• Tidak ada hasil yang ditemukan

Data Pembangunan Gedung Kantor 2011

N/A
N/A
Protected

Academic year: 2017

Membagikan "Data Pembangunan Gedung Kantor 2011"

Copied!
2
0
0

Teks penuh

(1)

NO KONTRAK SISA LELANG NAMA REKANAN KET

DANA ( RUPIAH ) (RUPIAH) ( % ) ( RUPIAH )

1 5 6 7 8 9 11 12 13 14

Honor Panitia Pelaksana Kegiatan 32,985,000 32,285,000 97.88 700,000

Belanja Alat Tulis Kantor 1,505,000 1,505,000 100.00

-Belanja makan dan minum rapat 3,025,000 3,025,000

Belanja Penggandaan 9,954,000 9,954,000 100.00

-Perencanaan Teknis

-- Perencanaan Teknis Paket I (Dikmenof) 50,000,000 49,912,000 88,000 CV. CITRA REKA GRAHA 49,912,000 100.00 88,000 - Perencanaan Teknis Paket II (Dikdas) 50,000,000 49,890,000 110,000 PT. KALA PRANA CONS 49,890,000 100.00 110,000 - Perencanaan Teknis Paket III 24,850,000 24,805,000 45,000 CV. DIAN KARTIKA 24,805,000 100.00 45,000 - Perencanaan Teknis DAK 50,000,000 49,830,000 170,000 PT. WASTU WIDYA W 49,830,000 100.00 170,000 - Perencanaan Teknis APBD 25,000,000 24,550,000 450,000 CV. TRIPILAR UTAMA CONS 24,550,000 100.00 450,000

Pengawasan Teknis

-- Pengawasan Teknis Paket I 45,000,000 44,902,000 98,000 CV. KARUNIA S. 44,902,000 100.00 98,000 - Pengawasan Teknis Paket II 45,000,000 44,945,000 55,000 CV. POLA PRAKARYA 44,945,000 100.00 55,000 - Pengawasan Teknis Paket III (SKB) 17,400,000 17,365,000 35,000 CV. KARUNIA S. 17,365,000 100.00 35,000 - Pengawasan Teknis DAK 45,000,000 44,935,000 65,000 CV. CIPTA WASTU WIDYA 44,935,000 100.00 65,000 - Pengawasan Teknis APBD 15,000,000 14,718,000 282,000 CV. DWI MATRA 14,718,000 100.00 282,000

Pembangunan Gedung Kantor

-- Pembangunan Mushola Rumah Dinas Kec. Bantul 1 unit APBD 100,000,000 98,500,000 1,500,000 UD TRUBUS BARU 98,500,000 100.00 1,500,000 - Pembangunan Lapangan Indoor Kec. Pleret 1 unit APBD 100,000,000 95,762,000 4,238,000 CV. RIZEKY BANGUN S 95,762,000 100.00 4,238,000 - Pembangunan Kantor Dinas Perijinan (DAK) Kec. Bantul 1 unit DAK 2,000,000,000 1,999,500,000 500,000 PB. DUTA PEMBANGUNAN 1,999,500,000 100.00 500,000 - Rehab. Berat Kantor Arsip (DAK) Kec. Bantul 1 unit DAK 1,253,910,000 1,240,492,000 13,418,000 PB. HATI SAMUDERA 1,240,492,000 100.00 13,418,000

Pembangunan Gedung Kantor (DID) - -

-- Pembangunan Kantor Dikmenof Kec. Bantul 1 unit DID 2,924,603,000 2,895,396,000 29,207,000 PT. BAYU UTAMA 2,895,396,000 100.00 29,207,000 - Pembangunan Kantor Dikdas Kec. Bantul 1 unit DID 3,000,000,000 2,996,894,000 3,106,000 PT. CAZIKHAL 2,996,894,000 100.00 3,106,000 - Pembangunan Kantor SKB Kec. Bantul 1 unit DID 700,000,000 693,814,000 6,186,000 PB. SEKAR WIJAYA 693,814,000 100.00 6,186,000

10,493,232,000

10,386,210,000 59,553,000 - 10,429,954,000 99.40 63,278,000 PENINGKATAN SARANA DAN PRASARANA APARATUR

PEMBANGUNAN GEDUNG KANTOR 2011

TARGET / SUMBER ANGGARAN SISA ANGGARAN

NAMA KEGIATAN / PEKERJAAN LOKASI KEUANGAN

VOLUME

2 3 4

(2)

Referensi

Dokumen terkait

Hal inilah yang disampaikan dalam acara pengajian yang disampaikan oleh Hajjah Lutfiah. Sungkar/ di gedung SMU Muhammadiyah Satu Jogjakarta/ Sabtu// Pengajian

Untuk struktur yang tidak begitu rumit konfigurasinya tentu hal ini tidak terlalu sulit, tapi jika strukturnya merupakan struktur yang kompleks dan besar tentu hal ini akan sangat

Yang menarik adalah terungkapnya dimensi penerimaan diri sebagai dimensi awal yang membantu subjek dalam mencapai dimensi-dimensi kesejahteraan psikologis yang lain,

Prosedur Penilaian : Penilaian Proses dan Penilaian Hasil Belajar.

LSPro yang menerbitkan SPPT-SNI bertanggungjawab atas pelaksanaan Surveilan pengguna tanda SNI dari SPPT-SNI yang ditebitkan.Ubin Keramik yang

[r]

[r]

Dalam penelitian ini akan dilakukan suatu studi tentang tingkat pelayanan bus DAMRI dilihat dari sisi penyedia (supply), yaitu menyangkut aspek (variabel) kinerja angkutan umum