Lampiran1 : Lingkup Pekerjaan RKS No. : 5706.RKS/612/UBJOMPTN/2018

Tanggal : 04 Mei 2018

RINCIAN DAN LINGKUP PEKERJAAN 1) CODES DAN STANDAR UNTUK INSULATION

Standar yang dipergunakan adalah standar insulation pada pipa dan ducting dengan temperature operasi 4°C hingga 700°C

NO MATERIAL STANDAR DESKRIPSI

1 Calcium Silicate Astm C533 Standard Spesification For Calcium Silicate

Block And Pipe Thermal Insulation

2 Mineral Fiber Astm C547 Standar Spesification For Mineral Fiber

Pipe Insulation

3 Perlite ASTM C610 Standard Spesification For Molded

Expanded Perlite Block And Pipe Thermal Insulation

4 Cellular Glass ASTM C552 Standard Spesification For Cellular Glass

Thermal Insulation (Not Specifically For Pipe Insulation, But It Includes Pipe Application)

5 Metal Mesh Covered

Mineral Fiber Blanket ASTM C592 Standard Specification For Mineral FiberInsulation And Blanket-Type Pipe Insulation (Metal-Mesh Covered) (Industrial Type)

6 Mineral Fiber Pipe

And Tank Wrap ASTM C1393 Standard Specification For PerpendicularlyOriented Mineral Fiber Roll And Sheet Thermal Insulation For Pipes And Tanks

7 Jacketing Material For

Thermal Insulation ASTM C921 Standard Practice For Determining TheProperties Of Jacketing Materials For Thermal Insulation

2) Lingkup Pekerjaan

a. Pekerjaan hot insulation services meliputi kegiatan supervisi, penyediaan tenaga kerja, penyediaan material, gambar/ sketsa hasil pekerjaan, tool, alat penerangan, consumable material, penyimpanan, transportasi, fasilitas bantu dan seluruh pendukung lain yang tidak disebutkan diatas untuk meyelesaiakan pekerjaan service insulation selama kontrak berlangsung.

b. Durasi pekerjaan berlangsung selama 1 (satu) tahun kalender sejak surat penunjukan terbit

c. Perhitungan volume pekerjaan menggunakan satuan diameter dan panjang. Harga satuan akan disepakati bersama dalam kontrak sesuai dimensi table dibawah.

d. Harga satuan sudah meliputi material insulation dan asesorisnya, transportasi, fabrikasi, dan instalasi. Harga ini mencakup semua alat bantu untuk menyelesaikan pekerjaan.

e. Marking dan keterangan-keterangan yang ada pada isolasi sebelumnya harus dikembalikan seperti semula dan menjadi tanggung jawab pihak pelaksana.

(5)

RencanaKerjadanSyarat-syarat f. Jika terdapat ukuran di luar table di bawah, maka akan dilakukan perhitungan secara

proporsional menyesuaikan dengan table yang ada.

g. Pelaksanaan mulai dilakukan pekerjaan maksimal 7 (tujuh) hari setelah diterbitkan DO h. Perintah kerja (Delivery Order) diterbitkan oleh bidang Pengadaan atas permintaan

Rendal Har dan Rendal Outage.

i. Dalam proses pelaksanaan pekerjaan kondisional kerusakan isolasi thermal yang ada pada unit pembangkit, hasil akhir pekerjaan disesuaikan dengan realisasi pekerjaan yang selanjutnya dilakukan stock opname/perhitungan luasan yang dikerjakan oleh pelaksana pekerjaan.

j. Harga pekerjaan berdasarkan volume pekerjaan, yang akan ditentukan setelah pekerjaan selesai dengan dilakukan stock opname bersama dengan harga satuan sesuai lampiran surat perjanjian.

k. Estimasi pekerjaan sebagaimana dimaksud tidak mengikat dan tergantung realisasi stock opname setelah pekerjaan selesai, dan sudah termasuk pajak yang berlaku, biaya mob- demob, material, alat-alat, tenaga kerja, asuransi tenaga kerja, asuransi pengangkutan, biaya-biaya/pungutan-pungutan yang berkaitan dengan pelaksanaan pekerjaan.

l. Selama jangka waktu surat perjanjian kontrak payung, pelaksana pekerjaan harus bersedia untuk melaksanakan apabila sewaktu-waktu dibutuhkan PT PJB UBJO&M Paiton.

m. Pelaksana pekerjaan menyediakan alat angkut yang dibutuhkan dalam melaksanakan pekerjaan

n. Pelaksana pekerjaan bertanggungjawab penuh terhadap keselamatan pekerjanya dan melakukan tindakan pencegahan kecelakaan yang diperlukan

o. Pelaksana pekerjaan wajib melakukan pengendalian lingkungan saat pelaksanaan pekerjaan, dan pembersihan pada lokasi pekerjaan setelah pekerjaan selesai, sehingga tidak terdapat limbah yang tercecer di lokasi pekerjaan

3) Detail Pekerjaan a. Isolasi Pipa NO Dimensi Pipa (INCH) Thickness (MM) Material Cover 1 0.5

50 ROCKWOOL Aluminium sheet 0.8 MM

50-100 ROCKWOOL Aluminium sheet 0.8 MM

50 Calcium Silicate Aluminium sheet 0.8 MM

1 1

50 ROCKWOOL Aluminium sheet 0.8 MM

50-100 ROCKWOOL Aluminium sheet 0.8 MM

50 Calcium Silicate Aluminium sheet 0.8 MM

2 2

50 ROCKWOOL Aluminium sheet 0.8 MM

50-100 ROCKWOOL Aluminium sheet 0.8 MM

50 Calcium Silicate Aluminium sheet 0.8 MM

(6)

50-100 ROCKWOOL Aluminium sheet 0.8 MM

50 Calcium Silicate Aluminium sheet 0.8 MM

4 3

50 ROCKWOOL Aluminium sheet 0.8 MM

50-100 ROCKWOOL Aluminium sheet 0.8 MM

50 Calcium Silicate Aluminium sheet 0.8 MM

5 4

50 ROCKWOOL Aluminium sheet 0.8 MM

50-100 ROCKWOOL Aluminium sheet 0.8 MM

50 Calcium Silicate Aluminium sheet 0.8 MM

6 6

50 ROCKWOOL Aluminium sheet 0.8 MM

50-100 ROCKWOOL Aluminium sheet 0.8 MM

50 Calcium Silicate Aluminium sheet 0.8 MM

7 8

50 ROCKWOOL Aluminium sheet 0.8 MM

50-100 ROCKWOOL Aluminium sheet 0.8 MM

50 Calcium Silicate Aluminium sheet 0.8 MM

8 10

100 ROCKWOOL Aluminium sheet 0.8 MM

50-100 ROCKWOOL Aluminium sheet 0.8 MM

50 Calcium Silicate Aluminium sheet 0.8 MM

9 12

100 ROCKWOOL Aluminium sheet 0.8 MM

50-100 ROCKWOOL Aluminium sheet 0.8 MM

50 Calcium Silicate Aluminium sheet 0.8 MM

10 16

50 ROCKWOOL Aluminium sheet 0.8 MM

50-100 ROCKWOOL Aluminium sheet 0.8 MM

50 Calcium Silicate Aluminium sheet 0.8 MM

11 20

50 ROCKWOOL Aluminium sheet 0.8 MM

50-100 ROCKWOOL Aluminium sheet 0.8 MM

50 Calcium Silicate Aluminium sheet 0.8 MM

12 24

50 ROCKWOOL Aluminium sheet 0.8 MM

(7)

RencanaKerjadanSyarat-syarat

50 Calcium Silicate Aluminium sheet 0.8 MM

b. Isolasi Elbow

NO Dimensi (INCH) Thickness

(MM) Material Cover

1 1

50 ROCKWOOL Aluminium sheet 0.8 MM

50-100 ROCKWOOL Aluminium sheet 0.8 MM

50 Calcium Silicate Aluminium sheet 0.8 MM

2 2

50 ROCKWOOL Aluminium sheet 0.8 MM

50-100 ROCKWOOL Aluminium sheet 0.8 MM

50 Calcium Silicate Aluminium sheet 0.8 MM

3 3

50 ROCKWOOL Aluminium sheet 0.8 MM

50-100 ROCKWOOL Aluminium sheet 0.8 MM

50 Calcium Silicate Aluminium sheet 0.8 MM

4 4

50 ROCKWOOL Aluminium sheet 0.8 MM

50-100 ROCKWOOL Aluminium sheet 0.8 MM

50 Calcium Silicate Aluminium sheet 0.8 MM

5 6

50 ROCKWOOL Aluminium sheet 0.8 MM

50-100 ROCKWOOL Aluminium sheet 0.8 MM

50 Calcium Silicate Aluminium sheet 0.8 MM

6 8

50 ROCKWOOL Aluminium sheet 0.8 MM

50-100 ROCKWOOL Aluminium sheet 0.8 MM

50 Calcium Silicate Aluminium sheet 0.8 MM

7 10

50 ROCKWOOL Aluminium sheet 0.8 MM

50-100 ROCKWOOL Aluminium sheet 0.8 MM

50 Calcium Silicate Aluminium sheet 0.8 MM

8 12

50 ROCKWOOL Aluminium sheet 0.8 MM

50-100 ROCKWOOL Aluminium sheet 0.8 MM

(8)

9 14

50 ROCKWOOL Aluminium sheet 0.8 MM

50-100 ROCKWOOL Aluminium sheet 0.8 MM

50 Calcium Silicate Aluminium sheet 0.8 MM

c. Isolasi Flange

NO Dimensi (INCH) Thickness

(MM) Material Cover

1 1

50 ROCKWOOL Aluminium sheet 0.8 MM

50-100 ROCKWOOL Aluminium sheet 0.8 MM

50 Calcium Silicate Aluminium sheet 0.8 MM

2 2

50 ROCKWOOL Aluminium sheet 0.8 MM

50-100 ROCKWOOL Aluminium sheet 0.8 MM

50 Calcium Silicate Aluminium sheet 0.8 MM

3 3

50 ROCKWOOL Aluminium sheet 0.8 MM

50-100 ROCKWOOL Aluminium sheet 0.8 MM

50 Calcium Silicate Aluminium sheet 0.8 MM

4 4

50 ROCKWOOL Aluminium sheet 0.8 MM

50-100 ROCKWOOL Aluminium sheet 0.8 MM

50 Calcium Silicate Aluminium sheet 0.8 MM

5 6

50 ROCKWOOL Aluminium sheet 0.8 MM

50-100 ROCKWOOL Aluminium sheet 0.8 MM

50 Calcium Silicate Aluminium sheet 0.8 MM

6 8

50 ROCKWOOL Aluminium sheet 0.8 MM

50-100 ROCKWOOL Aluminium sheet 0.8 MM

50 Calcium Silicate Aluminium sheet 0.8 MM

7 10

50 ROCKWOOL Aluminium sheet 0.8 MM

50-100 ROCKWOOL Aluminium sheet 0.8 MM

50 Calcium Silicate Aluminium sheet 0.8 MM

(9)

RencanaKerjadanSyarat-syarat

50-100 ROCKWOOL Aluminium sheet 0.8 MM

50 Calcium Silicate Aluminium sheet 0.8 MM

9 14

50 ROCKWOOL Aluminium sheet 0.8 MM

50-100 ROCKWOOL Aluminium sheet 0.8 MM

50 Calcium Silicate Aluminium sheet 0.8 MM

d. Isolasi Tee

NO Dimensi (INCH) Thickness

(MM) Material Cover

1 1

50 ROCKWOOL Aluminium sheet 0.8 MM

50-100 ROCKWOOL Aluminium sheet 0.8 MM

50 Calcium Silicate Aluminium sheet 0.8 MM

2 2

50 ROCKWOOL Aluminium sheet 0.8 MM

50-100 ROCKWOOL Aluminium sheet 0.8 MM

50 Calcium Silicate Aluminium sheet 0.8 MM

2 3

50 ROCKWOOL Aluminium sheet 0.8 MM

50-100 ROCKWOOL Aluminium sheet 0.8 MM

50 Calcium Silicate Aluminium sheet 0.8 MM

3 4

50 ROCKWOOL Aluminium sheet 0.8 MM

50-100 ROCKWOOL Aluminium sheet 0.8 MM

50 Calcium Silicate Aluminium sheet 0.8 MM

4 6

50 ROCKWOOL Aluminium sheet 0.8 MM

50-100 ROCKWOOL Aluminium sheet 0.8 MM

50 Calcium Silicate Aluminium sheet 0.8 MM

5 8

50 ROCKWOOL Aluminium sheet 0.8 MM

50-100 ROCKWOOL Aluminium sheet 0.8 MM

(10)

e. Isolasi Valve NO Dimensi

(IN) Thickness(MM) Material Cover

1 0.5

50 ROCKWOOL Aluminium sheet 0.8 MM

50-100 ROCKWOOL Aluminium sheet 0.8 MM

2 1

50 ROCKWOOL Aluminium sheet 0.8 MM

50-100 ROCKWOOL Aluminium sheet 0.8 MM

3 2

50 ROCKWOOL Aluminium sheet 0.8 MM

50-100 ROCKWOOL Aluminium sheet 0.8 MM

4 2.5

50 ROCKWOOL Aluminium sheet 0.8 MM

50-100 ROCKWOOL Aluminium sheet 0.8 MM

5 3

50 ROCKWOOL Aluminium sheet 0.8 MM

50-100 ROCKWOOL Aluminium sheet 0.8 MM

6 4

50 ROCKWOOL Aluminium sheet 0.8 MM

50-100 ROCKWOOL Aluminium sheet 0.8 MM

100 Calcium Silicate Aluminium sheet 0.8 MM

7 6

50 ROCKWOOL Aluminium sheet 0.8 MM

50-100 ROCKWOOL Aluminium sheet 0.8 MM

100 Calcium Silicate Aluminium sheet 0.8 MM

8 8

50 ROCKWOOL Aluminium sheet 0.8 MM

50-100 ROCKWOOL Aluminium sheet 0.8 MM

100 Calcium Silicate Aluminium sheet 0.8 MM

9 10

50 ROCKWOOL Aluminium sheet 0.8 MM

50-100 ROCKWOOL Aluminium sheet 0.8 MM

100 Calcium Silicate Aluminium sheet 0.8 MM

10 12

50 ROCKWOOL Aluminium sheet 0.8 MM

50-100 ROCKWOOL Aluminium sheet 0.8 MM

100 Calcium Silicate Aluminium sheet 0.8 MM

(11)

RencanaKerjadanSyarat-syarat

50-100 ROCKWOOL Aluminium sheet 0.8 MM

100 Calcium Silicate Aluminium sheet 0.8 MM

12 16

50 ROCKWOOL Aluminium sheet 0.8 MM

50-100 ROCKWOOL Aluminium sheet 0.8 MM

150 Calcium Silicate Aluminium sheet 0.8 MM

13 18

50 ROCKWOOL Aluminium sheet 0.8 MM

50-100 ROCKWOOL Aluminium sheet 0.8 MM

150 Calcium Silicate Aluminium sheet 0.8 MM

14 20

50 ROCKWOOL Aluminium sheet 0.8 MM

50-100 ROCKWOOL Aluminium sheet 0.8 MM

150 Calcium Silicate Aluminium sheet 0.8 MM

f. Isolasi Ducting NO Dimensi

(M2) Thickness(MM) Material Cover

1 1 100 ROCKWOOL Aluminium sheet 0.8MM

2 1 100 ROCKWOOL Aluminium embose 0.8 MM

3 1 100 Calcium Silicate Aluminium sheet 0.8 MM

4 1 100 Calcium Silicate Aluminium embose 0.6 MM

4) Tahapan Pekerjaan

a. Tahap Spesifikasi material 1. Rockwool pipe :

1. Density :100-150kg/m3

2. Thickness : 30-150mm

3. Applicable inner diameter : 18-1500mm

4. Physical properties Thermal Conductivit : ≤0.035W/mk 70 ±5°C

5. Fireproof Inflamable : Grade A

6. Applicable Temperature : -240 to 650°C

7. Moistureproof : ≥95%

2. Gift Silica : Spesifikasi

1. Thermal conductivity : 0.060W/mK

2. Working temperature max : 650°C

3. Flexurel Strength : 0.35 Mpa

4. Compressive Strength : 0.60 Mpa

(12)

b. Tahap Konstruksi

1. Pelaksana pekerjaan berkewajiban melakukan identifikasi terhadap pekerjaan yang telah disetujui oleh Pemberi kerja

2. Pelaksana pekerjaan berkewajiban melakukan perbaikan isolasi pipa dan valve di PT PJB UBJ O&M PLTU PAITON beserta modifikasinya sesuai desain yang telah disetujui oleh Pemberi Kerja

3. Pelaksana pekerjaan wajib membuat prosedur komisioning yang disusun dengan lengkap dan rapi. Prosedur yang telah dibuat harus mendapatkan approval dari Pemberi Kerja

4. Pelaksana pekerjaan harus melaksanakan pekerjaan yang bersifat finishing (pembersihan, dan lain-lain)

5) Laporan

1. Pelaksana pekerjaan wajib membuat laporan harian kemajuan pekerjaan dan foto setiap hari diserahkan kepada pemberi kerja

2. Pelaksana pekerjaan wajib membuat laporan hasil konstruksi, commissioning, training dan workshop

3. Pelaksana pekerjaan wajib membuat laporan final. Kelengkapan laporan tersebut diantaranya:

o Semua laporan kegiatan tersebut diatas yang sudah disetujui oleh pemberi kerja o Technical Specification

Pemberi kerja akan melakukan approval terhadap laporan tersebut diatas.

4. Laporan harus diserahkan kepada Pemberi Kerja dalam berbentuk hard copy dan soft copy

6) Kriteria keberhasilan dan garansi

a. Seluruh material yang ditawarkan harus disebutkan Merk dan Spesifikasinya.

b. Barang atau material yang dipasang atau diserahkan harus dalam keadaan baru (brand new), asli dan layak pakai atau operasional.

c. Dalam Proposal penawaran juga harus disertakan brosur asli atau foto copy, yang berisi data teknis untuk seluruh perangkat yang ditawarkan.

d. Seluruh perangkat yang dipasang harus mempunyai garansi dimana garansi terhitung dari mulai tanggal serah terima barang atau jasa.

e. Ketepatan waktu pelaksanaan pekerjaan sesuai schedule yang direncanakan.

f. Apabila hasil dari visual check dan pengukuran masih belum sesuai dengan kriteria yang ditentukan diatas, maka Pelaksana Pekerjaan wajib melakukan perbaikan hingga memenuhi kriteria yang ditentukan tersebut diatas.

g. Garansi berlaku selama 90 hari kalender untuk setiap pekerjaan sejak berita acara penyelesaian pekerjaan. Jika selama masa garansi terjadi kerusakan akibat pekerjaan yang tidak baik, pelaksana berkewajiban memperbaikinya tanpa tambahan biaya 7) Pembayaran

Pembayaran dilakukan berdasarkan pekerjaan aktual yang telah dilakukan oleh Pelaksana Pekerjaan

Referensi

Dokumen terkait

Also, the exchange rate between the Asian currency and the dollar, while not significantly affecting the aggregate manufacturing sector, has a significant impact in some

For the case of Hertzian contacts, the problem of partial slip of the contact when first a constant normal load is applied, and then a monotonically increasing tangential force

Dengan berbagai latihan siswa mampu mengidentifikasi dan menyelesaikan masalah yang berkaitan dengan perkalian dan pembagian pecahan dan desimal2. Pemecahan masalah perkalian

[r]

[r]

Plat datar dan dinding adalah struktur kaku pembentuk permukaan suatu dinding pemikul beban dapat memikul beban baik beban yang bekerja dari arah vertical maupun

Tazkiyatun nafs , baik dalam artian mensucikan hati, membersihkan diri serta prilaku dari sifart negatif atasdalam artian meningkatkan kualitas diri yang dihiasi dengan

Populasi adalah sekelompok orang, kejadian atau segala sesuatu yang mempunyai karakteristik tertentu (Darmawa, 2013, hlm. Berdasarkan pengertian diatas, maka yang