Nama Pekerjaan : PEM BANGUNAN HUTAN KOTA JOM BANG Lokasi Pekerjaan : JOM BANG, CIPUTAT, KOTA TANGERANG SELATAN

Pemberi Tugas : BADAN LINGKUNGAN HIDUP DAERAH KOTA TANGERANG SELATAN

NO SATUAN HARGA SATUAN

I BAHAN PASIR

1 Pasir Urug M 3

2 Sirt u M 3

3 Pasir Pasang M 3

4 Pasir Cor M 3

5 Abu Bat u (filt er) M 3

II BAHAN BATU

1 Bat u gunung belah 15/ 20 (lokal) M 3

2 Bat u bat a m erah kls. I bh

3 Bat u Tem pel Bulat bh

III BAHAN KERIKIL/ KORAL

1 Bat u pecah m esin 1/ 2 M 3

2 Bat u koral./ kerikil bulat 2/ 3 M 3

IV PORTLAND CEM ENT (PC)

1 Sem en abu-abu @ 50 kg zak

2 Paving Expose t = 5 cm , K-350 (Ubin Classico) M 2

3 Paving block t = 6cm , K-350, abu-abu M 2

4 Paving block t = 6cm , K-350, w arna M 2

5 Paving block t = 6cm , K-350, (ubin set w arna) M 2 6 Paving Expose t = 5 cm , K-350 (Pem bat as Pohon) M 2 7 Paving Expose uk = 50x25x6 cm , K-350 (Ubin panjang) BUAH

8 Kanst een abu-abu uk. 10 x 20 x 40 K-250 BUAH

9 Drainage t erbuka 1/ 2Ø 30 cm t anpa t ulangan BUAH

V BAHAN BESI

1 Besi bet on polos Kg

2 Kaw at bendrad Kg

3 Paku Kg

4 Angkur Ø16 m m L=50 cm Bh

VI BAHAN KAYU

1 Dolken Dia. 8-10 cm / 4 m et er bt g

2 Tiang balok kayu m erant i 8/ 12 cm M 3

3 Balok kayu m erant i m elint ang 5/ 10 cm M 3

4 Balok kayu m erant i m em anjang 5/ 7 cm M 3

5 Papan lant ai kayu m erant i 3/ 20 cm M 3

6 Papan railing kayu m erant i 2/ 20 cm M 3

7 Balok M erant i Palem bang Basah uk. 8 x 15 x 400 cm M 3 8 Papan M erant i Palem bang Basah uk. 2 x 30 x 400 cm M 3

9 Kaso M erant i Jam bi Basah M 3

10 Triplek uk. 4 x 8 ft (120 x 240 cm ), 4 m m lem bar

VII BOX CULVERT

1 Box Culvert ukuran 100 x 100 cm unit

DAFTAR HARGA SATUAN BAHAN

(2)

Nama Pekerjaan : PEM BANGUNAN HUTAN KOTA JOM BANG Lokasi Pekerjaan : JOM BANG, CIPUTAT, KOTA TANGERANG SELATAN

Pemberi Tugas : BADAN LINGKUNGAN HIDUP DAERAH KOTA TANGERANG SELATAN

NO SATUAN HARGA SATUAN

DAFTAR HARGA SATUAN BAHAN

BAHAN / M ATERIAL VIII BAHAN ELEKTRIKAL

1 Solar Garden Lam p 10 w at t LED (t erpasang) unit - Light source : 10 w at t LED

- Solar M odule : M onocryst alline / Polycryt alline Silicon 40 Wp - M aint enance-Free Lead Acid Bat t ery : 12V 42Ah

: Cont roller : Solar Special Int elligent Cont roller - Pole m at erial : Zinc-plat ed

- Pole High : 3500 m m

- Working t im e : 12h/ day, for 3-5 overcast days - Operat ion t em perat ure : - 40'C - +65'C - Ingress Prot ect ion : IP65

LAIN-LAIN

1 Ijuk ikat

2 Pipa PVC, WAVIN, St andard, Dia. 2" bat ang

3 Pipa PVC Abu-abu dia. ½" (AW) bat ang

4 Cat Tem bok nippon paint - Vinilex Kg

5 Plam ur Tem bok set ara m at ek/ nipon paint Kg

6 Rol Cat Tem bok biasa bh

7 Am plas Lbr

8 Engsel Pint u Kuningan uk. 3" (Aiw a) bh

9 Kaca (Ex. Asahi M as) bening 5 m m m 2

10 Rangka Nako dan Besi Tralis Nako buah

11 Asbes Gelom bang Super Harflex, uk. 240x108x0.5 cm , berat 28.1 kg/ lbr Lem bar

12 Kunci Gem bok Kecil buah

13 Residu lit er

Tangerang Selat an, ……… PT./ CV. ……….

Referensi

Dokumen terkait

Proyek : PEM BANGUNAN HUTAN KOTA JOM BANG Pem ilik : JOM BANG, CIPUTAT, KOTA TANGERANG SELATAN.. Lokasi : BADAN LINGKUNGAN HIDUP DAERAH KOTA

DAFTAR HARGA

[r]

[r]

Pasangan Batako tebal 1/2

Analisa Biaya Konstruksi adalah suatu cara perhitungan harga satuan pekerjaan konstruksi yang dijabarkan dalam perkalian indeks bahan bangunan dan upah kerja dengan harga bahan bangunan

End of line resistor Terminal Box Fire Alarm TB-FA Kabel Feeder fire alarm Instalasi Ceiling speaker dgn kabel NYMHY 3 x 1,5mm dlm pipa conduit PVC dia.. 20 mm2 Celling Speaker 3 W

19931203 202203 1 005 Diajukan Oleh: Kontraktor Pelaksana WG-NK KSO Buharianto Manajer Proyek Disetujui Oleh: Konsultan Manajemen Konstruksi PT VIRAMA KARYA Persero KSO PT LARAS