• Tidak ada hasil yang ditemukan

isprsannals II 5 W3 335 2015

N/A
N/A
Protected

Academic year: 2017

Membagikan "isprsannals II 5 W3 335 2015"

Copied!
7
0
0

Teks penuh

Loading

Gambar

Table 1.  Mutual reliability
Table 3. Normality test of scores converted from content analysis
Table 7. Independent-sample t test of LSA

Referensi

Dokumen terkait

ISPRS Annals of the Photogrammetry, Remote Sensing and Spatial Information Sciences, Volume II-5/W3, 2015 25th International CIPA Symposium 2015, 31 August – 04 September 2015,

We were able to carry out spatial observations of the locations of tower tombs in situ in Palmyra, at the fort of Tabus on the northeastern mountain edge of

Similarly, the attempt at assigning the ‘Approximate Time Period’ based on the study of construction technology, type of articulation, elements on the façade and imagery

In order to check the statues of the bridge and analyze the major risks and causes, judge the stability of the structure as well as make the restoration

In the last stage of the HBIM process, the libraries of parametric objects are mapped onto the point cloud and image survey data using a platform of cross software management.

3.5 Condition assessment and recording of mural paintings After creating the base maps, the conditions of the mural paintings were recorded on the OHP sheets on the

Instead of performing a continuous generation of 3D models, which is a time consuming process,, we need (i) to create a high resolution model (first time instance), (ii)

Examples of utilisating and evaluating this framework will range from a UNESCO World Heritage site, the Byzantine church of Panagia Forviotissa Asinou in the Troodos Mountains