• Tidak ada hasil yang ditemukan

290518 Metode Erection + jadwal .pdf

N/A
N/A
Protected

Academic year: 2021

Membagikan "290518 Metode Erection + jadwal .pdf"

Copied!
31
0
0

Teks penuh

(1)

JEMBATAN KALI KUTO

JEMBATAN KALI KUTO

STA 412+116

STA 412+116

PROYEK JALAN T

PROYEK JALAN TOL BA

OL BAT

TANG SEMARANG SEKSI 1 –

ANG SEMARANG SEKSI 1 – 2

2

(Sta.

(2)

Nama Proyek

Nama Proyek

Design and Build Pembangunan Jalan

Design and Build Pembangunan Jalan

Tol

Tol Bata

Batang

ng –– Sema

Semarang

rang (Sta

(Sta.

. 375

375+000

+000 sd

sd Sta.

Sta. 449

449+200

+200))

LLo

ok

ka

assii

:

: B

Ba

atta

an

ng – S

g – Se

em

ma

arra

an

ng

g 7

74

4,,2

20

0 K

Km

m

P

Pe

em

miilliik

k P

Prro

oy

ye

ek

k

: P

: PTT. J

. Ja

assa

am

ma

arrg

ga

a SSe

em

ma

arra

an

ng B

g Ba

atta

an

ng

g

Kon

Konsul

sultan

tan Per

Perenc

encana

ana : PT. Pe

: PT. Peren

rencan

cana

a Dja

Djaya

ya

SSiiffa

at K

t Ko

on

nttrra

ak

k

:

: D

De

essiig

gn

n a

an

nd

d B

Bu

uiilld

d

JJe

en

niiss K

Ko

on

nttrra

ak

k

:

: LLu

um

mp

p ssu

um

mp

p ((ffiix

xe

ed

d p

prriic

ce

e))

SSu

um

mb

be

er

r D

Da

an

na

a

:

: P

PTT.

. JJa

assa

am

ma

arrg

ga

a SSe

em

ma

arra

an

ng

g B

Ba

atta

an

ng

g

Wa

Wakt

ktu Pe

u Pela

laks

ksan

anaa

aan

n

: 793 Ha

: 79

3 Hari

ri

Ma

Masa P

sa Pem

emel

elih

ihar

araa

aan

n

: 36

: 365 Ha

5 Hari

ri Ka

Kale

lend

nder

er

M

Ma

assa

a P

Pe

errffo

orrm

ma

a

: 2

:

2 TTa

ah

hu

un

n 2

2 B

Bu

ulla

an

n

4

4

414+300 (36,1 Km) 414+300 (36,1 Km)

Data UmumProyek

Data UmumProyek

(3)

1

1 Be

Bent

ntan

ang

g Je

Jemb

mbat

atan

an

-- 30 + 100 + 30 m

30 + 100 + 30 m

-- Str

Strukt

uktur : Gi

ur : Girde

rder + Ste

r + Steel Ar

el Arch Bo

ch Box

x + Gir

+ Girder 

der 

2

2 Pondasi

Pondasi

-- Jen

Jenis Po

is Ponda

ndasi : B

si : Bore P

ore Pile 1

ile 1,5 m

,5 m

-- Ju

Juml

mlah

ah bo

bore

re pi

pile

le

P1,P

P1,P2: @ 80

2: @ 80 titik

titik, Total 1

, Total 160

60 titik

titik

 A1,A2:

 A1,A2: @ 16

@ 16 titik, Total

titik, Total 32

32 titik

titik

Total (192 titik)

Total (192 titik)

-- Di

Dim

men

ensi

si fo

foo

ottin

ing

g

P1,P

P1,P2 : @ 2

2 : @ 22,65

2,65 x 34,5

x 34,5 x 3,5

x 3,5 m

m

 A1,A2 :

 A1,A2 : @ 34,5 x

@ 34,5 x 7,85 x 2

7,85 x 2 m

m

3

3 Kolom

Kolom

-- A1,

A1,A2 : Di

A2 : Dindi

nding

ng Bet

Beton(

on(dim 3

dim 32,8

2,8 x 8,8 x 2 m)

x 8,8 x 2 m)

-- P1,

P1,P2 : D

P2 : Dind

inding

ing Bet

Beton

on den

dengan

gan pen

pengak

gaku

u (di

(dim 46,

m 46,3x1

3x11,8

1,8x3 m

x3 m))

4

4 Slab

Slab

-- A

A1

1 - P

- P1

1

PC

PCI Gir

I Girder

der 30m

30m -- ste

steel d

el dek

ek -- sla

slab be

b beton

ton 25 c

25 cm -

m - bla

blak

k top

top

-- P

P1

1 - P

- P2

2

1. Steel Girder trans

1. Steel Girder transversal 32m

versal 32m jumlah 20 bh

jumlah 20 bh

2. Steel steffener /

2. Steel steffener /pengaku Girder transvers

pengaku Girder transversal

al 5,03m

5,03m

3. Strand penggantung @strand 33 x 15,8mm

3. Strand penggantung @strand 33 x 15,8mm

4. Struktur Pelengkung box steel 2,5 x 1,5 m

4. Struktur Pelengkung box steel 2,5 x 1,5 m

5. Sl

5. Slab bet

ab beton

on 30

30 cm, Bl

cm, Black Top

ack Top

-- P

P2

2 - A

- A1

1

PC

PCI Gird

I Girder 30

er 30m -

m - ste

steel de

el dek

k -- sla

slab bet

b beton

on 25 cm -

25 cm - bla

black to

ck top

p

Identifikasi Desain Jembatan Kali Kuto

Identifikasi Desain Jembatan Kali Kuto

1

1

2

2

3

3

4

4

(4)

Time Line Jembatan Kali Kuto

Time Line Jembatan Kali Kuto

Basic Design

Basic Design

-- Jemb

Jembata

atan

n Kon

Konven

vensiona

sionall

PCI Girder

PCI Girder

-- Ju

Juml

mlah

ah be

bent

ntan

ang

g 3

3

(50+50+30)m

(50+50+30)m

Ijin

Ijin pelak

pelaksaan

saan kon

konstru

struksi

ksi

PSDA,

PSDA,

Sura

Suratt Kepu

Keputusa

tusan

n PTSP

PTSP No.

No.

616/2355/2017,

616/2355/2017, T

Tgl

gl 21

21

Mar

Maret

et 201

2017

7

Surat

Surat BP

BPJT rev

JT review basic

iew basic

desi

design Kali Kut

gn Kali Kuto

o no.

no.

JL.03.04-P

JL.03.04-P/125, T

/125, Tgl

gl 9 Mei

9 Mei

2017

2017

Pres

Present

entasi

asi desa

desain

in Kali K

Kali Kuto

uto

kepada

kepada BPJ

BPJT

T, T

, Tgl

gl 6 Juni

6 Juni

2017

2017

Rapat

Rapat BP

BPJT per

JT persetujuan

setujuan

review

review Jembata

Jembatan

n Kali Kuto

Kali Kuto

(Jembatan

(Jembatan Pelengkung) T

Pelengkung) Tgl

gl

20 Ju

20 Juli

li 201

2017

7

Pros

Proses d

es desai

esain

n dan

dan appr

approva

ovall

Penambahan 12 Titik

Penambahan 12 Titik

Borepile dari desain

Borepile dari desain

sebelumnya atas Instruksi

sebelumnya atas Instruksi

KKJTJ melalui Surat no.

KKJTJ melalui Surat no.

Um.01.03-KKJTJ.03/241

Um.01.03-KKJTJ.03/241

Tanggal 13 Desember 2017

Tanggal 13 Desember 2017

Proses pelaksanaan

Proses pelaksanaan

Kons

Konstruk

truksi

si mulai

mulai Janua

Januari

ri

2018

2018

     4      4      3      3      0      0      0      0 P1 P1      5      5      0      0      7      7      2      2      9      9      0      0      0      0      0      0      2      2      0      0      0      0      0      0 30.830.8x1.x1.7x7x2.2.11      7      7      5      5      0      0      0      0 A2 A2      2      2      0      0      0      0      0      0 P2 P2      3      3      7      7      8      8      5      5      3      3      7      7      7      7      7      7      4      4      3      3      0      0      0      0      5      5      0      0      8      8      8      8 50.50.8x8x2.2.3x23x2.1.1 115201 115201 31605 31605 A1 A1 30.8x1.7x2.1 30.8x1.7x2.1 31605 31605 51991 51991

(5)

Potong

(6)

Metode Tahap Konstruksi Jembatan Kali Kuto

Metode Tahap Konstruksi Jembatan Kali Kuto

(7)

Overview Jembatan Kali Kuto

Overview Jembatan Kali Kuto

(8)

Overview Jembatan Kali Kuto

Overview Jembatan Kali Kuto

(9)

Dokumentasi Pekerjaan

(10)

Dokumentasi Pekerjaan

(11)

Dokumentasi Pekerjaan

(12)

Dokumentasi Pekerjaan

(13)

Segmental Jembatan Kali Kuto

Segmental Jembatan Kali Kuto

Bo

Box Arc

x Arch Segm

h Segmen

en 3

3

Hanger

Hanger

(33 pcs)

(33 pcs)

Cross Beam Arch

Cross Beam Arch

Cross Girder

Cross Girder

(20 pcs)

(20 pcs)

Selongsong

Selongsong

hanger

hanger

Steel deck

Steel deck

LRB Tumpuan

LRB Tumpuan

Exp

(14)

Schedule Material Import UB

Schedule Material Import UB

Kali Kuto

Kali Kuto

N

Noo.. CCoommmmooddiittyy Type ofType of Commodity Commodity Type of Type of Import Import County of County of Origin Origin Freigh Freigh tt ETDETD ETA ETA Tanjung Tanjung Priok / Air Priok / Air Port Port Custom Custom Clearance

Clearance EETTA A SSiittee BB//LL HHS S CCooddee SSttaattuus s ppeer r ttaannggggaal l 1122//0044//22001188

11

PC Strand 15.70 mm, PC Strand 15.70 mm, HDPE Sheating and HDPE Sheating and Wax Coating Wax Coating

M a

M at et erriiaal l f of or r HHaanngge re r PPeerrm am anneenntt SSlloovvaakkiiaa LLaauutt 2288//0033/ 2/ 2001188 0011//0055/ 2/ 200118 8 110 0 1 21 2/ 0/ 055/ 2/ 2001188 996644116655008866

7312.10.65; 7312.10.65; 7312.10.69; 7312.10.69; 7312.10.99 7312.10.99 Dalam Perjalanan Dalam Perjalanan

228/8/0303/2/2010188 331/1/0303/2/201018 8 SSelelesesai ai 0303/0/04/4/20201818 2020474706063939535344

Telah melewati Bea Cukai Bandara Telah melewati Bea Cukai Bandara Soekarn

Soekarno-Hatta, Mobilisasi ke o-Hatta, Mobilisasi ke sitesite tanggal 03/04/2018

tanggal 03/04/2018 2200//0044//22001188 0044//0055//2200118 8 110 0 1155//0055//22001188 PPrreeppaarraattiioonn 33 Heavy LifitingHeavy Lifiting

Equipment Equipment

Equipment for Equipment for lowering the arch

lowering the arch T eT em pm po ro ra ra ryy SSwwiit zt ze re rlla na ndd LLa ua utt 115 /5 /0033/ 2/ 2001188 220 /0 /0044/ 2/ 200118 8 110 0 0 10 1/ 0/ 055/ 2/ 2001 81 8 SSA TA TT 0T 0000055113388 884 24 288. 9. 9000000 DDa la laam m P eP errj aj alla na naann 44 Equipment for Equipment for Installation of Cable Installation of Cable Stayed Stayed Equipment for Equipment for hanger installation

hanger installation TeTempmpororararyy FrFranancece LaLauutt 221/1/0303/2/2010188 220/0/0404/2/201018 8 110 0 0101/0/05/5/202018HLC18HLCULULE1E1181803034141727299 8842428.8.90900000 DaDalalam m PePerrjajallanananan

55 SStteeeel Tl Tuubbee MMaatteerriiaal fl foor Hr Haannggeerr PPeerrmmaanneenntt VViieettnnaamm UUddaarraa 3311//0033//22001188 0033//0044//22001188 SSeelleessaaii 1111//0044//22001188 666666881155224455 77330044..22221100 Sudah sampai di kantor PT. FreyssinetSudah sampai di kantor PT. Freyssinet Total Technology 11/04/2018 Total Technology 11/04/2018 66 HHDDPPEE MMaatteerriiaal l ffoor r HHaannggeerr PPeerrmmaanneenntt FFrraannccee LLaauutt 2222//0022//22001188 2288//0033//22001188 SSeelleessaaii MMOOLLUU2288001144887700998800 33990011

Telah melewati Bea Cukai Pelabuhan Telah melewati Bea Cukai Pelabuhan Tj.Priuk, Mobilisasi ke site tanggal Tj.Priuk, Mobilisasi ke site tanggal 04/04/2018

04/04/2018 77 1 B1 Box ox of of EqEquiuipmepmentnt Equipment forEquipment for

hanger installation

hanger installation PPeerrmmaanneenntt FFrraannccee LLaauutt 2255//0033//22001188 2200//0044//22001188 1100 0 10 1/ 0/ 055/ 2/ 2001 81 8 LLY SY S/ J/ JK TK T/ 0/ 044665533 88220088. 1. 100 DDa la laam m P eP errj aj alla na naann 88 Box CBox Clamlampiping Sng Sprpray (Hay (HEE

Consumable Consumable material for lowering material for lowering work 

work 

PPeerrmmaanneenntt FFrraannccee UUddaarraa 2222//0033//22001188 2255//0033//22001188 SSeelleessaaii BBRRNN00000022003377 33440033..99990000

Telah melewati Bea Cukai Bandara Telah melewati Bea Cukai Bandara Soekarn

Soekarno-Hatta, Mobilisasi ke o-Hatta, Mobilisasi ke sitesite tanggal 04/04/2018

tanggal 04/04/2018 99 LLRRB B ((LLeeaad d RRuubbbbeer r BBeeaarri M ai M atteerriiaal l ffoor r AArrcch h BBrriid Pd Peerrm am anneenntt IIttaallyy LLaauutt 2222//0044//22001166 1199//0055//22001188 1100 30/05/201830/05/2018 Akan Akan di di informasikainformasikan4008.2n4008.2900900

E

Exxppaannssiioon n JJooiinnt t / / SSFFX X JJoo 2222//0044//22001166 1199//0055//22001188 1100 30/05/201830/05/2018 Akan Akan di di informasikainformasikan4016.9n4016.9300300 D

Drraaiinnaagge e PPiippee 2222//0044//22001166 0033//0066//22001188 1100 14/06/201814/06/2018 Akan Akan di di informasikainformasikan3917.2n3917.2310310 T

Tiiggiieeppoox x TT0011 2222//0044//2200116 06 033//0066//22001188 1100 14/06/201814/06/2018 Akan Akan di di informasikainformasikan3506.9n3506.9100100 FFllaasshhiinngg 2222//0044//22001166 0033//0066//22001188 1100 14/06/201814/06/2018 Akan Akan di di informasikainformasikan39.191n39.191.019.019

7312.10.99 7312.10.99

1100 MMaatteerriiaal l ffoor r AArrcch h BBrriidd PPeerrmmaanneenntt IIttaallyy LLaauutt 22 337 H7 H2 02 0000 A0 Anncchho ro ra ga ge se s M aM at et erriia l a l f of or Hr Ha na ngge re r PPe re rm am anne ne ntt F rF ra na nc ec e U dU da ra raa

(15)

Metode Tahap Konstruksi Jembatan Kali Kuto

Metode Tahap Konstruksi Jembatan Kali Kuto

N

No

o..

T

Tyyp

pe

e

W

We i

e iggh

ht

t ( t

( to

on

n//p

pccss)) Q

Qtty

y ((p

pccss)) T

To

ottaal W

l We

ei g

i gh

ht

t ((tto

on

n))

1

1

B

Baasse

e

P

Pllaatte

e

1

14

4,,3

36

65

5

4

4

5

57

7,,4

46

6

2

2

B

Bo

ox

x

1

1

4

44

4,,4

40

06

6

4

4

1

17

77

7,,6

62

24

4

3

3

B

Bo

ox

x

2

2

3

33

3,,5

58

8

4

4

1

13

34

4,,3

32

2

4

4

B

Bo

ox

x

3

3

3

36

6,,7

77

71

1

4

4

1

14

47

7,,0

08

84

4

5

5

B

Bo

ox

x

4

4

3

34

4,,7

77

77

7

4

4

1

13

39

9,,1

10

08

8

6

6

B

Bo

ox

x

5

5

3

32

2,,3

38

87

7

4

4

1

12

29

9,,5

54

48

8

7

7

B

Bo

ox

x

6

6

3

31

1,,4

48

85

5

4

4

1

12

25

5,,9

94

4

911,084

911,084

Kalikuto Box Weight Kalikuto Box Weight

Total

Total

(16)

Metode Tahap Konstruksi Jembatan Kali Kuto

Metode Tahap Konstruksi Jembatan Kali Kuto

(17)

Metode Tahap Konstruksi Jembatan Kali Kuto

Metode Tahap Konstruksi Jembatan Kali Kuto

1

1

1

1

2

2

2

2

T

Ta

ah

ha

ap

p

U

Urra

aiia

an

n

S

Stta

arrt

t

F

Fiin

niissh

h

1

(18)

Metode Tahap Konstruksi Jembatan Kali Kuto

Metode Tahap Konstruksi Jembatan Kali Kuto

3

3

3

3

4

4

4

4

T

Ta

ah

ha

ap

p

U

Urra

aiia

an

n

S

Stta

arrt

t

F

Fiin

niissh

h

3

(19)

Metode Tahap Konstruksi Jembatan Kali Kuto

Metode Tahap Konstruksi Jembatan Kali Kuto

S1

S1

S2

S2

S1

S1

S2

S2

5

5

5

5

T

Ta

ah

ha

ap

p

U

Urra

aiia

an

n

S

Stta

arrt

t

F

Fiin

niissh

h

P

Pe

en

ng

ge

ella

assa

an

n sse

eg

gm

me

en

n 1

1 &

& sse

eg

gm

me

en

n 2

2

0

05

5//0

05

5//1

18

8

0

08

8//0

05

5//1

18

8

5

5

E

Erre

eccttiio

on s

n se

eg

gm

me

en

n 1 &

1 & sse

eg

gm

me

en 2

n 2 ((LL//R

R) B

) Ba

arra

at +

t + ssu

up

pp

po

orrttiin

ng p

g piip

pe

e

0

08

8//0

05

5//1

18

8

1

10

0//0

05

5//1

18

8

5

5

5

5

6

6

6

6

5

5

(20)

Metode Tahap Konstruksi Jembatan Kali Kuto

Metode Tahap Konstruksi Jembatan Kali Kuto

S3

S3

S4

S4

T

Ta

ah

ha

ap

p

U

Urra

aiia

an

n

S

Stta

arrt

t

F

Fiin

niissh

h

P

Pe

en

ng

ge

ella

assa

an

n sse

eg

gm

me

en

n 3

3 &

& sse

eg

gm

me

en

n 4

4

1

10

0//0

05

5//1

18

8

1

15

5//0

05

5//1

18

8

7

7

E

Erre

eccttiio

on

n sse

eg

gm

me

en 3

n 3 &

& sse

eg

gm

me

en

n 4

4 ((LL//R

R)

) B

Ba

arra

att

1

15

5//0

05

5//1

18

8

1

18

8//0

05

5//1

18

8

8

8

E

Erre

eccttiio

on

n sse

eg

gm

me

en 3

n 3 &

& sse

eg

gm

me

en

n 4

4 ((LL//R

R)

) T

Tiim

mu

urr

1

16

6//0

05

5//1

18

8

1

19

9//0

05

5//1

18

8

9

9

IIn

nsstta

all

ll b

brra

aci

cin

ng

g a

arrcch

h B

Ba

arra

at

t +

+ iin

nsstta

alll

l kka

ab

be

el

l b

ba

ack

ck sstta

ayye

ed

d

1

19

9//0

05

5//1

18

8

2

23

3//0

05

5//1

18

8

S1

S1

S2

S2

S3

S3

S4

S4

7

7

7

7

5

5

9

9

7

7

7

7

8

8

8

8

9

9

(21)

Metode Tahap Konstruksi Jembatan Kali Kuto

Metode Tahap Konstruksi Jembatan Kali Kuto

S1

S1

S2

S2

S3

S3

S4

S4

S5

S5

T

Ta

ah

ha

ap

p

U

Urra

aiia

an

n

S

Stta

arrt

t

F

Fiin

niissh

h

1

11

1

E

Erre

eccttiio

on

n sse

eg

gm

me

en

n 5

5 ((LL//R

R)

) B

Ba

arra

att

2

24

4//0

05

5//1

15

5

2

26

6//0

05

5//1

18

8

1

12

2

ii

((LL// )

) ii

2

2 //0

0 //1

1

2

2 //0

0 //1

1

11

11

11

11

11

11

12

12

7

7

9

9

7

7

(22)

Metode Tahap Konstruksi Jembatan Kali Kuto

Metode Tahap Konstruksi Jembatan Kali Kuto

S1

S1

S2

S2

S3

S3

S4

S4

S5

S5

S6

S6

13

13

14

14

14

14

T

Ta

ah

ha

ap

p

U

Urra

aiia

an

n

S

Stta

arrt

t

F

Fiin

niissh

h

1

13

3

IIn

nsstta

allll b

brra

acciin

ng

g a

arrcch

h B

Ba

arra

at

t

2

27

7//0

05

5//1

15

5

2

29

9//0

05

5//1

15

5

1

14

4

E

Erre

eccttiio

on

n sse

eg

gm

me

en

n 6

6 ((LL//R

R)

) B

Ba

arra

att

3

30

0//0

05

5//1

15

5

3

31

1//0

05

5//1

15

5

1

15

5

IIn

nsstta

allll b

brra

acciin

ng

g

a

arrcch

h

T

Tiim

mu

urr

2

28

8//0

05

5//1

15

5

2

29

9//0

05

5//1

15

5

14

(23)

Metode Tahap Konstruksi Jembatan Kali Kuto

Metode Tahap Konstruksi Jembatan Kali Kuto

S1

S1

S2

S2

S3

S3

S4

S4

S5

S5

S6

S6

17

17

18

18

T

Ta

ah

ha

ap

p

U

Urra

aiia

an

n

S

Stta

arrt

t

F

Fiin

niissh

h

1

17

7

IIn

nsstta

allll b

brra

acciin

ng

g a

arrcch

h B

Ba

arra

at

t

3

30

0//0

05

5//1

18

8

3

31

1//0

05

5//1

18

8

17

17

(24)

Metode Tahap Konstruksi Jembatan Kali Kuto

Metode Tahap Konstruksi Jembatan Kali Kuto

S1

S1

S2

S2

S3

S3

S4

S4

S5

S5

S6

S6

T

Ta

ah

ha

ap

p

U

Urra

aiia

an

n

S

Stta

arrt

t

F

Fiin

niissh

h

1

19

9

IIn

nsstta

allll h

ha

an

ng

ge

er

r

1

1

– 1

10

0

B

Ba

arra

att

0

01

1//0

06

6//1

18

8

0

03

3//0

06

6//1

18

8

2

20

0

IIn

nsstta

allll h

ha

an

ng

ge

er

r

1

1

– 1

10

0

T

Tiim

mu

urr

0

01

1//0

05

5//1

18

8

0

03

3//0

06

6//1

18

8

2

21

1

IIn

nsstta

alll

l ccrro

osss

s g

giirrd

de

er

r 1

10

0 –

– 7

7 B

Ba

arra

att

0

01

1//0

06

6//1

18

8

0

02

2//0

06

6//1

18

8

19

19

21

21

(25)

Metode Tahap Konstruksi Jembatan Kali Kuto

Metode Tahap Konstruksi Jembatan Kali Kuto

S1

S1

S2

S2

S3

S3

S4

S4

S5

S5

S6

S6

T

Ta

ah

ha

ap

p

U

Urra

aiia

an

n

S

Stta

arrt

t

F

Fiin

niissh

h

2

23

3

S

Sw

wiin

ng

g

a

arrcch

h

B

Ba

arra

at

t

-- T

Tiim

mu

urr

0

03

3//0

06

6//1

18

8

0

04

4//0

06

6//1

18

8

2

24

4

W

We

elld

diin

ng

g

jjo

oiin

nt

t

a

arrcch

h

0

04

4//0

06

6//1

18

8

0

06

6//0

06

6//1

18

8

2

25

5

IIn

nsstta

alll

l ccrro

osss

s g

giirrd

de

er

r 6

6 –

– 1

1 B

Ba

arra

att

0

08

8//0

06

6//1

18

8

1

12

2//0

06

6//1

18

8

25

25

23

23

(26)

Metode Tahap Konstruksi Jembatan Kali Kuto

Metode Tahap Konstruksi Jembatan Kali Kuto

(27)

Metode Tahap Konstruksi Jembatan Kali Kuto

Metode Tahap Konstruksi Jembatan Kali Kuto

T

Ta

ah

ha

ap

p

U

Urra

aiia

an

n

S

Stta

arrt

t

F

Fiin

niissh

h

2

27

7

IIn

nsstta

alll

l

ssttiiffffn

ne

err

0

08

8//0

06

6//1

18

8

1

12

2//0

06

6//1

18

8

2

28

8

IIn

nsstta

alll

l

b

brra

acciin

ng

g

08

0

8//0

06

6//1

18

8

1

12

2//0

06

6//1

18

8

Cross girder

Cross girder

Stiffener

Stiffener

Bracing

Bracing

(28)

TEMPORARY SLAB

TEMPORARY SLAB

Fungsiona

Fungsionall deck

deck Slab

Slab deng

dengan

an

 Plat Steel 2cm

 Plat Steel 2cm

Mater

Material : WF 250,

ial : WF 250, Plat s

Plat steel,

teel, join ba

join baut

ut

Di

Dime

mens

nsii Ak

Akse

sess : L=

: L=10

10m in

m incl

clud

ude MC

e MCB

B

Vo

Volume : WF 250

lume : WF 250 = 1045 m’

= 1045 m’

Pla

Plat 2cm,

t 2cm, P: 10m, L

P: 10m, L: 2,5m = 38 lb

: 2,5m = 38 lbrr

STEEL DECK

STEEL DECK

Opsi Jalur Fungsional

(29)

Metode Tahap Konstruksi Jembatan Kali Kuto

Metode Tahap Konstruksi Jembatan Kali Kuto

Lay Out moving crane & Storage Yard Struktur Steel Pelengkung

Lay Out moving crane & Storage Yard Struktur Steel Pelengkung

20 m

20 m

23 m

23 m

Akse

Aksess cran

crane

e

300 T

300 T

Akse

Aksess cran

crane

e

300 T

300 T

Storage yard

Storage yard

Box Steel

Box Steel

Storage yard

Storage yard

Box Steel

Box Steel

(30)

Metode Tahap Konstruksi Jembatan Kali Kuto

Metode Tahap Konstruksi Jembatan Kali Kuto

Lay Out moving crane & Storage Yard Struktur Steel Pelengkung

Lay Out moving crane & Storage Yard Struktur Steel Pelengkung

11 m

11 m

Storage yard

Storage yard

Box assembly

Box assembly

Box assembly

Box assembly

11 m

11 m

Box assembly

Box assembly

Storage yard

Storage yard

Box assembly

Box assembly

B

(31)

Referensi

Dokumen terkait

Paket pengadaan ini terbuka untuk penyedia yang teregistrasi pada Layanan Pengadaan Secara Elektronik (LPSE) dan memenuhi persyaratan yang dilihat dengan mengakses aplikasi

secara elektronik, dengan mengakses asi SPSE) pada Alamat Website

In cases of companies having several divisions like a chain of outlets, it is still crucial for each to have their own dedicated server because they can create many domains on a

Paket Pengadaan ini terbuka untuk penyedia jasa yang teregistrasi pada layanan pengadaan secara Elektronik (LPSE) dan memenuhi persyaratan yang dilihat dengan mengalses

Perangkat dimana disimpan semua sistem dr suatu komp yg berfungsi utk komp itu bekerja3. Suatu alat yg berfungsi utk memproses suatu input yg menghasilkan output yg

The International Archives of the Photogrammetry, Remote Sensing and Spatial Information Sciences, Volume XLI-B7, 2016 XXIII ISPRS Congress, 12–19 July 2016, Prague, Czech

Operasi tersebut meliputi operasi perpindahan/transfer data, operasi aritmatika & logika, serta operasi pengendalian I/O device serta seluruh sumber daya

It can be concluded that:(1) the surface of Huangdao town and Jiaonan town is relatively stable, almost no settlement;(2) a large area of deformation happend