• Tidak ada hasil yang ditemukan

Selanjutnya

N/A
N/A
Protected

Academic year: 2017

Membagikan "Selanjutnya "

Copied!
2
0
0

Teks penuh

(1)

JOINT STATEMENT BETWEEN

THE MINISTRY OF ENERGY AND MINERAL RESOURCES OF THE REPUBLIC OF INDONESIA

AND

THE MINISTRY OF ENERGY, GREEN TECHNOLOGY AND WATER OF MALAYSIA

ON

THE ACCELERATION OF THE IMPLEMENTATION OF POWER INTERCONNECTION PROJECTS BETWEEN INDONESIA-MALAYSIA

UNDER ASEAN POWER GRID FRAMEWORK

Bali, Indonesia, 12 Februari 2016,

1. A bilateral meeting between the Minister of Energy and Mineral Resources of the Republic of Indonesia, H.E. Sudirman Said, and Minister of Energy, Green Technology and Water of Malaysia, H.E. Datuk Seri Panglima Dr. Maximus Johnity Ongkili, was held in Bali, Indonesia, 12 February 2016.

2. The Ministers recognized the achievements under the ASEAN Plan of Action on Energy Cooperation (APAEC) 2010-2015 and considered the APAEC 2016 - 2025 Phase I (2016 - 2020), which encourages the implementation of the ASEAN Power Grid, especially a bilateral power interconnection between Indonesia and Malaysia.

(2)

4. The Ministers referred to the Memorandum of Understanding on the ASEAN Power Grid, signed in Singapore, 23 August 2007, as the umbrella of the implementation of the power interconnection projects between Indonesia and Malaysia, namely:

a. The Peninsular Malaysia (Malacca) - Sumatera (Pekanbaru); b. Sarawak (Kuching) - West Kalimantan (Pontianak);

c. East Sabah (Tawau) - North Kalimantan (Tarakan).

5. The Ministers agreed to accelerate the implementafion of the power interconnection projects between Indonesia and Malaysia under the ASEAN Power Grid Framework, through the establishment of the Malaysia-Indonesia Joint Technical Committee, which is reflected in the Terms of Reference (appendix).

DONE in Nusa Dua, Bali, Indonesia on OセN BZZPNセN ZセY⦅Oヲ ゥョ@ two original copies, in the English language, all texts being equally authentic.

For the Ministry of Energy and Mineral Resources of the Republic of Indonesia

Sudirman Said Minister

For the Ministry of Energy, Green Technology and Water of

Malaysia

Y.B. Datuk Seri Panglima Dr. Maximus Johnity Ongkili

Referensi

Dokumen terkait

This research result can provide a clear picture of the priciples of real time control at the boiler of Cirebon steam power plant.We hope this research an

Akan tetapi masih terdapat ketidaksesuaian sebesar 17,86% yaitu masih adanya keterlambatan penerimaan bahan baku karena jarak pemesanan bahan baku dengan jadwal produksi

Menyatakan dengan sesungguhnya bahwa skripsi saya yang berjudul : Pola Tidur Pasien yang Terpasang Infus di Rumah Sakit Umum Daerah Dr.Pirngadi Medan adalah benar-benar hasil

Kepada para peserta yang merasa keberatan atas penetapan tersebut diatas, diberikan hak untuk menyampaikan sanggahan baik secara sendiri maupun bersama-sama, mulai

4) Petani jagung di pedukuhan Sawah diharapkan dapat memperbaiki penggunaan jumlah bibit yaitu dengan menggunakan bibit unggul agar dapat memberikan hasil

(1) Faktor yang berhubungan dengan adopsi peternak sapi perah tentang teknologi biogas di Kabupaten Enrekang Sulawesi Selatan diantaranya: selang dari tahu sampai

Musi Banyuasin Tahun Anggaran 2012, dengan kami ini minta kepada Saudara Direktur untuk hadir dalam melakukan Pembuktian Kualifikasi dengan membawa berkas asli data perusahaan pada

Seluruh asli dokumen penawaran Saudara yang telah diunggah melalui LPSE Kota Medan;.. Berkas asli Dokumen Kualifikasi dan fotokopinya sebanyak 1