PROGRAM
:
PEMBANGUNAN SALURAN DRAINASE KOTA TANGERANG
PEKERJAAN
:
PEMBONGKARAN DAN PEMBUATAN BARU SALURAN DRAINASE
LOKASI
:
KECAMATAN CIBODAS
TAHUN ANGGARAN
:
2012
I
PEKERJAAN PERSIAPAN
Rp
3,300,000.00
II
PEKERJAAN TANAH DAN PEMBONGKARAN
Rp
22,098,314.38
III
PEKERJAAN DRAINASE
Rp
154,571,832.52
VII PENGEMBALIAN KONDISI
Rp
1,802,622.40
181,772,769.30
Rp
18,177,276.93
Rp
199,950,046.23
Rp
199,950,000.00
Rp
Terbilang =
REKAPITULASI BIAYA
Dibulatkan
SERATUS SEMBILAN PULUH SEMBILAN JUTA SEMBILAN RATUS LIMA
PULUH RIBU RUPIAH
NO
JENIS PEKERJAAN
HARGA
SUB TOTAL
PPN 10 %
TOTAL
NAMA KEGIATAN : PEMBANGUNAN SALURAN DARINASE/GORONG-GORONG KECAMATAN : CIBODAS
NAMA PAKET : PAKET 4 KOTA : TANGERANG
VOLUME : V = 164 Pagu = Rp. 200,000,000,00 SUMBER DANA : APBD II
VOLUME per LAJUR : Kiri :
LOKASI : Saluran Eksisting : 50/70 152 50 70 Plat Deker 20 50 12 Gorong-gorong 12 70 50 Saluran Rencana : 60/80 152 60 80 BC 60 12 60 60
NO MATA
PEMBAYARAN
SAT
VOLUME
HARGA SATUAN
1
3
4
5
I
1.2.4(1)
LS
1.00
500,000.00
bh
1.00
300,000.00
LS
1.00
2,500,000.00
II
m³
25.56
54,921.98
m³
20.45
38,720.00
m³
99.40
19,597.99
m³
92.52
173,749.40
m³
1.77
165,729.94
m²
14.40
110,126.63
III.
m'
152.00
695,497.44
m'
12.00
1,038,775.30
m'
152.00
215,077.50
m³
4.92
751,857.33
VII
m²
14.40
125,182.11
JUMLAH
PPN 10%
JUMLAH TOTAL
DIBULATKAN
RENCANA ANGGARAN BIAYA
TAHUN ANGGARAN 20126
JUMLAH HARGA
URAIAN PEKERJAAN
2
Tinggi (cm) Lebar (cm) Panjang (m) TypePerkiraan vol eksisting
Vol Galian (m3/m') Jl. Siliwangi Kelurahan Cibodas
Type Panjang (m) Lebar
(cm) Tinggi (cm)
Perkiraan vol rencana
0.72 0.72 Vol Bongkaran (m3/m') 0.64 0.108 0.28
SUB JUMLAH
SUB JUMLAH
PEKERJAAN DRAINASE
Saluran U-Ditch 60x80
Cover U-Ditch 600x80
PEKERJAAN TANAH DAN PEMBONGKARAN
PEKERJAAN PERSIAPAN
SUB JUMLAH
SUB JUMLAH
Mobilisasi dan Demobilisasi
Papan Nama Proyek
Direksi Keet dan Gudang
Galian Tanah Biasa (Manual)
Timbunan tanah Bekas Galian
Buangan bahan galian/bongkaran
Pembongkaran Pasangan Batu
Pengembalian Kondisi Jalan Aspal
Rabat Beton
PENGEMBALIAN KONDISI
3,699,138.08
105,715,610.88
12,465,303.56
181,772,769.30
18,177,276.93
199,950,046.23
199,950,000.00
1,802,622.40
1,802,622.40
154,571,832.52
500,000.00
300,000.00
2,500,000.00
3,300,000.00
22,098,314.38
32,691,780.00
16,075,294.49
293,540.87
1,585,823.49
1,403,805.77
791,746.56
1,948,103.20
Pembongkaran Beton (Plat Deker)
Pembongkaran Jalan aspal
NO SAT HARGA
II. PEKERJAAN TANAH DAN PEMBONGKARAN
1
m³
54,921.98 2m³
38,720.00 3m³
19,597.99 4m³
173,749.40 5m³
165,729.94 6m²
110,126.63 7m²
233,841.43 8m²
16,933.87 9 bh 339,114.29 10 bh 592,350.00 11 bh 905,142.86III. PEKERJAAN DRAINASE A. SALURAN PRECAST 1 m' 262,661.30 2 m' 381,082.90 3 m' 645,628.78 4 m' 695,497.44 5 m' 934,345.50 6 m' 1,560,341.93 7 m' 2,340,354.80 8 m' 2,813,987.20 9 m' 785,129.40 10 m' 802,935.85 11 m' 1,038,775.30 12 m' 1,298,485.30 13 m' 2,234,873.50 14 m' 2,657,265.05 15 m' 3,407,571.20 16 Cover U-Ditch 400x70 LD m' 115,607.80 17 Cover U-Ditch 500x75 LD m' 177,766.05 18 Cover U-Ditch 600x80 LD m' 215,077.50 19 Cover U-Ditch 800x90 LD m' 255,777.50 20 Cover U-Ditch 1000x95 LD m' 328,052.45 21 Cover U-Ditch 1200x100 LD m' 438,729.50 22 Cover U-Ditch 1500x120 LD m' 811,942.45 23 Cover U-Ditch 400x100 HD m' 215,157.80 24 Cover U-Ditch 500x100 HD m' 298,106.05 25 Cover U-Ditch 600x100 HD m' 362,477.50 26 Cover U-Ditch 800x130 HD m' 486,887.50 27 Cover U-Ditch 1000x140 HD m' 615,812.45 28 Cover U-Ditch 1200x150 HD m' 721,852.45 29 Cover U-Ditch 1500x170 HD m' 1,145,022.45 30
m³
751,857.33 31m³
838,449.70 32m³
1,023,000.00 33m³
750,612.50 34m²
62,238.75 35m²
40,150.00 36 kg 30,522.25 37 titik 629,317.86 38 titik 693,117.86IV. PENGEMBALIAN KONDISI
1
m³
342,800.45 2 m' 50,234.97 3 m' 90,438.13 4m²
86,197.32 5m²
102,556.52 6 m' 114,420.74 7m²
125,182.11 8m²
281,159.02Pembongkaran Jalan aspal Pembongkaran Jalan beton Pembongkaran Jalan paving Penebangan Pohon Ø 30 - 50 cm Timbunan tanah Bekas Galian Buangan bahan galian/bongkaran Pembongkaran Pasangan Batu Pembongkaran Beton (Plat Deker)
URAIAN PEKERJAAN
Galian Tanah Biasa (Manual)
Penebangan Pohon Ø 50 - 75 cm Penebangan Pohon Ø > 75 cm
Lapis Pondasi Agregat Kelas B ( Dengan Stamper) Kansteen Uk 10.20.40 K - 300
Beton K - 175 Ready mix ( Cor setempat) Beton K - 350 Ready mix ( Cor Setempat) Pasangan Batu ( Manual)
Plesteran + Acian 1:4 (T=15 mm) Bekisting papan
Baja Tulangan ( Polos )
Pemasangan sumur resapan Ø 60 cm Pemasangan sumur resapan Ø 80 cm Saluran U-Ditch 30x40
Kansteen Uk 16/20.30.40. K-300 Pemasangan Paving; t=6 cm K-350 Pemasangan Paving; t=8 cm K-350 Tali Air 1,5/3
Pengembalian Kondisi Jalan Aspal Pengembalian Kondisi Jalan Beton Saluran U-Ditch 40x60 Saluran U-Ditch 50x70 Saluran U-Ditch 60x80 Saluran U-Ditch 80x100 Saluran U-Ditch 100x120 Saluran U-Ditch 120x150 Saluran U-Ditch 150x150 Box Culvert 40/40 Box Culvert 50/50 Box Curvert 60/60 Box Curvert 80/80 Box Curvert 100/100 Box Curvert 120/120 Box Curvert 150/150 Rabat Beton
NAMA PAKET KEGIATAN :
NO MATA PEMBAYARAN : 3.1 (1)
JENIS PEKERJAAN : Galian Tanah Biasa (manual)
SATUAN PEMBAYARAN : m³
HARGA SATUAN JUMLAH HARGA ( Rp. ) ( Rp. )
A TENAGA
1 Pekerja Galian/ Urug Hari 0.714 65,000 46,428.57 3 Mandor Hari 0.024 105,000 2,500.50
Jumlah Harga Tenaga (A) 48,929.07 B PERALATAN
1 Pick Up Jam 0.381 35,000.00 13,324.50 2 Alat Bantu Ls 1.000 1,000.00 1,000.00
Jumlah Harga Alat (B) 1,000.00
C JUMLAH HARGA,TENAGA,DAN PERALATAN (A+B) 49,929.07 D BIAYA UMUM DAN KEUNTUNGAN 10% 4,992.91 E HARGA SATUAN PEKERJAAN 54,921.98
NAMA PAKET KEGIATAN :
NO MATA PEMBAYARAN : 3.2 (7)
JENIS PEKERJAAN : Timbunan Tanah Bekas Galian
SATUAN PEMBAYARAN : m³
HARGA SATUAN JUMLAH HARGA ( Rp. ) ( Rp. )
A TENAGA
1 Pekerja Galian / Urug Hari 0.500 65,000.00 32,500.00 2 Mandor Hari 0.020 105,000.00 2,100.00
Jumlah Harga Tenaga (A) 34,600.00 B PERALATAN
1 Alat Bantu Ls 1.000 600.00 600.00
Jumlah Harga Alat (C) 600.00
C JUMLAH HARGA,TENAGA,DAN PERALATAN (A+B) 35,200.00 D BIAYA UMUM DAN KEUNTUNGAN 10% 3,520.00 E HARGA SATUAN PEKERJAAN 38,720.00
NAMA PAKET KEGIATAN :
ITEM PEMBAYARAN : 3.2 (7)
JENIS PEKERJAAN : Buangan Tanah Galian
SATUAN PEMBAYARAN : m³
HARGA SATUAN JUMLAH HARGA ( Rp. ) ( Rp. )
A TENAGA
1 Pekerja/ Kernet Hari 0.255 65,000.00 16,544.36 2 Mandor Hari 0.006 105,000.00 672.00
Jumlah Harga Tenaga (A) 17,216.36 B PERALATAN
1 Alat Bantu Ls 0.600 1,000.00 600.00
Jumlah Harga Alat (B) 600.00
C JUMLAH HARGA,TENAGA,DAN PERALATAN (A+B) 17,816.36 D BIAYA UMUM DAN KEUNTUNGAN 10% 1,781.64 E HARGA SATUAN PEKERJAAN 19,597.99
ANALISA HARGA SATUAN PEKERJAAN
SATUAN PERKIRAAN KUANTITAS NO. KOMPONEN
NO. KOMPONEN SATUAN PERKIRAAN KUANTITAS NO. KOMPONEN SATUAN PERKIRAAN
ITEM PEMBAYARAN : 7.15 (1)
JENIS PEKERJAAN : Bongkaran Pasangan Batu
SATUAN PEMBAYARAN : m³
HARGA SATUAN JUMLAH HARGA ( Rp. ) ( Rp. )
A TENAGA
1 Tukang Bongkar Hari 2.352 65,000.00 152,880.00 2 Mandor Hari 0.039 105,000.00 4,074.00
Jumlah Harga Tenaga (A) 156,954.00 B PERALATAN
1 Alat Bantu Ls 1.000 1,000.00 1,000.00
Jumlah Harga Alat (C) 1,000.00
C JUMLAH HARGA,TENAGA,DAN PERALATAN (A+B) 157,954.00 D BIAYA UMUM DAN KEUNTUNGAN 10% 15,795.40 E HARGA SATUAN PEKERJAAN 173,749.40
NAMA PAKET KEGIATAN :
NO. MATA PEMBAYARAN : 7.15 (2)
JENIS PEKERJAAN : Bongkaran Beton (Plat Deker) (tebal : 12 cm)
SATUAN PEMBAYARAN : m³
HARGA SATUAN JUMLAH HARGA ( Rp. ) ( Rp. )
A TENAGA
1 Pekerja/ Kernet Hari 0.095 65,000.00 6,190.48 2 Tukang Bongkar Hari 0.091 65,000.00 5,942.86 3 Mandor Hari 0.012 105,000.00 1,250.25
Jumlah Harga Tenaga (A) 13,383.58 B PERALATAN
1 Compressor Jam 0.180 190,000.00 34,200.00 2 Dump Truck 3-4 m³ Jam 0.250 280,000.00 70,000.00 3 Jack Hammer Jam 0.180 181,000.00 32,580.00 4 Alat Bantu Ls 1.000 500.00 500.00
Jumlah Harga Alat (C) 137,280.00
C JUMLAH HARGA,TENAGA,DAN PERALATAN (A+B) 150,663.58 D BIAYA UMUM DAN KEUNTUNGAN 10% 15,066.36 E HARGA SATUAN PEKERJAAN 165,729.94
NAMA PAKET KEGIATAN
NO MATA PEMBAYARAN :
JENIS PEKERJAAN : Bongkaran Jalan Aspal (tebal : 5 cm)
SATUAN PEMBAYARAN : m²
HARGA SATUAN JUMLAH HARGA ( Rp. ) ( Rp. )
A TENAGA
1 Pekerja/ Kernet Hari 0.190 65,000.00 12,380.95 2 Tukang Bongkar Hari 0.038 65,000.00 2,470.00 3 Mandor Hari 0.010 105,000.00 997.50
Jumlah Harga Tenaga (A) 15,848.45 B PERALATAN
1 Compressor Jam 0.100 190,000.00 19,000.00 2 Dump Truck 3-4 m³ Jam 0.167 280,000.00 46,666.67 3 Jack hammer Jam 0.100 181,000.00 18,100.00 4 Alat Bantu Ls 1.000 500.00 500.00
Jumlah Harga Alat (B) 84,266.67
C JUMLAH HARGA,TENAGA,DAN PERALATAN (A+B) 100,115.12 D BIAYA UMUM DAN KEUNTUNGAN 10% 10,011.51 E HARGA SATUAN PEKERJAAN 110,126.63
NO. KOMPONEN SATUAN
NO. KOMPONEN SATUAN
PERKIRAAN KUANTITAS PERKIRAAN KUANTITAS SATUAN PERKIRAAN KUANTITAS NO. KOMPONEN
NAMA PAKET KEGIATAN
NO MATA PEMBAYARAN :
JENIS PEKERJAAN : Bongkaran Jalan Beton (tebal : 10 cm)
SATUAN PEMBAYARAN : m²
HARGA SATUAN JUMLAH HARGA ( Rp. ) ( Rp. )
A TENAGA
1 Pekerja/ Kernet Hari 0.286 65,000.00 18,571.43 2 Tukang Bongkar Hari 0.076 65,000.00 4,949.29 3 Mandor Hari 0.024 105,000.00 2,500.50
Jumlah Harga Tenaga (A) 7,449.79 B PERALATAN
1 Compressor Jam 0.300 190,000.00 57,000.00 2 Dump Truck 3-4 m³ Jam 0.333 280,000.00 93,333.33 3 Jack hammer Jam 0.300 181,000.00 54,300.00 4 Alat Bantu Ls 1.000 500.00 500.00
Jumlah Harga Alat (B) 205,133.33 205,133.33 C JUMLAH HARGA,TENAGA,DAN PERALATAN (A+B) 212,583.12 D BIAYA UMUM DAN KEUNTUNGAN 10% 21,258.31 E HARGA SATUAN PEKERJAAN 233,841.43
NAMA PAKET KEGIATAN
NO MATA PEMBAYARAN :
JENIS PEKERJAAN : Bongkaran Jalan Paving
SATUAN PEMBAYARAN : m²
HARGA SATUAN JUMLAH HARGA ( Rp. ) ( Rp. )
A TENAGA
1 Pekerja/ Kernet Hari 0.0471 65,000.00 3,064.29 2 Tukang Bongkar Hari 0.0476 65,000.00 3,092.14 3 Mandor Hari 0.0096 105,000.00 1,008.00
Jumlah Harga Tenaga (A) 7,164.43 B BAHAN
1 Abu Batu m3 0.050 153,600.00 7,680.00
Jumlah Harga Bahan (B) 7,680.00 B PERALATAN
1 Alat Bantu Ls 1.000 550.00 550.00
Jumlah Harga Alat (C) 550.00
C JUMLAH HARGA,TENAGA,DAN PERALATAN (A+B+C) 15,394.43 D BIAYA UMUM DAN KEUNTUNGAN 10% 1,539.44 E HARGA SATUAN PEKERJAAN 16,933.87
NAMA PAKET KEGIATAN
NO MATA PEMBAYARAN :
JENIS PEKERJAAN : Penebangan Pohon; uk > 30 cm -50 cm
SATUAN PEMBAYARAN : bh
HARGA SATUAN JUMLAH HARGA ( Rp. ) ( Rp. )
A TENAGA
1 Pekerja Hari 0.571 65,000.00 37,142.86 2 Operator Hari 0.143 85,000.00 12,142.86 3 Mandor Hari 0.143 105,000.00 15,000.00
Jumlah Harga Tenaga (A) 64,285.71 B PERALATAN
1 Flat Blad Truck Jam 0.400 210,000.00 84,000.00 2 Sinsho Jam 1.000 150,000.00 150,000.00 3 Alat Bantu Ls 1.000 10,000.00 10,000.00
Jumlah Harga Alat (B) 244,000.00
C JUMLAH HARGA,TENAGA,DAN PERALATAN (A+B) 308,285.71 D BIAYA UMUM DAN KEUNTUNGAN 10% 30,828.57 E HARGA SATUAN PEKERJAAN 339,114.29
KOMPONEN SATUAN PERKIRAAN KUANTITAS NO.
NO. KOMPONEN SATUAN PERKIRAAN KUANTITAS
NO. KOMPONEN SATUAN PERKIRAAN KUANTITAS
NO MATA PEMBAYARAN :
JENIS PEKERJAAN : Penebangan Pohon; uk > 50 cm -75 cm
SATUAN PEMBAYARAN : bh
HARGA SATUAN JUMLAH HARGA ( Rp. ) ( Rp. )
A TENAGA
1 Pekerja Hari 0.857 65,000.00 55,714.29 2 Operator Hari 0.286 85,000.00 24,285.71 3 Mandor Hari 0.214 105,000.00 22,500.00
Jumlah Harga Tenaga (A) 102,500.00 B PERALATAN
1 Flat Blad Truck Jam 0.600 210,000.00 126,000.00 2 Sinsho Jam 2.000 150,000.00 300,000.00 3 Alat Bantu Ls 1.000 10,000.00 10,000.00
Jumlah Harga Alat (B) 436,000.00
C JUMLAH HARGA,TENAGA,DAN PERALATAN (A+B) 538,500.00 D BIAYA UMUM DAN KEUNTUNGAN 10% 53,850.00 E HARGA SATUAN PEKERJAAN 592,350.00
NAMA PAKET KEGIATAN
NO MATA PEMBAYARAN :
JENIS PEKERJAAN : Penebangan Pohon; uk > 75 cm
SATUAN PEMBAYARAN : bh
HARGA SATUAN JUMLAH HARGA ( Rp. ) ( Rp. )
A TENAGA
1 Pekerja Hari 1.143 65,000.00 74,285.71 2 Operator Hari 0.571 85,000.00 48,571.43 3 Mandor Hari 0.286 105,000.00 30,000.00
Jumlah Harga Tenaga (A) 152,857.14 B PERALATAN
1 Flat Blad Truck Jam 1.000 210,000.00 210,000.00 2 Sinsho Jam 3.000 150,000.00 450,000.00 3 Alat Bantu Ls 1.000 10,000.00 10,000.00
Jumlah Harga Alat (B) 670,000.00
C JUMLAH HARGA,TENAGA,DAN PERALATAN (A+B) 822,857.14 D BIAYA UMUM DAN KEUNTUNGAN 10% 82,285.71 E HARGA SATUAN PEKERJAAN 905,142.86
NAMA PAKET KEGIATAN
NO MATA PEMBAYARAN : 2.3(9)
JENIS PEKERJAAN : Saluran U-Ditch 30x40 cm
SATUAN PEMBAYARAN : m'
HARGA SATUAN JUMLAH HARGA ( Rp. ) ( Rp. )
A TENAGA
1 Pekerja Hari 0.300 65,000.00 19,500.00 2 Tukang Hari 0.100 70,000.00 7,000.00 3 Mandor Hari 0.100 105,000.00 10,500.00
Jumlah Harga Tenaga (A) 37,000.00 B BAHAN
1 U-Ditch 30x40 cm m' 1.000 163,553.00 163,553.00
Jumlah Harga Bahan (B) 163,553.00 C PERALATAN
2 Crane On Truck Jam 0.146 255,000.00 37,230.00 3 Flat Blad Truck Jam - 210,000.00 -4 Alat Bantu Ls 1.000 1,000.00 1,000.00
Jumlah Harga Alat (C) 38,230.00
D JUMLAH HARGA,TENAGA,DAN PERALATAN (A+B+C) 238,783.00 E BIAYA UMUM DAN KEUNTUNGAN 10% 23,878.30 F HARGA SATUAN PEKERJAAN 262,661.30
NO. KOMPONEN SATUAN PERKIRAAN KUANTITAS
NO. KOMPONEN SATUAN PERKIRAAN KUANTITAS NO. KOMPONEN SATUAN PERKIRAAN
NAMA PAKET KEGIATAN
NO MATA PEMBAYARAN : 2.3(9)
JENIS PEKERJAAN : Saluran U-Ditch 40x60 cm
SATUAN PEMBAYARAN : m'
HARGA SATUAN JUMLAH HARGA ( Rp. ) ( Rp. )
A TENAGA
1 Pekerja Hari 0.300 65,000.00 19,500.00 2 Tukang Hari 0.100 70,000.00 7,000.00 3 Mandor Hari 0.100 105,000.00 10,500.00
Jumlah Harga Tenaga (A) 37,000.00 B BAHAN
1 U-Ditch 40x60 cm m' 1.000 264,636.00 264,636.00
Jumlah Harga Bahan (B) 264,636.00 C PERALATAN
2 Crane On Truck Jam 0.146 255,000.00 37,230.00 3 Flat Blad Truck Jam 0.031 210,000.00 6,573.00 4 Alat Bantu Ls 1.000 1,000.00 1,000.00
Jumlah Harga Alat (C) 44,803.00
D JUMLAH HARGA,TENAGA,DAN PERALATAN (A+B+C) 346,439.00 E BIAYA UMUM DAN KEUNTUNGAN 10% 34,643.90 F HARGA SATUAN PEKERJAAN 381,082.90
NAMA PAKET KEGIATAN
NO MATA PEMBAYARAN : 2.3(9)
JENIS PEKERJAAN : Saluran U-Ditch 50x70 cm
SATUAN PEMBAYARAN : m'
HARGA SATUAN JUMLAH HARGA ( Rp. ) ( Rp. )
A TENAGA
1 Pekerja Hari 0.500 65,000.00 32,500.00 2 Tukang Hari 0.167 70,000.00 11,666.90 3 Mandor Hari 0.167 105,000.00 17,500.35
Jumlah Harga Tenaga (A) 61,667.25 B BAHAN
1 U-Ditch 50x70 cm m' 1.000 474,900.00 474,900.00
Jumlah Harga Bahan (B) 474,900.00 C PERALATAN
2 Crane On Truck Jam 0.146 255,000.00 37,230.00 3 Flat Blad Truck Jam 0.058 210,000.00 12,138.00 4 Alat Bantu Ls 1.000 1,000.00 1,000.00
Jumlah Harga Alat (C) 50,368.00
D JUMLAH HARGA,TENAGA,DAN PERALATAN (A+B+C) 586,935.25 E BIAYA UMUM DAN KEUNTUNGAN 10% 58,693.53 F HARGA SATUAN PEKERJAAN 645,628.78
NAMA PAKET KEGIATAN
NO MATA PEMBAYARAN : 2.3(9)
JENIS PEKERJAAN : Saluran U-Ditch 60x80 cm
SATUAN PEMBAYARAN : m'
HARGA SATUAN JUMLAH HARGA ( Rp. ) ( Rp. )
A TENAGA
1 Pekerja Hari 0.500 65,000.00 32,500.00 2 Tukang Hari 0.167 70,000.00 11,666.90 3 Mandor Hari 0.167 105,000.00 17,503.50
Jumlah Harga Tenaga (A) 61,670.40 B BAHAN
1 U-Ditch 60x80 cm m' 1.000 535,700.00 535,700.00
Jumlah Harga Bahan (B) 535,700.00 C PERALATAN
2 Crane On Truck Jam 0.100 255,000.00 25,500.00 3 Flat Blad Truck Jam 0.040 210,000.00 8,400.00 4 Alat Bantu Ls 1.000 1,000.00 1,000.00
Jumlah Harga Alat (C) 34,900.00
D JUMLAH HARGA,TENAGA,DAN PERALATAN (A+B+C) 632,270.40 E BIAYA UMUM DAN KEUNTUNGAN 10% 63,227.04 F HARGA SATUAN PEKERJAAN 695,497.44
NO. KOMPONEN SATUAN PERKIRAAN KUANTITAS
NO. KOMPONEN SATUAN PERKIRAAN KUANTITAS
NO. KOMPONEN SATUAN PERKIRAAN KUANTITAS
NO MATA PEMBAYARAN : 2.3(9)
JENIS PEKERJAAN : Saluran U-Ditch 80x100 cm
SATUAN PEMBAYARAN : m'
HARGA SATUAN JUMLAH HARGA ( Rp. ) ( Rp. )
A TENAGA
1 Pekerja Hari 0.300 65,000.00 19,500.00 2 Tukang Hari 0.100 70,000.00 7,000.00 3 Mandor Hari 0.075 105,000.00 7,875.00
Jumlah Harga Tenaga (A) 34,375.00 B BAHAN
1 U-Ditch 80x100 cm m' 1.000 768,400.00 768,400.00
Jumlah Harga Bahan (B) 768,400.00 C PERALATAN
2 Crane On Truck Jam 0.146 255,000.00 37,230.00 3 Flat Blad Truck Jam 0.040 210,000.00 8,400.00 4 Alat Bantu Ls 1.000 1,000.00 1,000.00
Jumlah Harga Alat (C) 46,630.00
D JUMLAH HARGA,TENAGA,DAN PERALATAN (A+B+C) 849,405.00 E BIAYA UMUM DAN KEUNTUNGAN 10% 84,940.50 F HARGA SATUAN PEKERJAAN 934,345.50
NAMA PAKET KEGIATAN
NO MATA PEMBAYARAN : 2.3(9)
JENIS PEKERJAAN : Saluran U-Ditch 100x120 cm
SATUAN PEMBAYARAN : m'
HARGA SATUAN JUMLAH HARGA ( Rp. ) ( Rp. )
A TENAGA
1 Pekerja Hari 0.667 65,000.00 43,333.64 2 Tukang Hari 0.167 70,000.00 11,666.90 3 Mandor Hari 0.167 105,000.00 17,500.13
Jumlah Harga Tenaga (A) 72,500.67 B BAHAN
1 U-Ditch 120x150 cm m' 1.000 1,294,700.00 1,294,700.00
Jumlah Harga Bahan (B) 1,294,700.00 C PERALATAN
2 Crane On Truck Kap. 10-15 ton Jam 0.146 255,000.00 37,230.00 3 Flat Blad Truck Jam 0.062 210,000.00 13,062.00 4 Alat Bantu Ls 1.000 1,000.00 1,000.00
Jumlah Harga Alat (C) 51,292.00
D JUMLAH HARGA,TENAGA,DAN PERALATAN (A+B+C) 1,418,492.67 E BIAYA UMUM DAN KEUNTUNGAN 10% 141,849.27 F HARGA SATUAN PEKERJAAN 1,560,341.93
NAMA PAKET KEGIATAN
NO MATA PEMBAYARAN : 2.3(9)
JENIS PEKERJAAN : Saluran U-Ditch 120x150 cm
SATUAN PEMBAYARAN : m'
HARGA SATUAN JUMLAH HARGA ( Rp. ) ( Rp. )
A TENAGA
1 Pekerja Hari 0.667 65,000.00 43,335.50 2 Tukang Hari 0.167 70,000.00 11,666.90 3 Mandor Hari 0.167 105,000.00 17,500.88
Jumlah Harga Tenaga (A) 72,503.28 B BAHAN
1 U-Ditch 120X150 cm m' 1.000 2,003,800.00 2,003,800.00
Jumlah Harga Bahan (B) 2,003,800.00 C PERALATAN
2 Crane On Truck Jam 0.146 255,000.00 37,230.00 3 Flat Blad Truck Jam 0.062 210,000.00 13,062.00 4 Alat Bantu Ls 1.000 1,000.00 1,000.00
Jumlah Harga Alat (C) 51,292.00
D JUMLAH HARGA,TENAGA,DAN PERALATAN (A+B+C) 2,127,595.28 E BIAYA UMUM DAN KEUNTUNGAN 10% 212,759.53 F HARGA SATUAN PEKERJAAN 2,340,354.80
NO. KOMPONEN SATUAN PERKIRAAN KUANTITAS
NO. KOMPONEN SATUAN PERKIRAAN KUANTITAS
NO. KOMPONEN SATUAN PERKIRAAN KUANTITAS
NAMA PAKET KEGIATAN
NO MATA PEMBAYARAN : 2.3(9)
JENIS PEKERJAAN : Saluran U-Ditch 150x150 cm
SATUAN PEMBAYARAN : m'
NO. KOMPONEN SATUAN PERKIRAAN
KUANTITAS HARGA SATUAN JUMLAH HARGA ( Rp. ) ( Rp. )
A TENAGA
1 Pekerja Hari 0.667 65,000.00 43,336.43 2 Tukang Hari 0.167 70,000.00 11,670.00 3 Mandor Hari 0.167 105,000.00 17,501.25
Jumlah Harga Tenaga (A) 72,507.68 B BAHAN
1 U-Ditch 150x150 cm m' 1.000 2,383,600.00 2,383,600.00
Jumlah Harga Bahan (B) 2,383,600.00 C PERALATAN
2 Crane On Truck Jam 0.345 255,000.00 88,000.50 3 Flat Blad Truck Jam 0.062 210,000.00 13,062.00 4 Alat Bantu Ls 1.000 1,000.00 1,000.00
Jumlah Harga Alat (C) 102,062.50
D JUMLAH HARGA,TENAGA,DAN PERALATAN (A+B+C) 2,558,170.18 E BIAYA UMUM DAN KEUNTUNGAN 10% 255,817.02 F HARGA SATUAN PEKERJAAN 2,813,987.20
NAMA PAKET KEGIATAN
NO MATA PEMBAYARAN : 2.3(9)
JENIS PEKERJAAN : Saluran Box Culvert 40/40 cm HD
SATUAN PEMBAYARAN : m'
NO. KOMPONEN SATUAN PERKIRAAN
KUANTITAS HARGA SATUAN JUMLAH HARGA ( Rp. ) ( Rp. )
A TENAGA
1 Pekerja Hari 0.500 65,000.00 32,500.00 2 Tukang Hari 0.167 70,000.00 11,670.00 3 Mandor Hari 0.125 105,000.00 13,125.00
Jumlah Harga Tenaga (A) 57,295.00 B BAHAN
1 Box Culvert 40x40 HD m' 1.000 598,600.00 598,600.00
Jumlah Harga Bahan (B) 598,600.00 C PERALATAN
2 Crane On Truck Jam 0.197 255,000.00 50,286.00 3 Flat Blad Truck Jam 0.031 210,000.00 6,573.00 4 Alat Bantu Ls 1.000 1,000.00 1,000.00
Jumlah Harga Alat (C) 57,859.00
D JUMLAH HARGA,TENAGA,DAN PERALATAN (A+B+C) 713,754.00 E BIAYA UMUM DAN KEUNTUNGAN 10% 71,375.40 F HARGA SATUAN PEKERJAAN 785,129.40
NAMA PAKET KEGIATAN
NO MATA PEMBAYARAN : 2.3(9)
JENIS PEKERJAAN : Saluran Box Culvert 50/50 cm HD
SATUAN PEMBAYARAN : m'
NO. KOMPONEN SATUAN PERKIRAAN
KUANTITAS HARGA SATUAN JUMLAH HARGA ( Rp. ) ( Rp. )
A TENAGA
1 Pekerja Hari 0.667 65,000.00 43,336.43 2 Tukang Hari 0.167 70,000.00 11,670.00 3 Mandor Hari 0.167 105,000.00 17,501.25
Jumlah Harga Tenaga (A) 72,507.68 B BAHAN
1 Box Culvert 50x50 HD m' 1.000 598,600.00 598,600.00
Jumlah Harga Bahan (B) 598,600.00 C PERALATAN
2 Crane On Truck Jam 0.179 255,000.00 45,696.00 3 Flat Blad Truck Jam 0.058 210,000.00 12,138.00 4 Alat Bantu Ls 1.000 1,000.00 1,000.00
Jumlah Harga Alat (C) 58,834.00
D JUMLAH HARGA,TENAGA,DAN PERALATAN (A+B+C) 729,941.68 E BIAYA UMUM DAN KEUNTUNGAN 10% 72,994.17 F HARGA SATUAN PEKERJAAN 802,935.85
NO MATA PEMBAYARAN : 2.3(9)
JENIS PEKERJAAN : Saluran Box Culvert 60/60 cm HD
SATUAN PEMBAYARAN : m'
HARGA SATUAN JUMLAH HARGA ( Rp. ) ( Rp. )
A TENAGA
1 Pekerja Hari 0.667 65,000.00 43,336.43 2 Tukang Hari 0.167 70,000.00 11,670.00 3 Mandor Hari 0.167 105,000.00 17,501.25
Jumlah Harga Tenaga (A) 72,507.68 B BAHAN
1 Box Curvert 60x60 HD m' 1.000 754,900.00 754,900.00
Jumlah Harga Bahan (B) 754,900.00 C PERALATAN
2 Crane On Truck Jam 0.422 255,000.00 107,533.50 3 Flat Blad Truck Jam 0.040 210,000.00 8,400.00 4 Alat Bantu Ls 1.000 1,000.00 1,000.00
Jumlah Harga Alat (C) 116,933.50
D JUMLAH HARGA,TENAGA,DAN PERALATAN (A+B+C) 944,341.18 E BIAYA UMUM DAN KEUNTUNGAN 10% 94,434.12 F HARGA SATUAN PEKERJAAN 1,038,775.30
NAMA PAKET KEGIATAN
NO MATA PEMBAYARAN : 2.3(9)
JENIS PEKERJAAN : Saluran Box Culvert 80/80 cm HD
SATUAN PEMBAYARAN : m'
NO. KOMPONEN SATUAN PERKIRAAN
KUANTITAS HARGA SATUAN JUMLAH HARGA ( Rp. ) ( Rp. )
A TENAGA
1 Pekerja Hari 0.667 65,000.00 43,336.43 2 Tukang Hari 0.167 70,000.00 11,670.00 3 Mandor Hari 0.167 105,000.00 17,501.25
Jumlah Harga Tenaga (A) 72,507.68 B BAHAN
1 Box Curvert 80x80 HD m' 1.000 991,000.00 991,000.00
Jumlah Harga Bahan (B) 991,000.00 C PERALATAN
2 Crane On Truck Jam 0.422 255,000.00 107,533.50 3 Flat Blad Truck Jam 0.040 210,000.00 8,400.00 4 Alat Bantu Ls 1.000 1,000.00 1,000.00
Jumlah Harga Alat (C) 116,933.50
D JUMLAH HARGA,TENAGA,DAN PERALATAN (A+B+C) 1,180,441.18 E BIAYA UMUM DAN KEUNTUNGAN 10% 118,044.12 F HARGA SATUAN PEKERJAAN 1,298,485.30
NAMA PAKET KEGIATAN
NO MATA PEMBAYARAN : 2.3(9)
JENIS PEKERJAAN : Saluran Box Culvert 100/100 cm HD
SATUAN PEMBAYARAN : m'
NO. KOMPONEN SATUAN PERKIRAAN
KUANTITAS HARGA SATUAN JUMLAH HARGA ( Rp. ) ( Rp. )
A TENAGA
1 Pekerja Hari 0.667 65,000.00 43,336.43 2 Tukang Hari 0.167 70,000.00 11,670.00 3 Mandor Hari 0.167 105,000.00 17,501.25
Jumlah Harga Tenaga (A) 72,507.68 B BAHAN
1 Box Curvert 100x100 HD m' 1.000 1,837,600.00 1,837,600.00
Jumlah Harga Bahan (B) 1,837,600.00 C PERALATAN
2 Crane On Truck Jam 0.422 255,000.00 107,533.50 3 Flat Blad Truck Jam 0.062 210,000.00 13,062.00 4 Alat Bantu Ls 1.000 1,000.00 1,000.00
Jumlah Harga Alat (C) 121,595.50
D JUMLAH HARGA,TENAGA,DAN PERALATAN (A+B+C) 2,031,703.18 E BIAYA UMUM DAN KEUNTUNGAN 10% 203,170.32 F HARGA SATUAN PEKERJAAN 2,234,873.50
NO. KOMPONEN SATUAN PERKIRAAN KUANTITAS
NAMA PAKET KEGIATAN
NO MATA PEMBAYARAN : 2.3(9)
JENIS PEKERJAAN : Saluran Box Culvert 120/120 cm HD
SATUAN PEMBAYARAN : m'
NO. KOMPONEN SATUAN PERKIRAAN
KUANTITAS HARGA SATUAN JUMLAH HARGA ( Rp. ) ( Rp. )
A TENAGA
1 Pekerja Hari 0.800 65,000.00 52,000.00 2 Tukang Hari 0.200 70,000.00 14,000.00 3 Mandor Hari 0.200 105,000.00 21,000.00
Jumlah Harga Tenaga (A) 87,000.00 B BAHAN
1 Box Curvert 120x120 HD m' 1.000 2,207,100.00 2,207,100.00
Jumlah Harga Bahan (B) 2,207,100.00 C PERALATAN
2 Crane On Truck Jam 0.422 255,000.00 107,533.50 3 Flat Blad Truck Jam 0.062 210,000.00 13,062.00 4 Alat Bantu Ls 1.000 1,000.00 1,000.00
Jumlah Harga Alat (C) 121,595.50
D JUMLAH HARGA,TENAGA,DAN PERALATAN (A+B+C) 2,415,695.50 E BIAYA UMUM DAN KEUNTUNGAN 10% 241,569.55 F HARGA SATUAN PEKERJAAN 2,657,265.05
NAMA PAKET KEGIATAN
NO MATA PEMBAYARAN : 2.3(9)
JENIS PEKERJAAN : Saluran Box Culvert 150/150 cm HD
SATUAN PEMBAYARAN : m'
NO. KOMPONEN SATUAN PERKIRAAN
KUANTITAS HARGA SATUAN JUMLAH HARGA ( Rp. ) ( Rp. )
A TENAGA
1 Pekerja Hari 0.800 65,000.00 52,000.00 2 Tukang Hari 0.200 70,000.00 14,000.00 3 Mandor Hari 0.200 105,000.00 21,000.00
Jumlah Harga Tenaga (A) 87,000.00 B BAHAN
1 Box Curvert 150x150 HD m' 1.000 2,816,700.00 2,816,700.00
Jumlah Harga Bahan (B) 2,816,700.00 C PERALATAN
2 Crane On Truck Jam 0.706 255,000.00 180,030.00 3 Flat Blad Truck Jam 0.062 210,000.00 13,062.00 4 Alat Bantu Ls 1.000 1,000.00 1,000.00
Jumlah Harga Alat (C) 194,092.00
D JUMLAH HARGA,TENAGA,DAN PERALATAN (A+B+C) 3,097,792.00 E BIAYA UMUM DAN KEUNTUNGAN 10% 309,779.20 F HARGA SATUAN PEKERJAAN 3,407,571.20
NAMA PAKET KEGIATAN
NO MATA PEMBAYARAN : 2.3(10)
JENIS PEKERJAAN : Cover U-Ditch Dimensi 400x70 LD
SATUAN PEMBAYARAN : m'
NO. KOMPONEN SATUAN PERKIRAAN
KUANTITAS HARGA SATUAN JUMLAH HARGA ( Rp. ) ( Rp. )
A TENAGA
1 Pekerja Hari 0.038 65,000.00 2,437.50 2 Tukang Hari 0.013 70,000.00 875.00 3 Mandor Hari 0.013 105,000.00 1,312.50
Jumlah Harga Tenaga (A) 4,625.00 B BAHAN
1 Cover U-Ditch 400x70 LD m' 1.000 92,900.00 92,900.00
Jumlah Harga Bahan (B) 92,900.00 C PERALATAN
1 Flat Blad Truck Jam 0.031 210,000.00 6,573.00 2 Alat Bantu Ls 1.000 1,000.00 1,000.00
Jumlah Harga Alat (C) 7,573.00
D JUMLAH HARGA,TENAGA,DAN PERALATAN (A+B+C) 105,098.00 E BIAYA UMUM DAN KEUNTUNGAN 10% 10,509.80 F HARGA SATUAN PEKERJAAN 115,607.80
NO MATA PEMBAYARAN : 2.3(10)
JENIS PEKERJAAN : Cover U-Ditch Dimensi 500x75 LD
SATUAN PEMBAYARAN : m'
NO. KOMPONEN SATUAN PERKIRAAN
KUANTITAS HARGA SATUAN JUMLAH HARGA ( Rp. ) ( Rp. )
A TENAGA
1 Pekerja Hari 0.050 65,000.00 3,250.00 2 Tukang Hari 0.017 70,000.00 1,167.00 3 Mandor Hari 0.017 105,000.00 1,750.50
Jumlah Harga Tenaga (A) 6,167.50 B BAHAN
1 Cover U-Ditch 500x75 LD m' 1.000 142,300.00 142,300.00
Jumlah Harga Bahan (B) 142,300.00 C PERALATAN
1 Flat Blad Truck Jam 0.058 210,000.00 12,138.00 2 Alat Bantu Ls 1.000 1,000.00 1,000.00
Jumlah Harga Alat (C) 13,138.00
D JUMLAH HARGA,TENAGA,DAN PERALATAN (A+B+C) 161,605.50 E BIAYA UMUM DAN KEUNTUNGAN 10% 16,160.55 F HARGA SATUAN PEKERJAAN 177,766.05
NAMA PAKET KEGIATAN
NO MATA PEMBAYARAN : 2.3(10)
JENIS PEKERJAAN : Cover U-Ditch Dimensi 600x80 LD
SATUAN PEMBAYARAN : m'
NO. KOMPONEN SATUAN PERKIRAAN
KUANTITAS HARGA SATUAN JUMLAH HARGA ( Rp. ) ( Rp. )
A TENAGA
1 Pekerja Hari 0.038 65,000.00 2,437.50 2 Tukang Hari 0.013 70,000.00 875.00 3 Mandor Hari 0.013 105,000.00 1,312.50
Jumlah Harga Tenaga (A) 4,625.00 B BAHAN
1 Cover U-Ditch 600x80 LD m' 1.000 181,500.00 181,500.00
Jumlah Harga Bahan (B) 181,500.00 C PERALATAN
1 Flat Blad Truck Jam 0.040 210,000.00 8,400.00 2 Alat Bantu Ls 1.000 1,000.00 1,000.00
Jumlah Harga Alat (C) 9,400.00
D JUMLAH HARGA,TENAGA,DAN PERALATAN (A+B+C) 195,525.00 E BIAYA UMUM DAN KEUNTUNGAN 10% 19,552.50 F HARGA SATUAN PEKERJAAN 215,077.50
NAMA PAKET KEGIATAN
NO MATA PEMBAYARAN : 2.3(10)
JENIS PEKERJAAN : Cover U-Ditch Dimensi 800x90 LD
SATUAN PEMBAYARAN : m'
NO. KOMPONEN SATUAN PERKIRAAN
KUANTITAS HARGA SATUAN JUMLAH HARGA ( Rp. ) ( Rp. )
A TENAGA
1 Pekerja Hari 0.038 65,000.00 2,437.50 2 Tukang Hari 0.013 70,000.00 875.00 3 Mandor Hari 0.013 105,000.00 1,312.50
Jumlah Harga Tenaga (A) 4,625.00 B BAHAN
1 Cover U-Ditch 800x90 LD m' 1.000 218,500.00 218,500.00
Jumlah Harga Bahan (B) 218,500.00 C PERALATAN
1 Flat Blad Truck Jam 0.040 210,000.00 8,400.00 2 Alat Bantu Ls 1.000 1,000.00 1,000.00
Jumlah Harga Alat (C) 9,400.00
D JUMLAH HARGA,TENAGA,DAN PERALATAN (A+B+C) 232,525.00 E BIAYA UMUM DAN KEUNTUNGAN 10% 23,252.50 F HARGA SATUAN PEKERJAAN 255,777.50
NAMA PAKET KEGIATAN
NO MATA PEMBAYARAN : 2.3(10)
JENIS PEKERJAAN : Cover U-Ditch Dimensi 1000x95 LD
SATUAN PEMBAYARAN : m'
NO. KOMPONEN SATUAN PERKIRAAN
KUANTITAS HARGA SATUAN JUMLAH HARGA ( Rp. ) ( Rp. )
A TENAGA
1 Pekerja Hari 0.050 65,000.00 3,250.00 2 Tukang Hari 0.017 70,000.00 1,167.00 3 Mandor Hari 0.017 105,000.00 1,750.50
Jumlah Harga Tenaga (A) 6,167.50 B BAHAN
1 Cover U-Ditch 1000x95 LD m' 1.000 278,000.00 278,000.00
Jumlah Harga Bahan (B) 278,000.00 C PERALATAN
1 Flat Blad Truck Jam 0.062 210,000.00 13,062.00 2 Alat Bantu Ls 1.000 1,000.00 1,000.00
Jumlah Harga Alat (C) 14,062.00
D JUMLAH HARGA,TENAGA,DAN PERALATAN (A+B+C) 298,229.50 E BIAYA UMUM DAN KEUNTUNGAN 10% 29,822.95 F HARGA SATUAN PEKERJAAN 328,052.45
NAMA PAKET KEGIATAN
NO MATA PEMBAYARAN : 2.3(10)
JENIS PEKERJAAN : Cover U-Ditch Dimensi 1200x100 LD
SATUAN PEMBAYARAN : m'
NO. KOMPONEN SATUAN PERKIRAAN
KUANTITAS HARGA SATUAN JUMLAH HARGA ( Rp. ) ( Rp. )
A TENAGA
1 Pekerja Hari 0.050 65,000.00 3,250.00 2 Tukang Hari 0.017 70,000.00 1,167.00 3 Mandor Hari 0.017 105,000.00 1,750.50
Jumlah Harga Tenaga (A) 6,167.50 B BAHAN
1 Cover U-Ditch 1200x100 LD m' 1.000 418,500.00 418,500.00
Jumlah Harga Bahan (B) 418,500.00 C PERALATAN
1 Flat Blad Truck Jam 0.062 210,000.00 13,062.00 2 Alat Bantu Ls 1.000 1,000.00 1,000.00
Jumlah Harga Alat (C) 14,062.00
D JUMLAH HARGA,TENAGA,DAN PERALATAN (A+B+C) 438,729.50 E BIAYA UMUM DAN KEUNTUNGAN 10% 43,872.95 F HARGA SATUAN PEKERJAAN 482,602.45
NAMA PAKET KEGIATAN
NO MATA PEMBAYARAN : 2.3(10)
JENIS PEKERJAAN : Cover U-Ditch Dimensi 1500x120 LD
SATUAN PEMBAYARAN : m'
NO. KOMPONEN SATUAN PERKIRAAN
KUANTITAS HARGA SATUAN JUMLAH HARGA ( Rp. ) ( Rp. )
A TENAGA
1 Pekerja Hari 0.050 65,000.00 3,250.00 2 Tukang Hari 0.017 70,000.00 1,167.00 3 Mandor Hari 0.017 105,000.00 1,750.50
Jumlah Harga Tenaga (A) 6,167.50 B BAHAN
1 Cover U-Ditch 1500x120 LD m' 1.000 717,900.00 717,900.00
Jumlah Harga Bahan (B) 717,900.00 C PERALATAN
1 Flat Blad Truck Jam 0.062 210,000.00 13,062.00 2 Alat Bantu Ls 1.000 1,000.00 1,000.00
Jumlah Harga Alat (C) 14,062.00
D JUMLAH HARGA,TENAGA,DAN PERALATAN (A+B+C) 738,129.50 E BIAYA UMUM DAN KEUNTUNGAN 10% 73,812.95 F HARGA SATUAN PEKERJAAN 811,942.45
NO MATA PEMBAYARAN : 2.3(10)
JENIS PEKERJAAN : Cover U-Ditch Dimensi 400x100 HD
SATUAN PEMBAYARAN : m'
NO. KOMPONEN SATUAN PERKIRAAN
KUANTITAS HARGA SATUAN JUMLAH HARGA ( Rp. ) ( Rp. )
A TENAGA
1 Pekerja Hari 0.038 65,000.00 2,437.50 2 Tukang Hari 0.013 70,000.00 875.00 3 Mandor Hari 0.013 105,000.00 1,312.50
Jumlah Harga Tenaga (A) 4,625.00 B BAHAN
1 Cover U-Ditch 400x70 LD m' 1.000 183,400.00 183,400.00
Jumlah Harga Bahan (B) 183,400.00 C PERALATAN
1 Flat Blad Truck Jam 0.031 210,000.00 6,573.00 2 Alat Bantu Ls 1.000 1,000.00 1,000.00
Jumlah Harga Alat (C) 7,573.00
D JUMLAH HARGA,TENAGA,DAN PERALATAN (A+B+C) 195,598.00 E BIAYA UMUM DAN KEUNTUNGAN 10% 19,559.80 F HARGA SATUAN PEKERJAAN 215,157.80
NAMA PAKET KEGIATAN
NO MATA PEMBAYARAN : 2.3(10)
JENIS PEKERJAAN : Cover U-Ditch Dimensi 500x100 HD
SATUAN PEMBAYARAN : m'
NO. KOMPONEN SATUAN PERKIRAAN
KUANTITAS HARGA SATUAN JUMLAH HARGA ( Rp. ) ( Rp. )
A TENAGA
1 Pekerja Hari 0.050 65,000.00 3,250.00 2 Tukang Hari 0.017 70,000.00 1,167.00 3 Mandor Hari 0.017 105,000.00 1,750.50
Jumlah Harga Tenaga (A) 6,167.50 B BAHAN
1 Cover U-Ditch 500x75 LD m' 1.000 251,700.00 251,700.00
Jumlah Harga Bahan (B) 251,700.00 C PERALATAN
1 Flat Blad Truck Jam 0.058 210,000.00 12,138.00 2 Alat Bantu Ls 1.000 1,000.00 1,000.00
Jumlah Harga Alat (C) 13,138.00
D JUMLAH HARGA,TENAGA,DAN PERALATAN (A+B+C) 271,005.50 E BIAYA UMUM DAN KEUNTUNGAN 10% 27,100.55 F HARGA SATUAN PEKERJAAN 298,106.05
NAMA PAKET KEGIATAN
NO MATA PEMBAYARAN : 2.3(10)
JENIS PEKERJAAN : Cover U-Ditch Dimensi 600x100 HD
SATUAN PEMBAYARAN : m'
NO. KOMPONEN SATUAN PERKIRAAN
KUANTITAS HARGA SATUAN JUMLAH HARGA ( Rp. ) ( Rp. )
A TENAGA
1 Pekerja Hari 0.038 65,000.00 2,437.50 2 Tukang Hari 0.013 70,000.00 875.00 3 Mandor Hari 0.013 105,000.00 1,312.50
Jumlah Harga Tenaga (A) 4,625.00 B BAHAN
1 Cover U-Ditch 600x80 LD m' 1.000 315,500.00 315,500.00
Jumlah Harga Bahan (B) 315,500.00 C PERALATAN
1 Flat Blad Truck Jam 0.040 210,000.00 8,400.00 2 Alat Bantu Ls 1.000 1,000.00 1,000.00
Jumlah Harga Alat (C) 9,400.00
D JUMLAH HARGA,TENAGA,DAN PERALATAN (A+B+C) 329,525.00 E BIAYA UMUM DAN KEUNTUNGAN 10% 32,952.50 F HARGA SATUAN PEKERJAAN 362,477.50
NAMA PAKET KEGIATAN
NO MATA PEMBAYARAN : 2.3(10)
JENIS PEKERJAAN : Cover U-Ditch Dimensi 800x130 HD
SATUAN PEMBAYARAN : m'
NO. KOMPONEN SATUAN PERKIRAAN
KUANTITAS HARGA SATUAN JUMLAH HARGA ( Rp. ) ( Rp. )
A TENAGA
1 Pekerja Hari 0.038 65,000.00 2,437.50 2 Tukang Hari 0.013 70,000.00 875.00 3 Mandor Hari 0.013 105,000.00 1,312.50
Jumlah Harga Tenaga (A) 4,625.00 B BAHAN
1 Cover U-Ditch 800x90 LD m' 1.000 428,600.00 428,600.00
Jumlah Harga Bahan (B) 428,600.00 C PERALATAN
1 Flat Blad Truck Jam 0.040 210,000.00 8,400.00 2 Alat Bantu Ls 1.000 1,000.00 1,000.00
Jumlah Harga Alat (C) 9,400.00
D JUMLAH HARGA,TENAGA,DAN PERALATAN (A+B+C) 442,625.00 E BIAYA UMUM DAN KEUNTUNGAN 10% 44,262.50 F HARGA SATUAN PEKERJAAN 486,887.50
NAMA PAKET KEGIATAN
NO MATA PEMBAYARAN : 2.3(10)
JENIS PEKERJAAN : Cover U-Ditch Dimensi 1000x140 HD
SATUAN PEMBAYARAN : m'
NO. KOMPONEN SATUAN PERKIRAAN
KUANTITAS HARGA SATUAN JUMLAH HARGA ( Rp. ) ( Rp. )
A TENAGA
1 Pekerja Hari 0.050 65,000.00 3,250.00 2 Tukang Hari 0.017 70,000.00 1,167.00 3 Mandor Hari 0.017 105,000.00 1,750.50
Jumlah Harga Tenaga (A) 6,167.50 B BAHAN
1 Cover U-Ditch 1000x95 LD m' 1.000 539,600.00 539,600.00
Jumlah Harga Bahan (B) 539,600.00 C PERALATAN
1 Flat Blad Truck Jam 0.062 210,000.00 13,062.00 2 Alat Bantu Ls 1.000 1,000.00 1,000.00
Jumlah Harga Alat (C) 14,062.00
D JUMLAH HARGA,TENAGA,DAN PERALATAN (A+B+C) 559,829.50 E BIAYA UMUM DAN KEUNTUNGAN 10% 55,982.95 F HARGA SATUAN PEKERJAAN 615,812.45
NAMA PAKET KEGIATAN
NO MATA PEMBAYARAN : 2.3(10)
JENIS PEKERJAAN : Cover U-Ditch Dimensi 1200x150 HD
SATUAN PEMBAYARAN : m'
NO. KOMPONEN SATUAN PERKIRAAN
KUANTITAS HARGA SATUAN JUMLAH HARGA ( Rp. ) ( Rp. )
A TENAGA
1 Pekerja Hari 0.050 65,000.00 3,250.00 2 Tukang Hari 0.017 70,000.00 1,167.00 3 Mandor Hari 0.017 105,000.00 1,750.50
Jumlah Harga Tenaga (A) 6,167.50 B BAHAN
1 Cover U-Ditch 1200x100 LD m' 1.000 636,000.00 636,000.00
Jumlah Harga Bahan (B) 636,000.00 C PERALATAN
1 Flat Blad Truck Jam 0.062 210,000.00 13,062.00 2 Alat Bantu Ls 1.000 1,000.00 1,000.00
Jumlah Harga Alat (C) 14,062.00
D JUMLAH HARGA,TENAGA,DAN PERALATAN (A+B+C) 656,229.50 E BIAYA UMUM DAN KEUNTUNGAN 10% 65,622.95 F HARGA SATUAN PEKERJAAN 721,852.45
NO MATA PEMBAYARAN : 2.3(10)
JENIS PEKERJAAN : Cover U-Ditch Dimensi 1500x170 HD
SATUAN PEMBAYARAN : m'
NO. KOMPONEN SATUAN PERKIRAAN
KUANTITAS HARGA SATUAN JUMLAH HARGA ( Rp. ) ( Rp. )
A TENAGA
1 Pekerja Hari 0.050 65,000.00 3,250.00 2 Tukang Hari 0.017 70,000.00 1,167.00 3 Mandor Hari 0.017 105,000.00 1,750.50
Jumlah Harga Tenaga (A) 6,167.50 B BAHAN
1 Cover U-Ditch 1500x120 LD m' 1.000 1,020,700.00 1,020,700.00
Jumlah Harga Bahan (B) 1,020,700.00 C PERALATAN
1 Flat Blad Truck Jam 0.062 210,000.00 13,062.00 2 Alat Bantu Ls 1.000 1,000.00 1,000.00
Jumlah Harga Alat (C) 14,062.00
D JUMLAH HARGA,TENAGA,DAN PERALATAN (A+B+C) 1,040,929.50 E BIAYA UMUM DAN KEUNTUNGAN 10% 104,092.95 F HARGA SATUAN PEKERJAAN 1,145,022.45
NAMA PAKET KEGIATAN :
NO MATA PEMBAYARAN :
JENIS PEKERJAAN : Pemasangan sumur resapan ø 60 cm tanpa tulangan panjang 1,00 m lokal
SATUAN PEMBAYARAN : unit
NO. KOMPONEN SATUAN PERKIRAAN
KUANTITAS HARGA SATUAN JUMLAH HARGA ( Rp. ) ( Rp. )
A TENAGA
1 Pekerja O/H 0.429 65,000.00 27,857.14 2 Tukang Batu O/H 0.143 70,000.00 10,000.00 3 Mandor O/H 0.107 105,000.00 11,250.00
Jumlah Harga Tenaga (A) 49,107.14 B BAHAN
1 Buis Beton ukuran ø 60 cm; 1,00 m unit 2.000 261,000.00 522,000.00 2 Mortar Utama 200 sak 2.262 4,600.00 10,404.95
Jumlah Harga Bahan (B) 522,000.00 C PERALATAN
1 Alat Bantu Ls 1.000 1,000.00 1,000.00
Jumlah Harga Alat (C) 1,000.00
D JUMLAH HARGA,TENAGA,DAN PERALATAN (A+B+C) 572,107.14 E BIAYA UMUM DAN KEUNTUNGAN 10% 57,210.71 F HARGA SATUAN PEKERJAAN 629,317.86
NAMA PAKET KEGIATAN :
NO MATA PEMBAYARAN :
JENIS PEKERJAAN : Pemasangan sumur resapan ø 80 cm tanpa tulangan panjang 1,00 m lokal
SATUAN PEMBAYARAN : unit
NO. KOMPONEN SATUAN PERKIRAAN
KUANTITAS HARGA SATUAN JUMLAH HARGA ( Rp. ) ( Rp. )
A TENAGA
1 Pekerja O/H 0.429 65,000.00 27,857.14 2 Tukang Batu O/H 0.143 70,000.00 10,000.00 3 Mandor O/H 0.107 105,000.00 11,250.00
Jumlah Harga Tenaga (A) 49,107.14 B BAHAN
1 Buis Beton ukuran ø 80 cm; 1,00 m unit 2.000 290,000.00 580,000.00 2 Mortar Utama 200 sak 2.827 4,600.00 13,006.19
Jumlah Harga Bahan (B) 580,000.00 C PERALATAN
1 Alat Bantu Ls 1.000 1,000.00 1,000.00
Jumlah Harga Alat (C) 1,000.00
D JUMLAH HARGA,TENAGA,DAN PERALATAN (A+B+C) 630,107.14 E BIAYA UMUM DAN KEUNTUNGAN 10% 63,010.71 F HARGA SATUAN PEKERJAAN 693,117.86
NAMA PAKET KEGIATAN
NO MATA PEMBAYARAN :
JENIS PEKERJAAN : Beton Tumbuk 1:3:5
SATUAN PEMBAYARAN : m³
NO. KOMPONEN SATUAN PERKIRAAN
KUANTITAS HARGA SATUAN JUMLAH HARGA ( Rp. ) ( Rp. )
A TENAGA
1 Pekerja O/H 1.650 65,000.00 107,250.00 2 Tukang Batu O/H 0.250 70,000.00 17,500.00 3 Kepala Tukang O/H 0.025 85,000.00 2,125.00 4 Mandor O/H 0.080 105,000.00 8,400.00
Jumlah Harga Tenaga (A) 135,275.00 B BAHAN
1 Semen Portland sak 4.360 59,900.00 261,164.00 2 Pasir Beton m3 0.520 210,400.00 109,408.00 3 Koral Beton m3 0.870 187,800.00 163,386.00
Jumlah Harga Bahan (B) 533,958.00 C PERALATAN
1 Concentrate Mixer Jam 0.042 85,000.00 3,541.67 Concentrate Vibrator Jam 0.012 60,000.00 732.00 2 Alat Bantu Ls 1.000 10,000.00 10,000.00
Jumlah Harga Alat (C) 14,273.67
D JUMLAH HARGA,TENAGA,DAN PERALATAN (A+B+C) 683,506.67 E BIAYA UMUM DAN KEUNTUNGAN 10% 68,350.67 F HARGA SATUAN PEKERJAAN 751,857.33
NAMA PAKET KEGIATAN
NO MATA PEMBAYARAN :
JENIS PEKERJAAN : Beton K-175 Ready Mix (cor setempat)
SATUAN PEMBAYARAN : m³
NO. KOMPONEN SATUAN PERKIRAAN
KUANTITAS HARGA SATUAN JUMLAH HARGA ( Rp. ) ( Rp. )
A TENAGA
1 Pekerja O/H 1.650 65,000.00 107,250.00 2 Tukang Batu O/H 0.275 70,000.00 19,250.00 3 Kepala Tukang O/H 0.028 85,000.00 2,380.00 4 Mandor O/H 0.083 105,000.00 8,715.00
Jumlah Harga Tenaga (A) 137,595.00 B BAHAN
1 Readymix Beton K-175 m3 1.000 623,000.00 623,000.00
Jumlah Harga Bahan (B) 623,000.00 C PERALATAN
1 Concentrate Vibrator Jam 0.012 60,000.00 732.00 2 Alat Bantu Ls 1.000 900.00 900.00
Jumlah Harga Alat (C) 1,632.00
D JUMLAH HARGA,TENAGA,DAN PERALATAN (A+B+C) 762,227.00 E BIAYA UMUM DAN KEUNTUNGAN 10% 76,222.70 F HARGA SATUAN PEKERJAAN 838,449.70
NAMA PAKET KEGIATAN
NO MATA PEMBAYARAN :
JENIS PEKERJAAN : Beton K-350 Ready Mix (cor setempat)
SATUAN PEMBAYARAN : m³
NO. KOMPONEN SATUAN PERKIRAAN
KUANTITAS HARGA SATUAN JUMLAH HARGA ( Rp. ) ( Rp. )
A TENAGA
1 Pekerja O/H 2.100 65,000.00 136,500.00 2 Tukang Batu O/H 0.350 70,000.00 24,500.00 3 Kepala Tukang O/H 0.035 85,000.00 2,975.00 4 Mandor O/H 0.105 105,000.00 11,025.00
Jumlah Harga Tenaga (A) 175,000.00 B BAHAN
1 Readymix Beton K-300 m3 1.000 750,000.00 750,000.00
Jumlah Harga Bahan (B) 750,000.00 C PERALATAN
1 Alat Bantu 1.000 5,000.00 5,000.00
Jumlah Harga Alat (C) 5,000.00
D JUMLAH HARGA,TENAGA,DAN PERALATAN (A+B+C) 930,000.00 E BIAYA UMUM DAN KEUNTUNGAN 10% 93,000.00 F HARGA SATUAN PEKERJAAN 1,023,000.00
NO MATA PEMBAYARAN :
JENIS PEKERJAAN : Pemasangan Batu (manual)
SATUAN PEMBAYARAN : m³
HARGA SATUAN JUMLAH HARGA ( Rp. ) ( Rp. )
A TENAGA
1 Pekerja / Kernet O/H 1.500 65,000.00 97,500.00 2 Tukang Batu O/H 0.600 70,000.00 42,000.00 3 Kepal Tukang O/H 0.060 85,000.00 5,100.00 4 Mandor O/H 0.075 105,000.00 7,875.00
Jumlah Harga Tenaga (A) 152,475.00 B BAHAN
1 Batu Kali m3 0.900 213,700.00 192,330.00 2 Semen Portland sak 3.260 59,900.00 195,274.00 3 Pasir Pasang m3 0.520 244,800.00 127,296.00
Jumlah Harga Bahan (B) 514,900.00 C PERALATAN
1 Alat Bantu Ls 1.000 15,000.00 15,000.00
Jumlah Harga Alat (C) 15,000.00 D JUMLAH HARGA,TENAGA,DAN PERALATAN (A+B+C) 682,375.00 E BIAYA UMUM DAN KEUNTUNGAN 10% 68,237.50 F HARGA SATUAN PEKERJAAN 750,612.50
NAMA PAKET KEGIATAN
NO MATA PEMBAYARAN :
JENIS PEKERJAAN : Plesteran + Acian 1:4 (T=15 mm)
SATUAN PEMBAYARAN : m²
NO. KOMPONEN SATUAN PERKIRAAN
KUANTITAS HARGA SATUAN JUMLAH HARGA ( Rp. ) ( Rp. )
A TENAGA
1 Pekerja O/H 0.057 65,000.00 3,714.29 2 Tukang O/H 0.029 70,000.00 2,000.00 4 Mandor O/H 0.014 105,000.00 1,500.00
Jumlah Harga Tenaga (A) 7,214.29 B BAHAN
1 Semen Portland sak 0.080 59,900.00 4,792.00 2 Pasir Pasang m3 0.178 244,800.00 43,574.40
Jumlah Harga Bahan (B) 48,366.40 C PERALATAN
1 Alat Bantu Ls 1.000 1,000.00 1,000.00
Jumlah Harga Alat (C) 1,000.00
D JUMLAH HARGA,TENAGA,DAN PERALATAN (A+B+C) 56,580.69 E BIAYA UMUM DAN KEUNTUNGAN 10% 5,658.07 F HARGA SATUAN PEKERJAAN 62,238.75
NAMA PAKET KEGIATAN
NO MATA PEMBAYARAN :
JENIS PEKERJAAN : Bekisting dengan Papan
SATUAN PEMBAYARAN : m³
NO. KOMPONEN SATUAN PERKIRAAN
KUANTITAS HARGA SATUAN JUMLAH HARGA ( Rp. ) ( Rp. )
A TENAGA
1 Pekerja O/H 0.520 65,000.00 33,800.00 2 Tukang Kayu O/H 0.260 67,500.00 17,550.00 3 Kepala Tukang Kayu O/H 0.025 85,000.00 2,125.00 4 Mandor O/H 0.025 105,000.00 2,625.00
Jumlah Harga Tenaga (A) 22,300.00 B BAHAN
1 Kayu Kualitas III m3 0.040 95,000.00 3,800.00 2 Paku 5-10 cm kg 0.300 18,000.00 5,400.00 3 Minyak Bekisting liter 0.100 10,000.00 1,000.00
Jumlah Harga Bahan (B) 9,200.00 C PERALATAN
3 Alat Bantu Ls 1.000 5,000.00 5,000.00
Jumlah Harga Alat (C) 5,000.00
D JUMLAH HARGA,TENAGA,DAN PERALATAN (A+B+C) 36,500.00 E BIAYA UMUM DAN KEUNTUNGAN 10% 3,650.00 F HARGA SATUAN PEKERJAAN 40,150.00
NO. KOMPONEN SATUAN PERKIRAAN KUANTITAS
NAMA PAKET KEGIATAN
NO MATA PEMBAYARAN :
JENIS PEKERJAAN : Baja Tulangan (Polos)
SATUAN PEMBAYARAN : /10 kg
NO. KOMPONEN SATUAN PERKIRAAN
KUANTITAS HARGA SATUAN JUMLAH HARGA ( Rp. ) ( Rp. )
A TENAGA
1 Pekerja O/H 0.070 65,000.00 4,550.00 2 Tukang Besi O/H 0.070 65,000.00 4,550.00 3 Kepala Tukang O/H 0.007 82,500.00 577.50 4 Mandor O/H 0.004 105,000.00 420.00
Jumlah Harga Tenaga (A) 10,097.50 B BAHAN
1 Besi Beton Polos kg 1.500 9,400.00 14,100.00 2 Kawat Beton kg 0.150 17,000.00 2,550.00
Jumlah Harga Bahan (B) 16,650.00 C PERALATAN
1 Alat Bantu Ls 1.000 1,000.00 1,000.00
Jumlah Harga Alat (C) 1,000.00
D JUMLAH HARGA,TENAGA,DAN PERALATAN (A+B+C) 27,747.50 E BIAYA UMUM DAN KEUNTUNGAN 10% 2,774.75 F HARGA SATUAN PEKERJAAN 30,522.25
NO MATA PEMBAYARAN :
JENIS PEKERJAAN : Lapis Pondasi Agregat B (dengan Stamper)
SATUAN PEMBAYARAN : m³
NO. KOMPONEN SATUAN PERKIRAAN
KUANTITAS HARGA SATUAN JUMLAH HARGA ( Rp. ) ( Rp. )
A TENAGA
1 Tukang Batu O/H 0.071 70,000.00 5,000.00 2 Laden Tukang Batu O/H 0.071 55,000.00 3,928.57 3 Mandor O/H 0.018 105,000.00 1,875.00
Jumlah Harga Tenaga (A) 10,803.57 B BAHAN
1 Batu Belah Pondasi m3 1.200 206,111.00 247,333.20
Jumlah Harga Bahan (B) 247,333.20 C PERALATAN
1 Stamper Jam 0.833 63,000.00 52,500.00 2 Alat Bantu Ls 1.000 1,000.00 1,000.00
Jumlah Harga Alat (C) 53,500.00
D JUMLAH HARGA,TENAGA,DAN PERALATAN (A+B+C) 311,636.77 E BIAYA UMUM DAN KEUNTUNGAN 10% 31,163.68 F HARGA SATUAN PEKERJAAN 342,800.45
NO MATA PEMBAYARAN :
JENIS PEKERJAAN : Kansteen uk : 10.20.40 K-300
SATUAN PEMBAYARAN : m'
NO. KOMPONEN SATUAN PERKIRAAN
KUANTITAS HARGA SATUAN JUMLAH HARGA ( Rp. ) ( Rp. )
A TENAGA
1 Tukang Batu O/H 0.107 70,000.00 7,490.00 2 Laden Tukang Batu O/H 0.107 55,000.00 5,885.00 3 Mandor O/H 0.027 105,000.00 2,808.75
Jumlah Harga Tenaga (A) 16,183.75 B BAHAN
1 Kansteen uk. 10.20.40 K-300 m' 1.000 29,000.00 29,000.00 2 Semen Portland kg 0.004 59,900.00 239.60 3 Pasir Pasang m3 0.001 244,800.00 244.80
Jumlah Harga Bahan (B) 29,484.40 D JUMLAH HARGA,TENAGA,DAN PERALATAN (A+B) 45,668.15 E BIAYA UMUM DAN KEUNTUNGAN 10% 4,566.82 F HARGA SATUAN PEKERJAAN 50,234.97
SATUAN PEMBAYARAN : m'
NO. KOMPONEN SATUAN PERKIRAAN
KUANTITAS HARGA SATUAN JUMLAH HARGA ( Rp. ) ( Rp. )
A TENAGA
1 Pekerja O/H 0.107 65,000.00 6,955.00 2 Tukang O/H 0.107 71,666.67 7,668.33 3 Mandor O/H 0.027 105,000.00 2,808.75
Jumlah Harga Tenaga (A) 17,432.08 B BAHAN
1 Kansteen uk 16/20.30.40 K-300 m' 1.000 64,300.00 64,300.00 2 Semen Portland sak 0.004 59,900.00 239.60 3 Pasir Pasang m3 0.001 244,800.00 244.80
Jumlah Harga Bahan (B) 64,784.40 D JUMLAH HARGA,TENAGA,DAN PERALATAN (A+B) 82,216.48 E BIAYA UMUM DAN KEUNTUNGAN 10% 8,221.65 F HARGA SATUAN PEKERJAAN 90,438.13
NO MATA PEMBAYARAN :
JENIS PEKERJAAN : Pemasangan Paving; t=6 cm K-350
SATUAN PEMBAYARAN : m²
NO. KOMPONEN SATUAN PERKIRAAN
KUANTITAS HARGA SATUAN JUMLAH HARGA ( Rp. ) ( Rp. )
A TENAGA
1 Pekerja O/H 0.140 65,000.00 9,100.00 2 Mandor O/H 0.004 105,000.00 403.20
Jumlah Harga Tenaga (A) 9,503.20 B BAHAN
1 Paving Block t=6 K-350 m2 1.000 63,700.00 63,700.00 2 Abu Batu / Screening 5 mm m3 0.030 153,600.00 4,608.00
Jumlah Harga Bahan (B) 68,308.00 C PERALATAN
1 Alat Bantu Ls 1.000 550.00 550.00
Jumlah Harga Alat (C) 550.00
D JUMLAH HARGA,TENAGA,DAN PERALATAN (A+B+C) 78,361.20 E BIAYA UMUM DAN KEUNTUNGAN 10% 7,836.12 F HARGA SATUAN PEKERJAAN 86,197.32
NO MATA PEMBAYARAN :
JENIS PEKERJAAN : Pemasangan Paving; t=8 cm K-350
SATUAN PEMBAYARAN : m²
NO. KOMPONEN SATUAN PERKIRAAN
KUANTITAS HARGA SATUAN JUMLAH HARGA ( Rp. ) ( Rp. )
A TENAGA
1 Pekerja O/H 0.140 65,000.00 9,100.00 4 Mandor O/H 0.004 105,000.00 403.20
Jumlah Harga Tenaga (A) 9,503.20 B BAHAN
1 Paving Block t=6 K-350 m2 1.000 75,500.00 75,500.00 2 Abu Batu m3 0.050 153,600.00 7,680.00
Jumlah Harga Bahan (B) 83,180.00 C PERALATAN
1 Alat Bantu Ls 1.000 550.00 550.00
Jumlah Harga Alat (C) 550.00
D JUMLAH HARGA,TENAGA,DAN PERALATAN (A+B+C) 93,233.20 E BIAYA UMUM DAN KEUNTUNGAN 10% 9,323.32 F HARGA SATUAN PEKERJAAN 102,556.52
JENIS PEKERJAAN : Tali Air 1,5/3
SATUAN PEMBAYARAN : m'
NO. KOMPONEN SATUAN PERKIRAAN
KUANTITAS HARGA SATUAN JUMLAH HARGA ( Rp. ) ( Rp. )
A TENAGA
1 Pekerja O/H 0.571 65,000.00 37,142.86 2 Tukang O/H 0.286 70,000.00 20,000.00 3 Mandor O/H 0.143 105,000.00 15,000.00
Jumlah Harga Tenaga (A) 72,142.86 B BAHAN
1 Semen Portland sak 0.040 59,900.00 2,396.00 2 Pasir Pasang m3 0.100 244,800.00 24,480.00
Jumlah Harga Bahan (B) 26,876.00 C PERALATAN
1 Alat Bantu 1.000 5,000.00 5,000.00
Jumlah Harga Alat (C) 5,000.00
D JUMLAH HARGA,TENAGA,DAN PERALATAN (A+B+C) 104,018.86 E BIAYA UMUM DAN KEUNTUNGAN 10% 10,401.89 F HARGA SATUAN PEKERJAAN 114,420.74
NO MATA PEMBAYARAN :
JENIS PEKERJAAN : Lapis Resap Pengikat (Prime Coat)
SATUAN PEMBAYARAN : m²
NO. KOMPONEN SATUAN PERKIRAAN
KUANTITAS HARGA SATUAN JUMLAH HARGA ( Rp. ) ( Rp. )
A TENAGA
1 Pekerja O/H 0.003 65,000.00 195.00 2 Mandor O/H 0.006 105,000.00 630.00
Jumlah Harga Tenaga (A) 825.00 B BAHAN
1 Aspal kg 0.679 10,200.00 6,925.80 2 Kerosene ltr 0.371 8,000.00 2,966.40
Jumlah Harga Bahan (B) 9,892.20 C PERALATAN
1 Asphalt Sprayer Jam 0.003 145,000.00 435.00 2 Air Compresor Jam 0.003 190,000.00 589.00 3 Dump Truck 3-4 m3 Jam 0.003 280,000.00 840.00 4 Alat Bantu Ls 1.000 500.00 500.00
Jumlah Harga Alat (C) 2,364.00
D JUMLAH HARGA,TENAGA,DAN PERALATAN (A+B+C) 13,081.20 E BIAYA UMUM DAN KEUNTUNGAN 10% 1,308.12 F HARGA SATUAN PEKERJAAN 14,389.32
NO SATUAN HARGA 2013 HARGA 2012
A BATU ALAM
1 Abu Batu / Screening 5 mm m3 153,600 175,000 2 Batu Belah Pondasi m3 179,900 206,111 3 Batu Belah / Split ukr. 1-2 cm m3 196,500 197,083 4 Batu Belah / Split ukr. 2 - 3 cm m3 203,600 202,778 5 Batu Belah / Split ukr. 3 - 4 cm m3 203,200 202,500 6 Macadam / Steel Slag ukr.5 - 7 cm m3 175,000 175,000 7 Batu Sikat 20 Kg krg 150,000 150,000 8 Batu Sikat 25 Kg krg 165,000 165,000 9 Batu Sikat Alor 50 Kg krg 285,000 285,000 10 Batu Tempel Hitam m² 129,000 129,000
11 Batu Kali m3 213,700 200,000 12 Koral Beton m3 187,800 200,000 13 Pasir Putih m3 206,300 200,000 14 Pasir Hitam m3 210,400 190,000 15 Pasir Beton m3 210,400 192,000 16 Pasir Pasang m3 244,800 196,000
17 Pasir Urug Darat m3 187,300 135,000
18 Sirtu m3 173,300 160,000
19 Tanah Merah m3 75,000 785,000
20 Karung Goni bh 8,000 8,000 21 Karung Plastik bh 4,000 4,000 22 Palstik Alas Gelaran Beton m² 2,600 2,700
23 Batu Kapur m3 164,500 170,000 BATU CANDI 24 uk. 10 x 20 m² 76,800 -25 uk. 15 x 15 m² 78,600 -26 uk. 20 x 20 m² 84,900 -27 uk. 15 x 30 m² 84,900 -28 uk. 20 x 30 m² 84,900 -29 uk. 20 x 40 m² 84,900 -30 uk. 30 x 30 m² 84,900
-B PAVING BLOCK EXPOSE
1 Constone m² 157,500
-2 Colorstone m² 280,000
-3 Sandstone m² 174,600
-4 Conslab m² 190,000
-5 Halfbloc 6/ Veta B - Abu abu bh 9,000 -6 Halfbloc 8/ Veta B- Abu abu bh 11,000 -7 Kansteen 15.30.40 DKI m' 78,600 85,000 8 Kansteen Kapuk 19.20.40 m' 71,200 75,000 9 Kansteen Mulut Air 15.25.40/CTU (merk CI) m' 96,400 98,000 10 Kansteen Mulut Air 15.30.40/CTU (merk CI) m' 96,400 102,000 11 Kansteen Pilar 15.20.50 m' 75,000 75,000 12 Kansteen Pilar 15.25.40 m' 64,000 64,000 13 Kansteen Abu-abu ukr.10.20.40 K 250 m' 27,800 29,600 14 Kansteen Abu-abu ukr.10.20.40 K 300 m' 29,000 31,500 15 Kansteen 16/20.30.40 K 250 m' 62,900 66,000 16 Kansteen 16/20.30.40 K 300 m' 64,300 69,000
C PAVING BLOCK
1 Paving Block K 250 Tebal 6 Abu-abu m² 50,300 55,000 2 Paving Block K 250 Tebal 8 Abu-abu m² 75,800 71,000 3 Paving Block K 350 Tebal 6 Abu-abu m² 63,700 56,000 4 Paving Block K 350 Tebal 8 Abu-abu m² 75,500 76,000 5 Paving Block Type Grassbloc 20.10.40 Abu-abu m² 83,000 83,000 6 Paving Block Type Conbloc 4 - Merah/Kuning/Hitam m² 106,750 106,750 1 Paving Block Tinggi 6 Type Conbloc 4 - Hijau m² 100,500 100,500
2 Tali Air A m' 50,300 51,000
URAIAN
KEPUTUSAN WALIKOTA TANGERANG NOMOR :
TENTANG
STANDAR KESATUAN HARGA BAHAN MATERIAL, UPAH DAN SEWA PERALATAN UNTUK PEKERJAAN PEMBORONGAN SERTA BARANG INVENTARIS DAN PAKAI HABIS