DATA PENGADAAN BI BI T
GERAKAN NASI ONAL REHABI LI TASI HUTAN DAN LAHAN
Rencana
Btg Rencana Btg
Realisasi Btg
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15
1 Majene 540,100 540,100 891,000 891,000 179,050 179,050 480,500 480,500 75,000 75,000 2,165,650 2,165,650
2 Polew ali Mandar 961,400 961,400 1,070,455 1,070,455 246,250 246,250 57,200 57,200 100,000 100,000 2,435,305 2,435,305
3 Mamasa 1,122,000 1,122,000 2,168,100 2,168,100 435,250 435,250 108,300 108,300 100,000 100,000 3,933,650 3,933,650
4 Mamuju 1,023,000 1,023,000 1,865,600 1,865,600 385,500 385,500 92,000 92,000 150,000 150,000 3,516,100 3,516,100
5 Mamuju Utara 330,000 330,000 346,500 346,500 106,700 106,700 37,500 37,500 75,000 75,000 895,700 895,700
-Jumlah 3,976,500 3,976,500 6,341,655 6,341,655 1,352,750 1,352,750 775,500 775,500 500,000 500,000 12,946,405 12,946,405
2008
APBN
DATA PENGADAAN BI BI T GERAKAN NASI ONAL RHL DAS LARI ANG MAMASA SELAMA 5 TAHUN TERAKHI R
No KABUPATEN/ KOTA SUMBER DANA
Tahun
Jumlah
Rencana
Realisasi
1 2 3 4 5 6 7
1
NK 1
Majene
2
NK 2
Polewali Mandar
3
NK 3
Mamasa
4
NK 4
Mamuju
5
NK 5
Mamuju Utara
REKAPI TULASI ALOKASI PENGADAAN BI BI T GERAKAN NASI ONAL REHABI LI TASI HUTAN DAN LAHAN ( GERHAN)
DAS LARI ANG MAMASA TAHUN 2009
Mangrove
Asi/ Sumbu
Stek Pucuk
TB
TBT&TBS
APB
KB/ KP
TB
BS
TB
BS
TB
Stek Akar
KB/ KP
TB
BS
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16