v Adelia Rizka, 2016

ANALISIS KOORDINASI OCR, GFR DAN RECLOSER PADA PENYULANG KMO DI GIS KIARA CONDONG Universitas Pendidikan Indonesia | repository.upi.edu | perpustakaan.upi.edu

ABSTRAK

Salah satu parameter keandalan pasokan listrik dari PLN yaitu dapat dilihat seberapa seringnya pemadaman yang terjadi. Pemadaman listrik dapat disebabkan karena adanya gangguan pada sistem tenaga listrik, seperti gangguan hubung singkat. Guna meminimalisir gangguan, dibutuhkan suatu sistem proteksi pada sistem tenaga listrik yang terkoordinasi dari mulai sisi pembangkit, transmisi, hingga distribusi. Pada tulisan ini, dilakukan penelitian mengenai koordinasi sistem proteksi pada penyulang KMO di GIS Kiara Condong Bandung. Penyulang KMO memiliki gardu hubung (GH) dan memiliki dua jaringan keluaran, yaitu jaringan PKDM dan jaringan BMCA. Tujuan dari penelitian ini ialah untuk mengetahui besarnya nilai arus gangguan yang terjadi, sehingga dapat dihitung besarnya nilai setting arus serta nilai setting waktu untuk peralatan proteksinya, yakni OCR, GFR dan recloser. Nilai setting koordinasi yang diteliti pada tulisan ini diambil pada titik incoming feeder, outgoing feeder, serta penyulang pada masing-masing jaringan PKDM dan BMCA. Koordinasi sistem proteksi yang baik ialah yang memiliki waktu kerja antar sistem proteksi yang berurutan mulai dari penyulang, outgoing feeder, dan incoming feeder. Sehingga, kerja antar sistem proteksi tidak saling tumpang tindih. Dari hasil penelitian, waktu kerja relai mulai dari penyulang/recloser menuju incoming feeder semakin besar dan tidak terjadi adanya salah kerja antar relai. Sehingga, dapat diambil kesimpulan bahwa OCR, GFR dan recloser pada penyulang KMO di GIS Kiara Condong yang diteliti sudah terkoordinasi dengan baik.

Kata kunci: GIS Kiara Condong; gangguan hubung singkat; koordinasi sistem proteksi;

(2)

vi Adelia Rizka, 2016

ANALISIS KOORDINASI OCR, GFR DAN RECLOSER PADA PENYULANG KMO DI GIS KIARA CONDONG Universitas Pendidikan Indonesia | repository.upi.edu | perpustakaan.upi.edu

ABSTRACT

The reliability parameter of the electricity can be seen by the frequent of interrupts/blackouts occurred. Blackouts can be caused by the short circuit in the power system. To minimalize the short circuit, it needs a protection system which is well-coordinated from the power plants to the distribution lines. The study of protection system coordination on feeder KMO from GIS Kiara Condong Bandung is written in this paper. Feeder KMO has a substation circuit which has two outputs; line PKDM and line BMCA. The aims of this study is to know the magnitude of short circuit that occurred on the lines, that it can be used to calculate the current and time setting of the OCRs, GFRs and reclosers. The coordination setting of relays in this paper is located on the incoming feeder, outgoing feeder, and feeder on each line PKDM and BMCA. The best coordination of the protection system is the coordination which each relay can be worked in sequence, without overlap occurred from the feeder to the incoming feeder. The result of this study is the time setting (tripping time) of the relays from the feeder/recloser to the incoming feeder is increasing and the overlapping is not occurred.

(3)

7 Adelia Rizka, 2016

Referensi

Dokumen terkait

Koordinasi antara relay arus lebih dari sisi incoming maupun outgoing pada Penyulang Palur 12 dengan recloser sebagai pengaman utama harus tepat dan sesuai..

Koordinasi relay proteksi arus lebih pada sistem tenaga listrik yang besar sangat sulit dilakukan dengan menggunakan perhitungan setting biasa.. Sehingga dibutuhkan suatu

Penelitian ini bertujuan untuk mencari rugi energi listrik yang terjadi pada jaringan distribusi primer penyulang Lebaksari PT PLN (Persero) Rayon Padalarang.. Data dalam

Dari hasil simulasi WLS State Estimation pada empat penyulang jaringan distribusi 20 KV di Kota Bandung menunjukkan bahwa dengan metode ini, jumlah bus yang

ANALISIS KOORDINASI OCR, GFR DAN RECLOSER PADA PENYULANG KMO DI GIS KIARA CONDONG Universitas Pendidikan Indonesia | repository.upi.edu | perpustakaan.upi.edu!. 2.7

Dengan ini saya menyatakan bahwa skripsi dengan judul ANALISIS KOORDINASI SETTING OVER CURRENT RELAY DAN GROUND FAULT RELAY PADA PENYULANG ALUN 20 KV DI GIS

Alhamdulillah syukur atas rahmat dan hidayahnya penulis dapat menyelesaikan Laporan akhir ini yang berjudul : “Koordinasi Setting Over Current Relay pada Incoming dan Outgoing

Pada saat dilakukan simulasi gangguan pada incoming feeder Tursina terjadi kesalahan koordinasi proteksi dengan terputusnya rele diluar kawasan Tursina karena setting