Muhammad Rizki, 2015

STUDI KOORDINASI RELAY PROTEKSI PADA MAIN TRANSFER STATION II PT. KRAKATAU DAYA LISTRIK DENGAN METODE PEMROGRAMAN LINIER

Universitas Pendidikan Indonesia | repository.upi.edu | perpustakaan.upi.edu

vii

STUDI KOORDINASI RELAY PROTEKSI PADA MAIN TRANSFER

STATION II PT. KRAKATAU DAYA LISTRIK DENGAN METODE

PEMROGRAMAN LINIER

MUHAMMAD RIZKI

E.5051. 1101732

ABSTRAK

Koordinasi relay proteksi arus lebih pada sistem tenaga listrik yang besar sangat sulit dilakukan dengan menggunakan perhitungan setting biasa. Sehingga dibutuhkan suatu cara atau metode yang mempermudah dalam melakukan perhitungan setting waktu kerja proteksi relay arus lebih. Pada penelitian ini digunakan metode pemrograman linier untuk mendapatkan hasil koordinasi waktu kerja relay yang optimal. Pada perhitungan dengan menggunakan pemrograman linier ini, semua persamaan diubah menjadi linier dengan tujuan untuk mempermudah dalam melakukan perhitungan. Sebelum melakukan perhitungan dengan metode ini, dilakukan pemilihan pasangan relay yang berdekatan dan berhubungan dengan bus atau daerah yang terdekat dengan gangguan. Nilai konstanta dari masing-masing relay atau TDS (time dial setting) yang menjadi titik acuan untuk mendapatkan waktu kerja relay yang terkoordinasi. Untuk itu, dilakukan pemilihan CT (current transformer) untuk mendapatkan nilai koefisien persamaan pasangan relay yang sesuai dengan metode pemrograman linier. Nilai inilah yang dicari dengan menggunakan pemrograman linier dan batasan koordinasi relay atau CTI (coordination time interval) sebesar 0,4 detik. Penelitian yang dilakukan pada sistem tenaga listrik Main Transfer Station II PT. Krakatau Daya Listrik mendapatkan waktu koordinasi relay yang optimal. Hasil koordinasi waktu kerja proteksi relay arus lebih mendapatkan waktu kerja yang sesuai dengan batas waktu koordinasi relay atau CTI sebesar 0,4 detik.

(2)

Muhammad Rizki, 2015

STUDI KOORDINASI RELAY PROTEKSI PADA MAIN TRANSFER STATION II PT. KRAKATAU DAYA LISTRIK DENGAN METODE PEMROGRAMAN LINIER

Universitas Pendidikan Indonesia | repository.upi.edu | perpustakaan.upi.edu

viii

STUDI KOORDINASI RELAY PROTEKSI PADA MAIN TRANSFER

STATION II PT. KRAKATAU DAYA LISTRIK DENGAN METODE

PEMROGRAMAN LINIER

MUHAMMAD RIZKI

E.5051. 1101732

ABSTRACT

Coordination of overcurrent protection relay with the large system is difficult if using regular setting calculation. So, we need a method to calculate setting of protection overcurrent relay. The research using linear programming methods to obtain the optimal coordination of overcurrent relay. On the calculations using linear programming, all of equation converted into a linear calculation with the aim to facilitate the calculation. Before calculation of the equation by this method, we must choose pair of overcurrent relay with the bus or the area closest to the disorder. Constant value of each relay or TDS (time dial setting) which become a reference point to obtain a coordinated of relay. Therefore we must choose value of CT (current transformer) each relay to get the value equation coefficients corresponding relay pair of linear programming methods. This value is found using linear programming and limitation of coordination relay or CTI (coordination time interval) of 0.4 seconds. The research of the power system Main Transfer Station II PT. Krakatau Daya listrik obtain optimal time relay coordination. The Results of coordination of overcurrent protection relay getting time operation according to the time limit relay coordination or CTI of 0.4 seconds.

Referensi

Dokumen terkait

Maka, pengairan terbaik adalah menggunakan empat pompa dengan hasil waktu yang efisien. Jawaban 1B (Periode penanaman

Enam kelompok mengalami kenaikan indeks, yaitu kelompok bahan makanan sebesar 0,14 persen; kelompok makanan jadi, minuman, rokok, dan tembakau sebesar 0,41 persen; kelompok

Sesuai pada Hipotesis ketiga yang menyatakan ada dugaan variabel promosi jabatan terhadap kepuasan kerja terbukti benar yang dibuktikan dengan hasil penelitian

Masing-masing isolat ditumbuhkan terlebih dahulu pada media kaya dan media minimal sebelum diaplikasikan pada limbah minyak berat. Media kaya dibuat dalam erlenmeyer 250 mL

Dari masalah masalah yang di hadapi para petani garam solusinya nya yaitu mengganti panas matahari yang di gunakan sebagai energi pembuatan garam dengan heater yang

Tanda Lulus Sensor adalah surat yang dikeluarkan oleh Lembaga Sensor Film bagi setiap kopi film, trailer serta film iklan, dan tanda yang dibubuhkan oleh Lembaga Sensor Film

Penghentian pemberian air pada umur 60 hari yaitu pada saat keadaan cuaca sangat kering dan panas dimana panen daun tembakau dilakukan pada umur 71 hari mengakibatkan

Papertech Indonesia Perusahaan Kertas Jl.