TABEL 1

I. PEMBANGKIT / POWER PLANT MW 23,079.16 35,676.92 36,114.40 36,872.90 23,425.77 21,517.23 24,375.91 27,629.09 27,953.60 30,958.21

- PEMBANGKIT PLN / PLN'S POWER PLANT MW 13,698.52 20,552.69 20,591.78 20,761.69 21,058.83 21,517.23 21,206.33 22,340.59 22,515.10 24,846.21

- LISTRIK SWASTA / PRIVATE'S MW 96.44 651.80 651.80 1,608.80 2,366.94 - 3,169.58 5.288,5 * 5,438.50 6,112.00

- IUKS / CAPTIVE POWER 9,284.20 14,472.44 14,870.82 14,502.41 - - -

-II. SARANA TRANSMISI

SARANA TRANSMISI PLN / PLN'S TRANSMISSION LINES

- Transmisi TET / 500 kV TL (EHVTL) kms 1,501.51 2,665.46 2,767.66 2,774.00 2,849.00 3,207.00 3,607.61 3,578.27 3,578.27 5,047.78 - Transmisi TT / 25 kV s.d 150 kV TL (HVTL) kms 15,659.55 21,195.45 21,621.08 22,047.00 23,139.84 24,363.00 24,565.33 27,215.70 27,367.21 27,869.05

GARDU INDUK / SUB STATION

- Kapasitas / Transformer Capacity MVA 26,989.24 45,361.10 46,783.60 46,958.00 50,486 51,845.00 53,400.00 54,128.00 53,976.00 54,527.00 - Jumlah Gardu / Units unit 847.00 962.00 991.00 1,044 1,057.00 1,093.00 1,089.00 1,129.00 1,080.00 1,101.00

III. SARANA DISTRIBUSI / DISTRIBUTION FACILITIES SARANA DISTRIBUSI PLN / PLN'S DISTRIBUTION LINES kms

- J T M / Medium Voltage (6 - 20) kV kms 110,509.52 198,086.00 207,615.00 214,311.90 222,355 228,003.00 233,381.60 285,052.17 239,384.16 246,775.43 - J T R / Low Voltage (< 6 kV) kms 154,713.18 260,927.88 282,922.00 287,531.00 296,744 307,868.00 313,828.78 322,702.79 324,454.18 326,274.01

GARDU DISTRIBUSI / DISTRIBUTION SUBSTATION

- Kapasitas / Transformer Capacity MVA 14,847.25 24,678.10 25,063.12 27,550.00 28,585 29,712.66 30,255.52 30,595.13 29,013.33 32,873.70 - Jumlah Gardu / Units unit 124,624.00 210,656.00 208,727.00 222,992 244,544 230,288.00 230,841.00 241,394.00 254,966.00 259,444.00

(2)

TABEL 2

KAPASITAS TERPASANG PEMBANGKIT TENAGA LISTRIK NASIONAL

NATIONAL INSTALLED CAPACITIES BY TYPE OF POWER PLANT (MW)

TAHUN PLTU-M PLTD PLTG-M PLTGU-M PLTG-U PLTA PLTP PLTU-B PLTU-G PLTG-G PLTGU-G PLT-LK PLTM-G PLTM JUMLAH

YEAR STEAM DIESEL OIL FIRED COMBINED GAS HYDRO GEOTHER - STEAM STEAM NATURAL COMBINED DENDRO COMBINED Minihydro TOTAL OIL PP PP GAS TUR- CYCLE PP PP PP MAL PP COAL PP NATURAL GAS CYCLE PP THERMAL CYCLE

BINE PP GAS PP TURBINE PP

*) Tidak termasuk captive power / Not included captive power

(3)

TABEL 3

III. SARANA DISTRIBUSI / DISTRIBUTION LINES kms 459,013.88 502,532.00 502,532.00 501,842.90 519,099.05 535,870.25 547,210.38 607,754.96 563,838.34

J T M / Medium Voltage (6 s.d 20 kV) kms 198,086.00 219,610.00 219,610.00 214,312 222,355 228,002.86 233,381.60 285,052.17 239,384.16 J T R / Low Voltage (< 6 kV) kms 260,927.88 282,922.00 282,922.00 287,531 296,744 307,867.39 313,828.78 322,702.79 324,454.18 GARDU DISTRIBUSI / DISTRIBUTION SUBSTATION

(4)
(5)

TABEL 4

KAPASITAS TERPASANG PEMBANGKIT TENAGA LISTRIK MENURUT JENIS PEMBANGKIT PLN

PLN'S INSTALLED CAPACITIES BY TYPE OF POWER PLANT

(MW)

TAHUN PLTU-M PLTD PLTG-M PLTGU-M PLTA PLTP PLTU-B PLTU-G PLTG-G PLTGU-G PLTM-G JUMLAH

YEAR STEAM OIL DIESEL GAS TURBINE COMBINED HYDRO GEOTHER- STEAM STEAM NATU- NATURAL GAS COMBINED COMBINED TOTAL PP PP OIL PP CYCLE PP PP MAL PP COAL PP RAL GAS PP TURBINE PP CYCLE PP CYCLE PP

(6)
(7)

TABEL 5

KAPASITAS TERPASANG PEMBANGKIT TENAGA LISTRIK PLN MENURUT JENIS PEMBANGKIT PER WILAYAH 2006

PLN'S INSTALLED CAPACITY BY TYPE OF POWER PLANT AND BY REGION 2006

(MW)

KAPASITAS TERPASANG (MW) / INSTALLED CAPACITY

No WILAYAH/ REGION/ P L T A P LT P PLTU-M PLTU-B PLTU-G P L T D PLTG-M PLTG-G PLTGU-M PLTGU-G PLTM-G JUMLAH Nr. PROPINSI PROVINCE HYDRO GEO- STEAM STEAM STEAM DIESEL GAS NATURAL COMBINED COMBINED COMBINED TOTAL

THERMAL OIL COAL NATURAL TURBINE GAS CYCLE CYCLE CYCLE

(8)
(9)

TABEL 6

JUMLAH UNIT PEMBANGKIT PLN MENURUT JENIS PEMBANGKIT PER WILAYAH 2006

PLN'S NUMBER OF UNIT POWER PLAN BY TYPE OF POWER PLANT AND BY REGION 2006

(UNIT)

Number of PLTD PT PLN Tarakan is include PLTD/G (Diesel/Dual Fuel) IP mengubah PLTGU Grati dan PLTGU Pemaron menjadi PLTG / IP change PLTGU Grati and PLTGU Pemaron to PLTG

Catatan tahun 2006 : / Note in 2006 :

Jumlah unit pembangkit mengalami penurunan disebabkan koreksi angka dari Wil. NTT. / Number of unit power plant is discresed cause of correction on NTT

(10)
(11)

TABEL 7

RATED CAPACITY OF POWER PLANT

(MW)

TAHUN

PLTA

PLTU

PLTG

PLTGU

PLTP

PLTD*)

JUMLAH

YEAR

HYDRO

STEAM

GAS PP

COMBINED

GEOTHER-

DIESEL

TOTAL

PP

PP

CYCLE PP

MAL PP

PP

1997

2,409.01

6,107.00

992.25

5,563.54

360.00 1,792.09 17,223.89

1998

2,994.64

6,700.40 1,086.86

6,463.09

360.00 1,649.36 19,254.35

1999

2,985.10

6,671.50

997.81

6,264.09

360.00 1,890.45 19,168.95

2000

2,747.42

6,508.31

901.90

6,456.13

360.00 1,692.64 18,666.40

2001

2,952.45

6,502.28

1,054.82

6,306.19

379.62

1,694.48 18,889.84

2002

2,836.16

6,144.17

861.99

6,074.35

379.88 1,657.33 17,953.88

2003

3,122.93

6,185.50 1,457.00

5,923.40

360.00 1,730.41 18,779.24

2004

2,991.63

5,934.52 1,435.89

5,609.65

359.16 1,713.02 18,043.87

2005

3,079.53

5,657.07 2,829.11

5,854.39

339.86 1,776.42 19,536.38

2006

3,283.24

7,608.16 2,323.48

6,493.77

373.71 1,937.27 22,019.63

DAYA MAMPU KAPASITAS TERPASANG PEMBANGKIT TENAGA LISTRIK PLN

(12)

TABEL 8

DAYA MAMPU KAPASITAS TERPASANG PEMBANGKIT TENAGA LISTRIK PLN MENURUT JENIS PEMBANGKIT PER WILAYAH 2006

RATED CAPACITY OF POWER PLANT BY TYPE AND BY REGION 2006

(13)

J a w a J A V A 2,207.05 6,842.60 1,797.96 5,713.77 353.71 75.07 - 16,990.16 77.16

(14)

DAYA MAMPU KAPASITAS TERPASANG PEMBANGKIT TENAGA LISTRIK PLN MENURUT JENIS PEMBANGKIT PER WILAYAH (MW) 2006

PLN’S CAPABILITY OF INSTALLED CAPACITY POWER PLANT BY TYPE AND BY REGION (MW) 2006

(15)

TABEL 32

PEMBANGKIT LISTRIK SWASTA PER WILAYAH DESEMBER 2006

THE PRIVATE POWER BY REGION DECEMBER 2006

(MW)

WILAYAH

REGION

PLTP

PLTU-B

PLTD

PLTGU-G

PLTM

GEO-

STEAM

DIESEL

COMBINED

Minihydro

THERMAL

COAL

CYCLE

SUMATERA SELATAN

South Sumatera

-

-

-

200.00

200.00

SULAWESI SELATAN

South Sulawesi

-

-

60.00

200.00

260.00

SULAWESI TENGAH

Center Sulawesi

-

-

-

-

3.00

3.00

DIST JAWA TIMUR

Dist. of East Jawa

-

2,450.00

-

-

2,450.00

DIST. JAWA TENGAH

Dist of Central Java

60.00

1,920.00

-

-

1,980.00

DIST JAWA BARAT

Dist. Of West Jawa

345.00

-

-

474.00

819.00

BANTEN

Banten

400.00

400.00

JUMLAH

TOTAL

405.00

4,770.00

60.00

874.00

3.00

6,112.00

(16)

2001 2002 2003 2004 2005

(17)

2006

(18)

TABEL 10

JARINGAN TRANSMISI DAN DISTRIBUSI PLN PER WILAYAH 2005

PLN'S TRANSMISSION AND DISTRIBUTION LINES BY REGION 2005

SARANA JARINGAN TRANSMISI/ SARANA JARINGAN DISTRIBUSI/DISTRIBUTION

TRANSMISSION LINES LINES

No. J T E T J T T GARDU INDUK J T M/ J T R/ GARDU DISTRIBUSI

Nr. WILAYAH / REGION E H V H V SUB STATION MEDIUM LOW DIST. SUBSTATION

kms kms Buah VOLTAGE VOLTAGE Buah

kmc kmc Units (MVA) kms/kmc kms/kmc Units (MVA) 1 NANGGROE ACEH DARUSSALAM Nanggroe Aceh Darussalam - - - - 9,049.78 10,664.00 4,842 342.00

LUAR JAWA OUT SIDE JAVA 0.00 12,640.50 349 8,934.00 127,671.43 135,328.01 85,444.00 8,892.76

(19)
(20)

128,788 124,961

(21)

TABEL 28

KAPASITAS TERPASANG PEMBANGKIT TENAGA LISTRIK CAPTIVE POWER MENURUT JENIS PEMBANGKIT YANG TELAH MEMPUNYAI IZIN DI TIAP PROPINSI S/D 31 DESEMBER 2000

CAPTIVE POWER PERMITTED INSTALLED CAPACITY BY TYPE OF POWER PLANT AND PROVINCE UP TO DECEMBER, 31 2000

(MW)

PROPINSI

PROVINCE

P L T A

PLTU-M

PLTU-BB

PLTU - G

P L T D

P L T G

PLTU-LK

No.

HYDRO

STEAM

STEAM

STEAM

DIESEL

GAS

DENDRO

Nr.

PP

OIL

COAL

NATURAL

PP

TURBINE

THERMAL

PP

PP

GAS PP

PP

PP

11. KALIMANTAN SELATAN

SOUTH KALIMANTAN

- - 67.70 2.20 173.55 86.84 3.20 333.49

12. KALIMANTAN TIMUR

EAST KALIMANTAN

- - 34.00 232.13 367.28 139.06 11.60 784.07

13. SULAWESI UTARA

NORTH SULAWESI

- - - - 34.92 - - 34.92

14. SULAWESI TENGAH

CENTRAL SULAWESI

- - - - 1.07 - - 1.07

15. SULAWESI TENGGARA

SOUTH EAST SULAWESI

- 7.50 - - 31.56 - - 39.06

16. SULAWESI SELATAN

SOUTH SULAWESI

191.22 42.03 - 69.20 209.64 - 12.38 524.47

17. M A L U K U

MALUKU

- - - - 67.54 - - 67.54

18. IRIAN JAYA

IRIAN JAYA

5.60 - - - 94.97 - - 100.57

19. B A L I

BALI

- - - - 57.13 - - 57.13

20. NUSA TENGGARA BARAT

WEST NUSA TENGGARA

- - 161.08 - 64.53 - - 225.61

21. NUSA TENGGARA TIMUR

EAST NUSA TENGGARA

- - - 0.00

LUAR JAWA

OUTSIDE JAVA

196.82 49.53 274.78 731.02 2,361.34 683.07 189.12 4,485.68

22. JAWA TIMUR

EAST JAVA

0.04 28.95 - 212.72 515.13 88.09 45.06 889.99

INDONESIA

INDONESIA

354.14 78.48 415.85 1,579.22 5,183.32 885.89 253.86 8,750.75

*) sejak tahun 1984 (kumulatif)

JUMLAH

(22)
(23)

TABEL 30

KAPASITAS TERPASANG PEMBANGKIT TENAGA LISTRIK CAPTIVE POWER MENURUT JENIS PEMBANGKIT YANG TELAH MEMPUNYAI IZIN DI TIAP PROPINSI JANUARI 2000 S/D 31 DESEMBER 2000

CAPTIVE POWER PERMITTED INSTALLED CAPACITY BY TYPE OF POWER PLANT AND PROVINCE FROM JANUARY 2000 UP TO DECEMBER, 31 20

(MW)

PROPINSI PROVINCE

P L T A PLTU-M PLTU-BB PLTU - G P L T D P L T G PLTU-LK

No. HYDRO STEAM STEAM STEAM DIESEL GAS DENDRO

Nr. PP OIL COAL NATURAL PP TURBINE THERMAL

PP PP GAS PP PP PP

10. KALIMANTAN TENGAH CENTRAL KALIMANTAN 0.00 0.00 0.00 0.00 12.23 0.00 0.00

11. KALIMANTAN SELATAN SOUTH KALIMANTAN 0.00 0.00 60.00 0.00 40.04 0.00 0.00

12. KALIMANTAN TIMUR EAST KALIMANTAN 0.00 0.00 0.00 0.00 20.07 181.08 0.00

13. SULAWESI UTARA NORTH SULAWESI 0.00 0.00 0.00 0.00 0.00 0.00 0.00

14. SULAWESI TENGAH CENTRAL SULAWESI 0.00 0.00 0.00 0.00 0.00 0.00 0.00

15. SULAWESI TENGGARA SOUTH EAST SULAWESI 0.00 0.00 0.00 0.00 66.29 0.00 0.00

(24)
(25)

TABEL 40

KAPASITAS TERPASANG PEMBANGKIT TENAGA LISTRIK CAPTIVE POWER MENURUT JENIS PEMBANGKIT YANG TELAH MEMPUNYAI IZIN DI TIAP PROPINSI S/D 31 DESEMBER 1999 *)

CAPTIVE POWER PERMITTED INSTALLED CAPACITY BY TYPE OF POWER PLANT AND PROVINCE UPTO DECEMBER,31 1999

(MW)

P L T A PLTU-M PLTU-BB PLTU - G P L T D P L T G PLTU-LK JUMLAH

No. PROPINSI PROVINCE HYDRO STEAM STEAM STEAM DIESEL GAS DENDRO TOTAL

PP OIL COAL NATURAL PP TURBINE THERMAL

11. KALIMANTAN SELATAN SOUTH KALIMANTAN - 7.50 55.00 2.20 156.44 1.30 3.20 225.64

12. KALIMANTAN TIMUR EAST KALIMANTAN - 15.63 - 263.05 373.50 139.06 11.60 802.84

13. SULAWESI UTARA NORTH SULAWESI - - - - 34.92 - - 34.92

14. SULAWESI TENGAH CENTRAL SULAWESI - - - - 1.07 - - 1.07

15. SULAWESI TENGGARA SOUTH EAST SULAWESI - - - - 31.56 - - 31.56

16. SULAWESI SELATAN SOUTH SULAWESI 191.22 26.40 - 69.20 209.64 - 12.38 508.84

17. M A L U K U MALUKU - - - - 67.54 - - 67.54

INDONESIA INDONESIA 895.39 78.48 136.20 1,726.29 5,117.68 800.35 253.86 9,008.25

(26)

TABEL 29

KAPASITAS TERPASANG PEMBANGKIT TENAGA LISTRIK CAPTIVE POWER MENURUT JENIS PEMBANGKIT DI TIAP PROPINSI S/D 31 DESEMBER 2000 *)

NON PLN (CAPTIVE POWER) INSTALLED CAPACITY BY TYPE OF POWER PLANT AND PROVINCE UP TO DECEMBER, 2000

(MW)

PROPINSI PROVINCE

P L T A PLTU-M PLTU-BB PLTU-G P L T D P L T G PLTU-LK

No. HYDRO STEAM STEAM STEAM DIESEL GAS DENDRO

Nr. PP OIL COAL NATURAL PP TURBINE THERMAL

PP PP GAS PP PP PP

11. KALIMANTAN SELATAN SOUTH KALIMANTAN 0.00 7.50 68.75 0 204.26 85.54 13.10 379.15

12. KALIMANTAN TIMUR EAST KALIMANTAN 0.00 20.83 167.08 188.03 345.41 357.82 25.50 1,104.67

13. SULAWESI UTARA NORTH SULAWESI 0.00 0.00 0.00 0 39.88 0.00 0.00 39.88

LUAR JAWA OUTSIDE JAVA 1,019.16 238.30 253.27 1,514.16 3,145.58 1,444.50 280.64 7,895.61

22. JAWA TIMUR EAST JAVA 0.00 107.11 0.00 226.39 800.88 221.51 5.88 1,361.77

INDONESIA INDONESIA 1,176.44 421.66 322.47 2,288.43 8,507.47 2,205.62 298.04 15,220.13

*) Berdasarkan permohonan calon pemegang IUKS *) Based on the IUKS Proposals

JUMLAH

(27)

TABEL 25

KAPASITAS TERPASANG PEMBANGKIT TENAGA LISTRIK PRIVATE POWER MENURUT JENIS PEMBANGKIT YANG TELAH MEMPUNYAI IZIN DI TIAP PROPINSI S/D 31 DESEMBER 2000

PRIVATE POWER LEGALIZED INSTALLED CAPACITY BY TYPE OF POWER PLANT AND PROVINCE UP TO DECEMBER, 31 2000

(MW)

PROPINSI PROVINCE

P L T A PLTGU-M PLTGU-G PLTU-BB PLTU - G P L T D P L T G PLTG-M PLTU-LK

No. HYDRO STEAM STEAM STEAM DIESEL GAS DENDRO

Nr. PP OIL COAL NATURAL PP TURBINE THERMAL

(28)

3*460

(29)

TABEL 27

KAPASITAS TERPASANG PEMBANGKIT TENAGA LISTRIK PRIVATE POWER MENURUT JENIS PEMBANGKIT

YANG TELAH MEMPUNYAI IZIN DI TIAP PROPINSI S/D 31 DESEMBER 2000

PRIVATE POWER LEGALIZED INSTALLED CAPACITY BY TYPE OF POWER PLANT AND PROVINCE UP TO DECEMBER,31 2000

P L T A

PLTU-M

PLTU-BB PLTU - G

P L T D

P L T G

P L T P

PLTU-LK

JUMLAH

No.

PROPINSI

PROVINCE

HYDRO

STEAM

STEAM

STEAM

DIESEL

GAS

GEO

DENDRO

TOTAL

PP

OIL

COAL

NATURAL

PP

TURBINE THERMAL THERMAL

(30)

TABEL

GKIT LISTRIK SWASTA YANG BEROPERASI DAN TE

POWER LEGALIZED INSTALLED CAPACITY ON GOIN

(MW)

NO.

JENIS PEMBANGKIT

JUMLAH

1

PLTA

1.96

-2

PLTD

208.59

-3

PLTU

2,554.00

4

PLTMH

0.03

-5

PLTGU Sengkang

285.00

-6

PLTU-B

120.00

3,169.58

(31)

TABEL

KAPASITAS TERPASANG PEMBANGKIT LISTRIK SWASTA YANG BEROPERASI D

PRIVATE POWER LEGALIZED INSTALLED CAPACITY O

(MW)

NO.

PERUSAHAAN

JENIS IUPL

1

Anggrek Mekar Sari, PT

Pembangkit

2

Sinar Siwo Mego, Koperasi Listrik Perdesaan (KLP)

Terintegrasi

(32)
(33)

TABEL

TERPASANG PEMBANGKIT LISTRIK SWASTA YANG BEROPERASI DAN BELUM MEMPUNYAI I

PRIVATE POWER INSTALLED CAPACITY ON GOING UP TO 2003

(MW)

NO.

PERUSAHAAN

JENIS PEMBANGKIT

JUMLAH

PLTA

1

Perum Jasa Tirta II

PLTA Jatiluhur

165.00

Pembelian

613,709 Mwh

2

Jawa Power, PT

PLTU Paiton Swasta II

1,220.00

PLN

8,472,165 Mwh

3

Makassar Power, PT

PLTD Pare-pare

60.00

4

Unocal Geothermal Indonesia, PT

PLTP Gunung Salak

70.00

9,085,874 Mwh

5

Amoseas Indonesia, PT

PLTP Darajat

70.00

30,696

7

Magma Nusantara Ltd.

PLTP Wayang Windu

220.00

8

Geo Dipa Energi, PT

PLTP Dieng

180.00

9

Geo Dipa Energi, PT

PLTP Patuha

180.00

11

Tenaga Listrik Sibolga, PT

PLTU Sibolga A

200.00

12

Tenaga Listrik Amurang, PT

PLTU Amurang

110.00

13

Astrigita Prasarana, PT

PLTGU Palembang Timur

150.00

14

Bajradaya Sentranusa, PT

PLTA Asahan

180.00

15

Dizamatra Powerindo, PT

PLTP Sibayak

10.00

16

Lakota Trimas Bina Energi, PT

PLTP Kamojang

60.00

17

Yala Teknosa Geothermal, PT

PLTP Cibuni

10.00

18

Unocal North Sumatera Geothermal, Ltd/Parama

PLTP Sarulla

330.00

Nusantara, PT

19

Bali Energi, Ltd

PLTP Bedugul

175.10

20

Karaha Bodas, PT

PLTP Karaha Bodas

220.00

21

Daya Listrik Pratama, PT

PLTU Cilegon

400.00

22

Citra Kartika Daya, PT

PLTGU Cilacap

450.00

23

Tanjung Jati Power Company, PT

PLTU Tanjung Jati A

1,320.00

(34)

25

Power Jawa Barat, PT

PLTU Serang

450.00

26

East Java Power Corporation, PT

PLTGU Pasuruan

500.00

8,050.10

(35)

PLTP

3,356,405

2,958,627

6,315,031

(36)

37

TABEL 37

KAPASITAS TERPASANG PEMBANGKIT TENAGA LISTRIK PRIVATE POWER MENURUT JENIS PEMBANGKIT YANG TELAH MEMPUNYAI IZIN DI TIAP PROPINSI S/D 31 MARET 1999

PRIVATE POWER LEGALIZED INSTALLED CAPACITY BY TYPE OF POWER PLANT AND PROVINCE UP TO MARCH, 31 1999

(MW)

P L T A PLTU-M PLTU-BB PLTU - G P L T D PLTG-M PLTG-G PLTGU-M PLTGU-G P L T P PLTU-LK

No. PROPINSI PROVINCE HYDRO STEAM STEAM STEAM DIESEL GAS NATURAL COMBINE COMBINE GEO DENDRO

PP OIL COAL NATURAL PP TURBINE GAS CYCLE CYCLE THERMAL THERMAL TURBINE

(37)

Gambar

TABEL 1SARANA PENYEDIAAN TENAGA LISTRIK NASIONAL
TABEL 2
TABEL 3SARANA PENYEDIAAN TENAGA LISTRIK PLN
TABEL 4KAPASITAS TERPASANG PEMBANGKIT TENAGA LISTRIK MENURUT JENIS PEMBANGKIT PLN
+7

Referensi

Dokumen terkait

Sertifikat Layak Operasi (SLO). h) Pembangkit Listrik Tenaga Surya Fotovoltaik, Pembangkit Listrik Berbasis Sampah Kota dan Pembangkit Listrik Tenaga Air sampai dengan kapasitas 10

Data penelitian yang dikumpulkan antara lain kapasitas terpasang dan daya mampu Pembangkit Listrik Tenaga Diesel, pengoperasian pembangkit listrik, data beban listrik

Jika ketersediaan bahan bakar pembangkit yang murah dan dalam jumlah besar terjamin, maka pemerintah melalui PLN dapat segera memperbesar kapasitas produksi listrik,

JUMLAH UNIT PEMBANGKIT TENAGA LISTRIK PLN MENURUT JENIS PEMBANGKIT PER WILAYAH 2007 PLN'S NUMBER OF UNIT POWER PLANT BY TYPE OF POWER PLANT AND BY REGION

Peraturan Menteri Energi dan Sumber Daya Mineral Nomor 19 Tahun 2015 tentang Pembelian Tenaga Listrik Dari Pembangkit Listrik Tenaga Air Dengan Kapasitas Sampai Dengan 10 MW

Peraturan Menteri Energi dan Sumber Daya Mineral Nomor 19 Tahun 2015 tentang Pembelian Tenaga Listrik Dari Pembangkit Listrik Tenaga Air Dengan Kapasitas Sampai Dengan 10 MW

Menguraikan data potensi energi primer, wilayah usaha, konsumsi tenaga listrik, kapasitas pembangkit terpasang tenaga listrik, sistem transmisi, sistem distribusi, Rasio

Pada tahap studi awal, PLTM Kr Jambopapeun memiliki debit rancangan 11,87 m³/s, tinggi jatuh efektif 107 m, kapasitas terpasang 10,8 MW dan kapasitas listrik dapat terjual 71,195