• Tidak ada hasil yang ditemukan

Agustriyanto GRDG Analysis of the Alstom Reference 2007

N/A
N/A
Protected

Academic year: 2017

Membagikan "Agustriyanto GRDG Analysis of the Alstom Reference 2007"

Copied!
1
0
0

Teks penuh

(1)
[image:1.595.58.543.71.688.2]

Figure 3. Process response to step pressure disturbance at 100 % load

Figure 4. Process response to step pressure disturbance at 50% load

Figure 5. Process response to step pressure disturbance at 0% load

REFERENCES

[1] Asmar, BN., Jones, W.E., and Wilson, J.A, “A

process engineering approach to the ALSTOM gasifier problem,” Proceedings of the Institution of Mechanical Engineers Part I - Journal of Systems

and Control Engineering, Vol. 214, No. 16, pp.

441-452, 2000.

[2] Bristol,E, “On a new measure of interaction for

multivariable process control,” IEEE Transaction

on Automatic Control, Vol.11, No.1, pp.133-134,

1966.

[3] Burnham, K., Young, P., and Dixon, R., “Special

issue on the ALSTOM gasifier control engineering

benchmark challenge,” Proceedings of the

Institution of Mechanical Engineers Part I -

Journal of Systems and Control Engineering, Vol.

214, No. 16, 2000.

[4] Chang, J.W., and Yu, C.C., “Relative disturbance

gain array,” AIChE Journal, Vol. 38, No.4,

pp.521-534, 1992.

[5] Chen, D., and Seborg, D.E., “Relative gain array

abalysis for uncertain process models,” AIChE

Journal, Vol. 48, No.2, pp.302-310, 2002.

[6] Dixon, R., and Pike, A.W., “Introduction to the 2nd ALSTOM benchmark challenge on gasifier control,” in Control 2004, Bath, UK.

[7] Dixon, R., Pike, A.W., and Donne, M.S., “The

ALSTOM benchmark challenge on gasifier

control,” Proceedings of the Institution of

Mechanical Engineers Part I - Journal of Systems

and Control Engineering, Vol. 214, No. 16, pp.

389-394, 2000.

[8] Kariwala, V., Skogestad, S., and Forbes, J.F.,

“Relative gain array for norm-bounded uncertain

systems,” Industrial and Engineering Chemistry

Research, Vol.45, No.5, pp.1751-1757, 2006.

[9] Ljung, L, System Identification – Theory for the

Users, Prentice Hall, 1997.

[10]Luyben, W.L., Tyreus, B.D, and Luyben M.L,

Plantwide Process Control, McGraw Hill, New

York, 1998.

[11]Skogestad, S., “Control structure design for

complete chemical plants,” Computers and

Chemical Engineering, Vol. 28, pp.219-234, 2004.

[12]Stanley, G., Marino-Galarraga, M., and McAvoy,

T.J., “Shortcut operability analysis .1. The relative

disturbance gain,” Industrial and Engineering

Chemistry process Design and Development,

Vol.24, No.4, pp.1181-1188, 1985.

Gambar

Figure 3. Process response to step pressure

Referensi

Dokumen terkait

Analisis Kemampuan Pemahaman dan Komunikasi Matematis pada Siswa Level Tinggi, Level Sedang dan Level Rendah ……….....

(Paket pekerjaan ini terbuka untuk penyedia jasa konsultansi yang memiliki Izin usaha dan sertifikat Badan Usaha serta memenuhi persyaratan kualifikasi sebagaimana diatur dalam

Dari hasil penelitian yang telah dilakukan yang bertujuan untuk mengetahui pengaruh rasio CAMEL, yaitu Rasio Permodalan (CAR), Rasio Aktiva Produktif (NPL), Rasio

Tujuan dari penelitian ini untuk mengetahui gambaran profil hematologi pada pasien anak dengan Leukemia Limfoblastik Akut sebelum dan sesudah fase induksi kemoterapi di

Pada hari ini RABU tanggal SATU bulan MARET tahun DUA RIBU TUJUH BELAS, kami Kelompok Kerja Perencanaan Pembangunan Balai Nikah KUA dan Manasik Haji Kecamatan Dusun Tengah Tahun

[r]

Hasil yang didapat menunjukkan hampir dari nilai intrinsik saham pada saham-saham Jakarta Islamic Index lebih besar dari harga pasar saham oleh karena itu saham yang undervalued

Pada hari ini Selasa tanggal Sembilan Bulan Desember Tahun Dua ribu empat belas, mulai pukul 10.00 sampai dengan 11.00 WIB, Pokja/ULP II PSBK “Pangudi Luhur”