KEGIATAN : PEMANTAUAN KUALITAS LINGKUNGAN

PEKERJAAN :

Pembangunan Instalasi Pengolah Air Limbah (IPAL) Medik untuk Puskesmas Rawat lnap

LOKASI : PUSKESMAS NEGARA KECAMATAN DAHA UTARA KAB. HSS

PROVINSI : KALIMANTAN SELATAN

1 4 5 6

I. PEKERJAAN PERSIAPAN

1. Pembersihan Lokasi - Unit 1.000

2. Pengukuran - M2 1.000

4. Papan Nama Proyek - Bh 1.000

5. Pemasangan Bowplank - Unit 1.000

SUB TOTAL II. PEKERJAAN TANAH DAN PASIR

1. Pek. Galian Tanah 1 M3 4.050

2. Pek. Urugan Pasir Bawah Pondasi Poer 3 M3 0.825

SUB TOTAL III. PEKERJAAN LANTAI DUDUKAN REAKTOR

1. Pek. Beton Bertulang 1 : 2 : 3

- Kolom 30/30 10 M3 0.810

- Balok Lantai 30/30 10 M3 2.610

- Pondasi Poer 10 M3 1.800

- Plat Lantai tebal 12 cm 8 M3 4.080

2. Pek. Pancangan Galam Dia. 10 mm Panjang 4 m - Pot 54.000

SUB TOTAL IV. PEKERJAAN EQUALIZING TANK

1. Pek. Beton Bertulang 1 : 2 : 3

- Dinding Beton Bertulang Tebal 15/15 8 M3 2.250

- Lantai Beton Bertulang Tebal 15/15 8 M3 0.338

2. Pek. Pancangan Galam Dia. 10 mm Panjang 2 m - Pot 25.000

SUB TOTAL RENCANA ANGGARAN BIAYA

2 3

Satuan Volume Harga Satuan (Rp) Jumlah Harga (Rp) No. Analisa dan

(2)

1 4 5 6

V PENGADAAN REAKTOR IPAL KAPASITAS 8,0 M³/H - Unit 1.000

SPESIFIKASI 1. Box Shield

Dimension : 1500mmX800mmX900mm

Material : Mild steel

Coating Powder Coating

2. Oxidator Generator BART O2 2 unit

Oksigen Flow rate 1 - 5 L/min

Oxidator concentration 28 - 65 Mg/L

Oxidator output 3.9 - 5.04 g/hr

Power 0.05 kW

cooling Air Cooled

Ambient temperature maks 35.0 ⁰

C Fitting Size :

1. Inner Diameter 7.0 mm

2. Outer Diameter 11.0 mm

Output Frequency 42,186.0 Khz

Mounting holes foot print of power supply 190.5 x 75 mm

Dew Point (45.0)

C

Adjustable range 20 - 100 %

Ox tube dimension 250x105x125 mm

Power Supply Dimension 200 x 75 x 83 mm

Oxidator generator tube weight 0.53 kg

Power supply weight 1.2 kg

Tubing PTFE

Working condition Ambient temperature maksimum 35 ⁰

C , air cooled

3. Supply Oxidator BART O2 Genarator 2 unit

Oksigen output 3.0 L/min

Oksigen concentration 40 - 93 %

Power 0.3 kW

Pressure (inlet) 0.18 - 0.2 Mpa

Pressure (outlet) 0.06 - 0.08 Mpa

Relative Humidity ≤ 85%

Noise ≤ 55 Db

Rate speed 1,400 rpm

4. Ventury BART VENT 0503 2 unit

material PVDF

water flow rate up to 1 ton / hr

inlet and outlet 1/2"

flexible hose 1/4"

length 100 mm

5. Cooling system Fan Cooling

Power 0.125 kW

Forced condenser air cooling system

OXIDATOR GENERATOR UNIT

No. Uraian Pekerjaan Volume Harga Satuan (Rp) Jumlah Harga (Rp)

dan Satuan

2 3

(3)

1 4 5 6

1. Material Stainless Steel SUS 304 grade 8% 1,600 mm

Dimension High 382.0 mm

Diameter minimal 2 unit

Quantity 2 unit

Flow meter in line type Carbon

Odour removal upper location

With frame support made of UNP 100 Mild steel and others

1. Intake Pump Power 0.2 kW

Quantity 2 set

ON/OFF with WLC system

2. Circulation Pump Power 0.3 kW

Quantity 2 set

1. UV Filtering Capacity 8 GPM

Quantity 2 Set

1. Filter Tank Material FRP 10"

Capacity 4 m3/h

1. Frame Mild steel square pipe

Wall high 1000 mm made of Plate mild steel Finishing Powder coating

Dimension all 2400x2400x3200

1. Pipeline PVC AW

2. Outlet Control Pond

1 lot

SUB TOTAL EQUALIZER DAN OUTLET

Jumlah Harga (Rp) dan Satuan

2 3

REACTOR TOWER

Harga Satuan (Rp)

CIRCULATION PUMP SYSTEM

DISTRUCTED OXIDATOR SYSTEM

FILTERING SYSTEM

SHIELDING ALL SYSTEM

Referensi

Dokumen terkait

Tujuan dari penelitian sistem informasi pasien rawat inap di Puskesmas Sambirejo ini adalah untuk membangun sistem informasi pasien rawat inap di Puskesmas

Nama Paket : Pembangunan Instalasi Pengolahan Air Limbah (IPAL) TPI Wameo Kategori Pekerjaan : Pekerjaan Jasa Konstruksi. Metode Pemilihan : e-Pemilihan Langsu1 (satu) File

Dengan ini di Umumkan bahwa Pemenang Lelang Sederhana Pekerjaan Mesin Instalasi Pengolahan Air Limbah (IPAL) RSU.. Haji Medan Pemprovsu Dana APBD Provinsi Sumatera

Belanja modal pembangunan beton dudukan, pagar dan bak penampungan instalasi pengolahan air limbah di UPTD. puskesmas

bagaimana perencanaan instalasi pengolahan air limbah (IPAL) pabrik tahu Kecamatan Dendang, baik metoda dan perhitungan dimensi dan 2). mendesain sistem pengolahan

Evaluasi Instalasi Pengolahan Air Limbah (IPAL) Komunal di Kecamatan Rappocini bertujuan yaitu untuk mengetahui kinerja dari IPAL komunal dan untuk mengetahui

PEMILIHAN LOKASI INSTALASI PENGOLAHAN AIR LIMBAH (IPAL) KOMUNAL DENGAN METODE FUZZY TOPSIS (STUDI KASUS : SENTRA INDUSTRI TAHU

Faktor penghambat evaluasi program instalasi pengolahan air limbah (IPAL) di Batu Cermin RT 06 Kelurahan Sempaja Utara Kecamatan Samarinda Utara ada 2 kendala