• Tidak ada hasil yang ditemukan

Maintaining Jobs and Work Through Machine Automation

N/A
N/A
Protected

Academic year: 2017

Membagikan "Maintaining Jobs and Work Through Machine Automation"

Copied!
1
0
0

Teks penuh

(1)

Title:

Maintaining Jobs and Work Through Machine Automation Word Count:

281 Summary:

One of the great misleading myths of modern manufacturing is that North America cannot compete in a global manufacturing marketplace and is losing jobs due to lower foreign labor costs.

Keywords:

Maintaining Jobs and Work Through Machine Automation

Article Body:

One of the great misleading myths of modern manufacturing is that North America cannot compete in a global manufacturing marketplace and is losing jobs due to lower foreign labor costs.

This belief is not true, according to applications engineers at Makino, a global provider of advanced machining technology. They say the automation of manufacturing processes, including the robotic and conveyor integration of manufacturing work cells, can actually drive the parts production or die and mold manufacturing costs down while maintaining or enhancing quality. Makino has documented such manufacturing examples through customer contacts and interviews. Investing in such technologically advanced processes has become so productive that the low per-unit-part cost makes domestically manufactured goods competitive with the production of goods with foreign labor wages. Also, the local customer service and the shorter lead time aspects of U.S. and North American manufacturing aides in this competitive formula, making the company more valuable to its customers.

Making these technological upgrades will also save U.S. and North American jobs. Many manufacturers initially feared that by investing in automation technology, jobs would only be lost to the machinery as opposed to foreign competitors. However, as a number of manufacturing case studies prove, such a technological investment actually helps save and maintain jobs. Hiring also continues to grow at a significant annual rate to keep up with increasing work volume.

In one case study, the cycle times and lead times for many production processes improved dramatically. Some high-volume production parts that were previously manufactured at a rate of two per hour are now being manufactured at a rate of 126 per hour. And, some processes that used to take 12 weeks can now be completed in six.

This is a demo version of txt2pdf v.10.1

Referensi

Dokumen terkait

bertindak untuk dan atas nama PT...,dalam rangka memenuhi salah satu persyaratan dalam proses memperoleh Izin Penyelenggaraan Penyiaran bagi PT...sebagai lembaga

Dari sampel tanaman lada yang menunjukkan gejala sakit kuning di Kalimantan Barat berhasil dikoleksi 4 isolat jamur Fusarium yang selanjutnya dikultur- kan pada medium PDA dan

Edinburgh University Press, 1981), hlm.. pendidikan yang dikelola secara profesional. 12 Sebagai contoh, pengelola madrasah Niz}amiyah sudah menerapkan sistem

Sehubungan dengan Dokumen Penawaran yang saudara ajukan , dengan ini kami mengundang saudara untuk mengadakan klarifikasi Dokumen Kualifikasi Paket Pekerjaan Kegiatan

Pada hari ini Rabu tanggal Dua puluh tiga Maret tahun Dua ribu enam belas, kami yang bertanda tangan dibawah ini Kelompok Kerja Jasa Lainnya Kegiatan Pemasangan Iklan

b) apabila yang bersangkutan mengundurkan diri dan masa penawarannya masih berlaku dengan alasan yang tidak dapat diterima secara obyektif oleh Panitia Pengadaan, maka Jaminan

Berdasarkan hasil Evaluasi Penawaran dan Kualifikasi paket pekerjaan Penyusunan Kebijakan Pengembangan Industri Tahun 2017, bersama ini kami mengundang Saudara

[r]