.0 – 2.4

m/s

5

Arah Angin

Barat Daya

-

Bogor,

13 Februari 2019

Endih Saikudin

(8)

Hal 3 dari 4

PT. ITEC SOLUTION INDONESIA

Bogor Nirwana Residence

Jl.PadmaNirwana Raya No. 6 Bogor

P:0251-7560193, F:021-8715685

Email:

[email protected]

www.itec.co.id

File

: D.01.032/LHU/2019

No. Analisis

: D.01.032.b-UA.19

Deskripsi contoh

:

Kualitas Udara Ambien

Lokasi

: Batas Utara Stone Crusher 2

Koordinat

: S 08

0

31’15.6”; T 116

0

38’05.9”

Tanggal diterima

: 30 Januari 2019

Tanggal pengujian

: 30 Januari 2019 - 12 Februari 2019

No

Parameter

Satuan

Hasil

Analisa

Baku Mutu

Metode

1

Sulfur Dioksida (SO

2

)***

µg/Nm

3

35.68

900*

SNI 19-7119.7-2005

2

Karbon Monoksida (CO)

µg/Nm

3

1552

30000*

SNI 19-7119.10-2011

3

Nitrogen Dioksida (NO

2

)***

µg/Nm

3

14.67

400*

SNI 19-7119.2-2005

4

Ozon (O

3

)

µg/Nm

3

4.61

235*

SNI 19-7119.8-2005

5

Hidrokarbon (HC)

µg/Nm

3

9.89

160*

SNI 7119.13-2009

6

Partikel <10 μm (PM

10

)

µg/Nm

3

9.80

150*

Gravimetric

7

Partikel <2,5 μm (PM

2,5

)

µg/Nm

3

2.75

65*

Gravimetric

8

Particulate (TSP)

µg/Nm

3

15.81

230*

SNI 19-7119.3-2005

9

Timbal (Pb)

µg/Nm

3

<0.005

2*

SNI 19-7119.4-2005

10

Kebisingan***

dBA

68.1

70**

ITEC.IKM-19

(*) Baku mutu: Peraturan Pemerintah Republik Indonesia No.41 Tahun 1999

(**) Baku mutu: Keputusan Menteri Negara Lingkungan Hidup No. 48 Tahun 1996 (Kawasan Industri)

(***) Accredited parameter by KAN (ISO/IEC 17025)

<: Lebih kecil dari deteksi limit

Supporting Parameters

No.

Parameter

Hasil

Analisa

Satuan

1

Temperatur

31.0

o

C

2

Kelembaban

67.4

%

3

Tekanan

751.6

MmHg

4

Kecepatan Angin

0.0

– 1.0

m/s

5

Arah Angin

Timur

-

Bogor,

13 Februari 2019

Endih Saikudin

(9)

File

: D.01.032/LHU/2019

No. Analisis

: D.01.032.c-RK.19

Deskripsi contoh

:

Kualitas Udara Ruang Kerja

Lokasi

: Depan Office Project PLTS

Koordinat

: S 08

0

31’14.0”; T 116

0

38’06.6”

Tanggal diterima

: 30 Januari 2019

Tanggal pengujian

: 30 Januari 2019 - 12 Februari 2019

No

Parameter

Satuan

Hasil

Analisa

Baku

Mutu

Metode

1

Sulfur Dioksida (SO

2

)

mg/m

3

0.0313

-

SNI 19-7119.7-2005

2

Karbon Monoksida (CO)

mg/m

3

1.4470

-

SNI 19-7119.10-2011

3

Nitrogen Dioksida (NO

2

)

mg/m

3

0.0401

-

SNI 19-7119.2-2005

4

Oksidan (O

3

)

mg/m

3

<0.015

-

SNI 19-7119.8-2005

5

Hidrokarbon (HC)

mg/m

3

<0.0005

-

SNI 7119.13-2009

6

Partikulat (TSP)

mg/m

3

0.1531

-

SNI 16-7058-2004

7

Timbal (Pb)

mg/m

3

<0.005

-

SNI 19-7119.4-2005

8

Hydrogen Sulfide (H

2

S)

mg/m

3

0.0032

-

ITEC.IKM-28

9

Ammonia (NH

3

)

mg/m

3

0.0330

-

SNI 19-7119.1-2005

10

Kebisingan**

dBA

(a)

55.3

85

ITEC.IKM-13

* : Peraturan Menteri Ketenagakerjaan Republik Indonesia No. 05/MEN/IV/2018 tentang Keselamatan dan Kesehatan Kerja

Lingkungan Kerja (Lampiran 1. Faktor Fisika dan 3.C.d Faktor Kimia).

a)

Peraturan Menteri Ketenagakerjaan Republik Indonesia No. 05/MEN/IV/2018 tentang Keselamatan dan Kesehatan

Kerja Lingkungan Kerja (Lampiran 1.B. Nilai Ambang Batas Fisika, Kebisingan di Lingkungan Kerja Waktu Pemaparan

perhari 8 jam)

** : Accredited parameter by KAN (ISO/IEC 17025)

Supporting Parameters

No.

Parameter

Hasil

Analisa

Satuan

1

Temperatur

27.6

o

C

2

Kelembaban

78.4

%

3

Tekanan

752.2

MmHg

4

Kecepatan Angin

0.0 – 0.5

m/s

5

Arah Angin

Selatan

-

Bogor,

13 Februari 2019

Endih Saikudin

(10)

Hal 1 dari 4

LAPORAN HASIL UJI

File

:

D.01.033/LHU/2019

Pelanggan

:

PT. Vena Energy (Selong 5 MW)

Alamat

:

The Plaza Office Tower, 25

th

Floor

Jl. MH. Thamrin Kav. 28-30, Jakarta

Laporan

:

- Kualitas Udara Ambien

- Kualitas Udara Ruang Kerja

Tanggal diterima

:

30 Januari 2019

Tanggal selesai

:

13 Februari 2019

PT. ITEC SOLUTION INDONESIA

Endih Saikudin

Supervisor Teknis

1. Complaints within two (2) weeks of the issuance of certificates;

2. The results of these tests are not to be duplicated and only applies to parameter mentioned;

3. The laboratory is not responsible in the process of sampling for sample sent directly from the customer.

PT. ITEC SOLUTION INDONESIA

Bogor Nirwana Residence

Jl.PadmaNirwana Raya No. 6 Bogor

P:0251-7560193, F:021-8715685

Email:

[email protected]

(11)

File

: D.01.033/LHU/2019

No. Analisis

: D.01.033.a-UA.19

Deskripsi contoh

:

Kualitas Udara Ambien

Lokasi

: Kantor Desa Geres

Koordinat

: S 08

0

38’53.3”; T 116

0

34’18.5”

Tanggal diterima

: 30 Januari 2019

Tanggal pengujian

: 30 Januari 2019 - 12 Februari 2019

No

Parameter

Satuan

Hasil

Analisa

Baku Mutu

Metode

1

Sulfur Dioksida (SO

2

)***

µg/Nm

3

24.18

900*

SNI 19-7119.7-2005

2

Karbon Monoksida (CO)

µg/Nm

3

1444

30000*

SNI 19-7119.10-2011

3

Nitrogen Dioksida (NO

2

)***

µg/Nm

3

6.66

400*

SNI 19-7119.2-2005

4

Ozon (O

3

)

µg/Nm

3

5.98

235*

SNI 19-7119.8-2005

5

Hidrokarbon (HC)

µg/Nm

3

7.25

160*

SNI 7119.13-2009

6

Partikel <10 μm (PM

10

)

µg/Nm

3

7.72

150*

Gravimetric

7

Partikel <2,5 μm (PM

2,5

)

µg/Nm

3

2.16

65*

Gravimetric

8

Particulate (TSP)

µg/Nm

3

12.46

230*

SNI 19-7119.3-2005

9

Timbal (Pb)

µg/Nm

3

<0.005

2*

SNI 19-7119.4-2005

10

Kebisingan***

dBA

49.9

70**

ITEC.IKM-19

(*) Baku mutu: Peraturan Pemerintah Republik Indonesia No.41 Tahun 1999

(**) Baku mutu: Keputusan Menteri Negara Lingkungan Hidup No. 48 Tahun 1996 (Kawasan Industri)

(***) Accredited parameter by KAN (ISO/IEC 17025)

<: Lebih kecil dari deteksi limit

Supporting Parameters

No.

Parameter

Hasil

Analisa

Satuan

1

Temperatur

32.7

o

C

2

Kelembaban

60.4

%

3

Tekanan

749.1

MmHg

4

Kecepatan Angin

0.0 – 0.3

m/s

5

Arah Angin

Barat Daya

-

Bogor,

13 Februari 2019

Endih Saikudin

(12)

Hal 3 dari 4

PT. ITEC SOLUTION INDONESIA

Bogor Nirwana Residence

Jl.PadmaNirwana Raya No. 6 Bogor

P:0251-7560193, F:021-8715685

Email:

[email protected]

www.itec.co.id

File

: D.01.033/LHU/2019

No. Analisis

: D.01.033.b-UA.19

Deskripsi contoh

:

Kualitas Udara Ambien

Lokasi

: Desa Geres Lau

Koordinat

: S 08

0

38’56.3”; T 116

0

34’28.5”

Tanggal diterima

: 30 Januari 2019

Tanggal pengujian

: 30 Januari 2019 - 12 Februari 2019

No

Parameter

Satuan

Hasil

Analisa

Baku Mutu

Metode

1

Sulfur Dioksida (SO

2

)***

µg/Nm

3

36.75

900*

SNI 19-7119.7-2005

2

Karbon Monoksida (CO)

µg/Nm

3

1430

30000*

SNI 19-7119.10-2011

3

Nitrogen Dioksida (NO

2

)***

µg/Nm

3

9.30

400*

SNI 19-7119.2-2005

4

Ozon (O

3

)

µg/Nm

3

4.01

235*

SNI 19-7119.8-2005

5

Hidrokarbon (HC)

µg/Nm

3

6.88

160*

SNI 7119.13-2009

6

Partikel <10 μm (PM

10

)

µg/Nm

3

6.30

150*

Gravimetric

7

Partikel <2,5 μm (PM

2,5

)

µg/Nm

3

1.76

65*

Gravimetric

8

Particulate (TSP)

µg/Nm

3

10.17

230*

SNI 19-7119.3-2005

9

Timbal (Pb)

µg/Nm

3

<0.005

2*

SNI 19-7119.4-2005

10

Kebisingan***

dBA

51.6

70**

ITEC.IKM-19

(*) Baku mutu: Peraturan Pemerintah Republik Indonesia No.41 Tahun 1999

(**) Baku mutu: Keputusan Menteri Negara Lingkungan Hidup No. 48 Tahun 1996 (Kawasan Industri)

(***) Accredited parameter by KAN (ISO/IEC 17025)

<: Lebih kecil dari deteksi limit

Supporting Parameters

No.

Parameter

Hasil

Analisa

Satuan

1

Temperatur

34.5

o

C

2

Kelembaban

56.8

%

3

Tekanan

748.7

MmHg

4

Kecepatan Angin

0.0

– 0.4

m/s

5

Arah Angin

Barat Daya

-

Bogor,

13 Februari 2019

Endih Saikudin

(13)

File

: D.01.033/LHU/2019

No. Analisis

: D.01.033.c-RK.19

Deskripsi contoh

:

Kualitas Udara Ruang Kerja

Lokasi

: Depan Office PLTS Selong

Koordinat

: S 08

0

39’21.8”; T 116

0

34’32.7”

Tanggal diterima

: 30 Januari 2019

Tanggal pengujian

: 30 Januari 2019 - 12 Februari 2019

No

Parameter

Satuan

Hasil

Analisa

Baku

Mutu

Metode

1

Sulfur Dioksida (SO

2

)

mg/m

3

0.0389

-

SNI 19-7119.7-2005

2

Karbon Monoksida (CO)

mg/m

3

1.2092

-

SNI 19-7119.10-2011

3

Nitrogen Dioksida (NO

2

)

mg/m

3

0.0148

-

SNI 19-7119.2-2005

4

Oksidan (O

3

)

mg/m

3

<0.015

-

SNI 19-7119.8-2005

5

Hidrokarbon (HC)

mg/m

3

<0.0005

-

SNI 7119.13-2009

6

Partikulat (TSP)

mg/m

3

0.1672

-

SNI 16-7058-2004

7

Timbal (Pb)

mg/m

3

<0.005

-

SNI 19-7119.4-2005

8

Hydrogen Sulfide (H

2

S)

mg/m

3

0.0031

-

ITEC.IKM-28

9

Ammonia (NH

3

)

mg/m

3

0.0290

-

SNI 19-7119.1-2005

10

Kebisingan**

dBA

(a)

45.0

85

ITEC.IKM-13

* : Peraturan Menteri Ketenagakerjaan Republik Indonesia No. 05/MEN/IV/2018 tentang Keselamatan dan Kesehatan Kerja

Lingkungan Kerja (Lampiran 1. Faktor Fisika dan 3.C.d Faktor Kimia).

a)

Peraturan Menteri Ketenagakerjaan Republik Indonesia No. 05/MEN/IV/2018 tentang Keselamatan dan Kesehatan

Kerja Lingkungan Kerja (Lampiran 1.B. Nilai Ambang Batas Fisika, Kebisingan di Lingkungan Kerja Waktu Pemaparan

perhari 8 jam)

** : Accredited parameter by KAN (ISO/IEC 17025)

Supporting Parameters

No.

Parameter

Hasil

Analisa

Satuan

1

Temperatur

28.4

o

C

2

Kelembaban

72.2

%

3

Tekanan

751.2

MmHg

4

Kecepatan Angin

0.0 – 0.1

m/s

5

Arah Angin

Utara

-

Bogor,

13 Februari 2019

Endih Saikudin

(14)

Hal 1 dari 4

LAPORAN HASIL UJI

File

:

D.01.034/LHU/2019

Pelanggan

:

PT. Vena Energy (Sengkol 5 MW)

Alamat

:

The Plaza Office Tower, 25

th

Floor

Jl. MH. Thamrin Kav. 28-30, Jakarta

Laporan

:

- Kualitas Udara Ambien

- Kualitas Udara Ruang Kerja

Tanggal diterima

:

30 Januari 2019

Tanggal selesai

:

13 Februari 2019

PT. ITEC SOLUTION INDONESIA

Endih Saikudin

Supervisor Teknis

1. Complaints within two (2) weeks of the issuance of certificates;

2. The results of these tests are not to be duplicated and only applies to parameter mentioned;

3. The laboratory is not responsible in the process of sampling for sample sent directly from the customer.

PT. ITEC SOLUTION INDONESIA

Bogor Nirwana Residence

Jl.PadmaNirwana Raya No. 6 Bogor

P:0251-7560193, F:021-8715685

Email:

[email protected]

(15)

File

: D.01.034/LHU/2019

No. Analisis

: D.01.034.a-UA.19

Deskripsi contoh

:

Kualitas Udara Ambien

Lokasi

: Depan Kantor PDAM

Koordinat

: S 08

0

47’51.8”; T 116

0

17’42.5”

Tanggal diterima

: 30 Januari 2019

Tanggal pengujian

: 30 Januari 2019 - 12 Februari 2019

No

Parameter

Satuan

Hasil

Analisa

Baku Mutu

Metode

1

Sulfur Dioksida (SO

2

)***

µg/Nm

3

31.24

900*

SNI 19-7119.7-2005

2

Karbon Monoksida (CO)

µg/Nm

3

1244

30000*

SNI 19-7119.10-2011

3

Nitrogen Dioksida (NO

2

)***

µg/Nm

3

8.06

400*

SNI 19-7119.2-2005

4

Ozon (O

3

)

µg/Nm

3

5.96

235*

SNI 19-7119.8-2005

5

Hidrokarbon (HC)

µg/Nm

3

15.09

160*

SNI 7119.13-2009

6

Partikel <10 μm (PM

10

)

µg/Nm

3

8.43

150*

Gravimetric

7

Partikel <2,5 μm (PM

2,5

)

µg/Nm

3

2.36

65*

Gravimetric

8

Particulate (TSP)

µg/Nm

3

13.59

230*

SNI 19-7119.3-2005

9

Timbal (Pb)

µg/Nm

3

<0.005

2*

SNI 19-7119.4-2005

10

Kebisingan***

dBA

62.3

70**

ITEC.IKM-19

(*) Baku mutu: Peraturan Pemerintah Republik Indonesia No.41 Tahun 1999

(**) Baku mutu: Keputusan Menteri Negara Lingkungan Hidup No. 48 Tahun 1996 (Kawasan Industri)

(***) Accredited parameter by KAN (ISO/IEC 17025)

<: Lebih kecil dari deteksi limit

Supporting Parameters

No.

Parameter

Hasil

Analisa

Satuan

1

Temperatur

29.6

o

C

2

Kelembaban

73.6

%

3

Tekanan

743.9

MmHg

4

Kecepatan Angin

0.0 – 0.4

m/s

5

Arah Angin

Barat Daya

-

Bogor,

13 Februari 2019

Endih Saikudin

(16)

Hal 3 dari 4

PT. ITEC SOLUTION INDONESIA

Bogor Nirwana Residence

Jl.PadmaNirwana Raya No. 6 Bogor

P:0251-7560193, F:021-8715685

Email:

[email protected]

www.itec.co.id

File

: D.01.034/LHU/2019

No. Analisis

: D.01.034.b-UA.19

Deskripsi contoh

:

Kualitas Udara Ambien

Lokasi

: Pemukiman Penduduk

Koordinat

: S 08

0

47’42.9”; T 116

0

18’02.9”

Tanggal diterima

: 30 Januari 2019

Tanggal pengujian

: 30 Januari 2019 - 12 Februari 2019

No

Parameter

Satuan

Hasil

Analisa

Baku Mutu

Metode

1

Sulfur Dioksida (SO

2

)***

µg/Nm

3

26.75

900*

SNI 19-7119.7-2005

2

Karbon Monoksida (CO)

µg/Nm

3

1430

30000*

SNI 19-7119.10-2011

3

Nitrogen Dioksida (NO

2

)***

µg/Nm

3

9.67

400*

SNI 19-7119.2-2005

4

Ozon (O

3

)

µg/Nm

3

3.95

235*

SNI 19-7119.8-2005

5

Hidrokarbon (HC)

µg/Nm

3

15.21

160*

SNI 7119.13-2009

6

Partikel <10 μm (PM

10

)

µg/Nm

3

7.70

150*

Gravimetric

7

Partikel <2,5 μm (PM

2,5

)

µg/Nm

3

2.16

65*

Gravimetric

8

Particulate (TSP)

µg/Nm

3

12.42

230*

SNI 19-7119.3-2005

9

Timbal (Pb)

µg/Nm

3

<0.005

2*

SNI 19-7119.4-2005

10

Kebisingan***

dBA

67.2

70**

ITEC.IKM-19

(*) Baku mutu: Peraturan Pemerintah Republik Indonesia No.41 Tahun 1999

(**) Baku mutu: Keputusan Menteri Negara Lingkungan Hidup No. 48 Tahun 1996 (Kawasan Industri)

(***) Accredited parameter by KAN (ISO/IEC 17025)

<: Lebih kecil dari deteksi limit

Supporting Parameters

No.

Parameter

Hasil

Analisa

Satuan

1

Temperatur

29.1

o

C

2

Kelembaban

75.7

%

3

Tekanan

746.9

MmHg

4

Kecepatan Angin

0.0

– 0.2

m/s

5

Arah Angin

Barat

-

Bogor,

13 Februari 2019

Endih Saikudin

(17)

File

: D.01.034/LHU/2019

No. Analisis

: D.01.034.c-RK.19

Deskripsi contoh

:

Kualitas Udara Ruang Kerja

Lokasi

: Depan Office PLTS

Koordinat

: S 08

0

47’41.9”; T 116

0

17’47.1”

Tanggal diterima

: 30 Januari 2019

Tanggal pengujian

: 30 Januari 2019 - 12 Februari 2019

No

Parameter

Satuan

Hasil

Analisa

Baku

Mutu

Metode

1

Sulfur Dioksida (SO

2

)

mg/m

3

0.0826

-

SNI 19-7119.7-2005

2

Karbon Monoksida (CO)

mg/m

3

1.2092

-

SNI 19-7119.10-2011

3

Nitrogen Dioksida (NO

2

)

mg/m

3

0.0289

-

SNI 19-7119.2-2005

4

Oksidan (O

3

)

mg/m

3

<0.015

-

SNI 19-7119.8-2005

5

Hidrokarbon (HC)

mg/m

3

<0.0005

-

SNI 7119.13-2009

6

Partikulat (TSP)

mg/m

3

0.9579

-

SNI 16-7058-2004

7

Timbal (Pb)

mg/m

3

<0.005

-

SNI 19-7119.4-2005

8

Hydrogen Sulfide (H

2

S)

mg/m

3

0.0033

-

ITEC.IKM-28

9

Ammonia (NH

3

)

mg/m

3

0.0250

-

SNI 19-7119.1-2005

10

Kebisingan**

dBA

(a)

48.5

85

ITEC.IKM-13

* : Peraturan Menteri Ketenagakerjaan Republik Indonesia No. 05/MEN/IV/2018 tentang Keselamatan dan Kesehatan Kerja

Lingkungan Kerja (Lampiran 1. Faktor Fisika dan 3.C.d Faktor Kimia).

a)

Peraturan Menteri Ketenagakerjaan Republik Indonesia No. 05/MEN/IV/2018 tentang Keselamatan dan Kesehatan

Kerja Lingkungan Kerja (Lampiran 1.B. Nilai Ambang Batas Fisika, Kebisingan di Lingkungan Kerja Waktu Pemaparan

perhari 8 jam)

** : Accredited parameter by KAN (ISO/IEC 17025)

Supporting Parameters

No.

Parameter

Hasil

Analisa

Satuan

1

Temperatur

25.8

o

C

2

Kelembaban

84.3

%

3

Tekanan

746.3

MmHg

4

Kecepatan Angin

0.0 – 1.1

m/s

5

Arah Angin

Barat

-

Bogor,

13 Februari 2019

Endih Saikudin

(18)
(19)
(20)
(21)
(22)
(23)
(24)
(25)
(26)
(27)
(28)
(29)
(30)
(31)
(32)

No Date Internal Participants External Participants Village Meeting Agenda Key Discussion Point/Issue Issue category Level of Concern Action Plan Feedback Minutes of Meetings

1 11-Jan-18 Farhan, Adi, Navis Local Trainee, SMK 3 Mataram, Peka Energi Other Goodwill visit Opening and Motivation giving by Adi No issue Neutral/ maintain engagement Continue coordination No 2 12-Jan-18 Farhan, Adi, Navis, Jumahir,

Peter, Fajar, Sony Local Trainee, SMK 3 Mataram, Peka Energi Other Goodwill visit Motivation giving by Peter No issue Neutral/ maintain engagement Continue coordination No 3 12-Jan-18 Farhan, Jumahir, Peter, Fajar,

Sony

Head of Geres Village (Srijuddin) and Head of Hamlet

(Nurahyat) Geres Goodwill visit

Introduce new team and discussion regarding the latest isssue

that will rising up on the village Local Business opportunityIncrease Attention

Conducted meeting with Head of village and

coordination with PP No 4 12-Jan-18 Farhan, Jumahir, Peter, Fajar,

Sony

Head of Prinngabaya Utara Village (Zulkarnain) and

Head of Hamlet Cemporonan Pringgabaya Utara Goodwill visit

Introduce new team and discussion regarding the latest isssue

; The broken pipe at location caused by heavy equipment Local Business opportunityIncrease Attention

Conducted meeting with Head of village and

coordination with PP No 5 12-Jan-18 Farhan Zulkarnain (Head of Pringgabaya Utara village) Pringgabaya Utara Resolving Issues, complaint,

grievance

Request to be local supplier for heavy equipment for the

project Local Business opportunityNeutral/ maintain engagement

request regarding this issue out of aothority.

Coordination with PP No 6 13-Jan-18 Farhan, Jumahir, Navis, Peter,

Fajar, Sony

Head of Sengkol village (Lalu Taunuri), Head of hamlet

(Mahram) and Local Figure (Darmawan) Sengkol Goodwill visit

introduce new team and discussion regarding the latest isssues that will rising up on the village

Employment

opportunities Increase Attention

Conducted meeting with Head of village and

coordination with PP No 7 22-Jan-18 Farhan, Jumahir, Fajar Head of Geres Village (Srijudin) and Head of Geres

Barat hamlet (Nurahyat) Geres Goodwill visit

MoU regarding local employee and contribution to Geres

village Community contribution rIncrease Attention Continue coordination No 8 29-Jan-18 Farhan Head of Geres Village (Srijudin) Geres Resolving Issues, complaint,

grievance

MoU regarding local employee and contribution to Geres

village Community contribution rIncrease Attention Keep monitoring the reaction and coordination with PP No 9 31-Jan-18 Farhan, Maman (PP) Local army officer (Ruslan) of Pringgabaya Utara

village Pringgabaya Utara Goodwill visit Self introduce and discussion regarding newest issue No issue Neutral/ maintain engagement 2 weekly coordination No 10 1-Feb-18 Farhan Local figure (Darmawan) Sengkol Resolving Issues, complaint,

grievance

Inform the project cannot start regarding the NTP is still on

progress. Darmawan suggested to start the project as soon as Land, road access & propeIncrease Attention

Keep monitoring the reaction and keep coordination

with PP to avoid crop compensation request from land No 11 7-Feb-18 Farhan Head of Geres Barat hamlet (Nurahyat) Geres Goodwill visit Coordination regarding socialization of Grievance Mechanism Company regulations/proNeutral/ maintain engagement Will be conduct the socialization on 9 February 2018 No 12 9-Feb-18 Farhan, Maman (PP) Secretary of Pringgabaya village, KAUR Pembangunan

Pringgabaya village, Tony (operator water system), Pringgabaya Utara

Resolving Issues, complaint, grievance

Investigation of broken pipe line on Pringgabaya Project

caused by heavy equipment during the land clearing Access to natural resourceIncrease Attention

PP state will chahnge the broken pipe and help to put

the pipe line. Coordination with Dinas PPAT regarding No 13 9-Feb-18 Farhan, Adi, Jumahir Nur Ahyat, Suhaimi, Syamsul Rizal, Suhaimi, L.M.

Kholid, Jumaradi, Srijuddin, Nurimah Geres

Compliance of mandatory

requirement Socialization of Grievance Mechanism Employment opportunitieIncrease Attention

Will coordination with PP regarding the issues and ask

PP to use one gate (by village office) system to recruit Yes 14 9-Feb-18 Farhan Darmawan Sengkol Goodwill visit Updating issue on Sengkol project area No issue Neutral/ maintain engagement Meet him next week to ask issues regarding land user

reaction No

15 10-Feb-18 Farhan Lalu Tanuuri (Head of Sengkol village) Sengkol Goodwill visit Updating issue on Sengkol project area Employment opportunitieNeutral/ maintain engagement Coordination with PP No 16 12-Feb-18 Farhan, Jumahir Zulman (Kaur Pembangunan) Pringgabaya Utara village Pringgabaya Utara Compliance of mandatory

requirement

Posting NTS at village office. Zulma give advice the project

should coordination with local water government agency to No issue Neutral/ maintain engagement

Will do coordination with PP to manage the broken pipe

issue No

17 13-Feb-18 Jumahir Darmawan, BKD (Badan Keamanan Desa) Segala Anyar

village Sengkol Goodwill visit

Ask to be involve the project as local supplier, security and

local recruitment. Darmawan and Jumahir ask them to Local Business opportunityIncrease Attention

Coordination with head of Sengkol village to maintain

one channel communication for the project at Sengkol No 18 14-Feb-18 Farhan Silvana (PEKA SINERGI) Other Goodwill visit PEKA SINERGI ask help to distribute the certificates to the

trainees on three sites and distribute transportation money to No issue Neutral/ maintain engagement

Jumahir will distribute the certificates and

trasnportation money for head of Sengkol village. No 19 15-Feb-18 Jumahir, Maman (PP) Local police office (Polsek) and local army office Sengkol Coordination meeting Ask help to secure the project at Sengkol. The army office

asked PP to involve them on local security recruitment Community contribution rIncrease Attention

Good will visit. Assist PP to enhance communication

with local policeoffice and local army office No 20 16-Feb-18 Jumahir, Maman (PP) Head of hamlet (Pak Ram) Sengkol Resolving Issues, complaint,

grievance

Coordination and ensure the land user at sengkol will not

complain if the activity started. The head of hamlet convinced Land, road access & propeNeutral/ maintain engagement

PP will take the responsibility if any complain of land

clearing on access road and will provide compensation No 21 17-Feb-18 Jumahir, Maman (PP) Local police officer (Polsek) and local army office.

Mustafa (Copa Bali) Sengkol

Resolving Issues, complaint, grievance

Coordination to ensure the security of Sengkol project on

Sunday 18 february 2018. Local Business opportunityIncrease Attention

The local police and local army office will help to secure

the project activity No 22 6-Mar-18 Jumahir, Abdullah Lalu Taunuri (Head of Sengkol village) Sengkol Goodwill visit General discussion and give good will contribution regarding

Nyale ceremony Employment opportunitieIncrease Attention Keep maintenance the engagement No 23 9-Mar-18 Farhan, Maman (PP) Local figure (Syafruddin) Geres Goodwill visit The land user (H.Ahyar) complaint to Syafruddin regarding the

payment of the land. The ex-land owner (Mihtadun) has been Land, road access & propeIncrease Attention

Syafruddin given the explanation that this is internal

matter between Mihtadun and H. H Ahyar. Syafruddin No 24 10-Mar-18 Farhan Head of Geres Barat hamlet (Nurahyat) Geres Goodwill visit Received the proposal from Geres village No issue Neutral/ maintain engagement Ask the RAB(Rincian Anggaran Biaya) No 25 10-Mar-18 Jumahir Head of hamlet (Mahram) Sengkol Resolving Issues, complaint,

grievance

Murdiman's family complaint to the project that they still get

sharing or payment from Murdiman from land selling. Land, road access & propeIncrease Attention

Ask help Pak Ram to find out the information more

clearly No

26 13-Mar-18 Farhan Head of Geres Barat hamlet (Nurahyat) Geres Coordination meeting Survey the location where the water channel will be build

based on proposal submitted No issue Neutral/ maintain engagement

Prefer to contribute the materials for build the water

channel to avoid misappropriation or cash contribution No 27 14-Mar-18 Jumahir, Farhan Head of hamlet (Mahram) Sengkol Resolving Issues, complaint,

grievance

Ask help Head of Sengkol 1 hamlet to handle this matter

regarding this matter is part of his responsibility Land, road access & propeIncrease Attention

Head of Sengkol1 hamlet will re-mediate the meeting

(33)

37 3-Apr-18 Jumahir Zulkarnain Pringgabaya Utara Goodwill visit General discussion No issue Neutral/ maintain engagement Keep maintenance the engagement No 38 4-Apr-18 Farhan, Maman (PP) Mustofa (CV Copa Bali), Nurahyat, Head of LPMK

Geres village Geres

Resolving Issues, complaint, grievance

Mediation to resolve the matter between Mustofa and

Nurahyat regarding the earthwork on Selong project Local Business opportunityIncrease Attention

Mustofa (CV. Copa Bali) will make payment to

Nurhahyat on April 25 2018 Yes 39 6-Apr-18 Farhan Head of hamlet (Mahram) Sengkol Goodwill visit Update issue at Sengkol project area No issue Neutral/ maintain engagement Keep maintain the engaement No 40 10-Apr-18 Farhan, Jumahir Nasruddin Pringgabaya Utara Goodwill visit Update issue at Sengkol project area No issue Neutral/ maintain engagement Keep maintenance the engagement No 41 11-Apr-18 Farhan, Jumahir Head of hamlet (Mahram) Sengkol Goodwill visit Update issue at Sengkol project area No issue Neutral/ maintain engagement Keep maintain the engaement No 42 11-Apr-18 Farhan, Jumahir Darmawan Sengkol Goodwill visit Update issue at Sengkol project area No issue Neutral/ maintain engagement Keep maintain the engaement No 43 11-Apr-18 Farhan, Jumahir Lalu Taunuri (Head of Sengkol village) Sengkol Goodwill visit Update issue at Sengkol project area No issue Neutral/ maintain engagement Keep maintain the engaement No 44 11-Apr-18 Farhan Zulkarnain Pringgabaya Utara Goodwill visit Update issue at Sengkol project area No issue Neutral/ maintain engagement Keep maintenance the engagement No 45 12-Apr-18 Farhan Head of Geres Barat hamlet (Nurahyat) Geres Goodwill visit Update issue at Sengkol project area No issue Neutral/ maintain engagement Keep maintenance the engagement No 46 12-Apr-18 Farhan Srijuddin Geres Goodwill visit Responding to the water channel proposal from Geres village No issue Neutral/ maintain engagement Keep maintenance the engagement No 47 24-Apr-18 Jumahir, Filip, Bilma Junaidi (Notaris), Daud (Notaris), Heru (Maybank) Other Compliance of mandatory

requirement APHT Process Government Relations Neutral/ maintain engagement Keep updating the process No 48 30-Apr-18 Jumahir Eko Other Compliance of mandatory

requirement Get approval from PLN Wilayah NTB No issue Neutral/ maintain engagement Keep updating the process No 49 2-May-18 Jumahir Head of hamlet (Mahram) Sengkol Compliance of mandatory

requirement

Discussion regarding the SPT/ Land Tax for Sengkol project

area Land, road access & propeNeutral/ maintain engagement Keep updating the process No 50 3-May-18 Jumahir Head of hamlet (Mahram) Sengkol Goodwill visit Discussion regarding the SPT/ Land Tax for Sengkol project

area Land, road access & propeIncrease Attention Keep maintain the engaement No 51 3-May-18 Jumahir, Farhan, Maman (PP) Zulkarnain Pringgabaya Utara Goodwill visit Invite to attend the charity ceremony and prayer at project

location No issue Neutral/ maintain engagement Keep maintenance the engagement No 52 4-May-18 Jumahir Ngurah Ambara Other Compliance of mandatory

requirement Coordination with PLN Wilayah regarding consent letter Company regulations/proNeutral/ maintain engagement Keep updating the process No 53 4-May-18 Farhan Usman (head of Hamlet Cemporonan) Pringgabaya Utara Goodwill visit Community appreciate to the project since the project care to

orphans No issue Neutral/ maintain engagement Keep maintenance the engagement No 54 5-May-18 Farhan Nurahyat (Head of Geres Barat Hamlet) Geres Goodwill visit Confirmation payment from Mustofa to Nurahyat regarding

their internal matter that impacted the project. No issue Neutral/ maintain engagement Keep updating the process No 55 7-May-18 Jumahir Maman (PP), Mahram Sengkol Compliance of mandatory

requirement Discussion regarding SIPA permit for deepwell No issue Neutral/ maintain engagement Keep updating the process No 56 7-May-18 Jumahir Sukri Other Compliance of mandatory

requirement Discussion regarding SIPA permit for deepwell No issue Neutral/ maintain engagement Keep updating the process No 57 7-May-18 Farhan PLN Pringgabaya, PP (Eko) Sengkol Compliance of mandatory

requirement

Reminding PP and Vendor to make coordination before

erection work start to avoid complain from the land owner Land, road access & propeNeutral/ maintain engagement Keep coordination with PP and PLN No 58 8-May-18 Farhan PLN Pringgabaya, PP (Eko) Pringgabaya Utara Compliance of mandatory

requirement

Reminding PP and Vendor to make coordination before

erection work start to avid complain from the land owner Land, road access & propeNeutral/ maintain engagement Keep coordination with PP and PLN No 59 10-May-18 Jumahir Nurul (Ka Bid Tata Ruang) Other Coordination meeting PTSP survey location No issue Neutral/ maintain engagement Keep maintain the engagement No 60 11-May-18 Jumahir Darmawan, Maman (PP) Sengkol Goodwill visit Discussion regarding latest social situation at Sengkol project

area No issue Neutral/ maintain engagement Keep maintain the engagement No 61 14-May-18 Farhan, Jumahir Lalu Tanauri (Head of Sengkol village) Sengkol Goodwill visit General discussion Local Business opportunityNeutral/ maintain engagement Keep maintain the engagement No 62 16-May-18 Jumahir, Maman (PP) Head of Pujut sub - district (Sungkul) Other Goodwill visit Invite for orphan and praying ceremony at Sengkol project

area No issue Neutral/ maintain engagement Keep maintain the engagement No 63 16-May-18 Jumahir, Maman (PP) Head of Lamben hamlet Sengkol Goodwill visit Invite for orphan and praying ceremony at Sengkol project

(34)

64 16-May-18 Jumahir, Maman (PP) Head of Sengkol 1 hamlet (Mahram) Sengkol Goodwill visit Invite for orphan and praying ceremony at Sengkol project

area No issue Neutral/ maintain engagement Keep maintain the engagement No 65 16-May-18 Jumahir, Maman (PP) Head of local police station Sengkol Goodwill visit Invite for orphan and praying ceremony at Sengkol project

area No issue Neutral/ maintain engagement Keep maintain the engagement No 66 16-May-18 Jumahir, Maman (PP) Head of local army Sengkol Goodwill visit Invite for orphan and praying ceremony at Sengkol project

area No issue Neutral/ maintain engagement Keep maintain the engagement No 67 16-May-18 Jumahir, Maman (PP) Head of Sengkol village (Lalu Taunuri) Sengkol Goodwill visit Invite for orphan and praying ceremony at Sengkol project

area No issue Neutral/ maintain engagement Keep maintain the engagement No 68 16-May-18 Jumahir, Maman (PP) Head of Segala Anyar village (Muksin) Other Goodwill visit Invite for orphan and praying ceremony at Sengkol project

area No issue Neutral/ maintain engagement Keep maintain the engagement No 69 16-May-18 Jumahir, Maman (PP) PLN praya Other Coordination meeting Coordination regarding connecting transmission for Sengkol

site temporary office No issue Neutral/ maintain engagement Keep maintain the engagement No 70 18-May-18 Farhan, Abdullah, Jumahir Head of Sengkol village (Lalu Taunuri) Sengkol Goodwill visit Reconfirmed issue between PP and PP's local material supplier Local Business opportunityNeutral/ maintain engagement Keep maintain the engagement No 71 18-May-18 Farhan, Abdullah, Jumahir Darmawan (Local figure) Sengkol Goodwill visit Update issue at Sengkol project area No issue Neutral/ maintain engagement Keep maintain the engagement No 72 18-May-18 farhan, Abdullah Head of local army (Abdul Hamid) Sengkol Goodwill visit Self introduce No issue Neutral/ maintain engagement Keep maintain the engagement No 73 18-May-18 Farhan, Abdullah, Jumahir Head of Sengkol 1 hamlet (Mahram) Sengkol Goodwill visit Update issue at Sengkol project area No issue Neutral/ maintain engagement Keep maintain the engagement No 74 18-May-18 Farhan, Jumahir, Maman (PP) Seecretary of Segala Anyar village Other Goodwill visit Update issue at Segala Anyar village No issue Neutral/ maintain engagement Keep maintain the engagement No 75 21-May-15 Jumahir PV installation trainee - Sengkol area Sengkol Goodwill visit Confirmation date for recruitment process for PV installation

on PP contractor Employment opportunitieNeutral/ maintain engagement Keep coordination with PP No 76 22-May-18 Farhan Head of Geres Village (Srijuddin) Geres Goodwill visit Need assessment interview for women empowerement

program No issue Neutral/ maintain engagement

Assessment to local group - women group and other

stakeholders Yes 77 22-May-18 Jumahir Nasruddin Pringgabaya Utara Compliance of mandatory

requirement Car rent invoice progress Local Business opportunityIncrease Attention Confirmation date payment to head office finance No 78 26-May-18 Jumahir, Farhan, Fatma Raudi (Bank Sampah Embang - bangan) local

empowerment group leader Pringgabaya Utara Goodwill visit

Need assessment interview for women empowerement

program No issue Neutral/ maintain engagement Assessment to other stakeholders Yes 79 30-May-18 Farhan, Maman (PP) Karim, Head of RT Geres Barat Geres Compliance of mandatory

requirement

Assist PP Contaractor to get agreement from head of RT

regarding SIPA. Karim and Head of RT ask the project provide Access to natural resourceUrgent attention Assist PP to submit the requirement to PTSP No 80 30-May-18 Farhan, Maman (PP) Srijuddin (Head of Geres Village) Geres Compliance of mandatory

requirement

Assist PP Contaractor to get agreement from head of Geres

village regarding SIPA for Selong project No issue Urgent attention Assist PP to submit the requirement to PTSP No 81 1-Jun-18 Jumahir, Maman (PP) Head of Sengkol 1 hamlet (Mahram) Sengkol Compliance of mandatory

requirement

Assist PP Contaractor to get agreement from head of Sengkol

1 hamlet regarding SIPA for Sengkol project No issue Urgent attention Assist PP to submit the requirement to PTSP No 82 1-Jun-18 Jumahir, Maman (PP) Head of Sengkol village (Lalu Taunuri) Sengkol Compliance of mandatory

requirement

Assist PP Contaractor to get agreement from head of Sengkol

1 hamlet regarding SIPA for Sengkol project No issue Urgent attention Assist PP to submit the requirement to PTSP No 83 13-Jun-18 Jumahir Darmawan Sengkol Goodwill visit Update issue before lebaran No issue Neutral/ maintain engagement Keep maintain the engagement No 84 13-Jun-18 Jumahir Head of Sengkol 1 hamlet (Mahram) Sengkol Coordination meeting Update issue before lebaran No issue Neutral/ maintain engagement Keep maintain the engagement No 85 9-Jun-18 Farhan, Maman (PP) Head of Sengkol village (Lalu Taunuri) Sengkol Goodwill visit Update issue before lebaran No issue Neutral/ maintain engagement Keep maintain the engagement No 86 25-Jun-18 Jumahir, Amrizal (PP) Pak Ram, Darmawan Sengkol Coordination meeting Ensure PP not cross over the boundary from the land of

sengkol project that affecting the land owner beside the Land, road access & propeUrgent attention Survey location No 87 26-Jun-18 Farhan, Maman (PP), Eko (PP), WawHead of Pringgabaya Utara Village (Zulkarnain) Pringgabaya Utara Resolving Issues, complaint,

grievance

Ask help to head of Pringgabaya Utara village to permitting

for transmission line poles erection Land, road access & propeUrgent attention Ask help to head of village to lobbying the permit No 88 28-Jun-18 Farhan, Jumahir Head of Sengkol village (Lalui Tanauri) Sengkol Goodwill visit Update issue after lebaran No issue Neutral/ maintain engagement Keep maintain the engagement No 89 29-Jun-18 Farhan, Jumahir Head of Sengkol 1 hamlet (Mahram) Sengkol Goodwill visit Update issue after lebaran No issue Neutral/ maintain engagement Keep maintain the engagement No 90 30-Jun-18 Farhan Pak Karim Geres Resolving Issues, complaint,

grievance

Alwi and Taslim as the ex land owner of access road to Selong

site ask the project build the line water to the land across. Access to natural resourceUrgent attention Survey location with RT/ Karim No 91 30-Jun-18 Farhan Head of Kompi Bantuan (Ang Wicaksono) Pringgabaya Utara Goodwill visit Coordination and confirmation for shoot training beside the

site that might affected the project No issue Urgent attention Keep maintain the engagement No 92 30-Jun-18 Farhan Head of Geres Barat hamlet (Nurahyat) Geres Resolving Issues, complaint,

grievance

Confirmation regarding the issue to stop the project by him

caused by Mustofa broken the commitment to pay the Land, road access & propeUrgent attention

Ask Copa Bali and PP to make full payment regarding

this issue No 93 2-Jul-18 Farhan Karim Geres Resolving Issues, complaint,

grievance

Update the latest grievance of Alwi and Taslim. Alwi and

Taslim will not bring the problem to the village office. They Land, road access & propeUrgent attention Will discuss with technical team to handle this issue No 94 2-Jul-18 Farhan PLN Pringgabaya (Angga) Other Coordination meeting Invite PLN to join transmission line inspection (pole

inspection) No issue Urgent attention Inspection will be hold on Friday, 6 July No 95 3-Jul-18 Jumahir, Maman (PP) Dinas PU Lombok Province (Rahani) Other Compliance of mandatory

requirement

Get the result of water test for Sengkol Site as requirement to

submit the SIPA Government Relations Urgent attention Daily monitoring progress No 96 3-Jul-18 Jumahir, Maman (PP) PTSP Lombok Province (Ngurah) Other Compliance of mandatory

requirement Submit the SIPA requirement Government Relations Urgent attention Daily monitoring progress No 97 3-Jul-18 Farhan Nasrun (local figure) Geres Goodwill visit Finding information regarding the water flow across the area

on Alwi and Taslim land at Selong access road Access to natural resourceUrgent attention Get the water flow evidence No 98 3-Jul-18 Farhan Head of Pringgabaya Utara Village (Zulkarnain) Pringgabaya Utara Resolving Issues, complaint,

grievance

Update the last lobbying result of transmission line land

owner (Wayan) Land, road access & propeUrgent attention Involve PLN Pringgabaya to hel permitting No 99 4-Jul-18 Farhan, Eko (PP), Wawan (KTS) Apid Pringgabaya Utara Resolving Issues, complaint,

grievance

Gathering information of the land owner position (Wayan)

from the land user (Apid) to make ask the permit for Land, road access & propeUrgent attention Arrange meeting with PLN and the land owner (Wayan) No 100 4-Jul-18 Farhan, Maman (PP), Jumahir, Syafruddin Geres Resolving Issues, complaint,

grievance

Syafruddin ask the sustaibility of his position as PP's local

external relation staff Employment opportunitieIncrease Attention Keep maintain the engagement No 101 5-Jul-18 Jumahir, Maman (PP) Distamben Lombok Province Other Compliance of mandatory

requirement Submit the SIPA requirement Government Relations Urgent attention Will be update on Monday, 9 July 2018 No 102 5-Jul-18 Farhan Head of Geres village (Srijuddin) Geres Coordination meeting Survey location to selong site and discuss the solution