SUMBER DANA : KEGIATAN DANA OTONOMI KHUSUS KAB. SIMEULUE DINAS BINA MARGA DAN CIPTA KARYA ACEH NAMA PAKET : PENINGKATAN JALAN PSR INPRES - AIR DINGIN
NOMOR PAKET : BANG/SMUL/2011/01
NOMOR KONTRAK: 37/KTR/BANG/SMLU/OTSUS/V/2011 KONTRAKTOR : PT. SELAMAT JAYA ABADI
KONSULTAN : PT. NUSVEY Ass. CV. ALPHA ENGINEERING CONSULTANT
LOKASI : KABUPATEN SIMUELUE
DIVISI 1. UMUM
1.2
Mobilisasi
Ls
50,100,000.00
1.00
50,100,000.00
0.689
1.00
50,100,000.00
0.689
DIVISI 2. DRAINASE
50,100,000.00
0.689
-
50,100,000.00
0.689
2.1
Galian Untuk Selokan Drainase dan Saluran Air
M³
37,888.00
2,000.00
75,776,000.00
1.042
1,849.33
70,067,415.04
0.963
2.3.5
Gorong-gorong Pipa Baja Bergelombang
Ton
37,703,990.35
1.50
56,555,985.53
0.778
0.15
5,655,598.55
0.078
DIVISI 3. PEKERJAAN TANAH
132,331,985.53
1.820
-
75,723,013.59
1.041
3.1.1
Galian Biasa
M³
24,003.00
1,250.94
30,026,312.82
0.413
-
-
-3.2.1
Timbunan Biasa
M³
71,022.00
2,000.00
142,044,000.00
1.953
511.46
36,324,772.13
0.499
3.2.2
Timbunan Pilihan
M³
106,227.00
1,221.83
129,791,335.41
1.785
2,900.74
308,136,907.98
4.237
3.3.1
Penyiapan Badan Jalan
M²
2,922.00
27,900.00
81,523,800.00
1.121
25,840.15
75,504,918.30
1.038
DIVISI 4. PELEBARAN DAN PERKERASAN BAHU JALAN
383,385,448.23
5.272
-
419,966,598.41
5.775
4.2.2
Lapis Pondasi Agregat Klas B
M³
455,605.00
1,860.00
847,425,300.00
11.652
1,289.79
587,634,772.95
8.080
DIVISI 5. PERKERASAN BERBUTIR
847,425,300.00
11.652
-
587,634,772.95
8.080
5.1.1
Lapis Pondasi Agregat Klas A
M³
526,671.00
2,790.00
1,469,412,090.00
20.204
2,906.64
1,530,842,995.44
21.049
5.1.2
Lapis Pondasi Agregat Klas B
M³
449,249.00
3,720.00
1,671,206,280.00
22.979
3,875.52
1,741,073,484.48
23.940
DIVISI 6. PERKERASAN ASPAL
3,140,618,370.00
43.184
-
3,271,916,479.92
44.989
6.1.(1)(a)
Lapis Resap Pengikat - Aspal Cair
Liter
11,249.00
13,950.00
156,923,550.00
2.158
14,691.41
165,263,671.09
2.272
6.3.(6a)
Laston Lapis Antara (AC-BC) (gradasi halus/kasar)
Ton
521,662.00
2,027.22
1,057,523,639.64
14.541
2,134.97
1,113,732,720.14
15.314
6.3.8.a
Aspal
Ton
10,809,425.00
126.20
1,364,149,435.00
18.757
132.91
1,436,680,676.75
19.754
6.3.10
Bahan Pengisi (Filler) Tambahan
Kg
1,206.85
41,371.98
49,929,774.06
0.687
43,570.79
52,583,407.91
0.723
DIVISI 7. STRUKTUR
2,628,526,398.70
36.142
-
2,768,260,475.89
38.064
7.9
Pasangan Batu
M³
613,517.00
80.00
49,081,360.00
0.675
161.57
99,125,941.69
1.363
7.10 (3)
Bronjong
M³
589,406.00
70.00
41,258,420.00
0.567
-
-
-90,339,780.00
1.242
-
99,125,941.69
1.363
Jumlah Nilai Pekerjaan
7,272,727,282.46
100.00
7,272,727,282.46
100.00
PPN 10 %
727,272,728.25
727,272,728.25
TOTAL BIAYA PEKERJAAN
8,000,000,010.70
8,000,000,010.70
DIBULATKAN
8,000,000,000.00
8,000,000,000.00
VOLUME
DINAS BINA MARGA DAN DIPTA KARYA
KONTRAK AWAL
JUMLAH HARGA
(Rp.)
NO.
URAIAN
SAT.
HARGA SATUAN
(Rp.)
BOBOT
(%)
PENYEDIA
Ir. MUDJI HALIM
DIREKTUR UTAMA
JOHNNICO APRIANO
KONTRAK ADD-I
VOLUME
JUMLAH HARGA
(Rp.)
BOBOT
(%)
1.00
50,100,000.00
0.689
50,100,000.00
0.689
1,832.02
69,411,504.95
0.954
0.23
8,671,917.78
0.119
78,083,422.73
1.074
-
-477.20
33,891,698.40
0.466
2,870.08
304,879,988.16
4.192
26,746.55
78,153,419.10
1.075
416,925,105.66
5.733
1,259.31
573,747,932.55
7.889
573,747,932.55
7.889
3,010.14
1,585,353,443.94
21.799
3,904.56
1,754,119,675.44
24.119
3,339,473,119.38
45.918
15,189.31
170,864,548.19
2.349
2,203.27
1,149,362,234.74
15.804
123.32
1,333,018,291.00
18.329
44,964.74
54,265,696.47
0.746
2,707,510,770.40
37.228
174.22
106,886,931.74
1.470
-
106,886,931.74
1.470
7,272,727,282.46
100.00
727,272,728.25
8,000,000,010.70
8,000,000,000.00
DINAS BINA MARGA DAN DIPTA KARYA
Keterangan
PEMERINTAH ACEH
PENYEDIA
Ir. MUDJI HALIM
DIREKTUR UTAMA
JOHNNICO APRIANO
KONTRAK ADD FINAL
VOLUME
JUMLAH HARGA
(Rp.)
BOBOT
(%)
KEGIATAN : PEMBANGUNAN JALAN DAN JEMBATAN DINAS BINA MARGA DAN CIPTA KARYA ACEH SERTIFIKAT : 07 (TUJUH)
NAMA PAKET : PENINGKATAN JALAN SINABANG-SIBIGO BULAN : OKTOBER
NOMOR KONTRAK : 13/SPPK/PBJ/DBC/APBA/III/2012 TANGGAL : 23 OKTOBER 2012
TANGGAL KONTRAK : 21 MARET 2012 HALAMAN : 1 dari 8
NILAI KONTRAK
NOMOR KONTRAK ADD-I : 13.1/SPPK/PBJ/DBC/APBA/VII/2012 TANGGAL KONTRAK ADD-I : 03 JULI 2012
NILAI KONTRAK ADD-I
NOMOR KONTRAK ADD FINAL : 13.2/SPPK/PBJ/DBC/APBA/X/2012 TANGGAL KONTRAK ADD FINAL : 16 OKTOBER 2012
NILAI KONTRAK ADD FINAL
SUMBER DANA : APBA TAHUN ANGGARAN 2012
PENYEDIA JASA : PT. FLAMBOYANT HUMA ARTA
S/D S/D BOBOT (%) BOBOT (%)
BULAN LALU BULAN INI S/D BULAN INI ITEM PEKERJAAN
1 3 4 5 6 7 8 9 10
1 UMUM 50,100,000.00 50,100,000.00 50,100,000.00 35,070,000.00 15,030,000.00 50,100,000.00 0.69% 0.69% 2 DRAINASE 132,331,985.53 75,723,013.59 78,083,422.73 70,067,415.04 8,016,007.69 78,083,422.73 1.07% 1.07% 3 PEKERJAAN TANAH 383,385,448.23 419,966,598.41 416,925,105.66 415,993,619.55 931,486.11 416,925,105.66 5.73% 5.73% 4 PELEBARAN DAN PERKERASAN BAHU JALAN 847,425,300.00 587,634,772.95 573,747,932.55 - 573,747,932.55 573,747,932.55 7.89% 7.89% 5 PERKERASAN BERBUTIR 3,140,618,370.00 3,271,916,479.92 3,339,473,119.38 3,207,077,907.12 132,395,212.26 3,339,473,119.38 45.92% 45.92% 6 PERKERASAN ASPAL 2,628,526,398.70 2,768,260,475.89 2,707,510,770.40 2,527,370,130.26 180,140,640.14 2,707,510,770.40 37.23% 37.23% 7 STRUKTUR 90,339,780.00 99,125,941.69 106,886,931.74 99,125,941.69 7,760,990.05 106,886,931.74 1.47% 1.47%
A SUB TOTAL 7,272,727,282.46 7,272,727,282.46 7,272,727,282.46 6,354,705,013.66 918,022,268.80 7,272,727,282.46 S/D BULAN INI B PPN (10%) X A 727,272,728.25 727,272,728.25 727,272,728.25 635,470,501.37 91,802,226.88 727,272,728.25
C JUMLAH TOTAL A + B 8,000,000,010.70 8,000,000,010.70 8,000,000,010.70 6,990,175,515.02 1,009,824,495.68 8,000,000,010.70
D DIBULATKAN C 8,000,000,000.00 8,000,000,000.00 8,000,000,000.00 6,990,175,000.00 1,009,824,000.00 8,000,000,000.00 BULAN INI
E MATERIAL ON SITE (MOS)
F JUMLAH KOTOR SERTIFIKAT BULAN INI
G POTONGAN - POTONGAN S/D BULAN LALU
1 SERTIFIKAT S/D BULAN LALU (KOMULATIF) 5,242,631,250.00
2 5 % JAMINAN PEMELIHARAAN ( 5% X D ) 400,000,000.00
3 20 % PENGEMBALIAN UANG MUKA 1,600,000,000.00
H JUMLAH POTONGAN ( 1 + 2 + 3 ) 7,242,631,250.00
I JUMLAH BERSIH SERTIFIKAT BULAN INI TERMASUK PPN 10% (F-H) 757,368,750.00
J DIBULATKAN 757,368,750.00
Terbilang : tujuh ratus lima puluh tujuh juta tiga ratus enam puluh delapan ribu tujuh ratus lima puluh rupiah
DINAS BINA MARGA DAN CIPTA KARYA
PEMBANGUNAN JALAN DAN JEMBATAN WILAYAH XI SIMEULUE
2
SERTIFIKAT BULANAN
BULAN INI NOMOR MATA
PEMBAYARAN URAIAN PEKERJAAN
JUMLAH PEMBAYARAN MONTHLY CERTIFICATE (MC) 87.38% : Rp. 8,000,000,000.00,-12.62%
100.00%
100.00%KONTRAK ADD FINAL (Rp.) NILAI KONTRAK
: Rp. : Rp.
8,000,000,000.00,-KONTRAK AWAL (Rp.) KONTRAK ADD-I (Rp.)
DIPERIKSA/DISETUJUI OLEH : KONSULTAN SUPERVISI PT. CIPTA JAYA UTAMA KONSULTAN
LINDUNG NAINGGOLAN SITE ENGINEER
MENYETUJUI OLEH : PPTK
PEMBANGUNAN JALAN DAN JEMBATAN WILAYAH XI (SIMEULUE)
Ir. ZULKARNEN, MT. Nip. 19640516 199703 1 001 DIAJUKAN OLEH :
PENYEDIA BARANG/JASA PT. FLAMBOYANT HUMA ARTA
ALWIN ABDULLAH DIREKTUR UTAMA
MENGETAHUI OLEH :
KUASA PENGGUNA ANGGARAN / KUASA PENGGUNA BARANG KEGIATAN PEMBANGUNAN JALAN DAN JEMBATAN
DINAS BINA MARGA DAN CIPTA KARYA ACEH
Ir. FAJRI, MT PEMBINA NIP. 19640831 199203 1 005
KEGIATAN : PEMBANGUNAN JALAN DAN JEMBATAN DINAS BINA MARGA DAN CIPTA KARYA ACEH SERTIFIKAT : 07 (TUJUH)
NAMA PAKET : PENINGKATAN JALAN SINABANG-SIBIGO BULAN : OKTOBER
NOMOR KONTRAK : 13/SPPK/PBJ/DBC/APBA/III/2012 TANGGAL : 23 OKTOBER 2012
TANGGAL KONTRAK : 21 MARET 2012 HALAMAN : 2 dari 8
NILAI KONTRAK : Rp.
8,000,000,000.00,-NOMOR KONTRAK ADD-I : 13.1/SPPK/PBJ/DBC/APBA/VII/2012 TANGGAL KONTRAK ADD-I : 03 JULI 2012
NILAI KONTRAK ADD-I : Rp. 8,000,000,000.00,-NOMOR KONTRAK ADD FINAL : 13.2/SPPK/PBJ/DBC/APBA/X/2012 TANGGAL KONTRAK ADD FINAL : 16 OKTOBER 2012 NILAI KONTRAK ADD FINAL : Rp.
8,000,000,000.00,-SUMBER DANA : APBA TAHUN ANGGARAN 2012
PENYEDIA JASA : PT. FLAMBOYANT HUMA ARTA
DIVISI 1. UMUM JUMLAH KONTRAK ADD FINAL
KONTRAK AWAL
KONTRAK ADD-I
KONTRAK
ADD FINAL KUANTITAS
JUMLAH HARGA (Rp.) KUANTITAS JUMLAH HARGA (Rp.) KUANTITAS JUMLAH HARGA (Rp.)
1
3
4
5
6
7
8 = 6 x 7
9
10 = 7 x 9
11
12 = 7 x 11
13 = 9 + 11
14 = 10 + 12
1.2
Mobilisasi
Ls
1.00
1.00
1.00
50,100,000.00
50,100,000.00
0.70
35,070,000.00
0.30
15,030,000.00
1.00
50,100,000.00
50,100,000.00
-
-
35,070,000.00
15,030,000.00
50,100,000.00
100.00%
70.00%
30.00%
100.00%
DINAS BINA MARGA DAN CIPTA KARYA
PEMERINTAH ACEH
PEMBANGUNAN JALAN DAN JEMBATAN WILAYAH XI SIMEULUE
2
SERTIFIKAT BULANAN
SAT. URAIAN PEKERJAAN NOMOR MATA PEMB. S/D BULAN LALU 50,100,000.00 Rp JUMLAH HARGA ADD FINAL (Rp.) S/D BULAN INI BULAN INI HARGA SATUAN (Rp.)TOTAL HARGA
DIVISI 1. UMUM
KUANTITASTOTAL PEMBAYARAN
PERSENTASE
DISETUJUI OLEH : PEMBANTU PPTK PEMBANGUNAN JALAN DAN JEMBATANWILAYAH XI (SIMEULUE)
RUSVAN VERIZAL, ST Nip. 19830706 201001 1029
DIPERIKSA OLEH : KONSULTAN SUPERVISI PT. CIPTA JAYA UTAMA KONSULTAN
EDWARD NOUR, ST CHIEF INSPECTOR
DIBUAT OLEH : PENYEDIA BARANG/JASA PT. FLAMBOYANT HUMA ARTA
SYAHRIZAL, ST. GENERAL SUPERINTENDENT
KEGIATAN : PEMBANGUNAN JALAN DAN JEMBATAN DINAS BINA MARGA DAN CIPTA KARYA ACEH SERTIFIKAT : 07 (TUJUH)
NAMA PAKET : PENINGKATAN JALAN SINABANG-SIBIGO BULAN : OKTOBER
NOMOR KONTRAK : 13/SPPK/PBJ/DBC/APBA/III/2012 TANGGAL : 23 OKTOBER 2012
TANGGAL KONTRAK : 21 MARET 2012 HALAMAN : 3 dari 8
NILAI KONTRAK : Rp.
8,000,000,000.00,-NOMOR KONTRAK ADD-I : 13.1/SPPK/PBJ/DBC/APBA/VII/2012 TANGGAL KONTRAK ADD-I : 03 JULI 2012
NILAI KONTRAK ADD-I : Rp. 8,000,000,000.00,-NOMOR KONTRAK ADD FINAL : 13.2/SPPK/PBJ/DBC/APBA/X/2012 TANGGAL KONTRAK ADD FINAL : 16 OKTOBER 2012 NILAI KONTRAK ADD FINAL : Rp.
8,000,000,000.00,-SUMBER DANA : APBA TAHUN ANGGARAN 2012
PENYEDIA JASA : PT. FLAMBOYANT HUMA ARTA
DIVISI 2. DRAINASE JUMLAH KONTRAK ADD FINAL
KONTRAK AWAL
KONTRAK ADD-I
KONTRAK
ADD FINAL KUANTITAS
JUMLAH HARGA (Rp.) KUANTITAS JUMLAH HARGA (Rp.) KUANTITAS JUMLAH HARGA (Rp.)
1
3
4
5
6
7
8 = 6 x 7
9
10 = 7 x 9
11
12 = 7 x 11
13 = 9 + 11
14 = 10 + 12
2.1
Galian Untuk Selokan Drainase dan Saluran Air
M³
2,000.00
1,849.33
1,832.02
37,888.00
69,411,504.95
1,849.33
70,067,415.04
(17.31)
(655,910.09)
1,832.02
69,411,504.95
2.3.5
Gorong-Gorong Pipa Baja Bergelombang
Ton
1.50
0.15
0.23
37,703,990.35
8,671,917.78
-
-
0.23
8,671,917.78
0.23
8,671,917.78
78,083,422.73
-
-
70,067,415.04
8,016,007.69
78,083,422.73
100.00%
89.73%
10.27%
100.00%
DIVISI 2. DRAINASE
TOTAL HARGA
TOTAL PEMBAYARAN
DINAS BINA MARGA DAN CIPTA KARYA
2
SERTIFIKAT BULANAN
SAT. URAIAN PEKERJAAN NOMOR MATA PEMB. KUANTITASPEMBANGUNAN JALAN DAN JEMBATAN WILAYAH XI SIMEULUE
PERSENTASE
78,083,422.73 Rp
S/D BULAN LALU BULAN INI S/D BULAN INI
HARGA SATUAN (Rp.) JUMLAH HARGA ADD FINAL (Rp.) DISETUJUI OLEH : PEMBANTU PPTK PEMBANGUNAN JALAN DAN JEMBATAN
WILAYAH XI (SIMEULUE)
RUSVAN VERIZAL, ST Nip. 19830706 201001 1029
DIPERIKSA OLEH : KONSULTAN SUPERVISI PT. CIPTA JAYA UTAMA KONSULTAN
EDWARD NOUR, ST CHIEF INSPECTOR
DIBUAT OLEH : PENYEDIA BARANG/JASA PT. FLAMBOYANT HUMA ARTA
SYAHRIZAL, ST. GENERAL SUPERINTENDENT
KEGIATAN : PEMBANGUNAN JALAN DAN JEMBATAN DINAS BINA MARGA DAN CIPTA KARYA ACEH SERTIFIKAT : 07 (TUJUH)
NAMA PAKET : PENINGKATAN JALAN SINABANG-SIBIGO BULAN : OKTOBER
NOMOR KONTRAK : 13/SPPK/PBJ/DBC/APBA/III/2012 TANGGAL : 23 OKTOBER 2012
TANGGAL KONTRAK : 21 MARET 2012 HALAMAN : 4 dari 8
NILAI KONTRAK : Rp.
8,000,000,000.00,-NOMOR KONTRAK ADD-I : 13.1/SPPK/PBJ/DBC/APBA/VII/2012 TANGGAL KONTRAK ADD-I : 03 JULI 2012
NILAI KONTRAK ADD-I : Rp. 8,000,000,000.00,-NOMOR KONTRAK ADD FINAL : 13.2/SPPK/PBJ/DBC/APBA/X/2012 TANGGAL KONTRAK ADD FINAL : 16 OKTOBER 2012 NILAI KONTRAK ADD FINAL : Rp.
8,000,000,000.00,-SUMBER DANA : APBA TAHUN ANGGARAN 2012
PENYEDIA JASA : PT. FLAMBOYANT HUMA ARTA
DIVISI 3. PEKERJAAN TANAH JUMLAH KONTRAK ADD FINAL
KONTRAK AWAL
KONTRAK ADD-I
KONTRAK
ADD FINAL KUANTITAS
JUMLAH HARGA (Rp.) KUANTITAS JUMLAH HARGA (Rp.) KUANTITAS JUMLAH HARGA (Rp.)
1
3
4
5
6
7
8 = 6 x 7
9
10 = 7 x 9
11
12 = 7 x 11
13 = 9 + 11
14 = 10 + 12
3.1.1
Galian Biasa
M³
1,250.94
-
-
24,003.00
-
-
-
-
-
-
-3.2.1
Timbunan Biasa
M³
2,000.00
511.46
477.20
71,022.00
33,891,698.40
505.13
35,875,342.86
(27.93)
(1,983,644.46)
477.20
33,891,698.40
3.2.2
Timbunan Pilihan
M³
1,221.83
2,900.74
2,870.08
106,227.00
304,879,988.16
2,867.57
304,613,358.39
2.51
266,629.77
2,870.08
304,879,988.16
3.3
Penyiapan Badan jalan
M²
27,900.00
25,840.15
26,746.55
2,922.00
78,153,419.10
25,840.15
75,504,918.30
906.40
2,648,500.80
26,746.55
78,153,419.10
416,925,105.66
-
-
415,993,619.55
931,486.11
416,925,105.66
100.00%
99.78%
0.22%
100.00%
PEMERINTAH ACEH
PEMBANGUNAN JALAN DAN JEMBATAN WILAYAH XI SIMEULUE
HARGA SATUAN (Rp.)
JUMLAH HARGA ADD FINAL
(Rp.)
DINAS BINA MARGA DAN CIPTA KARYA
2
SERTIFIKAT BULANAN
SAT. URAIAN PEKERJAAN NOMOR MATA PEMB.DIVISI 3. PEKERJAAN TANAH
TOTAL HARGA
TOTAL PEMBAYARAN
PERSENTASE
416,925,105.66 Rp
S/D BULAN LALU BULAN INI S/D BULAN INI
KUANTITAS
DISETUJUI OLEH : PEMBANTU PPTK PEMBANGUNAN JALAN DAN JEMBATAN
WILAYAH XI (SIMEULUE)
RUSVAN VERIZAL, ST Nip. 19830706 201001 1029
DIPERIKSA OLEH : KONSULTAN SUPERVISI PT. CIPTA JAYA UTAMA KONSULTAN
EDWARD NOUR, ST CHIEF INSPECTOR
DIBUAT OLEH : PENYEDIA BARANG/JASA PT. FLAMBOYANT HUMA ARTA
SYAHRIZAL, ST. GENERAL SUPERINTENDENT
KEGIATAN : PEMBANGUNAN JALAN DAN JEMBATAN DINAS BINA MARGA DAN CIPTA KARYA ACEH SERTIFIKAT : 07 (TUJUH)
NAMA PAKET : PENINGKATAN JALAN SINABANG-SIBIGO BULAN : OKTOBER
NOMOR KONTRAK : 13/SPPK/PBJ/DBC/APBA/III/2012 TANGGAL : 23 OKTOBER 2012
TANGGAL KONTRAK : 21 MARET 2012 HALAMAN : 5 dari 8
NILAI KONTRAK : Rp.
8,000,000,000.00,-NOMOR KONTRAK ADD-I : 13.1/SPPK/PBJ/DBC/APBA/VII/2012 TANGGAL KONTRAK ADD-I : 03 JULI 2012
NILAI KONTRAK ADD-I : Rp. 8,000,000,000.00,-NOMOR KONTRAK ADD FINAL : 13.2/SPPK/PBJ/DBC/APBA/X/2012 TANGGAL KONTRAK ADD FINAL : 16 OKTOBER 2012 NILAI KONTRAK ADD FINAL : Rp.
8,000,000,000.00,-SUMBER DANA : APBA TAHUN ANGGARAN 2012
PENYEDIA JASA : PT. FLAMBOYANT HUMA ARTA
DIVISI 4. PELEBARAN DAN PERKERASAN BAHU JALAN JUMLAH KONTRAK ADD FINAL
KONTRAK AWAL
KONTRAK ADD-I
KONTRAK
ADD FINAL KUANTITAS
JUMLAH HARGA (Rp.) KUANTITAS JUMLAH HARGA (Rp.) KUANTITAS JUMLAH HARGA (Rp.)
1
3
4
5
6
7
8 = 6 x 7
9
10 = 7 x 9
11
12 = 7 x 11
13 = 9 + 11
14 = 10 + 12
4.2.2
Lapis Pondasi Aggregat Klas B
M³
1,860.00
1,289.79
1,259.31
455,605.00
573,747,932.55
-
-
1,259.31
573,747,932.55
1,259.31
573,747,932.55
573,747,932.55
-
-
-
573,747,932.55
573,747,932.55
100.00%
0.00%
100.00%
100.00%
DIVISI 4. PELEBARAN DAN PERKERASAN BAHU JALAN
TOTAL HARGA
TOTAL PEMBAYARAN
DINAS BINA MARGA DAN CIPTA KARYA
2
SERTIFIKAT BULANAN
SAT. URAIAN PEKERJAAN NOMOR MATA PEMB. KUANTITASPEMBANGUNAN JALAN DAN JEMBATAN WILAYAH XI SIMEULUE
PERSENTASE
573,747,932.55 Rp
S/D BULAN LALU BULAN INI S/D BULAN INI
HARGA SATUAN (Rp.) JUMLAH HARGA ADD FINAL (Rp.) DISETUJUI OLEH : PEMBANTU PPTK PEMBANGUNAN JALAN DAN JEMBATAN
WILAYAH XI (SIMEULUE)
RUSVAN VERIZAL, ST Nip. 19830706 201001 1029
DIPERIKSA OLEH : KONSULTAN SUPERVISI PT. CIPTA JAYA UTAMA KONSULTAN
EDWARD NOUR, ST CHIEF INSPECTOR
DIBUAT OLEH : PENYEDIA BARANG/JASA PT. FLAMBOYANT HUMA ARTA
SYAHRIZAL, ST. GENERAL SUPERINTENDENT
KEGIATAN : PEMBANGUNAN JALAN DAN JEMBATAN DINAS BINA MARGA DAN CIPTA KARYA ACEH SERTIFIKAT : 07 (TUJUH)
NAMA PAKET : PENINGKATAN JALAN SINABANG-SIBIGO BULAN : OKTOBER
NOMOR KONTRAK : 13/SPPK/PBJ/DBC/APBA/III/2012 TANGGAL : 23 OKTOBER 2012
TANGGAL KONTRAK : 21 MARET 2012 HALAMAN : 6 dari 8
NILAI KONTRAK : Rp.
8,000,000,000.00,-NOMOR KONTRAK ADD-I : 13.1/SPPK/PBJ/DBC/APBA/VII/2012 TANGGAL KONTRAK ADD-I : 03 JULI 2012
NILAI KONTRAK ADD-I : Rp. 8,000,000,000.00,-NOMOR KONTRAK ADD FINAL : 13.2/SPPK/PBJ/DBC/APBA/X/2012 TANGGAL KONTRAK ADD FINAL : 16 OKTOBER 2012 NILAI KONTRAK ADD FINAL : Rp.
8,000,000,000.00,-SUMBER DANA : APBA TAHUN ANGGARAN 2012
PENYEDIA JASA : PT. FLAMBOYANT HUMA ARTA
DIVISI 5. PERKERASAN BERBUTIR JUMLAH KONTRAK ADD FINAL
KONTRAK AWAL
KONTRAK ADD-I
KONTRAK
ADD FINAL KUANTITAS
JUMLAH HARGA (Rp.) KUANTITAS JUMLAH HARGA (Rp.) KUANTITAS JUMLAH HARGA (Rp.)
1
3
4
5
6
7
8 = 6 x 7
9
10 = 7 x 9
11
12 = 7 x 11
13 = 9 + 11
14 = 10 + 12
5.1.1
Lapis Pondasi Agregat Klas A
M³
2,790.00
2,906.64
3,010.14
526,671.00
1,585,353,443.94
2,849.04
1,500,506,745.84
161.10
84,846,698.10
3,010.14
1,585,353,443.94
5.1.2
Lapis Pondasi Agregat Klas B
M³
3,720.00
3,875.52
3,904.56
449,249.00
1,754,119,675.44
3,798.72
1,706,571,161.28
105.84
47,548,514.16
3,904.56
1,754,119,675.44
3,339,473,119.38
-
-
3,207,077,907.12
132,395,212.26
3,339,473,119.38
100.00%
96.04%
3.96%
100.00%
PEMERINTAH ACEH
PEMBANGUNAN JALAN DAN JEMBATAN WILAYAH XI SIMEULUE
HARGA SATUAN (Rp.)
JUMLAH HARGA ADD FINAL
(Rp.)
DINAS BINA MARGA DAN CIPTA KARYA
2
SERTIFIKAT BULANAN
SAT. URAIAN PEKERJAAN NOMOR MATA PEMB.DIVISI 5. PERKERASAN BERBUTIR
TOTAL HARGA
TOTAL PEMBAYARAN
PERSENTASE
3,339,473,119.38 Rp
S/D BULAN LALU BULAN INI S/D BULAN INI
KUANTITAS
DISETUJUI OLEH : PEMBANTU PPTK PEMBANGUNAN JALAN DAN JEMBATAN
WILAYAH XI (SIMEULUE)
RUSVAN VERIZAL, ST Nip. 19830706 201001 1029
DIPERIKSA OLEH : KONSULTAN SUPERVISI PT. CIPTA JAYA UTAMA KONSULTAN
EDWARD NOUR, ST CHIEF INSPECTOR
DIBUAT OLEH : PENYEDIA BARANG/JASA PT. FLAMBOYANT HUMA ARTA
SYAHRIZAL, ST. GENERAL SUPERINTENDENT
KEGIATAN : PEMBANGUNAN JALAN DAN JEMBATAN DINAS BINA MARGA DAN CIPTA KARYA ACEH SERTIFIKAT : 07 (TUJUH)
NAMA PAKET : PENINGKATAN JALAN SINABANG-SIBIGO BULAN : OKTOBER
NOMOR KONTRAK : 13/SPPK/PBJ/DBC/APBA/III/2012 TANGGAL : 23 OKTOBER 2012
TANGGAL KONTRAK : 21 MARET 2012 HALAMAN : 7 dari 8
NILAI KONTRAK : Rp.
8,000,000,000.00,-NOMOR KONTRAK ADD-I : 13.1/SPPK/PBJ/DBC/APBA/VII/2012 TANGGAL KONTRAK ADD-I : 03 JULI 2012
NILAI KONTRAK ADD-I : Rp. 8,000,000,000.00,-NOMOR KONTRAK ADD FINAL : 13.2/SPPK/PBJ/DBC/APBA/X/2012 TANGGAL KONTRAK ADD FINAL : 16 OKTOBER 2012 NILAI KONTRAK ADD FINAL : Rp.
8,000,000,000.00,-SUMBER DANA : APBA TAHUN ANGGARAN 2012
PENYEDIA JASA : PT. FLAMBOYANT HUMA ARTA
DIVISI 6. PERKERASAN ASPAL JUMLAH KONTRAK ADD FINAL
KONTRAK AWAL
KONTRAK ADD-I
KONTRAK
ADD FINAL KUANTITAS
JUMLAH HARGA (Rp.) KUANTITAS JUMLAH HARGA (Rp.) KUANTITAS JUMLAH HARGA (Rp.)
1
3
4
5
6
7
8 = 6 x 7
9
10 = 7 x 9
11
12 = 7 x 11
13 = 9 + 11
14 = 10 + 12
6.1.(1)(a) Lapis Resap Pengikat - Aspal Cair
Liter
13,950.00
14,691.41
15,189.31
11,249.00
170,864,548.19
14,178.41
159,492,934.09
1,010.90
11,371,614.10
15,189.31
170,864,548.19
6.3.(6a) Laston Lapis Antara (AC-BC) (gradasi halus/kasar)
Ton
2,027.22
2,134.97
2,203.27
521,662.00
1,149,362,234.74
2,056.64
1,072,871,053.78
146.63
76,491,180.96
2,203.27
1,149,362,234.74
6.3.8.a Aspal
Ton
126.20
132.91
123.32
10,809,425.00
1,333,018,291.00
115.12
1,244,352,036.74
8.20
88,666,254.26
123.32
1,333,018,291.00
6.3.10
Bahan Pengisi (Filler) Tambahan
Kg
41,371.98
43,570.79
44,964.74
1,206.85
54,265,696.47
41,972.16
50,654,105.64
2,992.58
3,611,590.83
44,964.74
54,265,696.47
2,707,510,770.40
-
-
2,527,370,130.26
180,140,640.14
2,707,510,770.40
100.00%
93.35%
6.65%
100.00%
DIVISI 6. PERKERASAN ASPAL
TOTAL HARGA
TOTAL PEMBAYARAN
DINAS BINA MARGA DAN CIPTA KARYA
2
SERTIFIKAT BULANAN
SAT. URAIAN PEKERJAAN NOMOR MATA PEMB. KUANTITASPEMBANGUNAN JALAN DAN JEMBATAN WILAYAH XI SIMEULUE
PERSENTASE
2,707,510,770.40 Rp
S/D BULAN LALU BULAN INI S/D BULAN INI
HARGA SATUAN (Rp.) JUMLAH HARGA ADD FINAL (Rp.) DISETUJUI OLEH : PEMBANTU PPTK PEMBANGUNAN JALAN DAN JEMBATAN
WILAYAH XI (SIMEULUE)
RUSVAN VERIZAL, ST Nip. 19830706 201001 1029
DIPERIKSA OLEH : KONSULTAN SUPERVISI PT. CIPTA JAYA UTAMA KONSULTAN
EDWARD NOUR, ST CHIEF INSPECTOR
DIBUAT OLEH : PENYEDIA BARANG/JASA PT. FLAMBOYANT HUMA ARTA
SYAHRIZAL, ST. GENERAL SUPERINTENDENT
KEGIATAN : PEMBANGUNAN JALAN DAN JEMBATAN DINAS BINA MARGA DAN CIPTA KARYA ACEH SERTIFIKAT : 07 (TUJUH)
NAMA PAKET : PENINGKATAN JALAN SINABANG-SIBIGO BULAN : OKTOBER
NOMOR KONTRAK : 13/SPPK/PBJ/DBC/APBA/III/2012 TANGGAL : 23 OKTOBER 2012
TANGGAL KONTRAK : 21 MARET 2012 HALAMAN : 8 dari 8
NILAI KONTRAK : Rp.
8,000,000,000.00,-NOMOR KONTRAK ADD-I : 13.1/SPPK/PBJ/DBC/APBA/VII/2012 TANGGAL KONTRAK ADD-I : 03 JULI 2012
NILAI KONTRAK ADD-I : Rp. 8,000,000,000.00,-NOMOR KONTRAK ADD FINAL : 13.2/SPPK/PBJ/DBC/APBA/X/2012 TANGGAL KONTRAK ADD FINAL : 16 OKTOBER 2012 NILAI KONTRAK ADD FINAL : Rp.
8,000,000,000.00,-SUMBER DANA : APBA TAHUN ANGGARAN 2012
PENYEDIA JASA : PT. FLAMBOYANT HUMA ARTA
DIVISI 7. STRUKTUR JUMLAH KONTRAK ADD FINAL
KONTRAK AWAL
KONTRAK ADD-I
KONTRAK
ADD FINAL KUANTITAS
JUMLAH HARGA (Rp.) KUANTITAS JUMLAH HARGA (Rp.) KUANTITAS JUMLAH HARGA (Rp.)
1
3
4
5
6
7
8 = 6 x 7
9
10 = 7 x 9
11
12 = 7 x 11
13 = 9 + 11
14 = 10 + 12
7.9
Pasangan Batu
M³
80.00
161.57
174.22
613,517.00
106,886,931.74
161.57
99,125,941.69
12.65
7,760,990.05
174.22
106,886,931.74
7.10 (3) Bronjong
M³
70.00
-
-
589,406.00
-
-
-
-
-
-
-106,886,931.74
-
-
99,125,941.69
7,760,990.05
106,886,931.74
100.00%
92.74%
7.26%
100.00%
NOMOR MATA PEMB.PERSENTASE
S/D BULAN LALUPEMERINTAH ACEH
PEMBANGUNAN JALAN DAN JEMBATAN WILAYAH XI SIMEULUE
HARGA SATUAN (Rp.)
JUMLAH HARGA ADD FINAL
(Rp.)
DINAS BINA MARGA DAN CIPTA KARYA
SERTIFIKAT BULANAN
106,886,931.74 Rp2
SAT. URAIAN PEKERJAANBULAN INI S/D BULAN INI
KUANTITAS
DIVISI 7. STRUKTUR
TOTAL HARGA
TOTAL PEMBAYARAN
DISETUJUI OLEH : PEMBANTU PPTK PEMBANGUNAN JALAN DAN JEMBATANWILAYAH XI (SIMEULUE)
RUSVAN VERIZAL, ST Nip. 19830706 201001 1029
DIPERIKSA OLEH : KONSULTAN SUPERVISI PT. CIPTA JAYA UTAMA KONSULTAN
EDWARD NOUR, ST CHIEF INSPECTOR
DIBUAT OLEH : PENYEDIA BARANG/JASA PT. FLAMBOYANT HUMA ARTA
SYAHRIZAL, ST. GENERAL SUPERINTENDENT