KEGIATAN :

Pengadaan Alat-alat Berat

PEKERJAAN :

- Vibrator Roller Single Drum 8 - 10 Ton

NO. PAKET :

01

LOKASI :

Kec. Sungai Penuh

KOTA :

Sungai Penuh

HPS/OE Rp 1,000,000,000.00

1 2 3 4 5=4:HPS x 100 6 7

1 CV JASA MITRA SAUDARA 879,534,000.00 879,534,000.00 87.95 1 2 CV PALUPUH 891,550,000.00 891,550,000.00 89.16 2 3 CV KURNIA HIDAYAH 895,180,000.00 895,180,000.00 89.52 3 4 PT WIJAYA KUSUMA MANDIRI 902,550,000.00 902,550,000.00 90.26 4 5 PT TUJUH PUTERA MANDIRI 903,100,000.00 903,100,000.00 90.31 5 6 CV PANCOE BOE 911,900,000.00 911,900,000.00 91.19 6 7 CV ADHI WAHANA PRAWIRA 915,200,000.00 915,200,000.00 91.52 7 8 CV LAURA SHANDY 929,500,000.00 929,500,000.00 92.95 8 9 CV TUNAS MUDA 935,000,000.00 935,000,000.00 93.50 9 10 CV SAVANNA MANGGANI 941,600,000.00 941,600,000.00 94.16 10 11 CV RESKI ISLAMI TAUHID 943,360,000.00 943,360,000.00 94.34 11 12 PT SUMBER MAS PRIMA MANDIRI 954,800,000.00 954,800,000.00 95.48 12

KEGIATAN :

Pengadaan Alat-alat Berat

PEKERJAAN :

Excavator Long Arms

NO. PAKET :

02

LOKASI :

Kec. Sungai Penuh

KOTA :

Sungai Penuh

HPS/OE Rp 1,800,000,000.00

1 2 3 4 5=4:HPS x 100 6 7

1 CV MANARAY VERTEXINDO 1,515,000,000.00 1,515,000,000.00 84.17 1 2 CV ANGKASA JAYA PERKASA PAMUNGKAS 1,636,800,000.00 1,636,800,000.00 90.93 2 3 PT WIJAYA KUSUMA MANDIRI 1,689,600,000.00 1,689,600,000.00 93.87 3 4 CV PANCOE BOE 1,692,350,000.00 1,692,350,000.00 94.02 4 5 CV PALUPUH 1,700,325,000.00 1,700,325,000.00 94.46 5 6 CV ADHI WAHANA PRAWIRA 1,703,900,000.00 1,703,900,000.00 94.66 6 7 PT TUJUH PUTERA MANDIRI 1,714,900,000.00 1,714,900,000.00 95.27 7 8 PT SUMBER MAS PRIMA MANDIRI 1,735,800,000.00 1,735,800,000.00 96.43 8 9 CV MILENIA SUKSES 1,760,000,000.00 1,760,000,000.00 97.78 9 10 CV CITRA BUMI KHATULISTIWA 1,773,200,000.00 1,773,200,000.00 98.51 10

KET

No NAMA PERUSAHAAN

TOTAL HARGA PENAWARAN SAAT

PEMBUKAAN PENAWARAN (Rp)

PROSENTASE HARGA TERKOREKSI

TERHADAP HPS/OE (%)

HASIL KOREKSI ARITMATIK

URUTAN PERINGKAT

HASIL KOREKSI ARITMATIK

TOTAL HARGA TERKOREKSI TERHADAP

VOLUME HPS/OE (Rp)

No NAMA PERUSAHAAN

TOTAL HARGA PENAWARAN SAAT

PEMBUKAAN PENAWARAN (Rp)

TOTAL HARGA TERKOREKSI TERHADAP

VOLUME HPS/OE (Rp)

PROSENTASE HARGA TERKOREKSI

TERHADAP HPS/OE (%)

URUTAN

(2)

KEGIATAN :

Pengadaan Alat-alat Berat

PEKERJAAN :

Mobil Tronton Flet Bad

NO. PAKET :

03

LOKASI :

Kec. Sungai Penuh

KOTA :

Sungai Penuh

HPS/OE Rp 1,200,000,000.00

1 2 3 4 5=4:HPS x 100 6 7

1 CV. MILENIA SUKSES 1,160,500,000.00 1,160,500,000.00 96.71 1 2 CV. RAFAEL KONSTRUKSI 1,189,496,000.00 1,189,496,000.00 99.12 2 3 CV. LAURA SHANDY 1,194,050,000.00 1,194,050,000.00 99.50 3 4 CV. PALUPUH 1,197,350,000.00 1,197,350,000.00 99.78 4

KEGIATAN :

Pengadaan Alat-alat Berat

PEKERJAAN :

Whell Loader

NO. PAKET :

04

LOKASI :

Kec. Sungai Penuh

KOTA :

Sungai Penuh

HPS/OE Rp 1,400,000,000.00

1 2 3 4 5=4:HPS x 100 6 7

1 CV. ANGKASA JAYA PERKASA PAMUNGKAS 1,233,980,000.00 1,233,980,000.00 88.14 1 2 CV. RESKI ISLAMI TAUHID 1,246,300,000.00 1,246,300,000.00 89.02 2 3 CV. PANCOE BOE 1,322,200,000.00 1,322,200,000.00 94.44 3 4 PT. WIJAYA KUSUMA MANDIRI 1,331,000,000.00 1,331,000,000.00 95.07 4 5 PT. TUJUH PUTERA MANDIRI 1,336,500,000.00 1,336,500,000.00 95.46 5 6 CV. PALUPUH 1,347,500,000.00 1,347,500,000.00 96.25 6 7 CV. ADHI WAHANA PRAWIRA 1,351,900,000.00 1,351,900,000.00 96.56 7

KEGIATAN :

Pengadaan Alat-alat Berat

PEKERJAAN :

Motor Greder

NO. PAKET :

05

LOKASI :

Kec. Sungai Penuh

KOTA :

Sungai Penuh

HPS/OE Rp 2,200,000,000.00

1 2 3 4 5=4:HPS x 100 6 7

1 CV. MARDHIAH 1,711,149,000.00 1,711,149,000.00 77.78 1 2 CV. RESKI ISLAMI TAUHID 1,750,100,000.00 1,750,100,000.00 79.55 2 3 PT. TUJUH PUTERA MANDIRI 1,886,500,000.00 1,886,500,000.00 85.75 3 4 CV. PALUPUH 1,897,500,000.00 1,897,500,000.00 86.25 4 5 CV. PANCOE BOE 1,908,500,000.00 1,908,500,000.00 86.75 5 6 CV. ADHI WAHANA PRAWIRA 1,941,500,000.00 1,941,500,000.00 88.25 6 7 PT. WIJAYA KUSUMA MANDIRI 1,952,500,000.00 1,952,500,000.00 88.75 7 8 CV. TUNAS MUDA 1,978,350,000.00 1,978,350,000.00 89.93 8 9 CV. KURNIA HIDAYAH 2,077,900,000.00 2,077,900,000.00 94.45 9 10 CV. CITRA BUMI KHATULISTIWA 2,090,000,000.00 2,090,000,000.00 95.00 10 11 CV. SAVANNA MANGGANI 2,101,000,000.00 2,101,000,000.00 95.50 11 12 CV. LAURA SHANDY 2,132,350,000.00 2,132,350,000.00 96.93 12

HASIL KOREKSI ARITMATIK

No NAMA PERUSAHAAN

TOTAL HARGA PENAWARAN SAAT

PEMBUKAAN PENAWARAN (Rp)

TOTAL HARGA TERKOREKSI TERHADAP

VOLUME HPS/OE (Rp)

PROSENTASE HARGA TERKOREKSI

TERHADAP HPS/OE (%)

URUTAN

PERINGKAT KET

HASIL KOREKSI ARITMATIK

HASIL KOREKSI ARITMATIK

No NAMA PERUSAHAAN

TOTAL HARGA PENAWARAN SAAT

PEMBUKAAN PENAWARAN (Rp)

TOTAL HARGA TERKOREKSI TERHADAP

VOLUME HPS/OE (Rp)

PROSENTASE HARGA TERKOREKSI

TERHADAP HPS/OE (%)

URUTAN

PERINGKAT KET

No NAMA PERUSAHAAN

TOTAL HARGA PENAWARAN SAAT

PEMBUKAAN PENAWARAN (Rp)

TOTAL HARGA TERKOREKSI TERHADAP

VOLUME HPS/OE (Rp)

PROSENTASE HARGA TERKOREKSI

TERHADAP HPS/OE (%)

URUTAN

(3)

KEGIATAN :

PEMBANGUNAN GEDUNG KANTOR

PEKERJAAN :

- Pembangunan Turap, Jalan Dan Pos Jaga Kantor Walikota Sungai Penuh

NO. PAKET :

06

LOKASI :

Kec. Sungai Penuh

KOTA :

Sungai Penuh

HPS/OE Rp 2,053,790,000.00

1 2 3 4 5=4:HPS x 100 6 7

1 CV. MIRA TB 1,746,997,000.00 1,746,997,000.00 85.06 1 2 CV. HEKSAPRIMA NUSAMITRA 1,767,235,000.00 1,767,235,000.00 86.05 2 3 CV. PUTRI AIR TERJUN 1,770,314,000.00 1,770,314,000.00 86.20 3 4 CV. AL-HUDA 1,776,237,000.00 1,776,237,000.00 86.49 4 5 CV. INDAH RAHMAN 1,776,749,000.00 1,776,749,000.00 86.51 5 6 CV. TOHA PUTRA 1,782,807,000.00 1,782,807,000.00 86.81 6 7 PT. MULYA PERMAI LAKSONO 1,786,803,000.00 1,786,803,000.00 87.00 7 8 CV. SINAR PEMBANGUNAN KERINCI 1,790,206,000.00 1,790,206,000.00 87.17 8 9 CV. TERATAI PUTIH 1,791,960,000.00 1,791,960,000.00 87.25 9 10 CV. ALAM SINAR JAYA 1,817,469,000.00 1,817,469,000.00 88.49 10 11 CV. KRESHNA DWIPA 1,834,800,000.00 1,834,800,000.00 89.34 11 12 CV. BHAKTI BERSAMA 1,847,580,000.00 1,847,580,000.00 89.96 12

KEGIATAN :

PEMBANGUNAN GEDUNG KANTOR

PEKERJAAN :

- Pembangunan Kantor KeJaksaan Negeri Sungai Penuh

NO. PAKET :

07

LOKASI :

Kec. Sungai Penuh

KOTA :

Sungai Penuh

HPS/OE Rp 750,000,000.00

1 2 3 4 5=4:HPS x 100 6 7

1 CV. ANDRE PUTRA 666,000,000.00 666,000,000.00 88.80 1 2 CV. DUA KARYA 667,463,000.00 667,463,000.00 89.00 2 3 CV. VALAN PUTRA 670,011,000.00 670,011,000.00 89.33 3 4 CV. SULTAN HAMPARAN 670,236,000.00 670,236,000.00 89.36 4 5 CV. PINANG SEBATANG 670,867,000.00 670,867,000.00 89.45 5 6 CV. SENI BUDAYA PEMBANGUNAN KERINCI 675,110,000.00 675,110,000.00 90.01 6 7 CV. PUTRA TANAH SEKUDUNG 682,498,000.00 682,498,000.00 91.00 7 8 CV. SATRIA 690,128,000.00 690,128,000.00 92.02 8 9 CV. BUDI UTAMA 727,994,000.00 727,994,000.00 97.07 9 10 CV. TITANIA 730,261,000.00 730,261,000.00 97.37 10 11 CV. PUTRA KERINCI 732,327,000.00 732,327,000.00 97.64 11 12 CV. RIKO PRATAMA JAYA 733,617,000.00 733,617,000.00 97.82 12 13 CV. TANAH AIR 735,137,000.00 735,137,000.00 98.02 13 14 CV. IVO LESTARI 742,485,000.00 742,485,000.00 99.00 14 15 CV. TIGA PUTRI 746,332,000.00 746,332,000.00 99.51 15 16 PT. RIZKI 747,773,000.00 747,773,000.00 99.70 16 17 CV. PRIMADONA PEMBANGUNAN 748,584,000.00 748,584,000.00 99.81 17 18 CV. MAKBUL 749,160,000.00 749,160,000.00 99.89 18 19 CV. PURNA BAKTI 749,743,000.00 749,743,000.00 99.97 19 20 CV. KONSTRUKSI PRIMA KONTRAKTOR 749,902,000.00 749,902,000.00 99.99 20

HASIL KOREKSI ARITMATIK

No NAMA PERUSAHAAN

TOTAL HARGA PENAWARAN SAAT

PEMBUKAAN PENAWARAN (Rp)

TOTAL HARGA TERKOREKSI TERHADAP

VOLUME HPS/OE (Rp)

PROSENTASE HARGA TERKOREKSI

TERHADAP HPS/OE (%)

URUTAN

PERINGKAT KET

HASIL KOREKSI ARITMATIK

No NAMA PERUSAHAAN

TOTAL HARGA PENAWARAN SAAT

PEMBUKAAN PENAWARAN (Rp)

TOTAL HARGA TERKOREKSI TERHADAP

VOLUME HPS/OE (Rp)

PROSENTASE HARGA TERKOREKSI

TERHADAP HPS/OE (%)

URUTAN

(4)

KEGIATAN :

Kegiatan Pembangunan Batas Wilayah Pemerintah Kota Sungai Penuh

PEKERJAAN :

- Pembangunan Gerbang Batas Kota Sungai Penuh ( Kec. Kumun Debai )

NO. PAKET :

08

LOKASI :

KEC. KUMUN DEBAI

KOTA :

Sungai Penuh

HPS/OE Rp 450,000,000.00

1 2 3 4 5=4:HPS x 100 6 7

1 CV. PUTRI AIR TERJUN 378,028,000.00 378,028,000.00 84.01 1 2 CV. TOHA PUTRA 384,969,000.00 384,969,000.00 85.55 2 3 CV. LIMA PUTRA 385,942,000.00 385,942,000.00 85.76 3 4 CV. SINAR PEMBANGUNAN KOTA 387,120,000.00 387,120,000.00 86.03 4 5 CV. BATANG PULAI 389,687,000.00 389,687,000.00 86.60 5 6 CV. VADERI ALKESINDO 389,945,000.00 389,945,000.00 86.65 6 7 CV. MITRA UTAMA 390,385,000.00 390,385,000.00 86.75 7 8 CV. LAPAN LAPAN 394,431,000.00 394,431,000.00 87.65 8 9 CV. SINAR PEMBANGUNAN KERINCI 400,569,000.00 400,569,000.00 89.02 9 10 CV. CIPTA PESONA KERINCI 400,804,000.00 400,804,000.00 89.07 10 11 CV. TECHNICS 404,007,000.00 404,007,000.00 89.78 11 12 CV. EXPO 66 405,052,000.00 405,052,000.00 90.01 12 13 CV. PRIMA MANDIRI 413,484,300.00 413,484,300.00 91.89 13 14 CV. SILIA 413,912,600.00 413,912,600.00 91.98 14 15 CV. RIZKY WIRA 418,464,800.00 418,464,800.00 92.99 15

KEGIATAN :

Kegiatan Pembangunan Batas Wilayah Pemerintah Kota Sungai Penuh

PEKERJAAN :

- Pembangunan Gerbang Batas Kota Sungai Penuh ( Kec. Tanah Kampung )

NO. PAKET :

09

LOKASI :

KEC. TANAH KAMPUNG

KOTA :

Sungai Penuh

HPS/OE Rp 450,000,000.00

1 2 3 4 5=4:HPS x 100 6 7

1 CV. PUTRI AIR TERJUN 378,028,000.00 378,028,000.00 84.01 1 2 CV. ALAM SINAR JAYA 379,420,000.00 379,420,000.00 84.32 2 3 CV. LIMA PUTRA 385,942,000.00 385,942,000.00 85.76 3 4 CV. SINAR PEMBANGUNAN KOTA 387,054,000.00 387,054,000.00 86.01 4 5 CV. ADE PUTRI 388,820,000.00 388,820,000.00 86.40 5 6 CV. Z.S. KONTRAKTOR 389,177,000.00 389,177,000.00 86.48 6 7 CV. VADERI ALKESINDO 389,945,000.00 389,945,000.00 86.65 7 8 CV. BATANG PULAI 392,612,000.00 392,612,000.00 87.25 8 9 CV. AL HUDA 392,973,000.00 392,973,000.00 87.33 9 10 CV. DUA PUTRA 393,903,000.00 393,903,000.00 87.53 10 11 CV. DATA 395,000,000.00 395,000,000.00 87.78 11 12 CV. ANDIKA 396,101,000.00 396,101,000.00 88.02 12 13 CV. BINTANG PERDANA 396,325,000.00 396,325,000.00 88.07 13 14 CV. ANDRE PUTRA 399,250,000.00 399,250,000.00 88.72 14 15 CV. SULTAN HAMPARAN 399,260,000.00 399,260,000.00 88.72 15 16 CV. VALAN PUTRA 399,270,000.00 399,270,000.00 88.73 16 17 CV. BIRO TEKHNIK 400,061,000.00 400,061,000.00 88.90 17 18 CV. SINAR PEMBANGUNAN KERINCI 400,569,000.00 400,569,000.00 89.02 18 19 CV. RIZKY WIRA 413,998,700.00 413,998,700.00 92.00 19 20 CV. PRIMA MANDIRI 418,503,300.00 418,503,300.00 93.00 20 21 CV. SILIA 422,995,500.00 422,995,500.00 94.00 21 22 CV. PUTRA UTAMA - - - 22

HASIL KOREKSI ARITMATIK

No NAMA PERUSAHAAN

TOTAL HARGA PENAWARAN SAAT

PEMBUKAAN PENAWARAN (Rp)

TOTAL HARGA TERKOREKSI TERHADAP

VOLUME HPS/OE (Rp)

PROSENTASE HARGA TERKOREKSI

TERHADAP HPS/OE (%)

URUTAN

PERINGKAT KET

HASIL KOREKSI ARITMATIK

No NAMA PERUSAHAAN

TOTAL HARGA PENAWARAN SAAT

PEMBUKAAN PENAWARAN (Rp)

TOTAL HARGA TERKOREKSI TERHADAP

VOLUME HPS/OE (Rp)

PROSENTASE HARGA TERKOREKSI

TERHADAP HPS/OE (%)

URUTAN

(5)

KEGIATAN :

Kegiatan Pembangunan Saluran Drainase /Gorong-gorong

PEKERJAAN : - Pembangunan Saluran Drainase & Trotoar Dalam Kota Sungai Penuh ( Jalan Muradi )

NO. PAKET :

10

LOKASI :

KEC. SUNGAI PENUH

KOTA :

Sungai Penuh

HPS/OE Rp 800,000,000.00

1 2 3 4 5=4:HPS x 100 6 7

1 CV. DUA DARA PERKASA 656,060,000.00 656,060,000.00 82.01 1 2 CV. SINAR PEMBANGUNAN KOTA 672,093,000.00 672,093,000.00 84.01 2 3 CV. GIANTARA 679,970,000.00 679,970,000.00 85.00 3 4 CV. KARISMA INDAH 680,000,000.00 680,000,000.00 85.00 4 5 CV. MEKAR JAYA 684,386,000.00 684,386,000.00 85.55 5 6 CV. TERATAI PUTIH 687,713,000.00 687,713,000.00 85.96 6 7 CV. SANIA 687,735,000.00 687,735,000.00 85.97 7 8 CV. GUNUNG INDAH 687,951,000.00 687,951,000.00 85.99 8 9 CV. CEMARA INDAH 687,980,000.00 687,980,000.00 86.00 9 10 CV. VILLA DUTA 688,121,000.00 688,121,000.00 86.02 10 11 CV. VADERI ALKESINDO 688,835,000.00 688,835,000.00 86.10 11 12 CV. KRESHNA DWIPA 690,497,000.00 690,497,000.00 86.31 12 13 CV. TRYOWIKA PUTRA 690,597,000.00 690,597,000.00 86.32 13 14 CV. MULTI MULYA 691,133,000.00 691,133,000.00 86.39 14 15 CV. INDIRA 692,015,000.00 692,015,000.00 86.50 15 16 CV. MULYA PUTRA 692,840,000.00 692,840,000.00 86.61 16 17 CV. CIPTA USAHA SAUDARA 694,060,000.00 694,060,000.00 86.76 17 18 CV. PUTRI AIR TERJUN 694,809,000.00 694,809,000.00 86.85 18 19 CV. SINAR REZEKI 695,835,300.00 695,835,300.00 86.98 19 20 CV. MULIA ARDANA 699,600,600.00 699,600,600.00 87.45 20 21 CV. LENTERA TANJUNG 699,963,000.00 699,963,000.00 87.50 21 22 CV. ADAM MULYA 704,070,000.00 704,070,000.00 88.01 22 23 CV. KANYAHO BATUAH 704,070,000.00 704,070,000.00 88.01 23 24 CV. SINAR PEMBANGUNAN KERINCI 712,198,000.00 712,198,000.00 89.02 24 25 CV. ANTAR NUSA SENTOSA 717,479,000.00 717,479,000.00 89.68 25

KEGIATAN :

Kegiatan Pembangunan Saluran Drainase /Gorong-gorong

PEKERJAAN : - Pembangunan Saluran Drainase & Trotoar Dalam Kota Sungai Penuh (Jl. RE. Martadinata)

NO. PAKET :

11

LOKASI :

KEC. SUNGAI PENUH

KOTA :

Sungai Penuh

HPS/OE Rp 600,000,000.00

1 2 3 4 5=4:HPS x 100 6 7

1 CV. BATU SERBAN 172,996,000.00 172,996,000.00 28.83 1 2 CV. SINAR PEMBANGUNAN KERINCI 504,069,000.00 504,069,000.00 84.01 2 3 CV. MEKAR JAYA 507,066,000.00 507,066,000.00 84.51 3 4 CV. VADERI ALKESINDO 512,619,000.00 512,619,000.00 85.44 4 5 CV. SHANIA 515,532,000.00 515,532,000.00 85.92 5 6 CV. TERATAI PUTIH 515,964,000.00 515,964,000.00 85.99 6 7 CV. VILLA DUTA 516,074,000.00 516,074,000.00 86.01 7 8 CV. CEMARA INDAH 518,979,000.00 518,979,000.00 86.50 8 9 CV. SINAR REZEKI 521,449,000.00 521,449,000.00 86.91 9 10 CV. LENTERA TANJUNG 524,995,000.00 524,995,000.00 87.50 10 11 CV. ANTAR NUSA SENTOSA 526,252,000.00 526,252,000.00 87.71 11 12 CV. KRESHNA DWIPA 528,048,000.00 528,048,000.00 88.01 12 13 CV. KANYAHO BATUAH 528,048,000.00 528,048,000.00 88.01 13 14 CV. TRYOWIKA PUTRA 528,103,000.00 528,103,000.00 88.02 14 15 CV. BINTANG PRDANA 530,459,000.00 530,459,000.00 88.41 15 16 CV. MULYA PUTRA 531,138,000.00 531,138,000.00 88.52 16 17 CV. BINTAN LESTARI 532,682,000.00 532,682,000.00 88.78 17 18 CV. SINAR PEMBANGUNAN KOTA 534,089,000.00 534,089,000.00 89.01 18 19 CV. GUNUNG INDAH 539,621,000.00 539,621,000.00 89.94 19 20 CV. CIPTA USAHA SAUDARA 542,564,000.00 542,564,000.00 90.43 20

SUNGAI PENUH, MEI 2011

TTD

PANITIA PENGADAAN BARANG/JASA DINAS PEKERJAAN UMUM KOTA SUNGAI PENUH

HASIL KOREKSI ARITMATIK

No NAMA PERUSAHAAN

TOTAL HARGA PENAWARAN SAAT

PEMBUKAAN PENAWARAN (Rp)

TOTAL HARGA TERKOREKSI TERHADAP

VOLUME HPS/OE (Rp)

PROSENTASE HARGA TERKOREKSI

TERHADAP HPS/OE (%)

URUTAN

PERINGKAT KET

HASIL KOREKSI ARITMATIK

No NAMA PERUSAHAAN

TOTAL HARGA PENAWARAN SAAT

PEMBUKAAN PENAWARAN (Rp)

TOTAL HARGA TERKOREKSI TERHADAP

VOLUME HPS/OE (Rp)

PROSENTASE HARGA TERKOREKSI

TERHADAP HPS/OE (%)

URUTAN

Referensi

Dokumen terkait

Pengaruh Kebisingan dan Getaran Terhadap Perubahan Tekanan Darah Masyarakat yang Tinggal di Pinggiran Rel Kereta Api Lingkungan XIV Kelurahan Tegal Sari Kecamatan Medan

The physiological function of LTP is not completely elucidated but in vitro studies have shown that LTP cata- lyzes the exchange and/or transfer of DAG: (1) between lipophorins

WR 1 WR 2 WR 3 SENAT BPM LP3M LPPI DIREKTUR PASCA SARJANA DEKAN WAKIL DEKAN BIDANG PENJAMINAN MUTU INTERNAL BIDANG PENJAMINAN MUTU EKSTERNAL DIVISI PENGEMBANGAN PENELITIAN DIVISI

Judul Tesis :Pengaruh Pencabutan Premolar Terhadap Overall Bolton Ratio Pada Maloklusi Klas I di RSGMP FKG USU.. Nama Mahasiswa : Mutia

Untuk mencegah masuknya barang impor ilegal lebih lanjut, Dinas UKM dan Perdagangan DKI akan berkoordinasi dengan pemerintah pusat, bea dan cukai serta aparat kepolisian, untuk

[r]

Penetapan Peraturan Pemerintah ini dimaksudkan untuk memberikan landasan hukum bagi pelaksanaan pemberian gaji/pensiun/tunjangan bulan ketiga belas bagi

Peraturan Pemerintah Nomor 79 Tahun 2007 tentang Perubahan Batas Daerah Kota Pangkalpinang dengan Kabupaten Bangka Tengah Provinsi Kepulauan Bangka Belitung di Desa Selindung