KEGIATAN :
Pengadaan Alat-alat Berat
PEKERJAAN :
- Vibrator Roller Single Drum 8 - 10 Ton
NO. PAKET :
01
LOKASI :
Kec. Sungai Penuh
KOTA :
Sungai Penuh
HPS/OE Rp 1,000,000,000.00
1 2 3 4 5=4:HPS x 100 6 7
1 CV JASA MITRA SAUDARA 879,534,000.00 879,534,000.00 87.95 1 2 CV PALUPUH 891,550,000.00 891,550,000.00 89.16 2 3 CV KURNIA HIDAYAH 895,180,000.00 895,180,000.00 89.52 3 4 PT WIJAYA KUSUMA MANDIRI 902,550,000.00 902,550,000.00 90.26 4 5 PT TUJUH PUTERA MANDIRI 903,100,000.00 903,100,000.00 90.31 5 6 CV PANCOE BOE 911,900,000.00 911,900,000.00 91.19 6 7 CV ADHI WAHANA PRAWIRA 915,200,000.00 915,200,000.00 91.52 7 8 CV LAURA SHANDY 929,500,000.00 929,500,000.00 92.95 8 9 CV TUNAS MUDA 935,000,000.00 935,000,000.00 93.50 9 10 CV SAVANNA MANGGANI 941,600,000.00 941,600,000.00 94.16 10 11 CV RESKI ISLAMI TAUHID 943,360,000.00 943,360,000.00 94.34 11 12 PT SUMBER MAS PRIMA MANDIRI 954,800,000.00 954,800,000.00 95.48 12
KEGIATAN :
Pengadaan Alat-alat Berat
PEKERJAAN :
Excavator Long Arms
NO. PAKET :
02
LOKASI :
Kec. Sungai Penuh
KOTA :
Sungai Penuh
HPS/OE Rp 1,800,000,000.00
1 2 3 4 5=4:HPS x 100 6 7
1 CV MANARAY VERTEXINDO 1,515,000,000.00 1,515,000,000.00 84.17 1 2 CV ANGKASA JAYA PERKASA PAMUNGKAS 1,636,800,000.00 1,636,800,000.00 90.93 2 3 PT WIJAYA KUSUMA MANDIRI 1,689,600,000.00 1,689,600,000.00 93.87 3 4 CV PANCOE BOE 1,692,350,000.00 1,692,350,000.00 94.02 4 5 CV PALUPUH 1,700,325,000.00 1,700,325,000.00 94.46 5 6 CV ADHI WAHANA PRAWIRA 1,703,900,000.00 1,703,900,000.00 94.66 6 7 PT TUJUH PUTERA MANDIRI 1,714,900,000.00 1,714,900,000.00 95.27 7 8 PT SUMBER MAS PRIMA MANDIRI 1,735,800,000.00 1,735,800,000.00 96.43 8 9 CV MILENIA SUKSES 1,760,000,000.00 1,760,000,000.00 97.78 9 10 CV CITRA BUMI KHATULISTIWA 1,773,200,000.00 1,773,200,000.00 98.51 10
KET
No NAMA PERUSAHAAN
TOTAL HARGA PENAWARAN SAAT
PEMBUKAAN PENAWARAN (Rp)
PROSENTASE HARGA TERKOREKSI
TERHADAP HPS/OE (%)
HASIL KOREKSI ARITMATIK
URUTAN PERINGKAT
HASIL KOREKSI ARITMATIK
TOTAL HARGA TERKOREKSI TERHADAPVOLUME HPS/OE (Rp)
No NAMA PERUSAHAAN
TOTAL HARGA PENAWARAN SAAT
PEMBUKAAN PENAWARAN (Rp)
TOTAL HARGA TERKOREKSI TERHADAP
VOLUME HPS/OE (Rp)
PROSENTASE HARGA TERKOREKSI
TERHADAP HPS/OE (%)
URUTAN
KEGIATAN :
Pengadaan Alat-alat Berat
PEKERJAAN :
Mobil Tronton Flet Bad
NO. PAKET :
03
LOKASI :
Kec. Sungai Penuh
KOTA :
Sungai Penuh
HPS/OE Rp 1,200,000,000.00
1 2 3 4 5=4:HPS x 100 6 7
1 CV. MILENIA SUKSES 1,160,500,000.00 1,160,500,000.00 96.71 1 2 CV. RAFAEL KONSTRUKSI 1,189,496,000.00 1,189,496,000.00 99.12 2 3 CV. LAURA SHANDY 1,194,050,000.00 1,194,050,000.00 99.50 3 4 CV. PALUPUH 1,197,350,000.00 1,197,350,000.00 99.78 4
KEGIATAN :
Pengadaan Alat-alat Berat
PEKERJAAN :
Whell Loader
NO. PAKET :
04
LOKASI :
Kec. Sungai Penuh
KOTA :
Sungai Penuh
HPS/OE Rp 1,400,000,000.00
1 2 3 4 5=4:HPS x 100 6 7
1 CV. ANGKASA JAYA PERKASA PAMUNGKAS 1,233,980,000.00 1,233,980,000.00 88.14 1 2 CV. RESKI ISLAMI TAUHID 1,246,300,000.00 1,246,300,000.00 89.02 2 3 CV. PANCOE BOE 1,322,200,000.00 1,322,200,000.00 94.44 3 4 PT. WIJAYA KUSUMA MANDIRI 1,331,000,000.00 1,331,000,000.00 95.07 4 5 PT. TUJUH PUTERA MANDIRI 1,336,500,000.00 1,336,500,000.00 95.46 5 6 CV. PALUPUH 1,347,500,000.00 1,347,500,000.00 96.25 6 7 CV. ADHI WAHANA PRAWIRA 1,351,900,000.00 1,351,900,000.00 96.56 7
KEGIATAN :
Pengadaan Alat-alat Berat
PEKERJAAN :
Motor Greder
NO. PAKET :
05
LOKASI :
Kec. Sungai Penuh
KOTA :
Sungai Penuh
HPS/OE Rp 2,200,000,000.00
1 2 3 4 5=4:HPS x 100 6 7
1 CV. MARDHIAH 1,711,149,000.00 1,711,149,000.00 77.78 1 2 CV. RESKI ISLAMI TAUHID 1,750,100,000.00 1,750,100,000.00 79.55 2 3 PT. TUJUH PUTERA MANDIRI 1,886,500,000.00 1,886,500,000.00 85.75 3 4 CV. PALUPUH 1,897,500,000.00 1,897,500,000.00 86.25 4 5 CV. PANCOE BOE 1,908,500,000.00 1,908,500,000.00 86.75 5 6 CV. ADHI WAHANA PRAWIRA 1,941,500,000.00 1,941,500,000.00 88.25 6 7 PT. WIJAYA KUSUMA MANDIRI 1,952,500,000.00 1,952,500,000.00 88.75 7 8 CV. TUNAS MUDA 1,978,350,000.00 1,978,350,000.00 89.93 8 9 CV. KURNIA HIDAYAH 2,077,900,000.00 2,077,900,000.00 94.45 9 10 CV. CITRA BUMI KHATULISTIWA 2,090,000,000.00 2,090,000,000.00 95.00 10 11 CV. SAVANNA MANGGANI 2,101,000,000.00 2,101,000,000.00 95.50 11 12 CV. LAURA SHANDY 2,132,350,000.00 2,132,350,000.00 96.93 12
HASIL KOREKSI ARITMATIK
No NAMA PERUSAHAAN
TOTAL HARGA PENAWARAN SAAT
PEMBUKAAN PENAWARAN (Rp)
TOTAL HARGA TERKOREKSI TERHADAP
VOLUME HPS/OE (Rp)
PROSENTASE HARGA TERKOREKSI
TERHADAP HPS/OE (%)
URUTAN
PERINGKAT KET
HASIL KOREKSI ARITMATIK
HASIL KOREKSI ARITMATIK
No NAMA PERUSAHAAN
TOTAL HARGA PENAWARAN SAAT
PEMBUKAAN PENAWARAN (Rp)
TOTAL HARGA TERKOREKSI TERHADAP
VOLUME HPS/OE (Rp)
PROSENTASE HARGA TERKOREKSI
TERHADAP HPS/OE (%)
URUTAN
PERINGKAT KET
No NAMA PERUSAHAAN
TOTAL HARGA PENAWARAN SAAT
PEMBUKAAN PENAWARAN (Rp)
TOTAL HARGA TERKOREKSI TERHADAP
VOLUME HPS/OE (Rp)
PROSENTASE HARGA TERKOREKSI
TERHADAP HPS/OE (%)
URUTAN
KEGIATAN :
PEMBANGUNAN GEDUNG KANTOR
PEKERJAAN :
- Pembangunan Turap, Jalan Dan Pos Jaga Kantor Walikota Sungai Penuh
NO. PAKET :
06
LOKASI :
Kec. Sungai Penuh
KOTA :
Sungai Penuh
HPS/OE Rp 2,053,790,000.00
1 2 3 4 5=4:HPS x 100 6 7
1 CV. MIRA TB 1,746,997,000.00 1,746,997,000.00 85.06 1 2 CV. HEKSAPRIMA NUSAMITRA 1,767,235,000.00 1,767,235,000.00 86.05 2 3 CV. PUTRI AIR TERJUN 1,770,314,000.00 1,770,314,000.00 86.20 3 4 CV. AL-HUDA 1,776,237,000.00 1,776,237,000.00 86.49 4 5 CV. INDAH RAHMAN 1,776,749,000.00 1,776,749,000.00 86.51 5 6 CV. TOHA PUTRA 1,782,807,000.00 1,782,807,000.00 86.81 6 7 PT. MULYA PERMAI LAKSONO 1,786,803,000.00 1,786,803,000.00 87.00 7 8 CV. SINAR PEMBANGUNAN KERINCI 1,790,206,000.00 1,790,206,000.00 87.17 8 9 CV. TERATAI PUTIH 1,791,960,000.00 1,791,960,000.00 87.25 9 10 CV. ALAM SINAR JAYA 1,817,469,000.00 1,817,469,000.00 88.49 10 11 CV. KRESHNA DWIPA 1,834,800,000.00 1,834,800,000.00 89.34 11 12 CV. BHAKTI BERSAMA 1,847,580,000.00 1,847,580,000.00 89.96 12
KEGIATAN :
PEMBANGUNAN GEDUNG KANTOR
PEKERJAAN :
- Pembangunan Kantor KeJaksaan Negeri Sungai Penuh
NO. PAKET :
07
LOKASI :
Kec. Sungai Penuh
KOTA :
Sungai Penuh
HPS/OE Rp 750,000,000.00
1 2 3 4 5=4:HPS x 100 6 7
1 CV. ANDRE PUTRA 666,000,000.00 666,000,000.00 88.80 1 2 CV. DUA KARYA 667,463,000.00 667,463,000.00 89.00 2 3 CV. VALAN PUTRA 670,011,000.00 670,011,000.00 89.33 3 4 CV. SULTAN HAMPARAN 670,236,000.00 670,236,000.00 89.36 4 5 CV. PINANG SEBATANG 670,867,000.00 670,867,000.00 89.45 5 6 CV. SENI BUDAYA PEMBANGUNAN KERINCI 675,110,000.00 675,110,000.00 90.01 6 7 CV. PUTRA TANAH SEKUDUNG 682,498,000.00 682,498,000.00 91.00 7 8 CV. SATRIA 690,128,000.00 690,128,000.00 92.02 8 9 CV. BUDI UTAMA 727,994,000.00 727,994,000.00 97.07 9 10 CV. TITANIA 730,261,000.00 730,261,000.00 97.37 10 11 CV. PUTRA KERINCI 732,327,000.00 732,327,000.00 97.64 11 12 CV. RIKO PRATAMA JAYA 733,617,000.00 733,617,000.00 97.82 12 13 CV. TANAH AIR 735,137,000.00 735,137,000.00 98.02 13 14 CV. IVO LESTARI 742,485,000.00 742,485,000.00 99.00 14 15 CV. TIGA PUTRI 746,332,000.00 746,332,000.00 99.51 15 16 PT. RIZKI 747,773,000.00 747,773,000.00 99.70 16 17 CV. PRIMADONA PEMBANGUNAN 748,584,000.00 748,584,000.00 99.81 17 18 CV. MAKBUL 749,160,000.00 749,160,000.00 99.89 18 19 CV. PURNA BAKTI 749,743,000.00 749,743,000.00 99.97 19 20 CV. KONSTRUKSI PRIMA KONTRAKTOR 749,902,000.00 749,902,000.00 99.99 20
HASIL KOREKSI ARITMATIK
No NAMA PERUSAHAAN
TOTAL HARGA PENAWARAN SAAT
PEMBUKAAN PENAWARAN (Rp)
TOTAL HARGA TERKOREKSI TERHADAP
VOLUME HPS/OE (Rp)
PROSENTASE HARGA TERKOREKSI
TERHADAP HPS/OE (%)
URUTAN
PERINGKAT KET
HASIL KOREKSI ARITMATIK
No NAMA PERUSAHAAN
TOTAL HARGA PENAWARAN SAAT
PEMBUKAAN PENAWARAN (Rp)
TOTAL HARGA TERKOREKSI TERHADAP
VOLUME HPS/OE (Rp)
PROSENTASE HARGA TERKOREKSI
TERHADAP HPS/OE (%)
URUTAN
KEGIATAN :
Kegiatan Pembangunan Batas Wilayah Pemerintah Kota Sungai Penuh
PEKERJAAN :
- Pembangunan Gerbang Batas Kota Sungai Penuh ( Kec. Kumun Debai )
NO. PAKET :
08
LOKASI :
KEC. KUMUN DEBAI
KOTA :
Sungai Penuh
HPS/OE Rp 450,000,000.00
1 2 3 4 5=4:HPS x 100 6 7
1 CV. PUTRI AIR TERJUN 378,028,000.00 378,028,000.00 84.01 1 2 CV. TOHA PUTRA 384,969,000.00 384,969,000.00 85.55 2 3 CV. LIMA PUTRA 385,942,000.00 385,942,000.00 85.76 3 4 CV. SINAR PEMBANGUNAN KOTA 387,120,000.00 387,120,000.00 86.03 4 5 CV. BATANG PULAI 389,687,000.00 389,687,000.00 86.60 5 6 CV. VADERI ALKESINDO 389,945,000.00 389,945,000.00 86.65 6 7 CV. MITRA UTAMA 390,385,000.00 390,385,000.00 86.75 7 8 CV. LAPAN LAPAN 394,431,000.00 394,431,000.00 87.65 8 9 CV. SINAR PEMBANGUNAN KERINCI 400,569,000.00 400,569,000.00 89.02 9 10 CV. CIPTA PESONA KERINCI 400,804,000.00 400,804,000.00 89.07 10 11 CV. TECHNICS 404,007,000.00 404,007,000.00 89.78 11 12 CV. EXPO 66 405,052,000.00 405,052,000.00 90.01 12 13 CV. PRIMA MANDIRI 413,484,300.00 413,484,300.00 91.89 13 14 CV. SILIA 413,912,600.00 413,912,600.00 91.98 14 15 CV. RIZKY WIRA 418,464,800.00 418,464,800.00 92.99 15
KEGIATAN :
Kegiatan Pembangunan Batas Wilayah Pemerintah Kota Sungai Penuh
PEKERJAAN :
- Pembangunan Gerbang Batas Kota Sungai Penuh ( Kec. Tanah Kampung )
NO. PAKET :
09
LOKASI :
KEC. TANAH KAMPUNG
KOTA :
Sungai Penuh
HPS/OE Rp 450,000,000.00
1 2 3 4 5=4:HPS x 100 6 7
1 CV. PUTRI AIR TERJUN 378,028,000.00 378,028,000.00 84.01 1 2 CV. ALAM SINAR JAYA 379,420,000.00 379,420,000.00 84.32 2 3 CV. LIMA PUTRA 385,942,000.00 385,942,000.00 85.76 3 4 CV. SINAR PEMBANGUNAN KOTA 387,054,000.00 387,054,000.00 86.01 4 5 CV. ADE PUTRI 388,820,000.00 388,820,000.00 86.40 5 6 CV. Z.S. KONTRAKTOR 389,177,000.00 389,177,000.00 86.48 6 7 CV. VADERI ALKESINDO 389,945,000.00 389,945,000.00 86.65 7 8 CV. BATANG PULAI 392,612,000.00 392,612,000.00 87.25 8 9 CV. AL HUDA 392,973,000.00 392,973,000.00 87.33 9 10 CV. DUA PUTRA 393,903,000.00 393,903,000.00 87.53 10 11 CV. DATA 395,000,000.00 395,000,000.00 87.78 11 12 CV. ANDIKA 396,101,000.00 396,101,000.00 88.02 12 13 CV. BINTANG PERDANA 396,325,000.00 396,325,000.00 88.07 13 14 CV. ANDRE PUTRA 399,250,000.00 399,250,000.00 88.72 14 15 CV. SULTAN HAMPARAN 399,260,000.00 399,260,000.00 88.72 15 16 CV. VALAN PUTRA 399,270,000.00 399,270,000.00 88.73 16 17 CV. BIRO TEKHNIK 400,061,000.00 400,061,000.00 88.90 17 18 CV. SINAR PEMBANGUNAN KERINCI 400,569,000.00 400,569,000.00 89.02 18 19 CV. RIZKY WIRA 413,998,700.00 413,998,700.00 92.00 19 20 CV. PRIMA MANDIRI 418,503,300.00 418,503,300.00 93.00 20 21 CV. SILIA 422,995,500.00 422,995,500.00 94.00 21 22 CV. PUTRA UTAMA - - - 22
HASIL KOREKSI ARITMATIK
No NAMA PERUSAHAAN
TOTAL HARGA PENAWARAN SAAT
PEMBUKAAN PENAWARAN (Rp)
TOTAL HARGA TERKOREKSI TERHADAP
VOLUME HPS/OE (Rp)
PROSENTASE HARGA TERKOREKSI
TERHADAP HPS/OE (%)
URUTAN
PERINGKAT KET
HASIL KOREKSI ARITMATIK
No NAMA PERUSAHAAN
TOTAL HARGA PENAWARAN SAAT
PEMBUKAAN PENAWARAN (Rp)
TOTAL HARGA TERKOREKSI TERHADAP
VOLUME HPS/OE (Rp)
PROSENTASE HARGA TERKOREKSI
TERHADAP HPS/OE (%)
URUTAN
KEGIATAN :
Kegiatan Pembangunan Saluran Drainase /Gorong-gorong
PEKERJAAN : - Pembangunan Saluran Drainase & Trotoar Dalam Kota Sungai Penuh ( Jalan Muradi )
NO. PAKET :
10
LOKASI :
KEC. SUNGAI PENUH
KOTA :
Sungai Penuh
HPS/OE Rp 800,000,000.00
1 2 3 4 5=4:HPS x 100 6 7
1 CV. DUA DARA PERKASA 656,060,000.00 656,060,000.00 82.01 1 2 CV. SINAR PEMBANGUNAN KOTA 672,093,000.00 672,093,000.00 84.01 2 3 CV. GIANTARA 679,970,000.00 679,970,000.00 85.00 3 4 CV. KARISMA INDAH 680,000,000.00 680,000,000.00 85.00 4 5 CV. MEKAR JAYA 684,386,000.00 684,386,000.00 85.55 5 6 CV. TERATAI PUTIH 687,713,000.00 687,713,000.00 85.96 6 7 CV. SANIA 687,735,000.00 687,735,000.00 85.97 7 8 CV. GUNUNG INDAH 687,951,000.00 687,951,000.00 85.99 8 9 CV. CEMARA INDAH 687,980,000.00 687,980,000.00 86.00 9 10 CV. VILLA DUTA 688,121,000.00 688,121,000.00 86.02 10 11 CV. VADERI ALKESINDO 688,835,000.00 688,835,000.00 86.10 11 12 CV. KRESHNA DWIPA 690,497,000.00 690,497,000.00 86.31 12 13 CV. TRYOWIKA PUTRA 690,597,000.00 690,597,000.00 86.32 13 14 CV. MULTI MULYA 691,133,000.00 691,133,000.00 86.39 14 15 CV. INDIRA 692,015,000.00 692,015,000.00 86.50 15 16 CV. MULYA PUTRA 692,840,000.00 692,840,000.00 86.61 16 17 CV. CIPTA USAHA SAUDARA 694,060,000.00 694,060,000.00 86.76 17 18 CV. PUTRI AIR TERJUN 694,809,000.00 694,809,000.00 86.85 18 19 CV. SINAR REZEKI 695,835,300.00 695,835,300.00 86.98 19 20 CV. MULIA ARDANA 699,600,600.00 699,600,600.00 87.45 20 21 CV. LENTERA TANJUNG 699,963,000.00 699,963,000.00 87.50 21 22 CV. ADAM MULYA 704,070,000.00 704,070,000.00 88.01 22 23 CV. KANYAHO BATUAH 704,070,000.00 704,070,000.00 88.01 23 24 CV. SINAR PEMBANGUNAN KERINCI 712,198,000.00 712,198,000.00 89.02 24 25 CV. ANTAR NUSA SENTOSA 717,479,000.00 717,479,000.00 89.68 25
KEGIATAN :
Kegiatan Pembangunan Saluran Drainase /Gorong-gorong
PEKERJAAN : - Pembangunan Saluran Drainase & Trotoar Dalam Kota Sungai Penuh (Jl. RE. Martadinata)
NO. PAKET :
11
LOKASI :
KEC. SUNGAI PENUH
KOTA :
Sungai Penuh
HPS/OE Rp 600,000,000.00
1 2 3 4 5=4:HPS x 100 6 7
1 CV. BATU SERBAN 172,996,000.00 172,996,000.00 28.83 1 2 CV. SINAR PEMBANGUNAN KERINCI 504,069,000.00 504,069,000.00 84.01 2 3 CV. MEKAR JAYA 507,066,000.00 507,066,000.00 84.51 3 4 CV. VADERI ALKESINDO 512,619,000.00 512,619,000.00 85.44 4 5 CV. SHANIA 515,532,000.00 515,532,000.00 85.92 5 6 CV. TERATAI PUTIH 515,964,000.00 515,964,000.00 85.99 6 7 CV. VILLA DUTA 516,074,000.00 516,074,000.00 86.01 7 8 CV. CEMARA INDAH 518,979,000.00 518,979,000.00 86.50 8 9 CV. SINAR REZEKI 521,449,000.00 521,449,000.00 86.91 9 10 CV. LENTERA TANJUNG 524,995,000.00 524,995,000.00 87.50 10 11 CV. ANTAR NUSA SENTOSA 526,252,000.00 526,252,000.00 87.71 11 12 CV. KRESHNA DWIPA 528,048,000.00 528,048,000.00 88.01 12 13 CV. KANYAHO BATUAH 528,048,000.00 528,048,000.00 88.01 13 14 CV. TRYOWIKA PUTRA 528,103,000.00 528,103,000.00 88.02 14 15 CV. BINTANG PRDANA 530,459,000.00 530,459,000.00 88.41 15 16 CV. MULYA PUTRA 531,138,000.00 531,138,000.00 88.52 16 17 CV. BINTAN LESTARI 532,682,000.00 532,682,000.00 88.78 17 18 CV. SINAR PEMBANGUNAN KOTA 534,089,000.00 534,089,000.00 89.01 18 19 CV. GUNUNG INDAH 539,621,000.00 539,621,000.00 89.94 19 20 CV. CIPTA USAHA SAUDARA 542,564,000.00 542,564,000.00 90.43 20
SUNGAI PENUH, MEI 2011
TTD
PANITIA PENGADAAN BARANG/JASA DINAS PEKERJAAN UMUM KOTA SUNGAI PENUH
HASIL KOREKSI ARITMATIK
No NAMA PERUSAHAAN
TOTAL HARGA PENAWARAN SAAT
PEMBUKAAN PENAWARAN (Rp)
TOTAL HARGA TERKOREKSI TERHADAP
VOLUME HPS/OE (Rp)
PROSENTASE HARGA TERKOREKSI
TERHADAP HPS/OE (%)
URUTAN
PERINGKAT KET
HASIL KOREKSI ARITMATIK
No NAMA PERUSAHAAN
TOTAL HARGA PENAWARAN SAAT
PEMBUKAAN PENAWARAN (Rp)
TOTAL HARGA TERKOREKSI TERHADAP
VOLUME HPS/OE (Rp)
PROSENTASE HARGA TERKOREKSI
TERHADAP HPS/OE (%)
URUTAN