SUMBER DANA : KEGIATAN DANA OTONOMI KHUSUS KAB. SIMEULUE DINAS BINA MARGA DAN CIPTA KARYA ACEH NAMA PAKET : PENINGKATAN JALAN PSR INPRES - AIR DINGIN

NOMOR PAKET : BANG/SMUL/2011/01

NOMOR KONTRAK : 37/KTR/BANG/SMLU/OTSUS/V/2011 KONTRAKTOR : PT. SELAMAT JAYA ABADI

KONSULTAN : PT. NUSVEY Ass. CV. ALPHA ENGINEERING CONSULTANT

LOKASI : KABUPATEN SIMUELUE

DIVISI 1. UMUM

1.2 Mobilisasi Ls 50,100,000.00 1.00 50,100,000.00 0.689

DIVISI 2. DRAINASE 50,100,000.00 0.689

2.1 Galian Untuk Selokan Drainase dan Saluran Air M³ 37,888.00 2,000.00 75,776,000.00 1.042 2.3.5 Gorong-gorong Pipa Baja Bergelombang Ton 37,703,990.35 1.50 56,555,985.53 0.778

DIVISI 3. PEKERJAAN TANAH 132,331,985.53 1.820

3.1.1 Galian Biasa M³ 24,003.00 1,250.94 30,026,312.82 0.413

3.2.1 Timbunan Biasa M³ 71,022.00 2,000.00 142,044,000.00 1.953

3.2.2 Timbunan Pilihan M³ 106,227.00 1,221.83 129,791,335.41 1.785 3.3.1 Penyiapan Badan Jalan M² 2,922.00 27,900.00 81,523,800.00 1.121

DIVISI 4. PELEBARAN DAN PERKERASAN BAHU JALAN 383,385,448.23 5.272

4.2.2 Lapis Pondasi Agregat Klas B M³ 455,605.00 1,860.00 847,425,300.00 11.652

DIVISI 5. PERKERASAN BERBUTIR 847,425,300.00 11.652

5.1.1 Lapis Pondasi Agregat Klas A M³ 526,671.00 2,790.00 1,469,412,090.00 20.204 5.1.2 Lapis Pondasi Agregat Klas B M³ 449,249.00 3,720.00 1,671,206,280.00 22.979

DIVISI 6. PERKERASAN ASPAL 3,140,618,370.00 43.184

6.1.(1)(a) Lapis Resap Pengikat - Aspal Cair Liter 11,249.00 13,950.00 156,923,550.00 2.158 6.3.(6a) Laston Lapis Antara (AC-BC) (gradasi halus/kasar) Ton 521,662.00 2,027.22 1,057,523,639.64 14.541

6.3.8.a Aspal Ton 10,809,425.00 126.20 1,364,149,435.00 18.757

6.3.10 Bahan Pengisi (Filler) Tambahan Kg 1,206.85 41,371.98 49,929,774.06 0.687

DIVISI 7. STRUKTUR 2,628,526,398.70 36.142

7.9 Pasangan Batu M³ 613,517.00 80.00 49,081,360.00 0.675

7.10 (3) Bronjong M³ 589,406.00 70.00 41,258,420.00 0.567

90,339,780.00

1.242

Jumlah Nilai Pekerjaan 7,272,727,282.46 100.00

PPN 10 % 727,272,728.25

TOTAL BIAYA PEKERJAAN 8,000,000,010.70

DIBULATKAN 8,000,000,000.00 JUMLAH HARGA (Rp.) BOBOT (%) PENYEDIA Ir. MUDJI HALIM

DIREKTUR UTAMA JOHNNICO APRIANO

NO. URAIAN SAT. HARGA SATUAN

(Rp.)

VOLUME

DINAS BINA MARGA DAN DIPTA KARYA

Keterangan KONTRAK AWAL

(2)

PENYEDIA Ir. MUDJI HALIM

DIREKTUR UTAMA JOHNNICO APRIANO

PEMERINTAH ACEH

DINAS BINA MARGA DAN DIPTA KARYA

(3)

KEGIATAN : PEMBANGUNAN JALAN DAN JEMBATAN DINAS BINA MARGA DAN CIPTA KARYA ACEH SERTIFIKAT : 01 (SATU)

NAMA PAKET : PENINGKATAN JALAN SINABANG-SIBIGO BULAN : APRIL

NOMOR KONTRAK : 13/SPPK/PBJ/DBC/APBA/III/2012 TANGGAL : 25 APRIL 2012

TANGGAL KONTRAK : 21 MARET 2012 HALAMAN : 1 dari 8

NILAI KONTRAK

SUMBER DANA : APBA TAHUN ANGGARAN 2012

PENYEDIA JASA : PT. FLAMBOYANT HUMA ARTA

S/D S/D BOBOT (%) BOBOT (%)

BULAN LALU BULAN INI S/D BULAN INI ITEM PEKERJAAN

1 3 4 5 6 7 8

1 UMUM 50,100,000.00 - 35,070,000.00 35,070,000.00 0.48% 0.48% 2 DRAINASE 132,331,985.53 - 70,067,415.04 70,067,415.04 0.96% 0.96% 3 PEKERJAAN TANAH 383,385,448.23 - 205,296,253.71 205,296,253.71 2.82% 2.82% 4 PELEBARAN DAN PERKERASAN BAHU JALAN 847,425,300.00 - - - 0.00% 0.00% 5 PERKERASAN BERBUTIR 3,140,618,370.00 - 526,376,068.32 526,376,068.32 7.24% 7.24% 6 PERKERASAN ASPAL 2,628,526,398.70 - - - 0.00% 0.00% 7 STRUKTUR 90,339,780.00 - - - 0.00% 0.00%

A SUB TOTAL 7,272,727,282.46 - 836,809,737.07 836,809,737.07 S/D BULAN INI B PPN (10%) X A 727,272,728.25 - 83,680,973.71 83,680,973.71

C JUMLAH TOTAL A + B 8,000,000,010.70 - 920,490,710.78 920,490,710.78

D DIBULATKAN C 8,000,000,000.00 - 920,490,000.00 920,490,000.00 BULAN INI

E MATERIAL ON SITE (MOS)

F JUMLAH KOTOR SERTIFIKAT BULAN INI

G POTONGAN - POTONGAN S/D BULAN LALU

1 SERTIFIKAT S/D BULAN LALU (KOMULATIF)

-2 5 % JAMINAN PEMELIHARAAN ( 5% X D ) 46,024,500.00

3 20 % PENGEMBALIAN UANG MUKA 184,098,000.00

H JUMLAH POTONGAN ( 1 + 2 + 3 ) 230,122,500.00

I JUMLAH BERSIH SERTIFIKAT BULAN INI TERMASUK PPN 10% (F-H) 690,367,500.00

J DIBULATKAN 690,367,500.00

Terbilang : enam ratus sembilan puluh juta tiga ratus enam puluh tujuh ribu lima ratus rupiah

NILAI KONTRAK : Rp. 8,000,000,000.00,-11.51%

11.51%

11.51% 0.00% KONTRAK AWAL (Rp.)

DINAS BINA MARGA DAN CIPTA KARYA

PEMBANGUNAN JALAN DAN JEMBATAN WILAYAH XV SIMEULUE

2

SERTIFIKAT BULANAN

BULAN INI NOMOR MATA

PEMBAYARAN URAIAN PEKERJAAN

JUMLAH PEMBAYARAN MONTHLY CERTIFICATE (MC) DIPERIKSA/DISETUJUI OLEH : KONSULTAN SUPERVISI __________________ SITE ENGINEER MENYETUJUI OLEH : PPTK

PEMBANGUNAN JALAN DAN JEMBATAN WILAYAH XI (SIMEULUE)

Ir. ZULKARNEN, MT. Nip. 19640516 199703 1 001 DIAJUKAN OLEH :

PENYEDIA BARANG/JASA PT. FLAMBOYANT HUMA ARTA

ALWIN ABDULLAH DIREKTUR UTAMA

MENGETAHUI OLEH :

KUASA PENGGUNA ANGGARAN / KUASA PENGGUNA BARANG KEGIATAN PEMBANGUNAN JALAN DAN JEMBATAN

DINAS BINA MARGA DAN CIPTA KARYA ACEH

Ir. FAJRI, MT PEMBINA NIP. 19640831 199203 1 005

(4)

KEGIATAN : PEMBANGUNAN JALAN DAN JEMBATAN DINAS BINA MARGA DAN CIPTA KARYA ACEH SERTIFIKAT : 01 (SATU)

NAMA PAKET : PENINGKATAN JALAN SINABANG-SIBIGO BULAN : APRIL

NOMOR KONTRAK : 13/SPPK/PBJ/DBC/APBA/III/2012 TANGGAL : 25 APRIL 2012

TANGGAL KONTRAK : 21 MARET 2012 HALAMAN : 2 dari 8

NILAI KONTRAK : Rp.

8,000,000,000.00,-SUMBER DANA : APBA TAHUN ANGGARAN 2012

PENYEDIA JASA : PT. FLAMBOYANT HUMA ARTA

DIVISI 1. UMUM JUMLAH KONTRAK AWAL

KUANTITAS KONTRAK AWAL KUANTITAS JUMLAH HARGA (Rp.) KUANTITAS JUMLAH HARGA (Rp.) KUANTITAS JUMLAH HARGA (Rp.) 1 3 4 5 6 = 4 x 5 7 8 = 5 x 7 9 10 = 5 x 9 11 = 7 + 9 12 = 8 + 10

1.2

Mobilisasi

Ls

1.00

50,100,000.00

50,100,000.00

-

-

0.70

35,070,000.00

0.70

35,070,000.00

50,100,000.00

-

-

-

35,070,000.00

35,070,000.00

100.00%

0.00%

70.00%

70.00%

S/D BULAN INI

DINAS BINA MARGA DAN CIPTA KARYA

DIVISI 1. UMUM

TOTAL HARGA

TOTAL PEMBAYARAN

PERSENTASE

50,100,000.00 Rp JUMLAH HARGA AWAL (Rp.)

PEMERINTAH ACEH

PEMBANGUNAN JALAN DAN JEMBATAN WILAYAH XV SIMEULUE

2

SERTIFIKAT BULANAN

SAT. URAIAN PEKERJAAN NOMOR MATA PEMB.

S/D BULAN LALU BULAN INI

HARGA SATUAN (Rp.)

DISETUJUI OLEH : PEMBANTU PPTK PEMBANGUNAN JALAN DAN JEMBATAN

WILAYAH XI (SIMEULUE) RUSVAN VERIZAL, ST Nip. 19830706 201001 1029 DIPERIKSA OLEH : KONSULTAN SUPERVISI ________________ CHIEF INSPECTOR DIBUAT OLEH : PENYEDIA BARANG/JASA PT. FLAMBOYANT HUMA ARTA

SYAHRIZAL, ST. GENERAL SUPERINTENDENT

(5)

KEGIATAN : PEMBANGUNAN JALAN DAN JEMBATAN DINAS BINA MARGA DAN CIPTA KARYA ACEH SERTIFIKAT : 01 (SATU)

NAMA PAKET : PENINGKATAN JALAN SINABANG-SIBIGO BULAN : APRIL

NOMOR KONTRAK : 13/SPPK/PBJ/DBC/APBA/III/2012 TANGGAL : 25 APRIL 2012

TANGGAL KONTRAK : 21 MARET 2012 HALAMAN : 3 dari 8

NILAI KONTRAK : Rp.

8,000,000,000.00,-SUMBER DANA : APBA TAHUN ANGGARAN 2012

PENYEDIA JASA : PT. FLAMBOYANT HUMA ARTA

DIVISI 2. DRAINASE JUMLAH KONTRAK AWAL

KUANTITAS KONTRAK AWAL KUANTITAS JUMLAH HARGA (Rp.) KUANTITAS JUMLAH HARGA (Rp.) KUANTITAS JUMLAH HARGA (Rp.) 1 3 4 5 6 = 4 x 5 7 8 = 5 x 7 9 10 = 5 x 9 11 = 7 + 9 12 = 8 + 10

2.1

Galian Untuk Selokan Drainase dan Saluran Air

2,000.00

37,888.00

75,776,000.00

-

-

1,849.33

70,067,415.04

1,849.33

70,067,415.04

2.3.5

Gorong-Gorong Pipa Baja Bergelombang

Ton

1.50

37,703,990.35

56,555,985.53

-

-

-

-

-

-132,331,985.53

-

-

-

70,067,415.04

70,067,415.04

100.00%

0.00%

52.95%

52.95%

PEMBANGUNAN JALAN DAN JEMBATAN WILAYAH XV SIMEULUE

PERSENTASE

132,331,985.53 Rp

S/D BULAN LALU BULAN INI S/D BULAN INI

HARGA SATUAN (Rp.) JUMLAH HARGA AWAL (Rp.)

DIVISI 2. DRAINASE

DINAS BINA MARGA DAN CIPTA KARYA

2

SERTIFIKAT BULANAN

SAT. URAIAN PEKERJAAN NOMOR MATA PEMB.

TOTAL HARGA

TOTAL PEMBAYARAN

DISETUJUI OLEH : PEMBANTU PPTK PEMBANGUNAN JALAN DAN JEMBATAN

WILAYAH XI (SIMEULUE) RUSVAN VERIZAL, ST Nip. 19830706 201001 1029 DIPERIKSA OLEH : KONSULTAN SUPERVISI ________________ CHIEF INSPECTOR DIBUAT OLEH : PENYEDIA BARANG/JASA PT. FLAMBOYANT HUMA ARTA

SYAHRIZAL, ST. GENERAL SUPERINTENDENT

(6)

KEGIATAN : PEMBANGUNAN JALAN DAN JEMBATAN DINAS BINA MARGA DAN CIPTA KARYA ACEH SERTIFIKAT : 01 (SATU)

NAMA PAKET : PENINGKATAN JALAN SINABANG-SIBIGO BULAN : APRIL

NOMOR KONTRAK : 13/SPPK/PBJ/DBC/APBA/III/2012 TANGGAL : 25 APRIL 2012

TANGGAL KONTRAK : 21 MARET 2012 HALAMAN : 4 dari 8

NILAI KONTRAK : Rp.

8,000,000,000.00,-SUMBER DANA : APBA TAHUN ANGGARAN 2012

PENYEDIA JASA : PT. FLAMBOYANT HUMA ARTA

DIVISI 3. PEKERJAAN TANAH JUMLAH KONTRAK AWAL

KUANTITAS KONTRAK AWAL KUANTITAS JUMLAH HARGA (Rp.) KUANTITAS JUMLAH HARGA (Rp.) KUANTITAS JUMLAH HARGA (Rp.) 1 3 4 5 6 = 4 x 5 7 8 = 5 x 7 9 10 = 5 x 9 11 = 7 + 9 12 = 8 + 10

3.1.1

Galian Biasa

1,250.94

24,003.00

30,026,312.82

-

-

-

-

-

-3.2.1

Timbunan Biasa

2,000.00

71,022.00

142,044,000.00

-

-

-

-

-

-3.2.2

Timbunan Pilihan

1,221.83

106,227.00

129,791,335.41

-

-

1,221.83

129,791,335.41

1,221.83

129,791,335.41

3.3

Penyiapan Badan jalan

27,900.00

2,922.00

81,523,800.00

-

-

25,840.15

75,504,918.30

25,840.15

75,504,918.30

383,385,448.23

-

-

-

205,296,253.71

205,296,253.71

100.00%

0.00%

53.55%

53.55%

PERSENTASE

383,385,448.23 Rp

S/D BULAN LALU BULAN INI S/D BULAN INI

2

SERTIFIKAT BULANAN

SAT. URAIAN PEKERJAAN NOMOR MATA PEMB.

DIVISI 3. PEKERJAAN TANAH

TOTAL HARGA

TOTAL PEMBAYARAN

PEMERINTAH ACEH

PEMBANGUNAN JALAN DAN JEMBATAN WILAYAH XV SIMEULUE

HARGA SATUAN (Rp.)

JUMLAH HARGA AWAL

(Rp.)

DINAS BINA MARGA DAN CIPTA KARYA

DISETUJUI OLEH : PEMBANTU PPTK PEMBANGUNAN JALAN DAN JEMBATAN

WILAYAH XI (SIMEULUE) RUSVAN VERIZAL, ST Nip. 19830706 201001 1029 DIPERIKSA OLEH : KONSULTAN SUPERVISI ________________ CHIEF INSPECTOR DIBUAT OLEH : PENYEDIA BARANG/JASA PT. FLAMBOYANT HUMA ARTA

SYAHRIZAL, ST. GENERAL SUPERINTENDENT

(7)

KEGIATAN : PEMBANGUNAN JALAN DAN JEMBATAN DINAS BINA MARGA DAN CIPTA KARYA ACEH SERTIFIKAT : 01 (SATU)

NAMA PAKET : PENINGKATAN JALAN SINABANG-SIBIGO BULAN : APRIL

NOMOR KONTRAK : 13/SPPK/PBJ/DBC/APBA/III/2012 TANGGAL : 25 APRIL 2012

TANGGAL KONTRAK : 21 MARET 2012 HALAMAN : 5 dari 8

NILAI KONTRAK : Rp.

8,000,000,000.00,-SUMBER DANA : APBA TAHUN ANGGARAN 2012

PENYEDIA JASA : PT. FLAMBOYANT HUMA ARTA

DIVISI 4. PELEBARAN DAN PERKERASAN BAHU JALAN JUMLAH KONTRAK AWAL

KUANTITAS KONTRAK AWAL KUANTITAS JUMLAH HARGA (Rp.) KUANTITAS JUMLAH HARGA (Rp.) KUANTITAS JUMLAH HARGA (Rp.) 1 3 4 5 6 = 4 x 5 7 8 = 5 x 7 9 10 = 5 x 9 11 = 7 + 9 12 = 8 + 10

4.2.2

Lapis Pondasi Aggregat Klas B

1,860.00

455,605.00

847,425,300.00

-

-

-

-

-

-847,425,300.00

-

-

-

-

-100.00%

0.00%

0.00%

0.00%

PEMBANGUNAN JALAN DAN JEMBATAN WILAYAH XV SIMEULUE

PERSENTASE

847,425,300.00 Rp

S/D BULAN LALU BULAN INI S/D BULAN INI

HARGA SATUAN (Rp.)

JUMLAH HARGA AWAL

(Rp.)

DIVISI 4. PELEBARAN DAN PERKERASAN BAHU JALAN

DINAS BINA MARGA DAN CIPTA KARYA

2

SERTIFIKAT BULANAN

SAT. URAIAN PEKERJAAN NOMOR MATA PEMB.

TOTAL HARGA

TOTAL PEMBAYARAN

DISETUJUI OLEH : PEMBANTU PPTK PEMBANGUNAN JALAN DAN JEMBATAN

WILAYAH XI (SIMEULUE) RUSVAN VERIZAL, ST Nip. 19830706 201001 1029 DIPERIKSA OLEH : KONSULTAN SUPERVISI ________________ CHIEF INSPECTOR DIBUAT OLEH : PENYEDIA BARANG/JASA PT. FLAMBOYANT HUMA ARTA

SYAHRIZAL, ST. GENERAL SUPERINTENDENT

(8)

KEGIATAN : PEMBANGUNAN JALAN DAN JEMBATAN DINAS BINA MARGA DAN CIPTA KARYA ACEH SERTIFIKAT : 01 (SATU)

NAMA PAKET : PENINGKATAN JALAN SINABANG-SIBIGO BULAN : APRIL

NOMOR KONTRAK : 13/SPPK/PBJ/DBC/APBA/III/2012 TANGGAL : 25 APRIL 2012

TANGGAL KONTRAK : 21 MARET 2012 HALAMAN : 6 dari 8

NILAI KONTRAK : Rp.

8,000,000,000.00,-SUMBER DANA : APBA TAHUN ANGGARAN 2012

PENYEDIA JASA : PT. FLAMBOYANT HUMA ARTA

DIVISI 5. PERKERASAN BERBUTIR JUMLAH KONTRAK AWAL

KUANTITAS KONTRAK AWAL KUANTITAS JUMLAH HARGA (Rp.) KUANTITAS JUMLAH HARGA (Rp.) KUANTITAS JUMLAH HARGA (Rp.) 1 3 4 5 6 = 4 x 5 7 8 = 5 x 7 9 10 = 5 x 9 11 = 7 + 9 12 = 8 + 10

5.1.1

Lapis Pondasi Agregat Klas A

2,790.00

526,671.00

1,469,412,090.00

-

-

-

-

-

-5.1.2

Lapis Pondasi Agregat Klas B

3,720.00

449,249.00

1,671,206,280.00

-

-

1,171.68

526,376,068.32

1,171.68

526,376,068.32

3,140,618,370.00

-

-

-

526,376,068.32

526,376,068.32

100.00%

0.00%

16.76%

16.76%

PERSENTASE

3,140,618,370.00 Rp

S/D BULAN LALU BULAN INI S/D BULAN INI

2

SERTIFIKAT BULANAN

SAT. URAIAN PEKERJAAN NOMOR MATA PEMB.

DIVISI 5. PERKERASAN BERBUTIR

TOTAL HARGA

TOTAL PEMBAYARAN

PEMERINTAH ACEH

PEMBANGUNAN JALAN DAN JEMBATAN WILAYAH XV SIMEULUE

HARGA SATUAN (Rp.)

JUMLAH HARGA AWAL

(Rp.)

DINAS BINA MARGA DAN CIPTA KARYA

DISETUJUI OLEH : PEMBANTU PPTK PEMBANGUNAN JALAN DAN JEMBATAN

WILAYAH XI (SIMEULUE) RUSVAN VERIZAL, ST Nip. 19830706 201001 1029 DIPERIKSA OLEH : KONSULTAN SUPERVISI ________________ CHIEF INSPECTOR DIBUAT OLEH : PENYEDIA BARANG/JASA PT. FLAMBOYANT HUMA ARTA

SYAHRIZAL, ST. GENERAL SUPERINTENDENT

(9)

KEGIATAN : PEMBANGUNAN JALAN DAN JEMBATAN DINAS BINA MARGA DAN CIPTA KARYA ACEH SERTIFIKAT : 01 (SATU)

NAMA PAKET : PENINGKATAN JALAN SINABANG-SIBIGO BULAN : APRIL

NOMOR KONTRAK : 13/SPPK/PBJ/DBC/APBA/III/2012 TANGGAL : 25 APRIL 2012

TANGGAL KONTRAK : 21 MARET 2012 HALAMAN : 7 dari 8

NILAI KONTRAK : Rp.

8,000,000,000.00,-SUMBER DANA : APBA TAHUN ANGGARAN 2012

PENYEDIA JASA : PT. FLAMBOYANT HUMA ARTA

DIVISI 6. PERKERASAN ASPAL JUMLAH KONTRAK AWAL

KUANTITAS KONTRAK AWAL KUANTITAS JUMLAH HARGA (Rp.) KUANTITAS JUMLAH HARGA (Rp.) KUANTITAS JUMLAH HARGA (Rp.) 1 3 4 5 6 = 4 x 5 7 8 = 5 x 7 9 10 = 5 x 9 11 = 7 + 9 12 = 8 + 10

6.1.(1)(a) Lapis Resap Pengikat - Aspal Cair

Liter

13,950.00

11,249.00

156,923,550.00

-

-

-

-

-

-6.3.(6a) Laston Lapis Antara (AC-BC) (gradasi halus/kasar)

Ton

2,027.22

521,662.00

1,057,523,639.64

-

-

-

-

-

-6.3.8.a Aspal

Ton

126.20

10,809,425.00

1,364,149,435.00

-

-

-

-

-

-6.3.10

Bahan Pengisi (Filler) Tambahan

Kg

41,371.98

1,206.85

49,929,774.06

-

-

-

-

-

-2,628,526,398.70

-

-

-

-

-100.00%

0.00%

0.00%

0.00%

PEMBANGUNAN JALAN DAN JEMBATAN WILAYAH XV SIMEULUE

PERSENTASE

2,628,526,398.70 Rp

S/D BULAN LALU BULAN INI S/D BULAN INI

HARGA SATUAN (Rp.)

JUMLAH HARGA AWAL

(Rp.)

DIVISI 6. PERKERASAN ASPAL

DINAS BINA MARGA DAN CIPTA KARYA

2

SERTIFIKAT BULANAN

SAT. URAIAN PEKERJAAN NOMOR MATA PEMB.

TOTAL HARGA

TOTAL PEMBAYARAN

DISETUJUI OLEH : PEMBANTU PPTK PEMBANGUNAN JALAN DAN JEMBATAN

WILAYAH XI (SIMEULUE) RUSVAN VERIZAL, ST Nip. 19830706 201001 1029 DIPERIKSA OLEH : KONSULTAN SUPERVISI ________________ CHIEF INSPECTOR DIBUAT OLEH : PENYEDIA BARANG/JASA PT. FLAMBOYANT HUMA ARTA

SYAHRIZAL, ST. GENERAL SUPERINTENDENT

(10)

KEGIATAN : PEMBANGUNAN JALAN DAN JEMBATAN DINAS BINA MARGA DAN CIPTA KARYA ACEH SERTIFIKAT : 01 (SATU)

NAMA PAKET : PENINGKATAN JALAN SINABANG-SIBIGO BULAN : APRIL

NOMOR KONTRAK : 13/SPPK/PBJ/DBC/APBA/III/2012 TANGGAL : 25 APRIL 2012

TANGGAL KONTRAK : 21 MARET 2012 HALAMAN : 8 dari 8

NILAI KONTRAK : Rp.

8,000,000,000.00,-SUMBER DANA : APBA TAHUN ANGGARAN 2012

PENYEDIA JASA : PT. FLAMBOYANT HUMA ARTA

DIVISI 7. STRUKTUR JUMLAH KONTRAK AWAL

KUANTITAS KONTRAK AWAL KUANTITAS JUMLAH HARGA (Rp.) KUANTITAS JUMLAH HARGA (Rp.) KUANTITAS JUMLAH HARGA (Rp.) 1 3 4 5 6 = 4 x 5 7 8 = 5 x 7 9 10 = 5 x 9 11 = 7 + 9 12 = 8 + 10

7.9

Pasangan Batu

80.00

613,517.00

49,081,360.00

-

-

-

-

-

-7.10 (3) Bronjong

70.00

589,406.00

41,258,420.00

-

-

-

-

-

-90,339,780.00

-

-

-

-

-100.00%

0.00%

0.00%

0.00%

DIVISI 7. STRUKTUR

TOTAL HARGA

TOTAL PEMBAYARAN

90,339,780.00 Rp 2

SERTIFIKAT BULANAN

SAT. URAIAN PEKERJAAN NOMOR MATA PEMB.

PERSENTASE

PEMERINTAH ACEH

PEMBANGUNAN JALAN DAN JEMBATAN WILAYAH XV SIMEULUE

HARGA SATUAN (Rp.)

JUMLAH HARGA AWAL

(Rp.)

DINAS BINA MARGA DAN CIPTA KARYA

S/D BULAN LALU BULAN INI S/D BULAN INI

DISETUJUI OLEH : PEMBANTU PPTK PEMBANGUNAN JALAN DAN JEMBATAN

WILAYAH XI (SIMEULUE) RUSVAN VERIZAL, ST Nip. 19830706 201001 1029 DIPERIKSA OLEH : KONSULTAN SUPERVISI ________________ CHIEF INSPECTOR DIBUAT OLEH : PENYEDIA BARANG/JASA PT. FLAMBOYANT HUMA ARTA

SYAHRIZAL, ST. GENERAL SUPERINTENDENT

Referensi

Dokumen terkait

(2) Dalam hal Piutang Daerah dalam satuan mata uang asing, nilai piutang yang dihapuskan secara bersyarat adalah nilai yang setara dengan nilai sebagaimana dimaksud

[r]

G., 2007, The rising tide: assessing the risks of climate change and human settlements in low elevation coastal zones: Environment and Urbanization, Vol.. Ragoonaden

[r]

[r]

Hartford school, Harriet wrote and published a geography textbook that would. remain in print for some years and be adopted by

Kandungan senyawa dalam seledri diekstraksi dan difraksinasi dengan pelarut etil asetat dan etanol 80% hingga didapat fraksi etil asetat dan fraksi etanol sebagai larutan uji

Adanya masalab resistensi bakteri yang makin meningkat melatarbelak:angi dilakukannya penelitian mengenai uji daya antimikroba isolate mikroorganisme air sungai