SUMBER DANA : KEGIATAN DANA OTONOMI KHUSUS KAB. SIMEULUE DINAS BINA MARGA DAN CIPTA KARYA ACEH NAMA PAKET : PENINGKATAN JALAN PSR INPRES - AIR DINGIN
NOMOR PAKET : BANG/SMUL/2011/01
NOMOR KONTRAK : 37/KTR/BANG/SMLU/OTSUS/V/2011 KONTRAKTOR : PT. SELAMAT JAYA ABADI
KONSULTAN : PT. NUSVEY Ass. CV. ALPHA ENGINEERING CONSULTANT
LOKASI : KABUPATEN SIMUELUE
DIVISI 1. UMUM
1.2 Mobilisasi Ls 50,100,000.00 1.00 50,100,000.00 0.689
DIVISI 2. DRAINASE 50,100,000.00 0.689
2.1 Galian Untuk Selokan Drainase dan Saluran Air M³ 37,888.00 2,000.00 75,776,000.00 1.042 2.3.5 Gorong-gorong Pipa Baja Bergelombang Ton 37,703,990.35 1.50 56,555,985.53 0.778
DIVISI 3. PEKERJAAN TANAH 132,331,985.53 1.820
3.1.1 Galian Biasa M³ 24,003.00 1,250.94 30,026,312.82 0.413
3.2.1 Timbunan Biasa M³ 71,022.00 2,000.00 142,044,000.00 1.953
3.2.2 Timbunan Pilihan M³ 106,227.00 1,221.83 129,791,335.41 1.785 3.3.1 Penyiapan Badan Jalan M² 2,922.00 27,900.00 81,523,800.00 1.121
DIVISI 4. PELEBARAN DAN PERKERASAN BAHU JALAN 383,385,448.23 5.272
4.2.2 Lapis Pondasi Agregat Klas B M³ 455,605.00 1,860.00 847,425,300.00 11.652
DIVISI 5. PERKERASAN BERBUTIR 847,425,300.00 11.652
5.1.1 Lapis Pondasi Agregat Klas A M³ 526,671.00 2,790.00 1,469,412,090.00 20.204 5.1.2 Lapis Pondasi Agregat Klas B M³ 449,249.00 3,720.00 1,671,206,280.00 22.979
DIVISI 6. PERKERASAN ASPAL 3,140,618,370.00 43.184
6.1.(1)(a) Lapis Resap Pengikat - Aspal Cair Liter 11,249.00 13,950.00 156,923,550.00 2.158 6.3.(6a) Laston Lapis Antara (AC-BC) (gradasi halus/kasar) Ton 521,662.00 2,027.22 1,057,523,639.64 14.541
6.3.8.a Aspal Ton 10,809,425.00 126.20 1,364,149,435.00 18.757
6.3.10 Bahan Pengisi (Filler) Tambahan Kg 1,206.85 41,371.98 49,929,774.06 0.687
DIVISI 7. STRUKTUR 2,628,526,398.70 36.142
7.9 Pasangan Batu M³ 613,517.00 80.00 49,081,360.00 0.675
7.10 (3) Bronjong M³ 589,406.00 70.00 41,258,420.00 0.567
90,339,780.00
1.242
Jumlah Nilai Pekerjaan 7,272,727,282.46 100.00
PPN 10 % 727,272,728.25
TOTAL BIAYA PEKERJAAN 8,000,000,010.70
DIBULATKAN 8,000,000,000.00 JUMLAH HARGA (Rp.) BOBOT (%) PENYEDIA Ir. MUDJI HALIM
DIREKTUR UTAMA JOHNNICO APRIANO
NO. URAIAN SAT. HARGA SATUAN
(Rp.)
VOLUME
DINAS BINA MARGA DAN DIPTA KARYA
Keterangan KONTRAK AWAL
PENYEDIA Ir. MUDJI HALIM
DIREKTUR UTAMA JOHNNICO APRIANO
PEMERINTAH ACEH
DINAS BINA MARGA DAN DIPTA KARYA
KEGIATAN : PEMBANGUNAN JALAN DAN JEMBATAN DINAS BINA MARGA DAN CIPTA KARYA ACEH SERTIFIKAT : 01 (SATU)
NAMA PAKET : PENINGKATAN JALAN SINABANG-SIBIGO BULAN : APRIL
NOMOR KONTRAK : 13/SPPK/PBJ/DBC/APBA/III/2012 TANGGAL : 25 APRIL 2012
TANGGAL KONTRAK : 21 MARET 2012 HALAMAN : 1 dari 8
NILAI KONTRAK
SUMBER DANA : APBA TAHUN ANGGARAN 2012
PENYEDIA JASA : PT. FLAMBOYANT HUMA ARTA
S/D S/D BOBOT (%) BOBOT (%)
BULAN LALU BULAN INI S/D BULAN INI ITEM PEKERJAAN
1 3 4 5 6 7 8
1 UMUM 50,100,000.00 - 35,070,000.00 35,070,000.00 0.48% 0.48% 2 DRAINASE 132,331,985.53 - 70,067,415.04 70,067,415.04 0.96% 0.96% 3 PEKERJAAN TANAH 383,385,448.23 - 205,296,253.71 205,296,253.71 2.82% 2.82% 4 PELEBARAN DAN PERKERASAN BAHU JALAN 847,425,300.00 - - - 0.00% 0.00% 5 PERKERASAN BERBUTIR 3,140,618,370.00 - 526,376,068.32 526,376,068.32 7.24% 7.24% 6 PERKERASAN ASPAL 2,628,526,398.70 - - - 0.00% 0.00% 7 STRUKTUR 90,339,780.00 - - - 0.00% 0.00%
A SUB TOTAL 7,272,727,282.46 - 836,809,737.07 836,809,737.07 S/D BULAN INI B PPN (10%) X A 727,272,728.25 - 83,680,973.71 83,680,973.71
C JUMLAH TOTAL A + B 8,000,000,010.70 - 920,490,710.78 920,490,710.78
D DIBULATKAN C 8,000,000,000.00 - 920,490,000.00 920,490,000.00 BULAN INI
E MATERIAL ON SITE (MOS)
F JUMLAH KOTOR SERTIFIKAT BULAN INI
G POTONGAN - POTONGAN S/D BULAN LALU
1 SERTIFIKAT S/D BULAN LALU (KOMULATIF)
-2 5 % JAMINAN PEMELIHARAAN ( 5% X D ) 46,024,500.00
3 20 % PENGEMBALIAN UANG MUKA 184,098,000.00
H JUMLAH POTONGAN ( 1 + 2 + 3 ) 230,122,500.00
I JUMLAH BERSIH SERTIFIKAT BULAN INI TERMASUK PPN 10% (F-H) 690,367,500.00
J DIBULATKAN 690,367,500.00
Terbilang : enam ratus sembilan puluh juta tiga ratus enam puluh tujuh ribu lima ratus rupiah
NILAI KONTRAK : Rp. 8,000,000,000.00,-11.51%
11.51%
11.51% 0.00% KONTRAK AWAL (Rp.)DINAS BINA MARGA DAN CIPTA KARYA
PEMBANGUNAN JALAN DAN JEMBATAN WILAYAH XV SIMEULUE2
SERTIFIKAT BULANAN
BULAN INI NOMOR MATA
PEMBAYARAN URAIAN PEKERJAAN
JUMLAH PEMBAYARAN MONTHLY CERTIFICATE (MC) DIPERIKSA/DISETUJUI OLEH : KONSULTAN SUPERVISI __________________ SITE ENGINEER MENYETUJUI OLEH : PPTK
PEMBANGUNAN JALAN DAN JEMBATAN WILAYAH XI (SIMEULUE)
Ir. ZULKARNEN, MT. Nip. 19640516 199703 1 001 DIAJUKAN OLEH :
PENYEDIA BARANG/JASA PT. FLAMBOYANT HUMA ARTA
ALWIN ABDULLAH DIREKTUR UTAMA
MENGETAHUI OLEH :
KUASA PENGGUNA ANGGARAN / KUASA PENGGUNA BARANG KEGIATAN PEMBANGUNAN JALAN DAN JEMBATAN
DINAS BINA MARGA DAN CIPTA KARYA ACEH
Ir. FAJRI, MT PEMBINA NIP. 19640831 199203 1 005
KEGIATAN : PEMBANGUNAN JALAN DAN JEMBATAN DINAS BINA MARGA DAN CIPTA KARYA ACEH SERTIFIKAT : 01 (SATU)
NAMA PAKET : PENINGKATAN JALAN SINABANG-SIBIGO BULAN : APRIL
NOMOR KONTRAK : 13/SPPK/PBJ/DBC/APBA/III/2012 TANGGAL : 25 APRIL 2012
TANGGAL KONTRAK : 21 MARET 2012 HALAMAN : 2 dari 8
NILAI KONTRAK : Rp.
8,000,000,000.00,-SUMBER DANA : APBA TAHUN ANGGARAN 2012
PENYEDIA JASA : PT. FLAMBOYANT HUMA ARTA
DIVISI 1. UMUM JUMLAH KONTRAK AWAL
KUANTITAS KONTRAK AWAL KUANTITAS JUMLAH HARGA (Rp.) KUANTITAS JUMLAH HARGA (Rp.) KUANTITAS JUMLAH HARGA (Rp.) 1 3 4 5 6 = 4 x 5 7 8 = 5 x 7 9 10 = 5 x 9 11 = 7 + 9 12 = 8 + 10
1.2
Mobilisasi
Ls
1.00
50,100,000.00
50,100,000.00
-
-
0.70
35,070,000.00
0.70
35,070,000.00
50,100,000.00
-
-
-
35,070,000.00
35,070,000.00
100.00%
0.00%
70.00%
70.00%
S/D BULAN INIDINAS BINA MARGA DAN CIPTA KARYA
DIVISI 1. UMUM
TOTAL HARGA
TOTAL PEMBAYARAN
PERSENTASE
50,100,000.00 Rp JUMLAH HARGA AWAL (Rp.)PEMERINTAH ACEH
PEMBANGUNAN JALAN DAN JEMBATAN WILAYAH XV SIMEULUE
2
SERTIFIKAT BULANAN
SAT. URAIAN PEKERJAAN NOMOR MATA PEMB.S/D BULAN LALU BULAN INI
HARGA SATUAN (Rp.)
DISETUJUI OLEH : PEMBANTU PPTK PEMBANGUNAN JALAN DAN JEMBATAN
WILAYAH XI (SIMEULUE) RUSVAN VERIZAL, ST Nip. 19830706 201001 1029 DIPERIKSA OLEH : KONSULTAN SUPERVISI ________________ CHIEF INSPECTOR DIBUAT OLEH : PENYEDIA BARANG/JASA PT. FLAMBOYANT HUMA ARTA
SYAHRIZAL, ST. GENERAL SUPERINTENDENT
KEGIATAN : PEMBANGUNAN JALAN DAN JEMBATAN DINAS BINA MARGA DAN CIPTA KARYA ACEH SERTIFIKAT : 01 (SATU)
NAMA PAKET : PENINGKATAN JALAN SINABANG-SIBIGO BULAN : APRIL
NOMOR KONTRAK : 13/SPPK/PBJ/DBC/APBA/III/2012 TANGGAL : 25 APRIL 2012
TANGGAL KONTRAK : 21 MARET 2012 HALAMAN : 3 dari 8
NILAI KONTRAK : Rp.
8,000,000,000.00,-SUMBER DANA : APBA TAHUN ANGGARAN 2012
PENYEDIA JASA : PT. FLAMBOYANT HUMA ARTA
DIVISI 2. DRAINASE JUMLAH KONTRAK AWAL
KUANTITAS KONTRAK AWAL KUANTITAS JUMLAH HARGA (Rp.) KUANTITAS JUMLAH HARGA (Rp.) KUANTITAS JUMLAH HARGA (Rp.) 1 3 4 5 6 = 4 x 5 7 8 = 5 x 7 9 10 = 5 x 9 11 = 7 + 9 12 = 8 + 10
2.1
Galian Untuk Selokan Drainase dan Saluran Air
M³
2,000.00
37,888.00
75,776,000.00
-
-
1,849.33
70,067,415.04
1,849.33
70,067,415.04
2.3.5
Gorong-Gorong Pipa Baja Bergelombang
Ton
1.50
37,703,990.35
56,555,985.53
-
-
-
-
-
-132,331,985.53
-
-
-
70,067,415.04
70,067,415.04
100.00%
0.00%
52.95%
52.95%
PEMBANGUNAN JALAN DAN JEMBATAN WILAYAH XV SIMEULUE
PERSENTASE
132,331,985.53 Rp
S/D BULAN LALU BULAN INI S/D BULAN INI
HARGA SATUAN (Rp.) JUMLAH HARGA AWAL (Rp.)
DIVISI 2. DRAINASE
DINAS BINA MARGA DAN CIPTA KARYA
2
SERTIFIKAT BULANAN
SAT. URAIAN PEKERJAAN NOMOR MATA PEMB.TOTAL HARGA
TOTAL PEMBAYARAN
DISETUJUI OLEH : PEMBANTU PPTK PEMBANGUNAN JALAN DAN JEMBATANWILAYAH XI (SIMEULUE) RUSVAN VERIZAL, ST Nip. 19830706 201001 1029 DIPERIKSA OLEH : KONSULTAN SUPERVISI ________________ CHIEF INSPECTOR DIBUAT OLEH : PENYEDIA BARANG/JASA PT. FLAMBOYANT HUMA ARTA
SYAHRIZAL, ST. GENERAL SUPERINTENDENT
KEGIATAN : PEMBANGUNAN JALAN DAN JEMBATAN DINAS BINA MARGA DAN CIPTA KARYA ACEH SERTIFIKAT : 01 (SATU)
NAMA PAKET : PENINGKATAN JALAN SINABANG-SIBIGO BULAN : APRIL
NOMOR KONTRAK : 13/SPPK/PBJ/DBC/APBA/III/2012 TANGGAL : 25 APRIL 2012
TANGGAL KONTRAK : 21 MARET 2012 HALAMAN : 4 dari 8
NILAI KONTRAK : Rp.
8,000,000,000.00,-SUMBER DANA : APBA TAHUN ANGGARAN 2012
PENYEDIA JASA : PT. FLAMBOYANT HUMA ARTA
DIVISI 3. PEKERJAAN TANAH JUMLAH KONTRAK AWAL
KUANTITAS KONTRAK AWAL KUANTITAS JUMLAH HARGA (Rp.) KUANTITAS JUMLAH HARGA (Rp.) KUANTITAS JUMLAH HARGA (Rp.) 1 3 4 5 6 = 4 x 5 7 8 = 5 x 7 9 10 = 5 x 9 11 = 7 + 9 12 = 8 + 10
3.1.1
Galian Biasa
M³
1,250.94
24,003.00
30,026,312.82
-
-
-
-
-
-3.2.1
Timbunan Biasa
M³
2,000.00
71,022.00
142,044,000.00
-
-
-
-
-
-3.2.2
Timbunan Pilihan
M³
1,221.83
106,227.00
129,791,335.41
-
-
1,221.83
129,791,335.41
1,221.83
129,791,335.41
3.3
Penyiapan Badan jalan
M²
27,900.00
2,922.00
81,523,800.00
-
-
25,840.15
75,504,918.30
25,840.15
75,504,918.30
383,385,448.23
-
-
-
205,296,253.71
205,296,253.71
100.00%
0.00%
53.55%
53.55%
PERSENTASE
383,385,448.23 RpS/D BULAN LALU BULAN INI S/D BULAN INI
2
SERTIFIKAT BULANAN
SAT. URAIAN PEKERJAAN NOMOR MATA PEMB.DIVISI 3. PEKERJAAN TANAH
TOTAL HARGA
TOTAL PEMBAYARAN
PEMERINTAH ACEH
PEMBANGUNAN JALAN DAN JEMBATAN WILAYAH XV SIMEULUE
HARGA SATUAN (Rp.)
JUMLAH HARGA AWAL
(Rp.)
DINAS BINA MARGA DAN CIPTA KARYA
DISETUJUI OLEH : PEMBANTU PPTK PEMBANGUNAN JALAN DAN JEMBATAN
WILAYAH XI (SIMEULUE) RUSVAN VERIZAL, ST Nip. 19830706 201001 1029 DIPERIKSA OLEH : KONSULTAN SUPERVISI ________________ CHIEF INSPECTOR DIBUAT OLEH : PENYEDIA BARANG/JASA PT. FLAMBOYANT HUMA ARTA
SYAHRIZAL, ST. GENERAL SUPERINTENDENT
KEGIATAN : PEMBANGUNAN JALAN DAN JEMBATAN DINAS BINA MARGA DAN CIPTA KARYA ACEH SERTIFIKAT : 01 (SATU)
NAMA PAKET : PENINGKATAN JALAN SINABANG-SIBIGO BULAN : APRIL
NOMOR KONTRAK : 13/SPPK/PBJ/DBC/APBA/III/2012 TANGGAL : 25 APRIL 2012
TANGGAL KONTRAK : 21 MARET 2012 HALAMAN : 5 dari 8
NILAI KONTRAK : Rp.
8,000,000,000.00,-SUMBER DANA : APBA TAHUN ANGGARAN 2012
PENYEDIA JASA : PT. FLAMBOYANT HUMA ARTA
DIVISI 4. PELEBARAN DAN PERKERASAN BAHU JALAN JUMLAH KONTRAK AWAL
KUANTITAS KONTRAK AWAL KUANTITAS JUMLAH HARGA (Rp.) KUANTITAS JUMLAH HARGA (Rp.) KUANTITAS JUMLAH HARGA (Rp.) 1 3 4 5 6 = 4 x 5 7 8 = 5 x 7 9 10 = 5 x 9 11 = 7 + 9 12 = 8 + 10
4.2.2
Lapis Pondasi Aggregat Klas B
M³
1,860.00
455,605.00
847,425,300.00
-
-
-
-
-
-847,425,300.00
-
-
-
-
-100.00%
0.00%
0.00%
0.00%
PEMBANGUNAN JALAN DAN JEMBATAN WILAYAH XV SIMEULUE
PERSENTASE
847,425,300.00 Rp
S/D BULAN LALU BULAN INI S/D BULAN INI
HARGA SATUAN (Rp.)
JUMLAH HARGA AWAL
(Rp.)
DIVISI 4. PELEBARAN DAN PERKERASAN BAHU JALAN
DINAS BINA MARGA DAN CIPTA KARYA
2
SERTIFIKAT BULANAN
SAT. URAIAN PEKERJAAN NOMOR MATA PEMB.TOTAL HARGA
TOTAL PEMBAYARAN
DISETUJUI OLEH : PEMBANTU PPTK PEMBANGUNAN JALAN DAN JEMBATANWILAYAH XI (SIMEULUE) RUSVAN VERIZAL, ST Nip. 19830706 201001 1029 DIPERIKSA OLEH : KONSULTAN SUPERVISI ________________ CHIEF INSPECTOR DIBUAT OLEH : PENYEDIA BARANG/JASA PT. FLAMBOYANT HUMA ARTA
SYAHRIZAL, ST. GENERAL SUPERINTENDENT
KEGIATAN : PEMBANGUNAN JALAN DAN JEMBATAN DINAS BINA MARGA DAN CIPTA KARYA ACEH SERTIFIKAT : 01 (SATU)
NAMA PAKET : PENINGKATAN JALAN SINABANG-SIBIGO BULAN : APRIL
NOMOR KONTRAK : 13/SPPK/PBJ/DBC/APBA/III/2012 TANGGAL : 25 APRIL 2012
TANGGAL KONTRAK : 21 MARET 2012 HALAMAN : 6 dari 8
NILAI KONTRAK : Rp.
8,000,000,000.00,-SUMBER DANA : APBA TAHUN ANGGARAN 2012
PENYEDIA JASA : PT. FLAMBOYANT HUMA ARTA
DIVISI 5. PERKERASAN BERBUTIR JUMLAH KONTRAK AWAL
KUANTITAS KONTRAK AWAL KUANTITAS JUMLAH HARGA (Rp.) KUANTITAS JUMLAH HARGA (Rp.) KUANTITAS JUMLAH HARGA (Rp.) 1 3 4 5 6 = 4 x 5 7 8 = 5 x 7 9 10 = 5 x 9 11 = 7 + 9 12 = 8 + 10
5.1.1
Lapis Pondasi Agregat Klas A
M³
2,790.00
526,671.00
1,469,412,090.00
-
-
-
-
-
-5.1.2
Lapis Pondasi Agregat Klas B
M³
3,720.00
449,249.00
1,671,206,280.00
-
-
1,171.68
526,376,068.32
1,171.68
526,376,068.32
3,140,618,370.00
-
-
-
526,376,068.32
526,376,068.32
100.00%
0.00%
16.76%
16.76%
PERSENTASE
3,140,618,370.00 RpS/D BULAN LALU BULAN INI S/D BULAN INI
2
SERTIFIKAT BULANAN
SAT. URAIAN PEKERJAAN NOMOR MATA PEMB.DIVISI 5. PERKERASAN BERBUTIR
TOTAL HARGA
TOTAL PEMBAYARAN
PEMERINTAH ACEH
PEMBANGUNAN JALAN DAN JEMBATAN WILAYAH XV SIMEULUE
HARGA SATUAN (Rp.)
JUMLAH HARGA AWAL
(Rp.)
DINAS BINA MARGA DAN CIPTA KARYA
DISETUJUI OLEH : PEMBANTU PPTK PEMBANGUNAN JALAN DAN JEMBATAN
WILAYAH XI (SIMEULUE) RUSVAN VERIZAL, ST Nip. 19830706 201001 1029 DIPERIKSA OLEH : KONSULTAN SUPERVISI ________________ CHIEF INSPECTOR DIBUAT OLEH : PENYEDIA BARANG/JASA PT. FLAMBOYANT HUMA ARTA
SYAHRIZAL, ST. GENERAL SUPERINTENDENT
KEGIATAN : PEMBANGUNAN JALAN DAN JEMBATAN DINAS BINA MARGA DAN CIPTA KARYA ACEH SERTIFIKAT : 01 (SATU)
NAMA PAKET : PENINGKATAN JALAN SINABANG-SIBIGO BULAN : APRIL
NOMOR KONTRAK : 13/SPPK/PBJ/DBC/APBA/III/2012 TANGGAL : 25 APRIL 2012
TANGGAL KONTRAK : 21 MARET 2012 HALAMAN : 7 dari 8
NILAI KONTRAK : Rp.
8,000,000,000.00,-SUMBER DANA : APBA TAHUN ANGGARAN 2012
PENYEDIA JASA : PT. FLAMBOYANT HUMA ARTA
DIVISI 6. PERKERASAN ASPAL JUMLAH KONTRAK AWAL
KUANTITAS KONTRAK AWAL KUANTITAS JUMLAH HARGA (Rp.) KUANTITAS JUMLAH HARGA (Rp.) KUANTITAS JUMLAH HARGA (Rp.) 1 3 4 5 6 = 4 x 5 7 8 = 5 x 7 9 10 = 5 x 9 11 = 7 + 9 12 = 8 + 10
6.1.(1)(a) Lapis Resap Pengikat - Aspal Cair
Liter
13,950.00
11,249.00
156,923,550.00
-
-
-
-
-
-6.3.(6a) Laston Lapis Antara (AC-BC) (gradasi halus/kasar)
Ton
2,027.22
521,662.00
1,057,523,639.64
-
-
-
-
-
-6.3.8.a Aspal
Ton
126.20
10,809,425.00
1,364,149,435.00
-
-
-
-
-
-6.3.10
Bahan Pengisi (Filler) Tambahan
Kg
41,371.98
1,206.85
49,929,774.06
-
-
-
-
-
-2,628,526,398.70
-
-
-
-
-100.00%
0.00%
0.00%
0.00%
PEMBANGUNAN JALAN DAN JEMBATAN WILAYAH XV SIMEULUE
PERSENTASE
2,628,526,398.70 Rp
S/D BULAN LALU BULAN INI S/D BULAN INI
HARGA SATUAN (Rp.)
JUMLAH HARGA AWAL
(Rp.)
DIVISI 6. PERKERASAN ASPAL
DINAS BINA MARGA DAN CIPTA KARYA
2
SERTIFIKAT BULANAN
SAT. URAIAN PEKERJAAN NOMOR MATA PEMB.TOTAL HARGA
TOTAL PEMBAYARAN
DISETUJUI OLEH : PEMBANTU PPTK PEMBANGUNAN JALAN DAN JEMBATANWILAYAH XI (SIMEULUE) RUSVAN VERIZAL, ST Nip. 19830706 201001 1029 DIPERIKSA OLEH : KONSULTAN SUPERVISI ________________ CHIEF INSPECTOR DIBUAT OLEH : PENYEDIA BARANG/JASA PT. FLAMBOYANT HUMA ARTA
SYAHRIZAL, ST. GENERAL SUPERINTENDENT
KEGIATAN : PEMBANGUNAN JALAN DAN JEMBATAN DINAS BINA MARGA DAN CIPTA KARYA ACEH SERTIFIKAT : 01 (SATU)
NAMA PAKET : PENINGKATAN JALAN SINABANG-SIBIGO BULAN : APRIL
NOMOR KONTRAK : 13/SPPK/PBJ/DBC/APBA/III/2012 TANGGAL : 25 APRIL 2012
TANGGAL KONTRAK : 21 MARET 2012 HALAMAN : 8 dari 8
NILAI KONTRAK : Rp.
8,000,000,000.00,-SUMBER DANA : APBA TAHUN ANGGARAN 2012
PENYEDIA JASA : PT. FLAMBOYANT HUMA ARTA
DIVISI 7. STRUKTUR JUMLAH KONTRAK AWAL
KUANTITAS KONTRAK AWAL KUANTITAS JUMLAH HARGA (Rp.) KUANTITAS JUMLAH HARGA (Rp.) KUANTITAS JUMLAH HARGA (Rp.) 1 3 4 5 6 = 4 x 5 7 8 = 5 x 7 9 10 = 5 x 9 11 = 7 + 9 12 = 8 + 10
7.9
Pasangan Batu
M³
80.00
613,517.00
49,081,360.00
-
-
-
-
-
-7.10 (3) Bronjong
M³
70.00
589,406.00
41,258,420.00
-
-
-
-
-
-90,339,780.00
-
-
-
-
-100.00%
0.00%
0.00%
0.00%
DIVISI 7. STRUKTUR
TOTAL HARGA
TOTAL PEMBAYARAN
90,339,780.00 Rp 2SERTIFIKAT BULANAN
SAT. URAIAN PEKERJAAN NOMOR MATA PEMB.PERSENTASE
PEMERINTAH ACEH
PEMBANGUNAN JALAN DAN JEMBATAN WILAYAH XV SIMEULUE
HARGA SATUAN (Rp.)
JUMLAH HARGA AWAL
(Rp.)
DINAS BINA MARGA DAN CIPTA KARYA
S/D BULAN LALU BULAN INI S/D BULAN INI
DISETUJUI OLEH : PEMBANTU PPTK PEMBANGUNAN JALAN DAN JEMBATAN
WILAYAH XI (SIMEULUE) RUSVAN VERIZAL, ST Nip. 19830706 201001 1029 DIPERIKSA OLEH : KONSULTAN SUPERVISI ________________ CHIEF INSPECTOR DIBUAT OLEH : PENYEDIA BARANG/JASA PT. FLAMBOYANT HUMA ARTA
SYAHRIZAL, ST. GENERAL SUPERINTENDENT