Green Infrastructure Design Charrette Activity
Design Pieces & Legend
Coastal Green & Resilient
Infrastructure Project |
RI GRIP
www.crc.uri.edu/projects_page/gi-coastal-ri
2018
Legend: Green Infrastructure Charrette Activity
Green Infrastructure Components
Components of Stormwater System
Inlet
Conveyance
Treatment
Impervious pavement
4 ’ 4 ’
Porous/pervious pavement
4 ’ 4 ’
Impervious
pavement
Stone/Gravel
/ ip ap 4 ’ 4 ’
Riprap Channel Stone channel
Stone
detension
Soil filter with
grass
Tree Filter
’
’
Tree well
Tree (3
’
canopy each)
T ee 8 ’ anop
Catch Basin (not to scale)
Leaching Catch Basin (not to scale)
Pipe (not to scale)
Pipeline
Slotted Pipe (not to scale)
Slotted pipe
inlet
Sedimentation Basin (not to scale)
Inlet
Make your own! Draw other
amenities or components on the
Legend: Green Infrastructure Charrette Activity
Picnic Table (Not to Scale)
Trash can (Not to Scale)
Gazebo (Not to Scale)
Make your own! Draw on the blank square other amenities or components
Drainage
Catch Basin
Leaching Catch Basin
Sediment Basin
Slotted Pipe
Parking
Parking