Environmental and Social Monitoring Report
Project Number: 51209-002
January–December 2018
Appendix
March 2021
Indonesia: Eastern Indonesia Renewable Energy
Project (Phase 2)
Prepared by PT Infrastruktur Terbarukan Lestari for the Asian Development Bank
The Environment and Social Monitoring Report is a document of the borrower. The views expressed
herein do not necessarily represent those of ADB's Board of Directors, Management, or staff, and
may be preliminary in nature. Your attention is directed to the “Terms of Use” section of this website.
PT BMT Asia Pacific Indonesia Divisi Laboratorium (BMT Lab)
S
ERTIFIKAT
H
ASIL
A
NALISIS
C
ERTIFICATE OF
A
NALYSIS
No. BMT-EMTL-510.19-0066
Nama Klien
: PT VENA ENERGY (LIKUPANG 25 MW)
Client Name
Address
: THE PLAZA OFFICE TOWER, 25
THFLOOR
Address
JL. MH. THAMRIN KAV. 28-30, JAKARTA, INDONESIA 10350
Concerning
: Construction RKL RPL Implementation
Concerning
U.p.
: Mr. Adi Nataatmadja
Attention to
REFERENSI
REFERENCESNo. Registrasi
: 0066/EMTL-REG/I/2019
Registration No.Tanggal Penerbitan Sertifikat : 11 Februari 2019
Date of Certificate IssuanceJumlah Total Halaman
: 15 halaman
Total PageDahlan Suteja
PT BMT Asia Pacific Indonesia Divisi Laboratorium (BMT Lab)
I
NFORMASI
C
ONTOH
No. Sertifikat
: BMT-EMTL-510.19-0066
No. Registrasi
: 0066/EMTL-REG/I/2019
Nama Klien
: PT. Vena Energy
U.p.
: Mr. Adi Nataatmadja
NO NO. LAB. IDENTITAS CONTOH LOKASI JENIS CONTOH PENERIMAAN
1 190066-1 MM – Area Sutet Projek PLTS Kab. Minahasa Utara
Medan Magnet &
Medan Listrik 31 Januari 2019 2 190066-2 AP1 – Upnstrean Drainase Projek PLTS Kab. Minahasa
Utara Air Permukaan 31 Januari 2019 3 190066-3 AP 2 – Downstream Drainase Projek
PLTS Dekat Reteantion Pound
Kab. Minahasa
Utara Air Permukaan 31 Januari 2019 4 190066-4 TA1 – Area Singkupan Bukit Projek PLTS Kab. Minahasa
Utara Tanah 31 Januari 2019 5 190066-5 TA 2 – Area Pondasi Panel PLTS Kab. Minahasa
Utara Tanah 31 Januari 2019
11 Februari 2019
Dahlan Suteja
Laboratory Manager
PT BMT Asia Pacific Indonesia Divisi Laboratorium (BMT Lab)
H
ASIL
A
NALISIS
L
ABORATORIUM
No. Sertifikat
: BMT-EMTL-510.19-0066
Nama Klien
: PT. Vena Energy
U.p.
: Mr. Adi Nataatmadja
Identitas Contoh
: MM
–
Area Sutet Projek PLTS
Matriks Contoh
: Medan Magnet & Listrik
Jenis Contoh
: Medan Magnet dan Medan Listrik
Lokasi
: Kab. Minahasa Utara
No. Lab.
: 190066-1
Tanggal Sampling
: 21 Januari 2019
Waktu Sampling : 16.30 WITA
Koordinat
: N 1°39
’
22.5
”; E 1
25°0
5’
45.7
”
PARAMETER UJI HASIL BAKU
MUTU ¹ LOR UNIT METODE ANALISIS
MEDAN MAGNET DAN MEDAN LISTRIK Medan magnet
(Rapat fluks magnet) 1,6850 2000 0,0001 mT IEC 61786:1998
KETERANGAN : 1 PerMenKes No. 70 Tahun 2016 ( Tentang Standar dan Syarat Kesehatan Lingkungan Kerja ) - BAB II.A.d.1.a. Tabel 10 (Seluruh
Tubuh – Tempat Kerja Umum)
LOR = Batas Pelaporan (Limit of Reporting)
PARAMETER UJI HASIL BAKU
MUTU ¹ LOR UNIT METODE ANALISIS
MEDAN MAGNET DAN MEDAN LISTRIK Kuat Medan Listrik Satis
<30 kHz 0,312 25 0,001 kV/m IEC 61786:1998
KETERANGAN : 1 PerMenKes No. 70 Tahun 2016 ( Tentang Standar dan Syarat Kesehatan Lingkungan Kerja ) –
BAB II.A.d.2.a. Tabel 11 ( Tempat Kerja Tidak lebih dari 8 Jam Kerja)
LOR = Batas Pelaporan (Limit of Reporting)
11 Februari 2019
Dahlan Suteja
Laboratory Manager
PT BMT Asia Pacific Indonesia Divisi Laboratorium (BMT Lab)
H
ASIL
A
NALISIS
L
ABORATORIUM
No. Sertifikat
: BMT-EMTL-510.19-0066
Nama Klien
: PT. Vena Energy
U.p.
: Mr. Adi Nataatmadja
Identitas Contoh
: AP 1
–
Upstream Drainase Projek PLTS
Matriks Contoh
: Air
Jenis Contoh
: Air Permukaan
Lokasi
: Kab. Minahasa Utara
No. Lab.
: 190066-2
Tanggal Sampling
: 21 Januari 2019
Waktu Sampling : 11.01 WITA
Koordinat
: N 1°39
’
14.1
”; E 1
25°0
5’
31.5
”
PARAMETER UJI HASIL BAKU
MUTU a) LOR UNIT METODE ANALISIS
FISIKA
Temperatur 28,2 deviasi 3 - °C SNI 06-6989.23-2005 Padatan terlarut total, TDS 240 1.000 2 mg/L SNI 06-6989.27-2005 Padatan tersuspensi total, TSS 12 50 1 mg/L SNI 06-6989.3-2004 KIMIA ANORGANIK
pH 7,56 6,0 - 9,0 - - SNI 06-6989.11-2004 Kebutuhan oksigen biokimia, BOD 3 3 2 mg/L SMEWW 22nd ed:5210 D, 2012
Kebutuhan oksigen kimiawi, COD 6 25 4 mg/L SMEWW 22nd ed:5220 D, 2012
Oksigen terlarut, DO 5,1 ≥4 0,1 mg/L SMEWW 22nd ed:4500-O G, 2012
Fosfat total sebagai P <0,02 0,2 0,02 mg/L SNI 06-6989.31-2005 Nitrat sebagai N, NO3-N 5,89 10 0,08 mg/L SMEWW 22nd ed:4500-NO3ˉ C, 2012
Amonia, NH3-N <0,1 - 0,1 mg/L SNI 06-6989.30-2005
Arsen, As <0,002 1 0,002 mg/L SMEWW 22nd ed:3114 B, 2012
Kobalt, Co <0,04 0,2 0,04 mg/L SMEWW 22nd ed:3111 B, 2012
Barium, Ba 0,1 - 0,1 mg/L SNI 06-6989.39-2005 Boron, B < 0,01 1 0,01 mg/L SMEWW 22nd ed:3120 B, 2012
Selenium, Se <0,002 0,05 0,002 mg/L SMEWW 22nd ed:3114 B, 2012
Kadmium, Cd <0,002 0,01 0,002 mg/L SNI 6989.16:2009 Kromium heksavalensi, Cr(VI) <0,01 0,05 0,01 mg/L SNI 6989.71:2009 Tembaga, Cu <0,007 0,02 0,007 mg/L SNI 6989.6:2009 Besi, Fe 1,20 - 0,03 mg/L SNI 6989.4:2009 Timbal, Pb 0,047 0,03 0,02 mg/L SNI 6989.8:2009 Mangan, Mn 0,02 - 0,01 mg/L SNI 6989.5:2009 Air raksa, Hg <0,0002 0,002 0,0002 mg/L SMEWW 22nd ed:3112 B, 2012
Seng, Zn a <0,008 0,05 0,008 mg/L SNI 6989.7:2009
Nitrit sebagai N, NO2-N <0,01 0,06 0,01 mg/L SNI 06-6989.9-2004
Sulfat, SO42¯ 11 - 3 mg/L SNI 6989.20:2009
Klorin bebas, Cl2 <0,02 0,03 0,02 mg/L SMEWW 22nd ed:4500-Cl G, 2012
Klorida, Cl¯ 37,2 - 1,5 mg/L SNI 6989.19:2009 Sulfur sebagai H2S <0,001 0,002 0,001 mg/L SMEWW 22nd ed:4500-S2ˉ F, 2012
Sianida, CN¯ <0,01 0,02 0,01 mg/L SMEWW 22nd ed:4500-CN¯ E, 2012
Fluorida, F¯ 0,34 1,5 0,06 mg/L SNI 06-6989.29-2005 MIKROBIOLOGI
Fecal coliform 255 1.000 2 jumlah/100 mL SMEWW 22nd ed:9222 B, 2012
PT BMT Asia Pacific Indonesia Divisi Laboratorium (BMT Lab)
PARAMETER UJI HASIL MUTU BAKU a) LOR UNIT METODE ANALISIS
KIMIA ORGANIK
Minyak dan lemak <1 1000 500 µg/L SNI 6989.10:2011 Detergen, sebagai MBAS <0,025 200 25 µg/L SNI 06-6989.51-2005 Senyawa fenol, sebagai fenol <0,001 1 1 µg/L SNI 06-6989.21-2004
KETERANGAN : a) Peraturan Pemerintah No. 82 Tahun 2001 Tentang Pengelolaan Kualitas Air Dan Pengendalian Pencemar (Kelas II) LOR = Limit of Reporting
11 Februari 2019
Dahlan Suteja
Laboratory Manager
PT BMT Asia Pacific Indonesia Divisi Laboratorium (BMT Lab)
H
ASIL
A
NALISIS
L
ABORATORIUM
No. Sertifikat
: BMT-EMTL-510.19-0066
Nama Klien
: PT. Vena Energy
U.p.
: Mr. Adi Nataatmadja
Identitas Contoh
: AP 2 - Dowstream Drainase Projek PLTS Dekat Retantion Pound
Matriks Contoh
: Air
Jenis Contoh
: Air Permukaan
Lokasi
: Kab. Minahasa Utara
No. Lab.
: 190066-3
Tanggal Sampling
: 21 Januari 2019
Waktu Sampling : 10.22 WITA
Koordinat
: N 1°39
’
05.1
”; E 1
25°0
5’
72.9
”
PARAMETER UJI HASIL BAKU
MUTU a) LOR UNIT METODE ANALISIS
FISIKA
Temperatur 27,8 deviasi 3 - °C SNI 06-6989.23-2005 Padatan terlarut total, TDS 316 1.000 2 mg/L SNI 06-6989.27-2005 Padatan tersuspensi total, TSS 24 50 1 mg/L SNI 06-6989.3-2004 KIMIA ANORGANIK
pH 7,35 6,0 - 9,0 - - SNI 06-6989.11-2004 Kebutuhan oksigen biokimia, BOD 8 3 2 mg/L SMEWW 22nd ed:5210 D, 2012
Kebutuhan oksigen kimiawi, COD 16 25 4 mg/L SMEWW 22nd ed:5220 D, 2012
Oksigen terlarut, DO 5,4 ≥4 0,1 mg/L SMEWW 22nd ed:4500-O G, 2012
Fosfat total sebagai P 0,03 0,2 0,02 mg/L SNI 06-6989.31-2005 Nitrat sebagai N, NO3-N 6,99 10 0,08 mg/L SMEWW 22nd ed:4500-NO3ˉ C, 2012
Amonia, NH3-N <0,1 - 0,1 mg/L SNI 06-6989.30-2005
Arsen, As <0,002 1 0,002 mg/L SMEWW 22nd ed:3114 B, 2012
Kobalt, Co <0,04 0,2 0,04 mg/L SMEWW 22nd ed:3111 B, 2012
Barium, Ba 0,1 - 0,1 mg/L SNI 06-6989.39-2005 Boron, B < 0,01 1 0,01 mg/L SMEWW 22nd ed:3120 B, 2012
Selenium, Se <0,002 0,05 0,002 mg/L SMEWW 22nd ed:3114 B, 2012
Kadmium, Cd <0,002 0,01 0,002 mg/L SNI 6989.16:2009 Kromium heksavalensi, Cr(VI) <0,01 0,05 0,01 mg/L SNI 6989.71:2009 Tembaga, Cu <0,007 0,02 0,007 mg/L SNI 6989.6:2009 Besi, Fe 1,44 - 0,03 mg/L SNI 6989.4:2009 Timbal, Pb <0,02 0,03 0,02 mg/L SNI 6989.8:2009 Mangan, Mn 0,02 - 0,01 mg/L SNI 6989.5:2009 Air raksa, Hg <0,0002 0,002 0,0002 mg/L SMEWW 22nd ed:3112 B, 2012
Seng, Zn a <0,008 0,05 0,008 mg/L SNI 6989.7:2009
Nitrit sebagai N, NO2-N 0,01 0,06 0,01 mg/L SNI 06-6989.9-2004
Sulfat, SO42¯ 10 - 3 mg/L SNI 6989.20:2009
Klorin bebas, Cl2 <0,02 0,03 0,02 mg/L SMEWW 22nd ed:4500-Cl G, 2012
Klorida, Cl¯ 41,2 - 1,5 mg/L SNI 6989.19:2009 Sulfur sebagai H2S <0,001 0,002 0,001 mg/L SMEWW 22nd ed:4500-S2ˉ F, 2012
Sianida, CN¯ <0,01 0,02 0,01 mg/L SMEWW 22nd ed:4500-CN¯ E, 2012
Fluorida, F¯ 0,10 1,5 0,06 mg/L SNI 06-6989.29-2005 MIKROBIOLOGI
Fecal coliform 120 1.000 2 jumlah/100 mL SMEWW 22nd ed:9222 B, 2012
PT BMT Asia Pacific Indonesia Divisi Laboratorium (BMT Lab)
PARAMETER UJI HASIL MUTU BAKU a) LOR UNIT METODE ANALISIS
KIMIA ORGANIK
Minyak dan lemak <500 1000 500 µg/L SNI 6989.10:2011 Detergen, sebagai MBAS <25 200 25 µg/L SNI 06-6989.51-2005 Senyawa fenol, sebagai fenol <1 1 1 µg/L SNI 06-6989.21-2004
KETERANGAN : a) Peraturan Pemerintah No. 82 Tahun 2001 Tentang Pengelolaan Kualitas Air Dan Pengendalian Pencemar (Kelas II) LOR = Limit of Reporting
11 Februari 2019
Dahlan Suteja
Laboratory Manager
PT BMT Asia Pacific Indonesia Divisi Laboratorium (BMT Lab)
H
ASIL
A
NALISIS
L
ABORATORIUM
No. Sertifikat
: BMT-EMTL-510.19-0066
Nama Klien
: PT. Vena Energy
U.p.
: Mr. Adi Nataatmadja
Identitas Contoh
: Biota ( Plankton )
Matriks Contoh
: Air
Jenis Contoh
: Air Permukaan
Lokasi
: Kab. Minahasa Utara
No. Lab.
: 190066-2 & 3
Tanggal Sampling
: -
Waktu Sampling : -
Koordinat
: -
FITOPLANKTON
190066-2 190066-3
AP 1 AP 2
TANGGAL
21 Januari 2019 21 Januari 2019CYANOPHYCEAE
Trichodesmium sp
11,292
7,526
BACILLARIOPHYCEAE
Chaetoceros sp.
127,976
126,094
Bacteriastrum sp.
0
1,882
Thalassionema sp.
9,410
1,882
Thalassiotrix sp.
0
1,882
Coscinodiscus sp.
7,528
9,410
Rhizosolenia sp.
0
0
Dithylum sp.
1,882
1,882
Climacodium sp.
3,764
1,882
Lauderia sp.
13,174
126,094
Navicula sp.
5,646
7,528
Nitzschia sp.
15,056
13,174
Gyrosigma sp.
1,882
3,764
Amphora sp.
0
0
Hemiaulus sp.
7,528
13,174
Pinmularia sp.
1,882
0
Biddulpia sp.
0
0
Campilodiscus sp.
0
0
Fragillaria sp.
0
0
DYNOPHYCEAE
Ceratium sp.
5,056
7,528
Peridinium sp.
0
0
Dinophysis sp.
0
0
Orinthocercus sp.
0
0
PT BMT Asia Pacific Indonesia Divisi Laboratorium (BMT Lab)
FITOPLANKTON
190066-2 190066-3
AP 1 AP 2
TANGGAL
21 Januari 2019 21 Januari 2019Jumlah Taksa
11
13
Kelimpahan sel/m³
225,23
205,14
Indeks Keragaman
1.69
1.52
Indeks Keseragaman
0.66
0.61
Indeks Dominansi
0.34
0.40
11 Februari 2019
Dahlan Suteja
Laboratory Manager
PT BMT Asia Pacific Indonesia Divisi Laboratorium (BMT Lab)
H
ASIL
A
NALISIS
L
ABORATORIUM
No. Sertifikat
: BMT-EMTL-510.19-0066
Nama Klien
: PT. Vena Energy
U.p.
: Mr. Adi Nataatmadja
Identitas Contoh
: Biota ( Benthos )
Matriks Contoh
: Air
Jenis Contoh
: Air Permukaan
Lokasi
: Kab. Minahasa Utara
No. Lab.
: 190066-2 & 3
Tanggal Sampling
: -
Waktu Sampling : -
Koordinat
: -
ZOOPLANKTON
190066-5 190066-6AP 1 AP 2
TANGGAL
21 Januari 2019 21 Januari 2019PROTOZOA
Codonellopsis sp.
0
0
Rhabdonella sp.
317
317
CRUSTACEAE
Nauplius
3,487
2,536
Calanus sp.
3,170
0
Corycaeus sp.
0
2,219
Oithona sp.
951
317
Oncaea sp.
0
0
Eucalamus sp.
0
0
Microsetella sp.
634
317
Jumlah Taksa
5
5
Kelimpahan (Ind/m
3)
8,559
5,706
Indeks Keragaman
1.18
1.19
Indeks Keseragaman
1,36
1.35
Indeks Dominansi
0.40
0.37
11 Februari 2019
Dahlan Suteja
Laboratory Manager
PT BMT Asia Pacific Indonesia Divisi Laboratorium (BMT Lab)
H
ASIL
A
NALISIS
L
ABORATORIUM
No. Sertifikat
: BMT-EMTL-510.19-0066
Nama Klien
: PT. Vena Energy
U.p.
: Mr. Adi Nataatmadja
Identitas Contoh
: TA 1
–
Area Singkupan Bukit Projek PLTS
Matriks Contoh
: Tanah
Jenis Contoh
: Tanah
Lokasi
: Kab. Minahasa Utara
No. Lab.
: 190066-4
Tanggal Sampling
: 21 Januari 2019
Waktu Sampling : 11.30 WITA
Koordinat
: N 1°39
’
16.0
”; E 1
25°0
5’
45.2
”
Parameter Uji
Satuan
Hasil
pH (H
2O)
-4,68
pH (KCl)
-4,60
Basa-basa Dapat Ditukar
Kalium, K
mg/Kg
7,22
Kalsium, Ca
mg/Kg
9,31
Magnesium, Mg
mg/Kg
4,02
Natrium, Na
mg/Kg
1,98
Total Basa
mg/Kg
30,22
Kapasitas Tukar Kation (KTK)
meq/100 g
0,45
Kejenuhan Basa
%
52,23
C- Organik
%
1,04
N-Total
%
0,18
C/N Rasio
%
14,12
P tersedia
mg/100g
14,22
H-dapatditukar (KCl 1M)
me/100g
0,09
Al-dapatditukar (KCl 1M)
me/100g
0,06
Tekstur:
Pasir
%
0,04
Debu
%
78,98
Liat
%
18,21
11 Februari 2019
Dahlan Suteja
Laboratory Manager
PT BMT Asia Pacific Indonesia Divisi Laboratorium (BMT Lab)
H
ASIL
A
NALISIS
L
ABORATORIUM
No. Sertifikat
: BMT-EMTL-510.19-0066
Nama Klien
: PT. Vena Energy
U.p.
: Mr. Adi Nataatmadja
Identitas Contoh
: TA 2
–
Area Pondasi Panel PLTS
Matriks Contoh
: Tanah
Jenis Contoh
: Tanah
Lokasi
: Kab. Minahasa Utara
No. Lab.
: 190066-5
Tanggal Sampling
: 21 Januari 2019
Waktu Sampling : 13.22 WITA
Koordinat
: N 1°39
’
30.0
”; E 1
25°0
5’
44.4
”
Parameter Uji
Satuan
Hasil
pH (H
2O)
-4,88
pH (KCl)
-4,22
1
Basa-basa Dapat Ditukar
Kalium, K
mg/Kg
7,84
Kalsium, Ca
mg/Kg
10,15
Magnesium, Mg
mg/Kg
3,95
5
Natrium, Na
mg/Kg
3,19
Total Basa
mg/Kg
26,43
Kapasitas Tukar Kation (KTK)
meq/100 g
0,68
Kejenuhan Basa
%
32,18
C- Organik
%
2,77
N-Total
%
0,27
C/N Rasio
%
15,12
P tersedia
mg/100g
12,47
H-dapatditukar (KCl 1M)
me/100g
0,18
Al-dapatditukar (KCl 1M)
me/100g
0,12
Tekstur:
Pasir
%
0,08
Debu
%
86,11
Liat
%
11,32
11 Februari 2019
Dahlan Suteja
Laboratory Manager
LAPORAN HASIL UJI
File
:
D.01.031/LHU/2019
Pelanggan
:
PT. Vena Energy (Likupang 5 MW)
Alamat
:
The Plaza Office Tower, 25
thFloor
Jl. MH. Thamrin Kav. 28-30, Jakarta
Laporan
:
- Kualitas Udara Ambien
- Kualitas Udara Ruang Kerja
Tanggal diterima
:
30 Januari 2019
Tanggal selesai
:
13 Februari 2019
PT. ITEC SOLUTION INDONESIA
Endih Saikudin
Supervisor Teknis
1.
Complaints within two (2) weeks of the issuance of certificates;
2.
The results of these tests are not to be duplicated and only applies to parameter mentioned;
3.
The laboratory is not responsible in the process of sampling for sample sent directly from the customer.
PT. ITEC SOLUTION INDONESIA
Bogor Nirwana Residence Jl.PadmaNirwana Raya No. 6 Bogor
P:0251-7560193, F:021-8715685
Email: itecsolutionjkt@gmail.com
PT. ITEC SOLUTION INDONESIA
Bogor Nirwana Residence Jl.PadmaNirwana Raya No. 6 Bogor
P:0251-7560193, F:021-8715685
Email: itecsolutionjkt@gmail.com
www.itec.co.id
File
: D.01.031/LHU/2019
No. Analisis
: D.01.031.a-UA.19
Deskripsi contoh
:
Kualitas Udara Ambien
Lokasi
: Gardu Induk PLN
Koordinat
: U 01
039’29.3”; T 125
005’36.8”
Tanggal diterima
: 30 Januari 2019
Tanggal pengujian
: 30 Januari 2019 - 12 Februari 2019
No
Parameter
Satuan
Hasil
Analisa
Baku Mutu
Metode
1
Sulfur Dioksida (SO
2)***
µg/Nm
331.61
900*
SNI 19-7119.7-2005
2
Karbon Monoksida (CO)
µg/Nm
31332
30000*
SNI 19-7119.10-2011
3
Nitrogen Dioksida (NO
2)***
µg/Nm
36.61
400*
SNI 19-7119.2-2005
4
Ozon (O
3)
µg/Nm
3<0.015
235*
SNI 19-7119.8-2005
5
Hidrokarbon (HC)
µg/Nm
35.21
160*
SNI 7119.13-2009
6
Partikel <10 μm (PM
10)
µg/Nm
37.70
150*
Gravimetric
7
Partikel <2,5 μm (PM
2,5)
µg/Nm
32.15
65*
Gravimetric
8
Particulate (TSP)
µg/Nm
312.41
230*
SNI 19-7119.3-2005
9
Timbal (Pb)
µg/Nm
3<0.005
2*
SNI 19-7119.4-2005
10
Kebisingan***
dBA
57.3
70**
ITEC.IKM-19
(*) Baku mutu: Peraturan Pemerintah Republik Indonesia No.41 Tahun 1999
(**) Baku mutu: Keputusan Menteri Negara Lingkungan Hidup No. 48 Tahun 1996 (Kawasan Industri) (***) Accredited parameter by KAN (ISO/IEC 17025)
<: Lebih kecil dari deteksi limit
Supporting Parameters
No.
Parameter
Hasil
Analisa
Satuan
1
Temperatur
31.1
oC
2
Kelembaban
68.2
%
3
Tekanan
755.2
MmHg
4
Kecepatan Angin
0.0
–
0.8
m/s
5
Arah Angin
Barat Laut
-
Bogor,
13 Februari 2019
PT. ITEC SOLUTION INDONESIA
Bogor Nirwana Residence Jl.PadmaNirwana Raya No. 6 Bogor
P:0251-7560193, F:021-8715685
Email: itecsolutionjkt@gmail.com
www.itec.co.id
File
: D.01.031/LHU/2018
No. Analisis
: D.01.031.b-UA.18
Deskripsi contoh
:
Kualitas Udara Ambien
Lokasi
: Lapangan Bola Dusun Wineru
Koordinat
: U 01
039’29.4”; T 125
006’13.3”
Tanggal diterima
: 30 Januari 2019
Tanggal pengujian
: 30 Januari 2019 - 12 Februari 2019
No
Parameter
Satuan
Hasil
Analisa
Baku Mutu
Metode
1
Sulfur Dioksida (SO
2)***
µg/Nm
329.49
900*
SNI 19-7119.7-2005
2
Karbon Monoksida (CO)
µg/Nm
31270
30000*
SNI 19-7119.10-2011
3
Nitrogen Dioksida (NO
2)***
µg/Nm
33.98
400*
SNI 19-7119.2-2005
4
Ozon (O
3)
µg/Nm
3<0.015
235*
SNI 19-7119.8-2005
5
Hidrokarbon (HC)
µg/Nm
35.11
160*
SNI 7119.13-2009
6
Partikel <10 μm (PM
10)
µg/Nm
37.05
150*
Gravimetric
7
Partikel <2,5 μm (PM
2,5)
µg/Nm
31.97
65*
Gravimetric
8
Particulate (TSP)
µg/Nm
311.37
230*
SNI 19-7119.3-2005
9
Timbal (Pb)
µg/Nm
3<0.005
2*
SNI 19-7119.4-2005
10
Kebisingan***
dBA
54.1
70**
ITEC.IKM-19
(*) Baku mutu: Peraturan Pemerintah Republik Indonesia No.41 Tahun 1999
(**) Baku mutu: Keputusan Menteri Negara Lingkungan Hidup No. 48 Tahun 1996 (Kawasan Industri) (***) Accredited parameter by KAN (ISO/IEC 17025)
<: Lebih kecil dari deteksi limit
Supporting Parameters
No.
Parameter
Hasil
Analisa
Satuan
1
Temperatur
35.5
oC
2
Kelembaban
57.5
%
3
Tekanan
753.3
MmHg
4
Kecepatan Angin
0.0
–
0.75
m/s
5
Arah Angin
Barat
-
PT. ITEC SOLUTION INDONESIA
Bogor Nirwana Residence Jl.PadmaNirwana Raya No. 6 Bogor
P:0251-7560193, F:021-8715685
Email: itecsolutionjkt@gmail.com
www.itec.co.id
File
: D.01.031/LHU/2019
No. Analisis
: D.01.031.c-RK.19
Deskripsi contoh
:
Kualitas Udara Ruang Kerja
Lokasi
: Depan Kantor PLTS Likupang
Koordinat
: U 01
039’30.04”; T 125
005’46.8”
Tanggal diterima
: 30 Januari 2019
Tanggal pengujian
: 30 Januari 2019 - 12 Februari 2019
No
Parameter
Satuan
Hasil
Analisa
Baku
Mutu
Metode
1
Sulfur Dioksida (SO
2)
mg/m
30.0282
-
SNI 19-7119.7-2005
2
Karbon Monoksida (CO)
mg/m
31.3143
-
SNI 19-7119.10-2011
3
Nitrogen Dioksida (NO
2)
mg/m
30.0108
-
SNI 19-7119.2-2005
4
Oksidan (O
3)
mg/m
3<0.015
-
SNI 19-7119.8-2005
5
Hidrokarbon (HC)
mg/m
3<0.0005
-
SNI 7119.13-2009
6
Partikulat (TSP)
mg/m
30.1315
-
SNI 16-7058-2004
7
Timbal (Pb)
mg/m
3<0.005
-
SNI 19-7119.4-2005
8
Hydrogen Sulfide (H
2S)
mg/m
30.0032
-
ITEC.IKM-28
9
Ammonia (NH
3)
mg/m
30.0220
-
SNI 19-7119.1-2005
10
Kebisingan**
dBA
(a)47.6
85
ITEC.IKM-13
* : Peraturan Menteri Ketenagakerjaan Republik Indonesia No. 05/MEN/IV/2018 tentang Keselamatan dan Kesehatan Kerja Lingkungan Kerja (Lampiran 1. Faktor Fisika dan 3.C.d Faktor Kimia).
a) Peraturan Menteri Ketenagakerjaan Republik Indonesia No. 05/MEN/IV/2018 tentang Keselamatan dan Kesehatan Kerja Lingkungan Kerja (Lampiran 1.B. Nilai Ambang Batas Fisika, Kebisingan di Lingkungan Kerja Waktu Pemaparan perhari 8 jam)
** : Accredited parameter by KAN (ISO/IEC 17025)
Supporting Parameters
No.
Parameter
Hasil
Analisa
Satuan
1
Temperatur
35.4
oC
2
Kelembaban
55.4
%
3
Tekanan
753.5
MmHg
4
Kecepatan Angin
0.0
–
0.7
m/s
5
Arah Angin
Barat
-
NO Date Vena/ Attendees External/Community Participants Village Subdistrict Area
Municipality/
regency Meeting Agenda Key Discussion Point/Issue Issue category Level of Concern Action Plan/Feedback Received
Minutes of Meetings
1 2-Jan-18 Roy (PP) Head of Local Likupang area Police (Mr.
Hendrik Rantung) wineru Likupang timur Minahasa Utara
coordination meeting
coordination regarding security for an emergency action
and site control Company regulations/procedure Increase Attention Continue coordination No 2 11-Jan-18 Roy (PP) Head of Likupang health clinic
(puskesmas), Dr.David wineru Likupang timur Minahasa Utara
coordination meeting
coordination for emergency procedure and action also
one day care service Company regulations/procedure Increase Attention Continue coordination No 3 13-Feb-18 James, pangeran Head of Village (Mr.Zubair) wineru Likupang timur Minahasa Utara goodwill visit continue coordination and update construction progress No issue Neutral/ maintain
engagement Continue coordination no 4 26-Feb-18 James Head of Likupang Sub District (Mr. Donny
Rondonuwu) Likupang 1 Likupang Timur Minahasa Utara Goodwill visit continue coordination and update construction progress Government Relations
Neutral/ maintain
engagement Continue coordination No 5 27-Feb-18 James Village office staff (Mr. Benny) wineru Likupang timur Minahasa Utara
Resolving Issues, complaint, grievance
Ask recruitment for Security at site Employment opportunities Increase Attention will coordination with PP for recruitment No
6 27-Feb-18 James Head of Village (Mr.Zubair) wineru Likupang timur Minahasa Utara
Resolving Issues, complaint, grievance
Ask the recruitment status not so many until now employment opportunities Increase Attention will coordination with PP for recruitment No
7 28-Feb-18 James Minut Police Operational Head (KomPol
Farly) Other Other Minahasa Utara
coordination meeting
introduce the company, update the construction progress
and coordination if any criminal action at site Government Relations
Neutral/ maintain
engagement Continue coordination No 8 1-Mar-18 James Assistant II of Bupati Minut (Mr.Alan
Mingkid) Other Other Minahasa Utara goodwill visit continue coordination and update construction progress Government Relations
Neutral/ maintain
engagement Continue coordination No 9 6-Mar-18 James Village secretary (Mrs.Olga) wineru Likupang timur Minahasa Utara coordination
meeting Socialization of Grievance mechanism procedure form Company regulations/procedure Increase Attention Continue coordination No 10 7-Mar-18 James Ex Landowner (Mr. Herman L) wineru Likupang timur Minahasa Utara Coordination
meeting Possibility as the local sub-cont Local Business opportunity Increase Attention will coordination with PP No 11 7-Mar-18 James PLN Sulut - Land Acquisition Team
(Mr.Andit), Ex Landowner (Mr.Herman) wineru Likupang timur Minahasa Utara
coordination meeting
Land Boundary the land that PLN will buy from Pak
Herman, between the S/S and ITL land Land, road access & properties Increase Attention Continue coordination No 12 9-Mar-18 James, Bilma, Daniel GM PLN North Sulawesi (Mr.Edison) Other Other Manado coordination
meeting
Introduction of Equis Director, update the construction
progress Company regulations/procedure
Neutral/ maintain
engagement Continue coordination No 13 12-Mar Roy (PP), James Head of TNI-likupang sub district (Mayor
Tony Wurangian) Likupang 1 Likupang timur Minahasa Utara goodwill visit
information about mutation Mayor Tony and will be
substitute with Sergeant mayor Andrias Government Relations
Neutral/ maintain
engagement Continue coordination No 14 15-Mar James, Rian, Isoon, Amir GM PLN North Sulawesi (Mr.Edison) Other Other Manado coordination
meeting Financial document signing Company regulations/procedure Urgent attention Continue coordination No 15 17-Mar Roy (PP) , James Head of Likupang health clinic
(puskesmas), Dr.David Likupang 1 Likupang timur Minahasa Utara goodwill visit
information about mutation Dr.David and will be
substitute with Dr.Ronald Government Relations
Neutral/ maintain
engagement Continue coordination No 16 20-Mar James BPN-Land Office Minut (Mrs. Vonny) Other Other Minahasa Utara coordination
meeting progress for the splitting certificate Company regulations/procedure Urgent attention Urgent attention No 17 21-Mar James, Pangeran, Harry, Anggra Head of Likupang health clinic
(puskesmas), Dr.Ronald Likupang 1 Likupang timur Minahasa Utara goodwill visit
Introduce the company, and coordination if any
emergency action, also for fogging service Company regulations/procedure Increase Attention Continue coordination No 18 27-Mar James, Anggra Head Of Wineru Village, village secretary wineru Likupang timur Minahasa Utara coordination
meeting landowner identification for additional land for Minut 2 Company regulations/procedure Increase Attention Continue coordination No 19 28-Mar James, anggra, Roy (PP), Alfi (PP) Head of Wineru village and local
community (the orphan) wineru Likupang timur Minahasa Utara goodwill visit PP-CSR program donation for the orphan in wineru viilage Company regulations/procedure
Neutral/ maintain
engagement Continue coordination No 20 9-Apr James, pangeran, Navis NGO-KPK, Likupang Police, Mr.Yoas wineru Likupang timur Minahasa Utara
Resolving Issues, complaint, grievance
Double claim of land status and mediation Land, road access & properties Urgent attention will conduct mediation between ITL, NGO, and
Pak Herman Yes
21 10-Apr James, Navis HoV wineru wineru Likupang timur Minahasa Utara coordination
meeting coordination meeting regarding double claim on ITL land Land, road access & properties Urgent attention invite HoV to attend the mediation Yes 22 10-Apr James, Navis Pak Herman (Ex LO) wineru Likupang timur Minahasa Utara coordination
meeting coordination meeting regarding double claim on ITL land Land, road access & properties Urgent attention invite Pak Herman to attend the mediation No 23 16-Apr James, Gerry Head of Land office (BPN) Other Other Minahasa Utara coordination
meeting preparation of land mortgage Company regulations/procedure Increase Attention continue coordination No 24 19-Apr Roy (PP), Sugiyarno (PP) Chief of Likupang TNI wineru Likupang timur Minahasa Utara goodwill visit coordination meeting and update project progress Government Relations Neutral/ maintain
engagement Continue coordination No 25 20-Apr Roy (PP), sub cont workers Head of Likupang Health Clinic Likupang 1 Likupang timur Minahasa Utara
Compliance of mandatory requirement
Medical check up for the sub-cont workers Company regulations/procedure Neutral/ maintain
engagement Continue coordination No 26 25-Apr James, Bilma, Rian Notary (Grace Sarendatu) Other Other Minahasa Utara
Compliance of mandatory requirement
Signing of Land Mortgage with the Lender Company regulations/procedure Urgent attention Continue coordination No
27 28-Apr James HoV wineru wineru Likupang timur Minahasa Utara coordination
meeting Land documents review for Minut 2 land acquisition Company regulations/procedure Increase Attention Continue coordination No MoM File already kept on Share drive
Additional list from submitted MoM
29 30-Apr James BPN-Land Office Minut (Mrs. Tresye) Other Other Minahasa Utara
Compliance of mandatory requirement
coordination related the Mortgage Deed Registration Company regulations/procedure Increase Attention Continue coordination No
30 2-May James PLN Suluttenggo - Planning Division
(Mr.Aguesno) Other Other Manado
Compliance of mandatory requirement
Drawings and Electrical Documents submission Company regulations/procedure Increase Attention Continue coordination No
31 3-May James Likupang House Owner (Mr.Denny) Likupang 1 Likupang timur Minahasa Utara coordination
meeting Control and check the progress of the Renovation No issue
Neutral/ maintain
engagement Continue coordination No 32 4-May James Head of Likupang Police (Mr.Steven) Likupang 1 Likupang timur Minahasa Utara coordination
meeting
coordination meeting and following up the mediation
invitation Land, road access & properties Increase Attention Continue coordination No 33 7-May James Notary (Grace Sarendatu) Other Other Minahasa Utara
Compliance of mandatory requirement
coordination related the Mortgage Deed Registration Company regulations/procedure Increase Attention Continue coordination No
34 8-May James BPN-Land Office Minut (Mrs. Tresye) Other Other Minahasa Utara
Compliance of mandatory requirement
Mortgage Deed Registration Company regulations/procedure Increase Attention Continue coordination No
35 9-May Roy (PP) PTSP office of North Sulawesi Other Other Manado
Compliance of mandatory requirement
SIPPA documents submission (ground water permit) Company regulations/procedure Increase Attention Continue coordination No
36 14-May James, Pangeran, Kezia NGO-KPK, Likupang Police, Mrs.
Antonetta Other Other Minahasa Utara
Resolving Issues, complaint, grievance
Double claim of land status (2nd mediation) Land, road access & properties Increase Attention Continue coordination Yes 37 15-May James Notary (Grace Sarendatu) Other Other Minahasa Utara
Compliance of mandatory requirement
coordination related the Mortgage Deed Registration Company regulations/procedure Increase Attention Continue coordination no
38 15-May James BPN-Land office Minut (Mr.Jamal) Other Other Minahasa Utara
Compliance of mandatory requirement
Mortgage Deed Registration Company regulations/procedure Increase Attention Continue coordination No
39 16-May James Head of PLN airmadidi office Other Other Minahasa Utara goodwill visit To Introduce the company No issue Neutral/ maintain
engagement Continue coordination No 40 16-May Roy (PP) Head of Likupang Police (Mr.Steven) Likupang 1 Likupang timur Minahasa Utara coordination
meeting
updating the project progress and discussing territprial
security situation No issue
Neutral/ maintain
engagement Continue coordination No 41 21-May James BPN Minut (Mr.Jamal) Other Other Minahasa Utara coordination
meeting coordination related the Mortgage Deed Registration Company regulations/procedure Increase Attention estimate will completed on 25 May 2018 No 42 22-May Roy (PP) ESDM North Sulawesi (Mr. Roy Terop) Other Other Manado
Compliance of mandatory requirement
scheduling the site visit to check the deep well for the SIPA
permit process Company regulations/procedure Increase Attention the schedule on 30 May 2018 No 43 23-May James Head of PLN airmadidi office Other Other Minahasa Utara coordination
meeting Registration for power capacity upgrade No issue Increase Attention Continue coordination No 44 25-May James Village secretary (Mrs.Olga) wineru Likupang timur Minahasa Utara coordination
meeting
t Land, road access & properties Neutral/ maintain
engagement Continue coordination No 46 18-Jun James, Syahrial, Roy(PP) Likupang Police (Mr.Akhmad) wineru Likupang timur Minahasa Utara
Resolving Issues, complaint, grievance
Land, road access & properties Increase Attention Continue coordination No
47 19-Jun Roy (PP) Local Likupang NGO (Aliansi Doyot
Linekepan) wineru Likupang timur Minahasa Utara
Resolving Issues, complaint, grievance
Giving permission the NGO entering the site to see
actually the Praying room was not a mosque. Land, road access & properties Increase Attention Continue coordination No 48 20-Jun James, Kezia NGO LTL (Ms.Yanti) Other Other Manado Coordination
meeting
Discussion and coordination for The CSR Program - Free
Health Clinic in Wineru-Likupang on July 11 Company regulations/procedure Increase Attention Continue coordination No 49 23-Jun James vilage secretary (Mrs Olga) wineru Likupang timur Minahasa Utara Coordination
meeting
Send the letter regarding the Health clinic program and
technical coordination to prepare the health clinic Company regulations/procedure Increase Attention
She will start to socialization to the community to participate to the program No 50 25-Jun James Governor office staff (Mr. Steven) Other Other Manado coordination
meeting
Giving information about Likupang project and coordination for set up meeting with The Governor with ITL Management
Company regulations/procedure Increase Attention ITL will prepare the Letter to have the meeting with the Governor No 51 30-Jun James Subdistrict Head (Mr.Donny) wineru Likupang timur Minahasa Utara Goodwill visit Update project progress Government Relations Neutral/ maintain
engagement continue maintain engagement No 52 2-Jul James HoV wineru wineru Likupang timur Minahasa Utara coordination
meeting
Coordination and to get permission to use Village function
room for ITL CSR Program (Health Clinic) Community contribution request Increase Attention
To coordination with village secretary to prepare the Function Room No 53 3-Jul James Village secretary (Mrs.Olga) wineru Likupang timur Minahasa Utara Coordination
meeting
inform what the LTL team need from the village function room and to put on our banner to socialize the Health clinic
Community contribution request Increase Attention Continue coordination No
56 9-Jul James Village secretary (Mrs.Olga) wineru Likupang timur Minahasa Utara Coordination meeting
final coordination to prepare function room and other
tools needed for the Health clinic program Community contribution request Increase Attention prepare all things ready to use for the program No 57 10-Jul James, Filip Police North Minahasa (Mr.Rizal) Other Other Minahasa Utara coordination
meeting
discussion and what the procedure if any criminal action
at site Land, road access & properties Increase Attention
will make an official report to police if any criminal action at site No 58 11-Jul James, Ratih, Kezia Locals community, NGO LTL, Village staff wineru Likupang timur Minahasa Utara
Compliance of mandatory requirement
Free health clinic CSR program for Wineru vilage and the
surrounding village Community contribution request
Neutral/ maintain
engagement more than 100 patients registered No 59 16-Jul james Section Head at Invesment Office
(Mr.Jan) Other Other Manado goodwill visit Update report project progress Company regulations/procedure
Neutral/ maintain
engagement continue maintain engagement No 60 17-Jul james Head of Elementary School, Local
Groceries Tent wineru Likupang timur Minahasa Utara Goodwill visit
Discussion about Likupang project, the positive and
negative effect to social and economic No issue
Neutral/ maintain
engagement continue maintain engagement no 61 18-Jul Adi, james North Minahasa Labor Office
(Mrs.Marlen) Other Other Minahasa Utara
Compliance of mandatory requirement
Request Labor Data of north Minahasa for AMDAL report Company regulations/procedure Increase Attention continue coordination No
62 19-Jul Bilma, James Vice Governor North Sulawesi, Vice
Regent North Minahasa Other Other Manado goodwill visit Update report project progress Government Relations
Neutral/ maintain
engagement continue maintain engagement No 63 23-Jul James HoV wineru wineru Likupang timur Minahasa Utara coordination
meeting
Discussion about the community issue related the Family
whom always try to claim the land Land, road access & properties Increase Attention
HoV will issued confirmation letter that the inheritance letter that used by the family as their land ownership letter is not registered in the Village's Land Registration
No
64 24-Jul James, Filip BPN Minut (Mr.Jamal) Other Other Manado coordination
meeting coordination related the certificate of land in the PTUN Land, road access & properties Increase Attention
BPN will prepare the documents/land registration process that related to land certificate
No
65 24-Jul James, Filip Ex Landowner (Mr. Herman L) Other Other Manado coordination meeting
coordination and to get additional documents that related
to the land ownership Land, road access & properties Increase Attention Continue coordination No 66 25-Jul Roy (PP) Locals (Mr.Kelvin) wineru Likupang timur Minahasa Utara coordination
meeting make new access road for the villagers Land, road access & properties Increase Attention PP will prepare and make the new access No 67 27-Jul James, Anggra Subdistrict Head (Mr.Donny) Likupang 1 Likupang timur Minahasa Utara coordination
meeting
Request top soil for the road around Likupang 1 village,
that prepared for the Independence day celebration Community contribution request
Neutral/ maintain
engagement coordination with PP to prepare the material No 68 28-Jul James HoV wineru wineru Likupang timur Minahasa Utara coordination
meeting
To get confirmation letter stated the inheritance letter that used by the family as their land ownership letter is not registered in the Village's Land Registration
Land, road access & properties Increase Attention Continue coordination No
70 30-Jul James security at site (Mr.Stevy) wineru Likupang timur Minahasa Utara coordination meeting
To collect additional information and pictures of the
criminal action at site as the proof for the police Land, road access & properties Increase Attention
ask the security come to police officer if the police need the report as a witness No 72 1-Aug James Notary (Grace Sarendatu) Other Other Minahasa Utara coordination
meeting
to get cover note from the notary that stated all land
certificate are in bank as a mortgage Land, road access & properties
Neutral/ maintain
engagement to submit to the police No 73 1-Aug james Telkom Office (Customer service) Other Other Minahasa Utara
Compliance of mandatory requirement
registration for the fixed line phone at site office No issue Increase Attention Continue coordination No No
75 15-Aug-18 Navis Steven (Kapolsek Likupang) & Ahmad
(Khabintimas) Likupang 1 Likupang timur Minahasa Utara Goodwill visit Local employment oppurtinities in PP Employment opportunities Increase Attention Reguler informal meeting No 76 15-Aug-18 Navis
Jhon (Guru SMK Likupang) Likupang 1 Likupang timur Minahasa Utara Goodwill visit Collect community concern about CSR program Community contribution request
Neutral/ maintain
engagement Develop proposal about repair for field sport No 77 16-Aug-18 Navis & Kezia
Edwin K, Heince V (Kantor Pelayanan
Pajak Bitung) Minahasa Utara
Compliance of mandatory requirement
Inspection about NPWP from tax department (Minut
District) Company regulations/procedure Increase Attention Coordination with Legal Dept. No 78 20-Aug-18 Navis Dina (Sekdes likupang 1) Likupang 1 Likupang timur Minahasa Utara Goodwill visit Collect community concern related local employment
opportunities Employment opportunities
Neutral/ maintain
engagement Reguler informal meeting No 79 23-Aug James, Navis, Kezia Public Works Office - National Road
Maintanance dept. Other Other Manado goodwill visit
Socialization and discussion related the material
mobilization from port to site in 40" container Company regulations/procedure
Neutral/ maintain
engagement Their team will conduct site visit in nearest time No 81 25-Aug James, Anggra Subdistrict Head (Mr.Donny) Likupang 1 Likupang timur Minahasa Utara goodwill visit Collect community concern related local employment
opportunities Employment opportunities Urgent attention
ITL inform that Wineru HoV will have formal meeting with PP team and ITL team on Monday No 82 27-Aug James, Anggra, Roy (PP), Rois (PP) Village apparatus and Hov wineru wineru Likupang timur Minahasa Utara
Resolving Issues, complaint, grievance
HoV checked in the data that workers from Java were more than the locals. He asked no more additional workers from Java except the skilled workers.
Employment opportunities Urgent attention
PP team promised for the next additional workers will prioritize from the locals. This was because PP still had a contract with the workers from Java.
Will have additional workers the estimation in the mid of September.
Yes 83 27-Aug James, Rudy (RMA) Brimob (Mr.Wayan) Other Other Manado Goodwill visit Update project progress and coordination about security if
any threat at site to the workers No issue
Neutral/ maintain
engagement Reguler informal meeting No 84 28-Aug James Police North Minahasa (Mr.Eko) Other Other Minahasa Utara Coordination
meeting discussion related the double claim by Mrs.A.Montalalu Land, road access & properties Urgent attention
Police will issue a summons to the party
involved No
85 28-Aug James, Kezia Permit Office Minut (Mr.Tormy) Other Other Minahasa Utara
Compliance of mandatory requirement
To collect information related some permit for Tax
88 31-Aug James GM UIP PLN Sulbagut (Mr.Sigit) Other Other Manado Coordination meeting
Submitted the Special Facilities documents for PLN
approval Company regulations/procedure Increase Attention
GM will disposition and circulate for approval
process No
89 3-Sep James, Imam Head of Likupang Police (Mr.Steven) Likupang 1 Likupang timur Minahasa Utara Coordination meeting
Giving information about the planning of material
mobilization from Bitung port to site Land, road access & properties Increase Attention
will doing the socialization to the villagers together with one of Police personel No 90 4-Sep James Likupang 1 Village Chief (Mr. Nus) Likupang 1 Likupang timur Minahasa Utara Goodwill visit Giving information about the project progress and the
possibilities for local recruiment from Likupang 1 Village Employment opportunities
Neutral/ maintain
engagement Continue coordination No
No
No
No
No
95 14-Sep James Tini (Enviromental Office SuLut) Other Other Manado
Compliance of mandatory requirement
Submission of environmental mid year report (RKL/RPL) Company regulations/procedure Neutral/ maintain engagement
They will review the report and will conduct a site visit if needed No 96 17-Sep Kezia Heince (Tax Office - KPP Pratama) Other Other Bitung
Compliance of mandatory requirement
Submission of statement letter regarding the Tax for the
branch office Company regulations/procedure
Neutral/ maintain
engagement Continue coordination No 97 19-Sep James Police North Minahasa (Mr. Rizal) Other Other Minahasa Utara goodwill visit update the site condition related to the security No issue Neutral/ maintain
engagement Continue coordination No 98 21-Sep James Enviromental Office North Minahasa
(Mr.Ronal) Other Other Minahasa Utara
Compliance of mandatory requirement
Submission of environmental mid year report (RKL/RPL) Company regulations/procedure Neutral/ maintain engagement
They will review the report and will conduct a site visit if needed No 99 24-Sep James, Navis, Farhan HoV wineru wineru Likupang timur Minahasa Utara coordination
meeting
discussion regarding the next CSR program, Women Empowerment. ITL team need to collect some datas and also to conduct assesment to some woman and will be held on Thursday, 27/9/18
Community contribution request Increase Attention
HoV is welcoming us and giving permission ITL to do the assesment for this program and can use Village Hall
No
100 25-Sep Navis, Farhan SMK Likupang Teacher (Mr.Helce) Other Likupang timur Minahasa Utara goodwill visit Discussion to implement CSR program, that ITL will repair
the sport field Community contribution request Increase Attention
Will have technical meeting with the SMK Head on Saturday, 29/09/18 No 101 27-Sep James, Navis, Farhan, Ratih Village secretary (Mrs.Olga), and some
women from the village as the participantwineru Likupang timur Minahasa Utara
coordination meeting
Assesment in Focus Group Discussion to collect the data about they capabilities, resources, and needs so ITL can give training based on the conclusion/the data
Community contribution request Increase Attention ITL got conclusion and data in order to
implement/to give training for the Community No Yes 103 29-Sep James, navis Some Villagers in Paslaten, Wangurer,
Kaweruan, Kokoleh Other Likupang Timur Minahasa Utara
Compliance of mandatory requirement
socialication to the villagers about the plan of mobilization the materials from bitung Port to Site through some villages, the cargoes using 40" container
Company regulations/procedure Increase Attention
giving and spread the brochure. the villagers request the mobilization going in the night or early morning to avoid any traffic jam process
Yes 105 2-Oct James, Navis Likupang Police (Mr. Zelik) Other Likupang timur Minahasa Utara
Resolving Issues, complaint, grievance
Coordination and ask to facilitated the mediation between
ITL, Mogonta Family, Ex Landowner Land, road access & properties Urgent attention
Will conduct the mediation and will invite the family and Ex landowner to attend the mediation on 4th October
No
before they receive any payment
No
107 4-Oct Bilma, James, Navis, Filip Likupang Police Head (Mr.Steven) Other Likupang timur Minahasa Utara coordination meeting
coordination and request for the routine security at the site at least for 1 month, so ITL can continue to work around the zone 6
Land, road access & properties Urgent attention
Mr.Steven will instruct some of police to check the area so after that to prepare how many police will secure the area
No
108 10-Oct James, Navis, Rudy (RMA) Brimob (Mr.Wayan) Other Other Manado goodwill visit Update project progress and coordination about security if
any threat at site to the workers Government Relations
Neutral/ maintain
engagement Continue coordination No 109 11-Oct Kezia Tax Office - KPP pratama (Mr.Heince) Other Other Bitung
Compliance of mandatory requirement
submission of tax documentation Company regulations/procedure Increase Attention Continue coordination No No
111 22-Oct Kezia Likupang Health clinic (Dr.Ronal) Other Likupang timur Minahasa Utara goodwill visit Puskesmas submit proposal to ITL request to provide the
trash can for the puskesmas Community contribution request
Neutral/ maintain engagement
Will discuss with VE ESG depart, if we can provide as CSR program No
114 31-Oct James, Bilma Brimob (Mr.Wayan) Other Other Manado goodwill visit Update site condition related to the security Company regulations/procedure Neutral/ maintain engagement
routine send some personel to check site
situation No
115 1-Nov Dan Atsbury, James, Ambhara GM PLN North Sulawesi (Mr.Edison) Other Other Manado coordination meeting
Update the project progress and discuss possibility to develop and or get new project in Bitung or in central sulawesi
Company regulations/procedure Increase Attention Will send the FS and GIS for the new project to Planning Divison No 116 6-Nov James Assistant II of Bupati Minut (Mr.Alan
Mingkid) Other Other Minahasa Utara goodwill visit
Update the project progress and inform regarding the plan of North Sulawesi Governor site visit in the end of November
Government Relations Neutral/ maintain engagement
He will inform Bupati and to match the visit schedule with Bupati schedule No 117 7-Nov James Likupang Health clinic (Dr.Ronal) Other Likupang timur Minahasa Utara Goodwill visit To give the donation to support clinic activities (CSR
program) community contribution request
Neutral/ maintain
engagement Continue coordination No 118 12-Nov James PLN UIP (Mr.Ronal) Other Other Manado coordination
meeting
Submission some documents and discussion regarding the
operation committee Company regulations/procedure Increase Attention
Letter for operation committee will send to PLN KitLur Sulawesi in Makassar No 119 13-Nov James HoV wineru wineru Likupang timur Minahasa Utara goodwill visit Collect community concern and man power supply Government Relations Increase Attention Man power from locals are ready, but waiting PP
to provide the PPE and hardware tools No 120 14-Nov Kezia BPJS Ketenagakerjaan Minut Other Other Minahasa Utara
Compliance of mandatory requirement
To get the cover letter from BPJS and submit some
required documents Company regulations/procedure
Neutral/ maintain engagement
Getting the cover letter on hand and continue
coordination No
121 19-Nov James Ex Landowner (Mr. Herman L) wineru Likupang timur Minahasa Utara goodwill visit
Discussion and to get permission regarding the excavation of the waterway (from site's drainage discharged to his land)
Land, road access & properties Increase Attention He will support us for the waterway excavation
on his land No
122 20-Nov Kezia Village secretary (Mrs. Olga) wineru Likupang timur Minahasa Utara coordination meeting
to collect participants/registration data for Women
empowerment training program Community contribution request Increase Attention continue coordination No 123 22-Nov James HoV wineru wineru Likupang timur Minahasa Utara coordination
meeting
continue coordination regarding the local manpower
supply (to get total 362 manpower) Community contribution request Increase Attention
Slow to supply man power because have to queud up in the health clinic to get Healthy certificate
No
124 23-Nov James Likupang Health clinic (Dr.Ronal) Likupang 1 Likupang timur Minahasa Utara coordination meeting
discussion and to get support the possibility for overtime
in the health clinic for a few days Government Relations
Neutral/ maintain
engagement He can support us with overtime for a few days No 125 26-Nov james Likupang Police Head (Mr.Steven) Likupang 1 Likupang timur Minahasa Utara goodwill visit
Discussion regarding how to manage the security and routine patrol at the site because of many workers works at site but from different place.
Company regulations/procedure Neutral/ maintain engagement
He will send his staff to conduct routine patrol
around site No
126 28-29 Nov james, Adi some women from Wineru and Likupang
1 village Other Other Minahasa Utara
Compliance of mandatory requirement
Women empowerment - enterpreneurship training Community contribution request Neutral/ maintain engagement
Good response from the participants and will start the business with good packaging and brand as per training given
No
127 3-Dec James Ex Landowner (Mr. Herman L) wineru Likupang timur Minahasa Utara
Compliance of mandatory requirement
Discussion about drainage works off site goes to the ocean
through his land Company regulations/procedure Increase Attention
He will prepare the quation and will mobilize his excavator to site as soon No 128 6-Dec James, Ambara Ikhsan (PLN KitLur Sulawesi region) Other Other makassar
Compliance of mandatory requirement
Discussion in preparation for the energise and
commissioning Company regulations/procedure Increase Attention
He asked ITL to prepare some letter and
documents to be submitted to PLN kitLur No 129 11-Dec James, Ambara Sugeng (PLN UP3B) Other Other Tomohon
Compliance of mandatory requirement
Discussion and coordination for the energise and
commissioning Company regulations/procedure Increase Attention
Pak Sugeng will give permission ITL to energise, when all the requirements completed No 130 20-Dec James PTSP office of Minut Other Other Minahasa Utara
Compliance of mandatory requirement
To collect SIUP and TDP of ITL Branch office and discussion regarding the new government regulation about permitting
Company regulations/procedure Neutral/ maintain