• Tidak ada hasil yang ditemukan

FKUSK1 F 8 Schedule of Equipment Maintenance

N/A
N/A
Protected

Academic year: 2017

Membagikan "FKUSK1 F 8 Schedule of Equipment Maintenance"

Copied!
1
0
0

Teks penuh

(1)

UPM/FMHS/F 8

Revision No.: 00 Issue No. : 01 Effective Date : 2 May 2013 1 of 1

FACULTY OF MEDICINE AND HEALTH SCIENCES

UNIVERSITI PUTRA MALAYSIA

F8

Year : ___________________ Laboratory : ___________________

No. Equipment

Serial No./ ID Asset

No

Internal/External

Maintenance Frequency

Planning Date

Maintenance Date

Prepared by (name

and signature)

Checked by (name

and signature)

Referensi

Dokumen terkait

Peningkatan Performansi Mesin dengan Metode Overall Equipment Effcetiveness (OEE) dan Preventive Maintenance Strategy pada Perusahaan.. √ √ √

Pada penelitian sebelumnya yang sudah ada mengenai pembahasan metode Total Productive Maintenance (TPM) dengan perhitungan Overall Equipment Effectiveness maka dapat kita

Water carts Used for dust suppression on stockyard floors 1 and 2 Operated at Stockyard 1 and Stockyard 2 areas, depicted in Figure 2 of Schedule 1, to supplement dust suppression from

Muhammad Yusuf Giovanni Date ABSTRACT IMPROVING OVERALL EQUIPMENT EFFECTIVENESS OF INJECTION MOLDING MACHINES BY ENHANCING THE MAINTENANCE MANAGEMENT SYSTEM: CASE STUDY AT INJECTION

Hierarchy 1 Hierarchy 2 Influencing factors Project costs Wages and related costs Production engineering Operators Project managers Maintenance Acquisition costs Equipment

In the GTEMSTS problem, the maintenance schedule binds time intervals together on the one hand and TS variables connect the normal and contingency states on the other hand, whereas

Berdasarkan masalah dan penelitian terdahulu maka perlu dibuatkan sebuah aplikasi schedule maintenance alat produksi berbasis web menggunakan metode waterfall yang dapat mempermudah

Penelitian yang dilakukan oleh Supriyadi, Gina Ramayanti dan Romi 2017 yang berjudul “Analisis Total Productive Maintenance dengan Metode Overall Equipment Effectiveness dan Fuzzy