CONTOH MC FINAL (CCO)

N/A
N/A
Protected

Academic year: 2021

Membagikan "CONTOH MC FINAL (CCO)"

Copied!
10
0
0

Teks penuh

(1)

SUMBER DANA : KEGIATAN DANA OTONOMI KHUSUS KAB. SIMEULUE DINAS BINA MARGA DAN CIPTA KARYA ACEH NAMA PAKET : PENINGKATAN JALAN PSR INPRES - AIR DINGIN

NOMOR PAKET : BANG/SMUL/2011/01

NOMOR KONTRAK: 37/KTR/BANG/SMLU/OTSUS/V/2011 KONTRAKTOR : PT. SELAMAT JAYA ABADI

KONSULTAN : PT. NUSVEY Ass. CV. ALPHA ENGINEERING CONSULTANT

LOKASI : KABUPATEN SIMUELUE

DIVISI 1. UMUM

1.2

Mobilisasi

Ls

50,100,000.00

1.00

50,100,000.00

0.689

1.00

50,100,000.00

0.689

DIVISI 2. DRAINASE

50,100,000.00

0.689

-

50,100,000.00

0.689

2.1

Galian Untuk Selokan Drainase dan Saluran Air

37,888.00

2,000.00

75,776,000.00

1.042

1,849.33

70,067,415.04

0.963

2.3.5

Gorong-gorong Pipa Baja Bergelombang

Ton

37,703,990.35

1.50

56,555,985.53

0.778

0.15

5,655,598.55

0.078

DIVISI 3. PEKERJAAN TANAH

132,331,985.53

1.820

-

75,723,013.59

1.041

3.1.1

Galian Biasa

24,003.00

1,250.94

30,026,312.82

0.413

-

-

-3.2.1

Timbunan Biasa

71,022.00

2,000.00

142,044,000.00

1.953

511.46

36,324,772.13

0.499

3.2.2

Timbunan Pilihan

106,227.00

1,221.83

129,791,335.41

1.785

2,900.74

308,136,907.98

4.237

3.3.1

Penyiapan Badan Jalan

2,922.00

27,900.00

81,523,800.00

1.121

25,840.15

75,504,918.30

1.038

DIVISI 4. PELEBARAN DAN PERKERASAN BAHU JALAN

383,385,448.23

5.272

-

419,966,598.41

5.775

4.2.2

Lapis Pondasi Agregat Klas B

455,605.00

1,860.00

847,425,300.00

11.652

1,289.79

587,634,772.95

8.080

DIVISI 5. PERKERASAN BERBUTIR

847,425,300.00

11.652

-

587,634,772.95

8.080

5.1.1

Lapis Pondasi Agregat Klas A

526,671.00

2,790.00

1,469,412,090.00

20.204

2,906.64

1,530,842,995.44

21.049

5.1.2

Lapis Pondasi Agregat Klas B

449,249.00

3,720.00

1,671,206,280.00

22.979

3,875.52

1,741,073,484.48

23.940

DIVISI 6. PERKERASAN ASPAL

3,140,618,370.00

43.184

-

3,271,916,479.92

44.989

6.1.(1)(a)

Lapis Resap Pengikat - Aspal Cair

Liter

11,249.00

13,950.00

156,923,550.00

2.158

14,691.41

165,263,671.09

2.272

6.3.(6a)

Laston Lapis Antara (AC-BC) (gradasi halus/kasar)

Ton

521,662.00

2,027.22

1,057,523,639.64

14.541

2,134.97

1,113,732,720.14

15.314

6.3.8.a

Aspal

Ton

10,809,425.00

126.20

1,364,149,435.00

18.757

132.91

1,436,680,676.75

19.754

6.3.10

Bahan Pengisi (Filler) Tambahan

Kg

1,206.85

41,371.98

49,929,774.06

0.687

43,570.79

52,583,407.91

0.723

DIVISI 7. STRUKTUR

2,628,526,398.70

36.142

-

2,768,260,475.89

38.064

7.9

Pasangan Batu

613,517.00

80.00

49,081,360.00

0.675

161.57

99,125,941.69

1.363

7.10 (3)

Bronjong

589,406.00

70.00

41,258,420.00

0.567

-

-

-90,339,780.00

1.242

-

99,125,941.69

1.363

Jumlah Nilai Pekerjaan

7,272,727,282.46

100.00

7,272,727,282.46

100.00

PPN 10 %

727,272,728.25

727,272,728.25

TOTAL BIAYA PEKERJAAN

8,000,000,010.70

8,000,000,010.70

DIBULATKAN

8,000,000,000.00

8,000,000,000.00

VOLUME

DINAS BINA MARGA DAN DIPTA KARYA

KONTRAK AWAL

JUMLAH HARGA

(Rp.)

NO.

URAIAN

SAT.

HARGA SATUAN

(Rp.)

BOBOT

(%)

PENYEDIA

Ir. MUDJI HALIM

DIREKTUR UTAMA

JOHNNICO APRIANO

KONTRAK ADD-I

VOLUME

JUMLAH HARGA

(Rp.)

BOBOT

(%)

(2)

1.00

50,100,000.00

0.689

50,100,000.00

0.689

1,832.02

69,411,504.95

0.954

0.23

8,671,917.78

0.119

78,083,422.73

1.074

-

-477.20

33,891,698.40

0.466

2,870.08

304,879,988.16

4.192

26,746.55

78,153,419.10

1.075

416,925,105.66

5.733

1,259.31

573,747,932.55

7.889

573,747,932.55

7.889

3,010.14

1,585,353,443.94

21.799

3,904.56

1,754,119,675.44

24.119

3,339,473,119.38

45.918

15,189.31

170,864,548.19

2.349

2,203.27

1,149,362,234.74

15.804

123.32

1,333,018,291.00

18.329

44,964.74

54,265,696.47

0.746

2,707,510,770.40

37.228

174.22

106,886,931.74

1.470

-

106,886,931.74

1.470

7,272,727,282.46

100.00

727,272,728.25

8,000,000,010.70

8,000,000,000.00

DINAS BINA MARGA DAN DIPTA KARYA

Keterangan

PEMERINTAH ACEH

PENYEDIA

Ir. MUDJI HALIM

DIREKTUR UTAMA

JOHNNICO APRIANO

KONTRAK ADD FINAL

VOLUME

JUMLAH HARGA

(Rp.)

BOBOT

(%)

(3)

KEGIATAN : PEMBANGUNAN JALAN DAN JEMBATAN DINAS BINA MARGA DAN CIPTA KARYA ACEH SERTIFIKAT : 07 (TUJUH)

NAMA PAKET : PENINGKATAN JALAN SINABANG-SIBIGO BULAN : OKTOBER

NOMOR KONTRAK : 13/SPPK/PBJ/DBC/APBA/III/2012 TANGGAL : 23 OKTOBER 2012

TANGGAL KONTRAK : 21 MARET 2012 HALAMAN : 1 dari 8

NILAI KONTRAK

NOMOR KONTRAK ADD-I : 13.1/SPPK/PBJ/DBC/APBA/VII/2012 TANGGAL KONTRAK ADD-I : 03 JULI 2012

NILAI KONTRAK ADD-I

NOMOR KONTRAK ADD FINAL : 13.2/SPPK/PBJ/DBC/APBA/X/2012 TANGGAL KONTRAK ADD FINAL : 16 OKTOBER 2012

NILAI KONTRAK ADD FINAL

SUMBER DANA : APBA TAHUN ANGGARAN 2012

PENYEDIA JASA : PT. FLAMBOYANT HUMA ARTA

S/D S/D BOBOT (%) BOBOT (%)

BULAN LALU BULAN INI S/D BULAN INI ITEM PEKERJAAN

1 3 4 5 6 7 8 9 10

1 UMUM 50,100,000.00 50,100,000.00 50,100,000.00 35,070,000.00 15,030,000.00 50,100,000.00 0.69% 0.69% 2 DRAINASE 132,331,985.53 75,723,013.59 78,083,422.73 70,067,415.04 8,016,007.69 78,083,422.73 1.07% 1.07% 3 PEKERJAAN TANAH 383,385,448.23 419,966,598.41 416,925,105.66 415,993,619.55 931,486.11 416,925,105.66 5.73% 5.73% 4 PELEBARAN DAN PERKERASAN BAHU JALAN 847,425,300.00 587,634,772.95 573,747,932.55 - 573,747,932.55 573,747,932.55 7.89% 7.89% 5 PERKERASAN BERBUTIR 3,140,618,370.00 3,271,916,479.92 3,339,473,119.38 3,207,077,907.12 132,395,212.26 3,339,473,119.38 45.92% 45.92% 6 PERKERASAN ASPAL 2,628,526,398.70 2,768,260,475.89 2,707,510,770.40 2,527,370,130.26 180,140,640.14 2,707,510,770.40 37.23% 37.23% 7 STRUKTUR 90,339,780.00 99,125,941.69 106,886,931.74 99,125,941.69 7,760,990.05 106,886,931.74 1.47% 1.47%

A SUB TOTAL 7,272,727,282.46 7,272,727,282.46 7,272,727,282.46 6,354,705,013.66 918,022,268.80 7,272,727,282.46 S/D BULAN INI B PPN (10%) X A 727,272,728.25 727,272,728.25 727,272,728.25 635,470,501.37 91,802,226.88 727,272,728.25

C JUMLAH TOTAL A + B 8,000,000,010.70 8,000,000,010.70 8,000,000,010.70 6,990,175,515.02 1,009,824,495.68 8,000,000,010.70

D DIBULATKAN C 8,000,000,000.00 8,000,000,000.00 8,000,000,000.00 6,990,175,000.00 1,009,824,000.00 8,000,000,000.00 BULAN INI

E MATERIAL ON SITE (MOS)

F JUMLAH KOTOR SERTIFIKAT BULAN INI

G POTONGAN - POTONGAN S/D BULAN LALU

1 SERTIFIKAT S/D BULAN LALU (KOMULATIF) 5,242,631,250.00

2 5 % JAMINAN PEMELIHARAAN ( 5% X D ) 400,000,000.00

3 20 % PENGEMBALIAN UANG MUKA 1,600,000,000.00

H JUMLAH POTONGAN ( 1 + 2 + 3 ) 7,242,631,250.00

I JUMLAH BERSIH SERTIFIKAT BULAN INI TERMASUK PPN 10% (F-H) 757,368,750.00

J DIBULATKAN 757,368,750.00

Terbilang : tujuh ratus lima puluh tujuh juta tiga ratus enam puluh delapan ribu tujuh ratus lima puluh rupiah

DINAS BINA MARGA DAN CIPTA KARYA

PEMBANGUNAN JALAN DAN JEMBATAN WILAYAH XI SIMEULUE

2

SERTIFIKAT BULANAN

BULAN INI NOMOR MATA

PEMBAYARAN URAIAN PEKERJAAN

JUMLAH PEMBAYARAN MONTHLY CERTIFICATE (MC) 87.38% : Rp. 8,000,000,000.00,-12.62%

100.00%

100.00%

KONTRAK ADD FINAL (Rp.) NILAI KONTRAK

: Rp. : Rp.

8,000,000,000.00,-KONTRAK AWAL (Rp.) KONTRAK ADD-I (Rp.)

DIPERIKSA/DISETUJUI OLEH : KONSULTAN SUPERVISI PT. CIPTA JAYA UTAMA KONSULTAN

LINDUNG NAINGGOLAN SITE ENGINEER

MENYETUJUI OLEH : PPTK

PEMBANGUNAN JALAN DAN JEMBATAN WILAYAH XI (SIMEULUE)

Ir. ZULKARNEN, MT. Nip. 19640516 199703 1 001 DIAJUKAN OLEH :

PENYEDIA BARANG/JASA PT. FLAMBOYANT HUMA ARTA

ALWIN ABDULLAH DIREKTUR UTAMA

MENGETAHUI OLEH :

KUASA PENGGUNA ANGGARAN / KUASA PENGGUNA BARANG KEGIATAN PEMBANGUNAN JALAN DAN JEMBATAN

DINAS BINA MARGA DAN CIPTA KARYA ACEH

Ir. FAJRI, MT PEMBINA NIP. 19640831 199203 1 005

(4)

KEGIATAN : PEMBANGUNAN JALAN DAN JEMBATAN DINAS BINA MARGA DAN CIPTA KARYA ACEH SERTIFIKAT : 07 (TUJUH)

NAMA PAKET : PENINGKATAN JALAN SINABANG-SIBIGO BULAN : OKTOBER

NOMOR KONTRAK : 13/SPPK/PBJ/DBC/APBA/III/2012 TANGGAL : 23 OKTOBER 2012

TANGGAL KONTRAK : 21 MARET 2012 HALAMAN : 2 dari 8

NILAI KONTRAK : Rp.

8,000,000,000.00,-NOMOR KONTRAK ADD-I : 13.1/SPPK/PBJ/DBC/APBA/VII/2012 TANGGAL KONTRAK ADD-I : 03 JULI 2012

NILAI KONTRAK ADD-I : Rp. 8,000,000,000.00,-NOMOR KONTRAK ADD FINAL : 13.2/SPPK/PBJ/DBC/APBA/X/2012 TANGGAL KONTRAK ADD FINAL : 16 OKTOBER 2012 NILAI KONTRAK ADD FINAL : Rp.

8,000,000,000.00,-SUMBER DANA : APBA TAHUN ANGGARAN 2012

PENYEDIA JASA : PT. FLAMBOYANT HUMA ARTA

DIVISI 1. UMUM JUMLAH KONTRAK ADD FINAL

KONTRAK AWAL

KONTRAK ADD-I

KONTRAK

ADD FINAL KUANTITAS

JUMLAH HARGA (Rp.) KUANTITAS JUMLAH HARGA (Rp.) KUANTITAS JUMLAH HARGA (Rp.)

1

3

4

5

6

7

8 = 6 x 7

9

10 = 7 x 9

11

12 = 7 x 11

13 = 9 + 11

14 = 10 + 12

1.2

Mobilisasi

Ls

1.00

1.00

1.00

50,100,000.00

50,100,000.00

0.70

35,070,000.00

0.30

15,030,000.00

1.00

50,100,000.00

50,100,000.00

-

-

35,070,000.00

15,030,000.00

50,100,000.00

100.00%

70.00%

30.00%

100.00%

DINAS BINA MARGA DAN CIPTA KARYA

PEMERINTAH ACEH

PEMBANGUNAN JALAN DAN JEMBATAN WILAYAH XI SIMEULUE

2

SERTIFIKAT BULANAN

SAT. URAIAN PEKERJAAN NOMOR MATA PEMB. S/D BULAN LALU 50,100,000.00 Rp JUMLAH HARGA ADD FINAL (Rp.) S/D BULAN INI BULAN INI HARGA SATUAN (Rp.)

TOTAL HARGA

DIVISI 1. UMUM

KUANTITAS

TOTAL PEMBAYARAN

PERSENTASE

DISETUJUI OLEH : PEMBANTU PPTK PEMBANGUNAN JALAN DAN JEMBATAN

WILAYAH XI (SIMEULUE)

RUSVAN VERIZAL, ST Nip. 19830706 201001 1029

DIPERIKSA OLEH : KONSULTAN SUPERVISI PT. CIPTA JAYA UTAMA KONSULTAN

EDWARD NOUR, ST CHIEF INSPECTOR

DIBUAT OLEH : PENYEDIA BARANG/JASA PT. FLAMBOYANT HUMA ARTA

SYAHRIZAL, ST. GENERAL SUPERINTENDENT

(5)

KEGIATAN : PEMBANGUNAN JALAN DAN JEMBATAN DINAS BINA MARGA DAN CIPTA KARYA ACEH SERTIFIKAT : 07 (TUJUH)

NAMA PAKET : PENINGKATAN JALAN SINABANG-SIBIGO BULAN : OKTOBER

NOMOR KONTRAK : 13/SPPK/PBJ/DBC/APBA/III/2012 TANGGAL : 23 OKTOBER 2012

TANGGAL KONTRAK : 21 MARET 2012 HALAMAN : 3 dari 8

NILAI KONTRAK : Rp.

8,000,000,000.00,-NOMOR KONTRAK ADD-I : 13.1/SPPK/PBJ/DBC/APBA/VII/2012 TANGGAL KONTRAK ADD-I : 03 JULI 2012

NILAI KONTRAK ADD-I : Rp. 8,000,000,000.00,-NOMOR KONTRAK ADD FINAL : 13.2/SPPK/PBJ/DBC/APBA/X/2012 TANGGAL KONTRAK ADD FINAL : 16 OKTOBER 2012 NILAI KONTRAK ADD FINAL : Rp.

8,000,000,000.00,-SUMBER DANA : APBA TAHUN ANGGARAN 2012

PENYEDIA JASA : PT. FLAMBOYANT HUMA ARTA

DIVISI 2. DRAINASE JUMLAH KONTRAK ADD FINAL

KONTRAK AWAL

KONTRAK ADD-I

KONTRAK

ADD FINAL KUANTITAS

JUMLAH HARGA (Rp.) KUANTITAS JUMLAH HARGA (Rp.) KUANTITAS JUMLAH HARGA (Rp.)

1

3

4

5

6

7

8 = 6 x 7

9

10 = 7 x 9

11

12 = 7 x 11

13 = 9 + 11

14 = 10 + 12

2.1

Galian Untuk Selokan Drainase dan Saluran Air

2,000.00

1,849.33

1,832.02

37,888.00

69,411,504.95

1,849.33

70,067,415.04

(17.31)

(655,910.09)

1,832.02

69,411,504.95

2.3.5

Gorong-Gorong Pipa Baja Bergelombang

Ton

1.50

0.15

0.23

37,703,990.35

8,671,917.78

-

-

0.23

8,671,917.78

0.23

8,671,917.78

78,083,422.73

-

-

70,067,415.04

8,016,007.69

78,083,422.73

100.00%

89.73%

10.27%

100.00%

DIVISI 2. DRAINASE

TOTAL HARGA

TOTAL PEMBAYARAN

DINAS BINA MARGA DAN CIPTA KARYA

2

SERTIFIKAT BULANAN

SAT. URAIAN PEKERJAAN NOMOR MATA PEMB. KUANTITAS

PEMBANGUNAN JALAN DAN JEMBATAN WILAYAH XI SIMEULUE

PERSENTASE

78,083,422.73 Rp

S/D BULAN LALU BULAN INI S/D BULAN INI

HARGA SATUAN (Rp.) JUMLAH HARGA ADD FINAL (Rp.) DISETUJUI OLEH : PEMBANTU PPTK PEMBANGUNAN JALAN DAN JEMBATAN

WILAYAH XI (SIMEULUE)

RUSVAN VERIZAL, ST Nip. 19830706 201001 1029

DIPERIKSA OLEH : KONSULTAN SUPERVISI PT. CIPTA JAYA UTAMA KONSULTAN

EDWARD NOUR, ST CHIEF INSPECTOR

DIBUAT OLEH : PENYEDIA BARANG/JASA PT. FLAMBOYANT HUMA ARTA

SYAHRIZAL, ST. GENERAL SUPERINTENDENT

(6)

KEGIATAN : PEMBANGUNAN JALAN DAN JEMBATAN DINAS BINA MARGA DAN CIPTA KARYA ACEH SERTIFIKAT : 07 (TUJUH)

NAMA PAKET : PENINGKATAN JALAN SINABANG-SIBIGO BULAN : OKTOBER

NOMOR KONTRAK : 13/SPPK/PBJ/DBC/APBA/III/2012 TANGGAL : 23 OKTOBER 2012

TANGGAL KONTRAK : 21 MARET 2012 HALAMAN : 4 dari 8

NILAI KONTRAK : Rp.

8,000,000,000.00,-NOMOR KONTRAK ADD-I : 13.1/SPPK/PBJ/DBC/APBA/VII/2012 TANGGAL KONTRAK ADD-I : 03 JULI 2012

NILAI KONTRAK ADD-I : Rp. 8,000,000,000.00,-NOMOR KONTRAK ADD FINAL : 13.2/SPPK/PBJ/DBC/APBA/X/2012 TANGGAL KONTRAK ADD FINAL : 16 OKTOBER 2012 NILAI KONTRAK ADD FINAL : Rp.

8,000,000,000.00,-SUMBER DANA : APBA TAHUN ANGGARAN 2012

PENYEDIA JASA : PT. FLAMBOYANT HUMA ARTA

DIVISI 3. PEKERJAAN TANAH JUMLAH KONTRAK ADD FINAL

KONTRAK AWAL

KONTRAK ADD-I

KONTRAK

ADD FINAL KUANTITAS

JUMLAH HARGA (Rp.) KUANTITAS JUMLAH HARGA (Rp.) KUANTITAS JUMLAH HARGA (Rp.)

1

3

4

5

6

7

8 = 6 x 7

9

10 = 7 x 9

11

12 = 7 x 11

13 = 9 + 11

14 = 10 + 12

3.1.1

Galian Biasa

1,250.94

-

-

24,003.00

-

-

-

-

-

-

-3.2.1

Timbunan Biasa

2,000.00

511.46

477.20

71,022.00

33,891,698.40

505.13

35,875,342.86

(27.93)

(1,983,644.46)

477.20

33,891,698.40

3.2.2

Timbunan Pilihan

1,221.83

2,900.74

2,870.08

106,227.00

304,879,988.16

2,867.57

304,613,358.39

2.51

266,629.77

2,870.08

304,879,988.16

3.3

Penyiapan Badan jalan

27,900.00

25,840.15

26,746.55

2,922.00

78,153,419.10

25,840.15

75,504,918.30

906.40

2,648,500.80

26,746.55

78,153,419.10

416,925,105.66

-

-

415,993,619.55

931,486.11

416,925,105.66

100.00%

99.78%

0.22%

100.00%

PEMERINTAH ACEH

PEMBANGUNAN JALAN DAN JEMBATAN WILAYAH XI SIMEULUE

HARGA SATUAN (Rp.)

JUMLAH HARGA ADD FINAL

(Rp.)

DINAS BINA MARGA DAN CIPTA KARYA

2

SERTIFIKAT BULANAN

SAT. URAIAN PEKERJAAN NOMOR MATA PEMB.

DIVISI 3. PEKERJAAN TANAH

TOTAL HARGA

TOTAL PEMBAYARAN

PERSENTASE

416,925,105.66 Rp

S/D BULAN LALU BULAN INI S/D BULAN INI

KUANTITAS

DISETUJUI OLEH : PEMBANTU PPTK PEMBANGUNAN JALAN DAN JEMBATAN

WILAYAH XI (SIMEULUE)

RUSVAN VERIZAL, ST Nip. 19830706 201001 1029

DIPERIKSA OLEH : KONSULTAN SUPERVISI PT. CIPTA JAYA UTAMA KONSULTAN

EDWARD NOUR, ST CHIEF INSPECTOR

DIBUAT OLEH : PENYEDIA BARANG/JASA PT. FLAMBOYANT HUMA ARTA

SYAHRIZAL, ST. GENERAL SUPERINTENDENT

(7)

KEGIATAN : PEMBANGUNAN JALAN DAN JEMBATAN DINAS BINA MARGA DAN CIPTA KARYA ACEH SERTIFIKAT : 07 (TUJUH)

NAMA PAKET : PENINGKATAN JALAN SINABANG-SIBIGO BULAN : OKTOBER

NOMOR KONTRAK : 13/SPPK/PBJ/DBC/APBA/III/2012 TANGGAL : 23 OKTOBER 2012

TANGGAL KONTRAK : 21 MARET 2012 HALAMAN : 5 dari 8

NILAI KONTRAK : Rp.

8,000,000,000.00,-NOMOR KONTRAK ADD-I : 13.1/SPPK/PBJ/DBC/APBA/VII/2012 TANGGAL KONTRAK ADD-I : 03 JULI 2012

NILAI KONTRAK ADD-I : Rp. 8,000,000,000.00,-NOMOR KONTRAK ADD FINAL : 13.2/SPPK/PBJ/DBC/APBA/X/2012 TANGGAL KONTRAK ADD FINAL : 16 OKTOBER 2012 NILAI KONTRAK ADD FINAL : Rp.

8,000,000,000.00,-SUMBER DANA : APBA TAHUN ANGGARAN 2012

PENYEDIA JASA : PT. FLAMBOYANT HUMA ARTA

DIVISI 4. PELEBARAN DAN PERKERASAN BAHU JALAN JUMLAH KONTRAK ADD FINAL

KONTRAK AWAL

KONTRAK ADD-I

KONTRAK

ADD FINAL KUANTITAS

JUMLAH HARGA (Rp.) KUANTITAS JUMLAH HARGA (Rp.) KUANTITAS JUMLAH HARGA (Rp.)

1

3

4

5

6

7

8 = 6 x 7

9

10 = 7 x 9

11

12 = 7 x 11

13 = 9 + 11

14 = 10 + 12

4.2.2

Lapis Pondasi Aggregat Klas B

1,860.00

1,289.79

1,259.31

455,605.00

573,747,932.55

-

-

1,259.31

573,747,932.55

1,259.31

573,747,932.55

573,747,932.55

-

-

-

573,747,932.55

573,747,932.55

100.00%

0.00%

100.00%

100.00%

DIVISI 4. PELEBARAN DAN PERKERASAN BAHU JALAN

TOTAL HARGA

TOTAL PEMBAYARAN

DINAS BINA MARGA DAN CIPTA KARYA

2

SERTIFIKAT BULANAN

SAT. URAIAN PEKERJAAN NOMOR MATA PEMB. KUANTITAS

PEMBANGUNAN JALAN DAN JEMBATAN WILAYAH XI SIMEULUE

PERSENTASE

573,747,932.55 Rp

S/D BULAN LALU BULAN INI S/D BULAN INI

HARGA SATUAN (Rp.) JUMLAH HARGA ADD FINAL (Rp.) DISETUJUI OLEH : PEMBANTU PPTK PEMBANGUNAN JALAN DAN JEMBATAN

WILAYAH XI (SIMEULUE)

RUSVAN VERIZAL, ST Nip. 19830706 201001 1029

DIPERIKSA OLEH : KONSULTAN SUPERVISI PT. CIPTA JAYA UTAMA KONSULTAN

EDWARD NOUR, ST CHIEF INSPECTOR

DIBUAT OLEH : PENYEDIA BARANG/JASA PT. FLAMBOYANT HUMA ARTA

SYAHRIZAL, ST. GENERAL SUPERINTENDENT

(8)

KEGIATAN : PEMBANGUNAN JALAN DAN JEMBATAN DINAS BINA MARGA DAN CIPTA KARYA ACEH SERTIFIKAT : 07 (TUJUH)

NAMA PAKET : PENINGKATAN JALAN SINABANG-SIBIGO BULAN : OKTOBER

NOMOR KONTRAK : 13/SPPK/PBJ/DBC/APBA/III/2012 TANGGAL : 23 OKTOBER 2012

TANGGAL KONTRAK : 21 MARET 2012 HALAMAN : 6 dari 8

NILAI KONTRAK : Rp.

8,000,000,000.00,-NOMOR KONTRAK ADD-I : 13.1/SPPK/PBJ/DBC/APBA/VII/2012 TANGGAL KONTRAK ADD-I : 03 JULI 2012

NILAI KONTRAK ADD-I : Rp. 8,000,000,000.00,-NOMOR KONTRAK ADD FINAL : 13.2/SPPK/PBJ/DBC/APBA/X/2012 TANGGAL KONTRAK ADD FINAL : 16 OKTOBER 2012 NILAI KONTRAK ADD FINAL : Rp.

8,000,000,000.00,-SUMBER DANA : APBA TAHUN ANGGARAN 2012

PENYEDIA JASA : PT. FLAMBOYANT HUMA ARTA

DIVISI 5. PERKERASAN BERBUTIR JUMLAH KONTRAK ADD FINAL

KONTRAK AWAL

KONTRAK ADD-I

KONTRAK

ADD FINAL KUANTITAS

JUMLAH HARGA (Rp.) KUANTITAS JUMLAH HARGA (Rp.) KUANTITAS JUMLAH HARGA (Rp.)

1

3

4

5

6

7

8 = 6 x 7

9

10 = 7 x 9

11

12 = 7 x 11

13 = 9 + 11

14 = 10 + 12

5.1.1

Lapis Pondasi Agregat Klas A

2,790.00

2,906.64

3,010.14

526,671.00

1,585,353,443.94

2,849.04

1,500,506,745.84

161.10

84,846,698.10

3,010.14

1,585,353,443.94

5.1.2

Lapis Pondasi Agregat Klas B

3,720.00

3,875.52

3,904.56

449,249.00

1,754,119,675.44

3,798.72

1,706,571,161.28

105.84

47,548,514.16

3,904.56

1,754,119,675.44

3,339,473,119.38

-

-

3,207,077,907.12

132,395,212.26

3,339,473,119.38

100.00%

96.04%

3.96%

100.00%

PEMERINTAH ACEH

PEMBANGUNAN JALAN DAN JEMBATAN WILAYAH XI SIMEULUE

HARGA SATUAN (Rp.)

JUMLAH HARGA ADD FINAL

(Rp.)

DINAS BINA MARGA DAN CIPTA KARYA

2

SERTIFIKAT BULANAN

SAT. URAIAN PEKERJAAN NOMOR MATA PEMB.

DIVISI 5. PERKERASAN BERBUTIR

TOTAL HARGA

TOTAL PEMBAYARAN

PERSENTASE

3,339,473,119.38 Rp

S/D BULAN LALU BULAN INI S/D BULAN INI

KUANTITAS

DISETUJUI OLEH : PEMBANTU PPTK PEMBANGUNAN JALAN DAN JEMBATAN

WILAYAH XI (SIMEULUE)

RUSVAN VERIZAL, ST Nip. 19830706 201001 1029

DIPERIKSA OLEH : KONSULTAN SUPERVISI PT. CIPTA JAYA UTAMA KONSULTAN

EDWARD NOUR, ST CHIEF INSPECTOR

DIBUAT OLEH : PENYEDIA BARANG/JASA PT. FLAMBOYANT HUMA ARTA

SYAHRIZAL, ST. GENERAL SUPERINTENDENT

(9)

KEGIATAN : PEMBANGUNAN JALAN DAN JEMBATAN DINAS BINA MARGA DAN CIPTA KARYA ACEH SERTIFIKAT : 07 (TUJUH)

NAMA PAKET : PENINGKATAN JALAN SINABANG-SIBIGO BULAN : OKTOBER

NOMOR KONTRAK : 13/SPPK/PBJ/DBC/APBA/III/2012 TANGGAL : 23 OKTOBER 2012

TANGGAL KONTRAK : 21 MARET 2012 HALAMAN : 7 dari 8

NILAI KONTRAK : Rp.

8,000,000,000.00,-NOMOR KONTRAK ADD-I : 13.1/SPPK/PBJ/DBC/APBA/VII/2012 TANGGAL KONTRAK ADD-I : 03 JULI 2012

NILAI KONTRAK ADD-I : Rp. 8,000,000,000.00,-NOMOR KONTRAK ADD FINAL : 13.2/SPPK/PBJ/DBC/APBA/X/2012 TANGGAL KONTRAK ADD FINAL : 16 OKTOBER 2012 NILAI KONTRAK ADD FINAL : Rp.

8,000,000,000.00,-SUMBER DANA : APBA TAHUN ANGGARAN 2012

PENYEDIA JASA : PT. FLAMBOYANT HUMA ARTA

DIVISI 6. PERKERASAN ASPAL JUMLAH KONTRAK ADD FINAL

KONTRAK AWAL

KONTRAK ADD-I

KONTRAK

ADD FINAL KUANTITAS

JUMLAH HARGA (Rp.) KUANTITAS JUMLAH HARGA (Rp.) KUANTITAS JUMLAH HARGA (Rp.)

1

3

4

5

6

7

8 = 6 x 7

9

10 = 7 x 9

11

12 = 7 x 11

13 = 9 + 11

14 = 10 + 12

6.1.(1)(a) Lapis Resap Pengikat - Aspal Cair

Liter

13,950.00

14,691.41

15,189.31

11,249.00

170,864,548.19

14,178.41

159,492,934.09

1,010.90

11,371,614.10

15,189.31

170,864,548.19

6.3.(6a) Laston Lapis Antara (AC-BC) (gradasi halus/kasar)

Ton

2,027.22

2,134.97

2,203.27

521,662.00

1,149,362,234.74

2,056.64

1,072,871,053.78

146.63

76,491,180.96

2,203.27

1,149,362,234.74

6.3.8.a Aspal

Ton

126.20

132.91

123.32

10,809,425.00

1,333,018,291.00

115.12

1,244,352,036.74

8.20

88,666,254.26

123.32

1,333,018,291.00

6.3.10

Bahan Pengisi (Filler) Tambahan

Kg

41,371.98

43,570.79

44,964.74

1,206.85

54,265,696.47

41,972.16

50,654,105.64

2,992.58

3,611,590.83

44,964.74

54,265,696.47

2,707,510,770.40

-

-

2,527,370,130.26

180,140,640.14

2,707,510,770.40

100.00%

93.35%

6.65%

100.00%

DIVISI 6. PERKERASAN ASPAL

TOTAL HARGA

TOTAL PEMBAYARAN

DINAS BINA MARGA DAN CIPTA KARYA

2

SERTIFIKAT BULANAN

SAT. URAIAN PEKERJAAN NOMOR MATA PEMB. KUANTITAS

PEMBANGUNAN JALAN DAN JEMBATAN WILAYAH XI SIMEULUE

PERSENTASE

2,707,510,770.40 Rp

S/D BULAN LALU BULAN INI S/D BULAN INI

HARGA SATUAN (Rp.) JUMLAH HARGA ADD FINAL (Rp.) DISETUJUI OLEH : PEMBANTU PPTK PEMBANGUNAN JALAN DAN JEMBATAN

WILAYAH XI (SIMEULUE)

RUSVAN VERIZAL, ST Nip. 19830706 201001 1029

DIPERIKSA OLEH : KONSULTAN SUPERVISI PT. CIPTA JAYA UTAMA KONSULTAN

EDWARD NOUR, ST CHIEF INSPECTOR

DIBUAT OLEH : PENYEDIA BARANG/JASA PT. FLAMBOYANT HUMA ARTA

SYAHRIZAL, ST. GENERAL SUPERINTENDENT

(10)

KEGIATAN : PEMBANGUNAN JALAN DAN JEMBATAN DINAS BINA MARGA DAN CIPTA KARYA ACEH SERTIFIKAT : 07 (TUJUH)

NAMA PAKET : PENINGKATAN JALAN SINABANG-SIBIGO BULAN : OKTOBER

NOMOR KONTRAK : 13/SPPK/PBJ/DBC/APBA/III/2012 TANGGAL : 23 OKTOBER 2012

TANGGAL KONTRAK : 21 MARET 2012 HALAMAN : 8 dari 8

NILAI KONTRAK : Rp.

8,000,000,000.00,-NOMOR KONTRAK ADD-I : 13.1/SPPK/PBJ/DBC/APBA/VII/2012 TANGGAL KONTRAK ADD-I : 03 JULI 2012

NILAI KONTRAK ADD-I : Rp. 8,000,000,000.00,-NOMOR KONTRAK ADD FINAL : 13.2/SPPK/PBJ/DBC/APBA/X/2012 TANGGAL KONTRAK ADD FINAL : 16 OKTOBER 2012 NILAI KONTRAK ADD FINAL : Rp.

8,000,000,000.00,-SUMBER DANA : APBA TAHUN ANGGARAN 2012

PENYEDIA JASA : PT. FLAMBOYANT HUMA ARTA

DIVISI 7. STRUKTUR JUMLAH KONTRAK ADD FINAL

KONTRAK AWAL

KONTRAK ADD-I

KONTRAK

ADD FINAL KUANTITAS

JUMLAH HARGA (Rp.) KUANTITAS JUMLAH HARGA (Rp.) KUANTITAS JUMLAH HARGA (Rp.)

1

3

4

5

6

7

8 = 6 x 7

9

10 = 7 x 9

11

12 = 7 x 11

13 = 9 + 11

14 = 10 + 12

7.9

Pasangan Batu

80.00

161.57

174.22

613,517.00

106,886,931.74

161.57

99,125,941.69

12.65

7,760,990.05

174.22

106,886,931.74

7.10 (3) Bronjong

70.00

-

-

589,406.00

-

-

-

-

-

-

-106,886,931.74

-

-

99,125,941.69

7,760,990.05

106,886,931.74

100.00%

92.74%

7.26%

100.00%

NOMOR MATA PEMB.

PERSENTASE

S/D BULAN LALU

PEMERINTAH ACEH

PEMBANGUNAN JALAN DAN JEMBATAN WILAYAH XI SIMEULUE

HARGA SATUAN (Rp.)

JUMLAH HARGA ADD FINAL

(Rp.)

DINAS BINA MARGA DAN CIPTA KARYA

SERTIFIKAT BULANAN

106,886,931.74 Rp

2

SAT. URAIAN PEKERJAAN

BULAN INI S/D BULAN INI

KUANTITAS

DIVISI 7. STRUKTUR

TOTAL HARGA

TOTAL PEMBAYARAN

DISETUJUI OLEH : PEMBANTU PPTK PEMBANGUNAN JALAN DAN JEMBATAN

WILAYAH XI (SIMEULUE)

RUSVAN VERIZAL, ST Nip. 19830706 201001 1029

DIPERIKSA OLEH : KONSULTAN SUPERVISI PT. CIPTA JAYA UTAMA KONSULTAN

EDWARD NOUR, ST CHIEF INSPECTOR

DIBUAT OLEH : PENYEDIA BARANG/JASA PT. FLAMBOYANT HUMA ARTA

SYAHRIZAL, ST. GENERAL SUPERINTENDENT

Referensi

Dokumen terkait

Berdasarkan hasil evaluasi dokumen penawaran dan evaluasi dokumen kualifikasi Pekerjan Perencanaan Teknis Pembangunan Jalan Dan Jembatan Wilayah I I ( DAU) pada

DINAS PEKERJAAN UMUM KABUPATEN BATANG HARI PE]ABAT PENGADMN BAMNGTASA.. KEGIATAN PEMBANGUNAN JALAN DAN JEMBATAN PEDESMN WILAYAH

DINAS PEKERJAAN UMUM KABUPATEN BATANG HARI PEIABAT PENGADMN BAMNGfi ASA. KEGIATAN PEMBANGUNAN JALAN DAN JEMBATAN PEDESMN WILAYAH

Rencana pembangunan jembatan Teluk Balikpapan merupakan salah satu prioritas dalam upaya peningkatan pelayanan jalan lintas “Kalimantan Poros Selatan” yang berada di

Kepentingan diatas tersebut menjadi beberapa acuan dasar yang menimbulkan kontrak pembangunan/rehabilitasi jalan dan jembatan lingkungan yang berada di wilayah Kabupaten

Bina Marga (2007) melakukan penelitian tentang penyusunan penilaian kinerja konsultan pengawas (supervisi) dalam penyelenggaraan pembangunan jalan dan jembatan nasional di

15 Meningkatnya kualitas dan kuantitas infrastruktur pembangunan Daerah Persentase Tingkat Kondisi Jalan Kabupaten baik Pekerjaan umum dan penataan ruang Perangkat Daerah

a) Dengan adanya pembangunan jembatan suramadu dan jalan tol lingkar timur Surabaya, tapak termasuk dalam wilayah yang memiliki potensi kegiatan atau bangunan dengan