1 Operator Forklift 3 3-5; 10-12; 17-19; 24-26 31-2; 7-9; 14-16; 21-23 28-2; 7-9; 14-16; 21-23; 29-31 4-6; 11-13; 18-20; 26-28 3-5; 8-10; 16-18; 22-24 4-6; 11-13; 18-20; 25-27 1-3; 8-10; 14-16; 22-24; 29-31 5-7; 12-14; 18-20; 26-28 3-5; 10-12; 17-19; 24-26; 31-2; 7-9;14-16; 21-23; 28-30 5-7; 12-14; 19-21; 27-29 BKS / JKT 2 Operator Crane 4 3-6 31-3 28-3 4-7 3-6 4-7 1-4 5-8 3-6 31-3 5-8 JKT 3

Rigger (Juru Ikat) 3 4-6 1-3 1-3 5-7 4-6 5-7 2-4 6-8 4-6 1-3 6-8 JKT

2-10 ; 16-24 30-7; 13-21 27-7; 13-21 29-6; 10-19 2-10; 15-23 3-11; 17-25 31-8; 21-29 4-12; 18-27 2-10; 16-24; 30-7; 13-21; 27-6 11-19 BDG 9-17; 23- 1 6-14; 20-28 6-14; 20-29 3-11; 17-26 8-17 3-11; 17-25; 31-8; 14-23 11-19; 25-3 9-17; 23-31 6-14; 20-28 4-12; JKT 2-7 ; 16-21 30-4; 13-18 27-4; 13-18 29-4; 10-17 2-8; 15-20 3-8; 17-22 31-5; 21-26 4-9; 18-25 2-7; 16-21; 30-4; 13-18; 27-4 11-16 BDG 9-14; 23- 30 6-11; 20-25 6-11; 20-25 3-8; 17-22 8-15 3-8; 17-22 31-5; 14-21 11-16; 25-30 9-14; 23-28 6-11; 20-25 4-9; JKT 6

Ahli K3 pesawat uap & bejana tekan 7 Teknisi perancah 4 17-20 14-17 14-17 11-14 16-19 11-14 8-11 12-15 17-20 14-17 12-15 JKT 8 K3 Supervisi perancah 5 16-20 13-17 13-17 10-14 15-19 10-14 7-11 11-15 16-20 13-17 11-15 JKT 9

Kelas 1 (SMAW) 6 23-30 20-25 20-25 17-22 15-20 24-29 21-26 25-30 23-28 20-25 18-23 JKT & BKS

kelas 2 (SMAW) 6 23-30 20-25 20-25 17-22 15-20 24-29 21-26 25-30 23-28 20-25 18-23 JKT & BKS

kelas 3 (SMAW) 6 23-30 20-25 20-25 17-22 15-20 24-29 21-26 25-30 23-28 20-25 18-23 JKT & BKS

Kelas 1 (GTAW) 6 23-30 20-25 20-25 17-22 15-20 24-29 21-26 25-30 23-28 20-25 18-23 JKT & BKS

Kelas 2 (GTAW) 6 23-30 20-25 20-25 17-22 15-20 24-29 21-26 25-30 23-28 20-25 18-23 JKT & BKS

Kelas 3 ( GTAW) 6 23-30 20-25 20-25 17-22 15-20 24-29 21-26 25-30 23-28 20-25 18-23 JKT & BKS

10 K3 Diesel 4 9-12 6-9 6-9 3-6 2-5 3-6 31-3 4-7 2-5 30-2 4-7 JKT 11 Petugas K3 Kimia 6 16-21 13-18 13-18 10-17 15-20 10-15 7-12 11-16 9-14 13-18 11-16 JKT 12 Ahli K3 Kimia 12 9-21 6-18 6-18 3-17 8-22 3-15 31-12 4-16 2-14 6-18 4-16 JKT 13

Petugas K3 Madya Ruang Terbatas 3 25-28 22-24 22-24 19-21 17-19 26-28 23-25 27-29 25-27 22-24 13-15 JKT

14

Petugas K3 Utama Ruang Terbatas 5 23-27 20-24 20-24 17-21 15-19 24-28 21-25 25-29 23-27 20-24 11-15 JKT

15

Petugas Kebakaran kelas D 3 3-5 7-9 7-9 4-6 3-5 5-7 1-3 5-7 3-5 7-9 5-7 JKT

16 Fire C + D 7 9-16 13-20 13-20 10-18 8-16 10-17 7-14 11-18 9-16 13-20 11-18 JKT 17 Fire B + D 7 9-16 13-20 13-20 10-18 8-16 10-17 7-14 11-18 9-16 13-20 11-18 JKT 18 Fire A + B + D 12 9-21 13-25 13-25 10-25 8-22 10-22 7-21 11-25 9-21 13-25 11-23 JKT 19

Regu Kebakaran kelas C 5 11-14 & 16 15-18 & 20 15-18 & 20 12,13 & 15-18 10-14 & 16 15 & 17 9-12 & 14 13-16 & 18 11-14 & 16 15-18 & 20 13-16 & 18 JKT 20

Koordinator Kebakaran kelas B 5 11-14 & 16 15-18 & 20 15-18 & 20 12,13 & 15-18 10-14 & 16 15 & 17 9-12 & 14 13-16 & 18 11-14 & 16 15-18 & 20 13-16 & 18 JKT 21

Ahli K3 Kebakaran kelas A 5 17-21 21-25 21-25 19-22 & 25 17-22 18-22 15,16 & 18-21 19,20 & 22-25 17-21 21-25 19-23 JKT

Operator pesawat uap (Boiler) kelas I 8 4

Operator pesawat uap (Boiler) kelas II 6 5

Juru Las

PROGRAM SERTIFIKASI KEMNAKERTRANS RI

RA M AD H AN RA M AD H AN

(2)

9-13; 23-27 6-10; 20-24 6-10; 20-24 3-7; 17-21 2-6; 4-8; 17-21 31 juli-4; 14-19 4-8; 18-23 2-6; 16-20 30 okt-3; 13-17 27 nov- 2; 11-15 JKT 2-6; 16-20 30-3; 13-17 27-3; 13-17 10-15; 25-29 15-19 10-14; 24 - 28 7-11; 21-25 11-15; 25-29 9-13; 23-27 6-10; 20-24 4-8; 18-22 BDG 16-30 13-25 13-25 29 maret - 11 2-16 3-15 31 juli - 12 4-16 25 sept - 7 ; 23 okt - 4 nov 20-4des 11-23 JKT

2-14 30-Jan-11 27-Feb-11 17-2 mei 8-22 17-29 14-28 11-25 9-21 6-18 4-16 BDG

24

Ahli Muda K3 Konstrksi 5 2-5 30-Jan-03 27-3 3-7 2-6 4-8 31 Juli -4; 4-8 2-6 30 okt- 3 4-8 JKT

25

Ahli K3 Umum 12

26

Petugas P3K 3 10-12 7-9 7-9 11-13 15-17 18-20 14-16 18-20 17-19 14-16 12-14 JKT

27

Teknisi K3 Deteksi Gas 2 11-12 8-9 8-9 12-13 16-17 19-20 15-16 19-20 18-19 15-16 13-14 JKT

28

Tenaga Kerja Bangunan Tk 1 1 5 1 1 5 3 12 9 6 5 8 6 JKT 29

Tenaga Kerja Bangunan Tk II 2 4-5 7-8 1-2 5-6 3-4 5-6 14-15 6-7 3-4 1-2 5-6 JKT

30

Tenaga Kerja Pada Ketinggian Tk I 3 10-12 30 jan - 1 28 feb-2 4-6 8-10 4-6 1-3 18-20 17-19 14-16 12-14 JKT

31

Tenaga Kerja Pada Ketinggian Tk II 4 16-19 13-16 6-9 10-13 15-18 10-13 7-10 4-7 9-12 6-9 4-7 JKT

32

Tenaga Kerja Pada Ketinggian Tk III 4 23-26 20-23 13-16 17-20 8-12 17-20 21-24 11-14 16-19 13-16 11-14 JKT

33

K3 Teknisi Lift 4 9-12 6-9 20-23 25-28 15-18 24-27 28-31 25-28 30 0ot-2 nov 27 -30 27-30 JKT

34

Bidang Operasi Pesawat Angkat Angkut & Ikat Beban (Forklift, Crane &

Rigging) 6 CEPU 35 Scaffolding 6 CEPU 36 K3 Migas 6 CEPU 37 H2S 6 CEPU 38

Pentanahan Sistem Instalasi 5 2-6 30-3 27-1 3-7 2-6 3-7 31-4 4-8 2-6 30-3 4-8 BDG

39

Generator Set 5 9-13 6-10 6-10 10-15 8-13 10-14 7-11 11-15 9-13 6-10 11-15 BDG

40

Jaringan Instalasi Tenaga & Perlengkapannya 5 16-20 13-17 13-17 17-21 15-19 17-21 14-19 18-23 16-20 13-17 18-22 BDG

41

Electrical Maintenance In Industri 5 23-27 20-24 20-24 25-29 2-6 24-28 21-25 25-29 23-27 20-24 4-8 BDG

42

Teknik Pemasangan & Pengujian Instalasi 5 2-6 30-3 27-1 3-7 8-13 3-7 31-4 4-8 2-6 30-3 11-15 BDG

43

Perawatan Peralatan Listrik 5 9-13 6-10 6-10 10-15 15-19 10-14 7-11 11-15 9-13 6-10 18-22 BDG

44

Material Science & Metalurgi Training 5 16-20 13-17 13-17 17-21 2-6 17-21 14-19 18-23 16-20 13-17 4-8 BDG

45

Alat berat pertambangan 5 23-27 20-24 20-24 25-29 8-13 24-28 21-25 25-29 23-27 20-24 11-15 BDG

46 Electrohydraulics 5 2-6 30-3 27-1 3-7 15-19 3-7 31-4 4-8 2-6 30-3 18-22 BDG 47 Electropneumatic 5 9-13 6-10 6-10 10-15 2-6 10-14 7-11 11-15 9-13 6-10 4-8 BDG Petugas K3 Listrik 5 22 12 Ahli K3 Listrik 23 PENGETAHUAN TEKNIK PROGRAM SERTIFIKASI MIGAS

BASED ON REQUEST BASED ON REQUEST BASED ON REQUEST BASED ON REQUEST BASED ON REQUEST RA M AD H AN RA M AD H AN RA M AD H AN

(3)

48

Failure Analisys & Engineering Material Selection 5 16-20 13-17 13-17 17-21 8-13 17-21 14-19 18-23 16-20 13-17 11-15 BDG

49

Hidraulic 5 23-27 20-24 20-24 25-29 15-19 24-28 21-25 25-29 23-27 20-24 18-22 BDG

50

Industrial Hidraulics System 5 2-6 30-3 27-1 3-7 2-6 3-7 31-4 4-8 2-6 30-3 4-8 BDG

51

Manajemen Pemeliharaan Alat Berat 5 9-13 6-10 6-10 10-15 8-13 10-14 7-11 11-15 9-13 6-10 11-15 BDG

52

Standard & Peraturan Pemasangan Instalasi Listrik 4 16-19 13-16 13-16 17-20 15-18 17-20 14-18 18-22 16-19 13-16 18-21 BDG

53

Mechanical Maintenance 5 23-27 20-24 20-24 25-29 2-6 24-28 21-25 25-29 23-27 20-24 4-8 BDG

54

Operasi Pemeliharaan Instalasi Pengolahan Air Bersih 5 2-6 30-3 27-1 3-7 8-13 3-7 31-4 4-8 2-6 30-3 11-15 BDG

55

Pemeriksaan Instalasi Listrik Industri 5 9-13 6-10 6-10 10-15 15-19 10-14 7-11 11-15 9-13 6-10 18-22 BDG

56

Pemipaan 5 16-20 13-17 13-17 17-21 2-6 17-21 14-19 18-23 16-20 13-17 4-8 BDG

57

Pemograman CNC 5 23-27 20-24 20-24 25-29 8-13 24-28 21-25 25-29 23-27 20-24 11-15 BDG

58

Penanggulangan Kebocoran Air 5 2-6 30-3 27-1 3-7 15-19 3-7 31-4 4-8 2-6 30-3 18-22 BDG

59

Pengawasan Kualitas Air & Praktek Laboratorium Air 5 9-13 6-10 6-10 10-15 2-6 10-14 7-11 11-15 9-13 6-10 4-8 BDG

60

Pengukur getaran untuk perancangan & perawatan 5 16-20 13-17 13-17 17-21 8-13 17-21 14-19 18-23 16-20 13-17 11-15 BDG

61

Perawatan bangunan gedung 5 23-27 20-24 20-24 25-29 15-19 24-28 21-25 25-29 23-27 20-24 18-22 BDG

62

Pneumatic lanjutan 5 2-6 30-3 27-1 3-7 2-6 3-7 31-4 4-8 2-6 30-3 4-8 BDG

63

Steam generator operation & maintenance 5 9-13 6-10 6-10 10-15 8-13 10-14 7-11 11-15 9-13 6-10 11-15 BDG

64

SCADA Lanjutan 5 16-20 13-17 13-17 17-21 15-19 17-21 14-19 18-23 16-20 13-17 18-22 BDG

65

DCS 5 23-27 20-24 20-24 25-29 2-6 24-28 21-25 25-29 23-27 20-24 4-8 BDG

66

Sistem Kendali Industrial Analog 5 2-6 30-3 27-1 3-7 8-13 3-7 31-4 4-8 2-6 30-3 11-15 BDG

67

Sistem Kendali Industri berbasis Komputer 5 9-13 6-10 6-10 10-15 15-19 10-14 7-11 11-15 9-13 6-10 18-22 BDG

68

Sistem Kendali Industrik dengan Logika Fuzzy 5 16-20 13-17 13-17 17-21 2-6 17-21 14-19 18-23 16-20 13-17 4-8 BDG

69

Otomasi & sistem Kendali Terapan Berbasis Komputer 5 23-27 20-24 20-24 25-29 8-13 24-28 21-25 25-29 23-27 20-24 11-15 BDG

70

Microprocessor 5 2-6 30-3 27-1 3-7 15-19 3-7 31-4 4-8 2-6 30-3 18-22 BDG

71

Microcontroller 5 9-13 6-10 6-10 10-15 2-6 10-14 7-11 11-15 9-13 6-10 4-8 BDG

72

Sistem Kendali Berbasis PLC Lanjutan 5 16-20 13-17 13-17 17-21 8-13 17-21 14-19 18-23 16-20 13-17 11-15 BDG

73 Isulation Testing 5 23-27 20-24 20-24 25-29 15-19 24-28 21-25 25-29 23-27 20-24 18-22 BDG 74 Advance Mechanic 5 2-6 30-3 27-1 3-7 2-6 3-7 31-4 4-8 2-6 30-3 4-8 BDG 75 AC Motor Control 5 9-13 6-10 6-10 10-15 8-13 10-14 7-11 11-15 9-13 6-10 11-15 BDG 76 AC Motor Basic 5 16-20 13-17 13-17 17-21 15-19 17-21 14-19 18-23 16-20 13-17 18-22 BDG 77

Fuse, Circuit Braker & Overloads 5 23-27 20-24 20-24 25-29 2-6 24-28 21-25 25-29 23-27 20-24 4-8 BDG

RA

M

AD

H

(4)

78

Electrical, Wire & Cable 5 2-6 30-3 27-1 3-7 8-13 3-7 31-4 4-8 2-6 30-3 11-15 BDG

79

Diesel Engine Operation & Maintenance 5 9-13 6-10 6-10 10-15 15-19 10-14 7-11 11-15 9-13 6-10 18-22 BDG

80

Generator & Eletric Motor Operation & Maintenance 5 16-20 13-17 13-17 17-21 2-6 17-21 14-19 18-23 16-20 13-17 4-8 BDG

81

Connecting & Disconnecting Motor 5 23-27 20-24 20-24 25-29 8-13 24-28 21-25 25-29 23-27 20-24 11-15 BDG

82

Mechanical Power Transmission 5 2-6 30-3 27-1 3-7 15-19 3-7 31-4 4-8 2-6 30-3 18-22 BDG

83

Penukar Kalor 5 9-13 6-10 6-10 10-15 2-6 10-14 7-11 11-15 9-13 6-10 4-8 BDG

84

Protective Relay System & Application 5 16-20 13-17 13-17 17-21 8-13 17-21 14-19 18-23 16-20 13-17 11-15 BDG

85

Metallography Testing 5 23-27 20-24 20-24 25-29 15-19 24-28 21-25 25-29 23-27 20-24 18-22 BDG

86

Persyaratan Umum Instalasi Listrik 2000 (PUIL 2000) 5 2-6 30-3 27-1 3-7 2-6 3-7 31-4 4-8 2-6 30-3 4-8 BDG

87

Perawatan dasar mekanik 4 9-12 6-9 6-9 10-13 8-12 10-13 7-10 11-14 9-12 6-9 11-14 BDG

88 Perawatan kompressor 4 16-19 13-16 13-16 17-20 15-18 17-20 14-18 18-22 16-19 13-16 18-21 BDG 89 Perawatan pompa 4 23-26 20-23 20-23 25-28 2-5 24-27 21-24 25-28 23-26 20-23 4-7 BDG 90 PLC Dasar 4 2-5 30-2 27-31 3-6 8-12 3-6 31-3 4-7 2-5 30-2 11-14 BDG 91 Dasar Pneumatic 4 9-12 6-9 6-9 10-13 15-18 10-13 7-10 11-14 9-12 6-9 18-21 BDG 92

Keselamatan Instalasi/Bangunan dari Bahaya Petir 4 16-19 13-16 13-16 17-20 2-5 17-20 14-18 18-22 16-19 13-16 4-7 BDG

93

Sistem Hidraulic alat berat 4 23-26 20-23 20-23 25-28 8-12 24-27 21-24 25-28 23-26 20-23 11-14 BDG

94

Kontrol Elektromekanikal 4 2-5 30-2 27-31 3-6 15-18 3-6 31-3 4-7 2-5 30-2 18-21 BDG

95

Pengasutan Motor Listrik 4 9-12 6-9 6-9 10-13 2-5 10-13 7-10 11-14 9-12 6-9 4-7 BDG

96

Perawatan Panel Penerangan & Daya 4 16-19 13-16 13-16 17-20 8-12 17-20 14-18 18-22 16-19 13-16 11-14 BDG

97

Troubleshooting Panel Penerangan & Daya 4 23-26 20-23 20-23 25-28 15-18 24-27 21-24 25-28 23-26 20-23 18-21 BDG

98

Perawatan Motor Listrik 4 2-5 30-2 27-31 3-6 2-5 3-6 31-3 4-7 2-5 30-2 4-7 BDG

99

Teknik Penyambungan Kabel 4 9-12 6-9 6-9 10-13 8-12 10-13 7-10 11-14 9-12 6-9 11-14 BDG

100

Penghantar/kabel 4 16-19 13-16 13-16 17-20 15-18 17-20 14-18 18-22 16-19 13-16 18-21 BDG

101

Alat Ukur & Pengukuran Listrik 4 23-26 20-23 20-23 25-28 2-5 24-27 21-24 25-28 23-26 20-23 4-7 BDG

102

Pentanahan 4 2-5 30-2 27-31 3-6 8-12 3-6 31-3 4-7 2-5 30-2 11-14 BDG

103

Isolasi & Resistensi Isolasi 4 9-12 6-9 6-9 10-13 15-18 10-13 7-10 11-14 9-12 6-9 18-21 BDG

104

Perawatan Transformator Tenaga Listrik 4 16-19 13-16 13-16 17-20 2-5 17-20 14-18 18-22 16-19 13-16 4-7 BDG

105

Kubical 4 23-26 20-23 20-23 25-28 8-12 24-27 21-24 25-28 23-26 20-23 11-14 BDG

106

Proteksi Sistem Tenaga 4 2-5 30-2 27-31 3-6 15-18 3-6 31-3 4-7 2-5 30-2 18-21 BDG

107 Hubungan Singkat 4 9-12 6-9 6-9 10-13 2-5 10-13 7-10 11-14 9-12 6-9 4-7 BDG RA M AD H AN

(5)

108

Dasar SCADA 4 16-19 13-16 13-16 17-20 8-12 17-20 14-18 18-22 16-19 13-16 11-14 BDG

109

Inspeksi pengecekan & maintenance sling & lifting equipment 4 23-26 20-23 20-23 25-28 15-18 24-27 21-24 25-28 23-26 20-23 18-21 BDG

110

Welding Inspection & Quality 4 2-5 30-2 27-31 3-6 2-5 3-6 31-3 4-7 2-5 30-2 4-7 BDG

111

Manajemen Perawatan 3 9-11 6-8 6-8 10-12 8-10 10-12 7-19 11-13 9-11 6-8 11-13 BDG

112

Pelatihan Maintenance System Tata Udara 2 16-17 13-14 13-14 17-18 15-16 17-18 14-15 18-19 16-17 13-4 18-19 BDG

113

Pembacaan Film Radiography 6 23-30 20-25 20-25 25-2 2-8 24-29 21-26 25-30 23-28 20-25 4-9 BDG

114 Welding Supervisor 3 2-4 30-1 27-30 3-5 15-17 3-5 31-2 4-6 2-4 30-1 11-13 BDG 115 P2K3 2 3-4 30-31 1-2 3-4 2-3 3-4 1-2 4-5 2-3 1-2 4-5 JKT 116 Auditor SMK3 2 5-6 1-2 6-7 5-6 4-5 5-6 3-4 6-7 4-5 6-7 6-7 JKT 117 Audit K3 2 10-11 6-7 8-9 10-11 8-9 10-11 7-8 11-12 9-10 8-9 11-12 JKT 118 CSMS 2 12-13 8-9 7-8 12-13 15-16 12-13 9-10 18-19 11-12 13-14 13-14 JKT 119 HAZOPs 3 16-18 13-14 13-14 17-19 17-19 17-19 14-16 25-27 16-18 15-17 18-20 JKT 120

Electrical Safety (durasi 2 hari) 2 19-20 15-16 15-16 20-21 22-23 20-21 21-22 28-29 19-20 20-21 21-22 JKT

121

First Aid 2

122

Fire Drill 1

123

Behaviour Based Safety 2 25-26 20-21 20-21 25-26 29-30 24-25 23-24 4-5 23-24 22-23 27-28 JKT

124

Basic Safety 2 30-31 22-23 22-23 27-28 31-1 26-27 28-29 6-7 25-26 27-28 4-5 JKT

125

HIRA (Hazardous Identification & Risk Assesment) 2 3-4 27-28 29-30 3-4 2-3 3-4 30-31 11-12 30-31 29-30 6-7 JKT

126

Process Safety Management 3 9-11 31-2 1-3 5-7 3-5 5-7 1-3 13-15 2-4 1-3 11-13 JKT

127

Professional Accident Investigation 3 16-18 6-8 6-8 10-12 8-10 10-12 7-9 18-20 4-6 6-8 13-15 JKT

128

Managing The Health & Safety Risks of Shift Work 2 11-12 8-9 9-10 17-18 15-16 13-14 10-11 25-26 9-10 9-10 18-19 JKT

129 Food Safety 2 18-19 13-14 13-14 19-20 17-18 17-18 14-15 27-28 11-12 13-14 20-21 JKT 130 Defensive Driving 131 Safety Riding 132

Food Safety Audit 2 3-4 15-16 15-16 25-26 22-23 19-20 21-22 4-5 16-17 15-16 27-28 JKT

133

Working at height 2 9-10 20-21 20-21 27-28 29-30 24-25 23-24 6-7 18-19 20-21 4-5 JKT

134

LOTO 2 10-11 22-23 22-23 3-4 2-3 26-27 28-29 11-12 23-24 22-23 6-7 JKT

135

Keselamatan Listrik di Industri 2 11-12 27-28 29-30 5-6 4-5 3-4 30-31 13-14 25-26 27-28 11-12 JKT

136

Emergency Planning & Management 2 16-17 1-2 1-2 10-11 8-9 5-6 1-2 18-19 30-31 29-30 13-14 JKT

RA M AD H AN INHOUSE TRAINING INHOUSE TRAINING HEALTH, SAFETY AND ENVIRONMENT

INHOUSE TRAINING RA M AD H AN RA M AD H AN RA M AD H AN

(6)

137

JSA & SSM 2 18-19 6-7 6-7 12-13 15-16 10-11 3-4 25-26 2-3 1-2 18-19 JKT

138

Modern Safety Management 2 23-24 8-9 8-9 17-18 17-18 12-13 7-8 27-28 4-5 6-7 20-21 JKT

139

Hazmat 2 25-26 7-8 13-14 19-20 22-23 17-18 9-10 4-5 9-10 8-9 27-28 JKT

140

H2s 2 30-31 13-14 15-16 25-26 29-30 19-20 14-15 6-7 11-12 13-14 4-5 JKT

141

Managing Stress in The Workplace 2 4-5 15-16 20-21 27-28 2-3 24-25 21-22 11-12 16-17 15-16 6-7 JKT

142

The Role Manager, Supervisor & HRD Professional in Health & Safety 2 11-12 14-15 22-23 3-4 4-5 26-27 23-24 13-14 18-19 20-21 11-12 JKT

143

TPM (Total Preventive Maintenance) 2 18-19 20-21 29-30 5-6 8-9 3-4 28-29 18-19 23-24 22-23 13-14 JKT

144

Audit Internal ISO 9001 2 25-26 22-23 1-2 10-11 15-16 5-6 30-31 25-26 25-26 27-28 18-19 JKT

Informasi lebih lanjut dapat menghubungi : PT. Upaya Riksa Patra

' 021.4715699,47865925,47861912,47882387

6 021.47865925

* [email protected]

J Eva / Nisa / Rosma

LAIN - LAIN RA M AD H AN RA M AD H AN

Referensi

Dokumen terkait

Uji kekerasan dilakukan untuk mengetahui gambaran kekompakan dan ketahanan tablet ketika diberi tekanan mekanik. Kekerasan tablet juga akan mempengaruhi uji

Momen inersia untuk benda yang berbentuk batang dengan sumbu putar tegak lurus dengan batang yang melalui salah satu ujungnya didapat dengan rumus sebagai berikut, massa total

Populasi penelitian ini merupakan seluruh warga Asrama Mahasiswa Islam Sunan Giri yang berjumlah 40 orang, sampel dalam penelitian ini berjumlah 20 orang yang

Keratitis Pungtata ini disebabkan oleh hal yang tidak spesifik dan dapat terjadi pada Moluskum kontangiosum, Akne rosasea, Herpes simpleks, Herpes zoster,

Humor juga digunakan untuk tujuan-tujuan seksis yang memanfaatkan perempuan sebagai objek, seperti merendahkan, menyepelekan, dan memarjinalkan posisi perempuan

Hasil penelitian yang dilakukan Dipdip Herdianata pada tahun 2008 tentang penerapan model pembelajaran kooperatif tipe Think, Talk, And Write untuk

Penderita DM tipe 2 di Rumah Sakit Budi Agung Juwana periode Januari - Desember 2015 berjumlah 116 kasus, terbanyak perempuan, pekerjaan ibu rumah tangga, usia 51-60

Atas dasar uraian tersebut maka, penulis tertarik untuk melakukan penelitian dalam rangka penyusunan skripsi dengan judul : Pengaruh Program Pelatihan Terhadap