Corporate Presentation
AUGUST 11, 2011
I.
1
st
Half 2011 Results
II. Product ion Perf ormance
III. Progress of St rat egic Proj ect s
IV. Cost Management & Energy Securit y
FINANCIAL SUMMARY: 1H-2011 RESULTS
EBITDA
(Rp billion)
NET INCOME
(Rp billion)
NET INCOME
(Rp billion)
EBITDA Margin
(%)
EBITDA Margin
(%)
1H-07
1H-08
1H-09
1H-10
1H-11
26. 16
31. 28
31. 45
34. 13
33. 2
NET INCOME Margin
(%)
NET INCOME Margin
(%)
1H-07
1H-08
1H-09
1H-10
1H-11
15. 79
19. 94
22. 37
24. 43
24. 60
Description
(Rpbn)
1H2010
1H2011
Change
(%)
Revenue
6, 661
7. 606
14. 2
Cost of revenue
3, 500
4, 110
17. 4
Gross profit
3, 161
3, 496
10. 6
Operating expenses
1, 111
1, 223
10. 1
Operating income
2, 050
2, 273
10. 8
Ebitda
2, 273
2, 528
11. 2
Net Income
1, 627
1, 873
15. 1
EPS (full amount)
274
316
15. 1
2,528
1H-07
1H-08
1H-09
1H-10
1H-11
1873
1H-07
1H-08
1H-09
1H-10
1H-11
SMGR Sales Volume
SMGR Sales Volume
1H-2011
1H-2010
± (%)
Domestic
9,171,428
8,360,335
9.7
Export
60,860
69,056
(11.8)
AGENDA
I.
1
st
Half 2011 Result s
II. Production Performance
III. Progress of St rat egic Proj ect s
PLANTS MAINTENANCE SCHEDULES - 2011
UNIT
REALIZATION
PROGNOSES
1
2
3
4
5
6
7
8
9
10
11
12
SEMEN PADANG
• Indarung II
- 670, 000 t on
(1976)
• Indarung III
- 770, 000 t on
(1981)
• Indarung IV
- 1, 620, 000 t on
(1993)
• Indarung V
- 2, 840, 000 t on
(1998)
SEMEN GRESIK
• Tuban I
- 2, 900, 000 t on
(1994)
• Tuban II
- 3, 000, 000 t on
(1997)
• Tuban III
- 3, 100, 000 t on
(1998)
SEMEN TONASA
• Tonasa II
- 610, 000 t on
(1980)
• Tonasa III
- 610, 000 t on
(1985)
• Tonasa IV
- 2, 880, 000 t on
(1996)
Annual maint enance (realizat ion up t o 7M2011)
Annual maint enance (realizat ion up t o 7M2011)
PRODUCTION PERFORMANCE
Unit
Cement Product ion
Growt h (%)
•
Semen Gresik
•
Semen Padang
•
Semen Tonasa
5, 400, 000
Unit
Prognoses Product ion
Growt h (%)
•
Semen Gresik
•
Semen Padang
•
Semen Tonasa
9, 700, 000
Unit
Cement Product ion
•
Semen Gresik
•
Semen Padang
•
Semen Tonasa
11, 700, 000
6, 200, 000
5, 100, 000
DE-BOTTLENECKING PROJECTS
UNIT
2010
2011
PLANTS
INITIAL CAPACITY
FEB
APR
MAY
AUG
JAN
APR
MAY
Cement Mill – Indarung III
110 t ph - cement
130 t ph
Cement Mill – Indarung IV
120 t ph - cement
150 t ph
Kiln – Tuban I
7, 500 t pd - clinker
8, 500 t pd
9, 000 t pd
Kiln – Tuban II
7, 600 t pd - clinker
8, 200 t pd
AGENDA
I.
1
st
Half 2011 Result s
II. Product ion Perf ormance
III.
Progress of Strategic Proj ects
PROGRESS OF TUBAN IV CEMENT PLANT
YEAR
2008
2009
2010
2011
2012
QUARTER
1
2
3
4
1
2
3
4
1
2
3
4
1
2
3
4
1
2
3
4
PREPARATION
M ANAGEM ENT
ENGINEERING
PROCUREM ENT
CONSTRUCTION
COM M ISSIONING
YEAR
2008
2009
2010
2011
2012
QUARTER
1
2
3
4
1
2
3
4
1
2
3
4
1
2
3
4
1
2
3
4
PREPARATION
M ANAGEM ENT
ENGINEERING
PROCUREM ENT
CONSTRUCTION
COM M ISSIONING
–
Real
•
Design Cap
: 2.5 million tpa
PROGRESS OF TONASA V CEMENT PLANT
YEAR
2008
2009
2010
2011
2012
QUARTER
1
2
3
4
1
2
3
4
1
2
3
4
1
2
3
4
1
2
3
4
PREPARATION
M ANAGEM ENT
ENGINEERING
PROCUREM ENT
CONSTRUCTION
COM M ISSIONING
YEAR
2008
2009
2010
2011
2012
QUARTER
1
2
3
4
1
2
3
4
1
2
3
4
1
2
3
4
1
2
3
4
PREPARATION
M ANAGEM ENT
ENGINEERING
PROCUREM ENT
CONSTRUCTION
COM M ISSIONING
–
Real
•
Design Cap
: 2.5 million tpa
PROGRESS OF POWER PLANT
YEAR
2009
2010
2011
2012
QUARTER
1
2
3
4
1
2
3
4
1
2
3
4
1
2
3
4
PREPARATION
M ANAGEM ENT
ENGINEERING
PROCUREM ENT
CONSTRUCTION
COM M ISSIONING
YEAR
2009
2010
2011
2012
QUARTER
1
2
3
4
1
2
3
4
1
2
3
4
1
2
3
4
PREPARATION
M ANAGEM ENT
ENGINEERING
PROCUREM ENT
CONSTRUCTION
COM M ISSIONING
–
Real
DESIGN CAPACITY (Mio Ton)
2007
2008
2009
2010
2011F 2012F 2013F 2014F 2015F
AGENDA
I.
1
st
Half 2011 Result s
II. Product ion Perf ormance
III. Progress of St rat egic Proj ect s
COST MANAGEMENT
350000
450000
550000
650000
750000
850000
3M2009
6M2009
9M2009
FY2009
3M2010
6M2010
9M2010
FY2010
3M2011
6M2011
ENERGY SECURITY
EQUIPMENT
2011
2013
May
4Q
New Coal Mill – Tuban *)
80 tph
New Coal Mill - Indarung
50 tph
New Coal Mill - Tonasa
80 tph
The const ruct ion of new Coal Mil l at Tuban wit h design
capacit y of 80 t ph, required t o meet pul verized coal at
Tuban 1, 2, 3 which designed t o consume medium – l ow
cal orie value of coal, as t he current exist ing Coal Mil l of
3x50 t ph is not adequat e t o meet cement product ion
capacit y.
In order to secure energy, the Company is converting coal calorie value from high
rank to medium – low rank coal which requires new coal mill additional facilities, as
follows:
In order to secure energy, the Company is converting coal calorie value from high
rank to medium – low rank coal which requires new coal mill additional facilities, as
follows:
16
16
Main Office:
Main Building of Semen Gresik
Jln. Veteran Gresik 61122 –
Indonesia
Phone: (62-31) 3981731 -2, 3981745
Fax: (62-31) 3983209, 3972264
Representative Office:
Gedung The East, 18
thFloor,
Jln. Lingkar Mega Kuningan Kav. E3.2 No. 1,
Jakarta 12950 – Indonesia
Phone : (62-21) 5261174 – 5
Fax
: (62-21) 5261176
www.semengresik.com
THANK YOU
THANK YOU
IMPORTANT NOTICE
THIS PRESENTATION IS NOT AND DOES NOT CONSTITUTE OR FORM PART OF, AND IS NOT MADE IN CONNECTION WITH, ANY OFFER FOR SALE OR SUBSCRIPTION OF OR SOLICITATION, RECOMMENDATION OR INVITATION OF ANY OFFER TO BUY OR SUBSCRIBE FOR ANY SECURITIES NOR SHALL IT OR ANY PART OF IT FORM THE BASIS OF OR BE RELIED ON IN CONNECTION WITH ANY CONTRACT, COMMITMENT OR INVESTMENT DECISION WHATSOEVER.
THE SLIDES USED IN THIS PRESENTATION ARE STRICTLY CONFIDENTIAL AND HAVE BEEN PREPARED AS A SUPPORT FOR ORAL DISCUSSIONS ONLY. THE INFORMATION CONTAINED IN THIS PRESENTATION IS BEING PRESENTED TO YOU SOLELY FOR YOUR INFORMATION AND MAY NOT BE REPRODUCED OR REDISTRIBUTED TO ANY OTHER PERSON, IN WHOLE OR IN PART.
This presentation includes forward-looking statements, which are based on current expectations and forecast about future events. Such statements involve known / unknown risks uncertainties and other factors, which could cause actual results to differ materially from historical results or those anticipated. Such factors include, among others:
● economic, social and political conditions in Indonesia, and the impact such conditions have on construction and infrastructure spending in Indonesia;
● the effects of competition;
● the effects of changes in laws, regulations, taxation or accounting standards or practices;
● acquisitions, divestitures and various business opportunities that we may pursue;
● changes or volatility in inflation, interest rates and foreign exchange rates;
● accidents, natural disasters or outbreaks of infectious diseases, such as avian influenza, in our markets;
● labor unrest or other similar situations; and
● the outcome of pending or threatened litigation.
We can give no assurance that our expectations will be attained.
DISCLAIMER
The information contained in this report has been taken from sources which we deem reliable. However, none of PT Semen Gresik (Persero) Tbk and/or its affiliated companies and/or their respective employees and/or agents make any representation or warranty (express or implied) or accepts any responsibility or liability as to, or in relation to, the accuracy or completeness of the information and opinions contained in this report or as to any information contained in this report or any other such information or opinions remaining unchanged after the issue thereof.