自動送りT.Tの WAKTU ( Detik ) Operation Time ( Detik )

待ち時間 VALUE NON VALUE AUTO JALAN

291,00 2,00 0,00 0,00 Remark : NO. REVIS ION ITEM REVISION DATE SIGN APPROVED CHECKED PREPARED

293,00 - Manual

600,00 - Auto

99% 1% 0% - Jalan

PRESENTASE Ambil yoke rivet Setting cross member no 5

Ambil rivet setting pada area cm no 5,cm no 6 dan cm rear

Ambil dan setting rivet pada area cm no 3 dan cm no 4 Ambil dan setting rivet area cm no 2 dan cm front Ambil dan setting cross member front Setting rivet stiffener front dan rear flange Setting cross member no 6 Ambil cross member no 5

25,00 15,00 2,00 20,00 13,00 3,00 28,00 1 2 3 4 5 6 7 8 8,00 9 STANDARD TOTAL TIME 10 11 12 13 TIME REMARK

Kembalikan hanger ke posisi semula

NO NAME OF WORK

TABEL STANDAR KERJA KOMBINASI ( TSKK )

Standardized Work Combination Table (SWCT)

14,00 9,00

Kembalikan yoke ke posisi semula Lakukan pengechekan

Lakukan pengrivetan dari front ke rear 137,00

12,00 7,00 0 102030405060708090 100 110 120 130 140 150 160 170 180 190 200 210 220 230 240 250 260 270 280 290 300 310 320 330 340 350 360 370 380 390 400 410 420 430 440 450 460 470 480 490 500 510 520 530 540 550 560 570 580 590 600 610 620 630 640 650 660 670 680 690 700 PT. GKD PRODUCTION DEPT ASSEMBLING SECT N O IT EM R EV IS IO N DA T E SIG N P AR T N A M E BY 366 LM TM P R O D/D P A G E 1 PA R T N O TA C K T IM E 600 DA TE 25/08/2008

(2)

自動送りT.Tの WAKTU ( Detik ) Operation Time ( Detik ) 待ち時間 VALUE NON VALUE AUTO JALAN

393,00 2,00 0,00 0,00 Remark : NO. REVI SI ON ITEM REVI SI ON DATE S IGN APPROVED CHECKED PREPARED

395,00 - Manual

600,00 - Auto

99% 1% 0% - Jalan

Kembalikan yoke ke posisi semula Lakukan pengechekan

Lakukan pengrivetan dari front ke rear 137,00

12,00 7,00

Ambil bracket helper setting pada side rail Ambil yoke

Lakukan pengrivetan Kembalikan yoke Balik side rail 180 derajat

Lakukan pengrivetan pada bracket spring no 1 flange Setting side rail pada stopper meja pre assy 2 siap angkat

TABEL STANDAR KERJA KOMBINASI ( TSKK )

Standardized Work Combination Table (SWCT)

14,00 9,00 Kembalikan hanger ke posisi semula

Ambil dan setting cross member front

NO NAME OF WORK TIME REMARK TOTAL TIME 10 11 12 13 14 15 16 17 18 STANDARD 9 5 6 7 8 8,00 3,00 28,00 1 2 3 4 19 20 25,00 15,00 2,00 20,00 13,00 4,00 3,00 78,00 2,00 3,00 6,00 6,00 Setting rivet stiffener front dan rear flange

Setting cross member no 6 Ambil cross member no 5 Setting cross member no 5

Ambil rivet setting pada area cm no 5,cm no 6 dan cm rear Ambil dan setting rivet pada area c m no 3 dan cm no 4 Ambil dan setting rivet area cm no 2 dan cm front Ambil yoke rivet

PRESENTASE 0 102030405060708090 100 110 120 130 140 150 160 170 180 190 200 210 220 230 240 250 260 270 280 290 300 310 320 330 340 350 360 370 380 390 400 410 420 430 440 450 460 470 480 490 500 510 520 530 540 550 560 570 580 590 600 610 620 630 640 650 660 670 680 690 700 PT. GKD PRODUCTION DEPT ASSEMBLING SECT N O IT EM R EV ISIO N D A TE S IG N P AR T NA M E B Y 366 LM T M P R O D /D P AG E 1 PA R T N O T A C K T IM E 600 D AT E 25/08/2008

(3)

自動送りT.Tの WAKTU ( Detik ) Operation Time ( Detik ) 待ち時間 VALUE NON VALUE AUTO JALAN

608,00 10,00 0,00 28,00 Remark : NO. REVISI ON I TEM REVI SION DATE S IGN APPROVED CHECKED PREPARED

646,00 - Manual

600,00 - Auto

94% 2% 4% - Jalan

Ambil rivet setting pada stiffener rear

Lakukan pengrivetan

Ambil plate stiffener rear 2,00

27,00 15,00

Tarik side rail ke meja pre assy 2

Ambil bracket spring no 4 taruh di area rear

Ambil rivet setting pada area inner rear

Ambil bracket absorber rear dan stiff frame setting pada Inner rear

Ambil bracket absorber front

Ambil bracket spring no 2 dan plate taruh pada area inner front Ambil reinforcement lh,bracker spring no 1 setting pada area front

Ambil rivet setting pada area front

Balik side rail 180 derajat

Lakukan pengrivetan pada bracket spring no 1 flange

Setting side rail pada stopper meja pre assy 2 siap angkat

Lakukan pengec hekan

4,00

TABEL STANDAR KERJA KOMBINASI ( TSKK )

Standardized Work Combination Table (SWCT)

14,00 Tarik side rail ke meja pre assy 1

Ambil inner front 6,00

NO NAME OF WORK 8,00 8,00 TIME REMARK 6,00 TOTAL TIME 10 11 12 13 14 15 16 17 18 6,00 STANDARD 6,00 6,00 14,00 9 5 6 7 8 50,00 14,00 16,00 1 2 3 4 19 20 21 22 23 24 25 26 27 28 29 30 17,00 8,00 23,00 2,00 7,00 4,00 50,00 4,00 8,00 3,00 41,00 50,00 3,00 28,00 55,00 2,00 49,00 4,00 3,00 78,00 2,00 3,00 31 32 33 34

Setting pada side rail

Ambil inner rear

Setting pada side rail

Ambil nut weld

Setting pada inner front

Ambil jig weld dan setting pada nut

Lakukan proses pengelasan

Lepas jig weld taruh pada tempatnya

Lakukan pengrivetan pada inner front,bracket spring no 2 dan reinforcemet

Lakukan pengrivetan

Kembalikan yoke

Lakukan pengrivetan pada bracket spring no 3

Ambil bracket helper setting pada side rail

Ambil yoke Rivetting bracket absorber front Lakukan pengrivetan pada bracket spring no 4,stiff frame,braacket absorber rear

Ambil bracket spring no 3 dan sertting pada side rail

PRESENTASE

0 102030405060708090 100 110 120 13 0 140 150 160 170 180 190 200 210 22 0 230 240 250 260 270 280 290 300 31 0 320 330 340 350 360 370 380 390 400 410 420 430 440 450 460 470 480 490 500 510 520 53 0 540 550 560 570 580 590 600 610 62 0 630 640 650 660 670 680 690 700

PT. GKD PRODUCTION DEPT ASSEMBLING SECT

NO ITEM REV IS IO N D AT E SIG N P ART N AM E B Y 366 L M TM P RO D/D PAG E 1

PAR T NO TA C K T IM E 600 DA TE 25/08/2008

(4)

自動送りT.Tの WAKTU ( Detik ) Operation Time ( Detik ) 待ち時間 VALUE NON VALUE AUTO JALAN

506,00 10,00 0,00 28,00 Remark : NO. REVI SION I TEM REVIS ION DATE SIGN APPROVED CHECKED PREPARED

544,00 - Manual

600,00 - Auto

93% 2% 5% - Jalan

PRESENTASE Lepas jig weld taruh pada tempatnya

Lakukan pengrivetan pada inner front,bracket spring no 2 dan reinforcemet

Ambil nut weld

Setting pada inner front

Ambil jig weld dan setting pada nut

Lakukan proses pengelasan

Lakukan pengrivetan pada bracket spring no 3

Lakukan pengechekan Rivetting bracket absorber front Lakukan pengrivetan pada bracket spring no 4,stiff frame,braacket absorber rear

Ambil brac ket spring no 3 dan sertting pada side rail Ambil inner front

Setting pada side rail

Ambil inner rear

Setting pada side rail

14,00 2,00 49,00 28,00 55,00 3,00 41,00 50,00 8,00 3,00 4,00 7,00 4,00 50,00 8,00 23,00 2,00 17,00 14,00 16,00 23 24 25 26 1 2 3 4 27 19 20 21 22 5 6 7 8 50,00 9 STANDARD 17 18 6,00 TOTAL TIME 10 11 12 13 14 15 16 8,00 TIME REMARK 6,00 Tarik side rail ke meja pre assy 1

NO NAME OF WORK

8,00

4,00

TABEL STANDAR KERJA KOMBINASI ( TSKK )

Standardized Work Combination Table (SWCT)

14,00 6,00

Ambil brac ket absorber front

Ambil brac ket spring no 2 dan plate taruh pada area inner front Ambil reinforcement lh,bracker spring no 1 setting pada area front

Ambil rivet setting pada area front Tarik side rail ke meja pre assy 2

Ambil brac ket spring no 4 taruh di area rear

Ambil rivet setting pada area inner rear

Ambil brac ket absorber rear dan stiff frame setting pada Inner rear

Ambil rivet setting pada stiffener rear

Lakukan pengrivetan

Ambil plate stiffener rear 2,00

27,00 15,00 0 102030405060708090 100 110 120 130 140 150 160 170 180 190 200 210 220 230 240 250 260 270 280 290 300 310 320 330 340 350 360 370 380 390 400 410 420 430 440 450 460 470 480 490 500 510 520 530 540 550 560 570 580 590 600 610 620 630 640 650 660 670 680 690 700 PT. GKD PRODUCTION DEPT ASSEMBLING SECT NO ITEM R EV IS IO N DA TE S IG N PA R T NA M E BY 366 L M T M P RO D/D PA G E 1 P A RT N O T AC K T IM E 600 D AT E 25/08/2008

(5)

自動送りT.Tの WAKTU ( Detik ) Operation Time ( Detik ) 待ち時間 VALUE NON VALUE AUTO JALAN

341,00 24,00 0,00 11,00 Remark : NO. REVIS I ON I TEM REVI SI ON DATE S IGN APPROVED CHECKED PREPARED

376,00 - Manual

600,00 - Auto

91% 6% 3% - Jalan

HARI PURWANTO SUKIDI SARJITO

Chec k hasil proses

4,00 10

Setting c ross member no 3

Ambil c ross member no 2 Ambil c ross member no 3 Setting rivet area inner front

21

Setting c ross member no 2

Tutup valve main jig

Setting rivet area cm front & c m no 2

Ambil dan setting rivet area cm no 3 & cm no 4

Ambil dan setting rivet area cm no 5 & 6

Ambil yoke,lakukan proses rivet dari rear ke front

5,00

TABEL STANDAR KERJA KOMBINASI ( TSKK )

Standardized Work Combination Table (SWCT)

6,00 25,00 Setting hanger pada side rail lh- rh

Angkat side rail bawa ke main assy

NO NAME OF WORK TIME REMARK 6,00 TOTAL TIME 11 12 13 14 15 16 17 18 5,00 STANDARD 5 6 7 8 15,00 15,00 4,00 18,00 1 2 3 4 19 20 9 7,00 8,00 3,00 4,00 9,00 5,00 8,00 6,00 17,00 18,00 163,00 9,00 16,00 Setting di main jig

Lepas pin hanger

Setting rivet area inner rear

Ambil c ross member rear

Setting c ross member rear

Ambil c ross member no 4

Setting c ross member no 4

Kembalikan yoke ke posisi semula

PRESENTASE

0 1020304050 6070 8090 100 110 120 130 140 150 160 170 180 190 200 210 220 230 240 250 260 270 280 290 300 310 320 330 340 350 360 370 380 390 400 410 420 430 440 450 460 470 480 490 500 510 520 530 540 550 560 570 580 590 600 610 620 630 640 650 660 670 680 690 700

PT. GKD PRODUCTION DEPT ASSEMBLING SECT

NO ITEM REVISIO N DATE SIG N PART NAM E BY LM TM PRO D/D PAG E 1

PART NO TAC K TIM E 600 DATE 19/08/2008

(6)

自動送りT.Tの WAKTU ( Detik ) Operation Time ( Detik ) 待ち時間 VALUE NON VALUE AUTO JALAN

452,00 24,00 0,00 11,00 Remark : NO. REVI SION ITEM REVISION DATE SIGN APPROVED CHECKED PREPARED

487,00 - Manual

600,00 - Auto

93% 5% 2% - Jalan

HARI PURWANTO SUKIDI SARJITO

PRESENTASE Ambil yoke

Lakukan pengrivetan

3,00 85,00 Angkat side rail bawa ke main assy

Setting di main jig

Lepas pin hanger

Setting rivet area inner rear

7,00

Setting side rail pada stopper meja pre assy 2 siap angkat Ambil cross member rear

Setting c ross member rear

Ambil cross member no 4

Setting c ross member no 4

Setting c ross member no 2

Kembalikan yoke Setting rivet area inner front

Tutup valve main jig

7,00 7,00 2,00 3,00 16,00 4,00 9,00 18,00 163,00 9,00 5,00 8,00 4,00 6,00 19 20 21 22 8,00 3,00 23 24 25 26 27 28 1 2 3 4 10 5 6 7 8 15,00 15,00 4,00 18,00 9 STANDARD 5,00 TOTAL TIME 11 12 13 14 15 16 17 18 TIME REMARK 6,00 NO NAME OF WORK

TABEL STANDAR KERJA KOMBINASI ( TSKK )

Standardized Work Combination Table (SWCT)

6,00 25,00 Setting hanger pada side rail lh-rh

5,00

Ambil bracket helper setting pada side rail Ambil dan setting rivet area c m no 5 & 6

Ambil yoke,lakukan proses rivet dari rear ke front

Kembalikan yoke ke posisi semula

Check hasil proses

Balik side rail 180 derajat

Lakukan pengrivetan pada bracket spring no 1 flange Ambil dan setting rivet area c m no 3 & cm no 4

4,00 Setting c ross member no 3

Ambil cross member no 2 Ambil cross member no 3

17,00 Setting rivet area cm front & cm no 2

0 10 2030 4050 6070 8090 100 110 120 130 140 15 0 160 170 180 190 20 0 210 220 230 240 250 260 270 280 29 0 300 310 320 330 340 350 360 370 38 0 390 400 410 420 430 440 450 460 47 0 480 490 500 510 520 530 540 550 56 0 570 580 590 600 61 0 620 630 640 650 660 670 680 690 70 0 PT. GKD PRODUCTIO N DEPT ASSEMBLING SECT N O IT EM R EV ISIO N D AT E SIG N PA R T NA M E B Y LM T M PR O D /D P A G E 1 P A RT N O TA C K T IM E 600 DA T E 19/08/2008

(7)

自動送りT.Tの WAKTU ( Detik ) Operation Time ( Detik ) 待ち時間 VALUE NON VALUE AUTO JALAN

635,00 16,00 0,00 27,00 Remark : NO. REVISI ON I TEM REVI SION DATE SIGN APPROVED CHECKED PREPARED

678,00 - Manual

600,00 - Auto

94% 2% 4% - Jalan

HARI PURWANTO SUKIDI SARJITO

PRESENTASE Lepas jig weld taruh pada tempatnya

Lakukan pengrivetan pada inner front,bracket spring no 2 dan reinforcemet

Ambil nut weld,setting pada inner front Setting pada inner font

Ambil jig weld dan setting pada nut

Lakukan proses pengelasan

Lakukan pengrivetan

Kembalikan yoke

Lakukan pengrivetan pada bracket spring no 3

Ambil bracket helper setting pada side rail

Ambil yoke Rivetting bracket absorber front Lakukan pengrivetan pada bracket spring no 4,stiff frame,braacket absorber rear

Ambil bracket spring no 3 dan sertting pada side rail Ambil inner front

Setting pada side rail Ambil inner rear

Setting pada side rail

3,00 85,00 31 32 33 34 2,00 4,00 3,00 10,00 47,00 25,00 68,00 6,00 27,00 49,00 7,00 6,00 11,00 14,00 4,00 43,00 8,00 39,00 3,00 7,00 16,00 9,00 29 30 23 24 25 26 1 2 3 4 27 28 19 20 21 22 5 6 7 8 57,00 9 STANDARD 7,00 7,00 15,00 17 18 6,00 TOTAL TIME 10 11 12 13 14 15 16 7,00 TIME REMARK 6,00 Tarik side rail ke meja pre assy 1

NO NAME OF WORK

8,00

7,00

TABEL STANDAR KERJA KOMBINASI ( TSKK )

Standardized Work Combination Table (SWCT)

11,00 9,00

Ambil bracket absorber front

Ambil bracket spring no 2 dan plate taruh pada area inner front Ambil reinforcement lh,bracker spring no 1 setting pada area front

Ambil rivet setting pada area front

Balik side rail 180 derajat

Lakukan pengrivetan pada bracket spring no 1 flange

Setting side rail pada stopper meja pre assy 2 siap angkat

Lakukan pengechekan Tarik side rail ke meja pre assy 2

Ambil bracket spring no 4 taruh di area rear

Ambil rivet setting pada area inner rear

Ambil bracket absorber rear dan stiff frame setting pada Inner rear

Ambil rivet setting pada stiffener rear

Lakukan pengrivetan

Ambil plate stiffener rear 2,00

20,00 20,00 0 102030405060708090 10 0 110 120 130 140 150 160 170 180 190 200 210 220 230 240 250 260 270 280 290 300 31 0 320 330 340 350 360 370 380 390 400 410 420 430 440 450 460 47 0 480 490 500 510 520 530 540 550 560 570 580 590 600 610 620 630 640 650 660 670 68 0 690 700 PT. GKD PRODUCTION DEPT ASSEMBLING SECT

NO ITEM REV IS IO N D ATE SIG N PA RT NA M E BY L M T M PR O D /D PA G E 1

P ART NO T AC K TIM E 600 DA TE 19/08/2008

(8)

自動送りT.Tの WAKTU ( Detik ) Operation Time ( Detik ) 待ち時間 VALUE NON VALUE AUTO JALAN

524,00 16,00 0,00 27,00 Remark : NO. REVISION ITEM REVISION DATE SIGN APPROVED CHECKED PREPARED

567,00 - Manual

600,00 - Auto

92% 3% 5% - Jalan

HARI PURWANTO SUKIDI SARJITO

Ambil rivet setting pada stiffener rear

Lakukan pengrivetan

Ambil plate stiffener rear 2,00

20,00 20,00

Tarik side rail ke meja pre assy 2

Ambil brac ket spring no 4 taruh di area rear

Ambil rivet setting pada area inner rear

Ambil brac ket absorber rear dan stiff frame setting pada Inner rear

Ambil brac ket absorber front

Ambil brac ket spring no 2 dan plate taruh pada area inner front Ambil reinforcement lh,brac ker spring no 1 setting pada area front

Ambil rivet setting pada area front

7,00

TABEL STANDAR KERJA KOMBINASI ( TSKK )

Standardized Work Combination Table (SWCT)

11,00 Tarik side rail ke meja pre assy 1

Ambil inner front 9,00

NO NAME OF WORK 8,00 7,00 TIME REMARK 6,00 TOTAL TIME 10 11 12 13 14 15 16 17 18 6,00 STANDARD 9 5 6 7 8 57,00 16,00 9,00 1 2 3 4 19 20 21 22 23 24 25 26 27 7,00 8,00 39,00 3,00 14,00 4,00 43,00 11,00 7,00 6,00 27,00 49,00 6,00 25,00 68,00 10,00 47,00 15,00 Setting pada side rail

Ambil inner rear

Setting pada side rail

Ambil nut weld,setting pada inner front

Setting pada inner font

Ambil jig weld dan setting pada nut

Lakukan proses pengelasan

Lepas jig weld taruh pada tempatnya

Lakukan pengrivetan pada inner front,brac ket spring no 2 dan reinforc emet

Lakukan pengrivetan pada brac ket spring no 3

Lakukan pengec hekan Rivetting bracket absorber front Lakukan pengrivetan pada brac ket spring no 4,stiff frame,braac ket absorber rear

Ambil brac ket spring no 3 dan sertting pada side rail

PRESENTASE

0 1020 304050 607080 90 100 110 120 130 140 150 160 170 180 190 200 210 220 230 240 250 260 270 280 290 300 310 320 330 340 350 360 370 380 390 400 410 420 430 440 450 460 470 480 490 500 510 520 530 540 550 560 570 580 590 600 610 620 630 640 650 660 670 680 690 700

PT. GKD PRODUCTION DEPT ASSEMBLING SECT

NO ITEM REV ISIO N D AT E SIG N P AR T N AM E B Y L M TM PR O D/D PA G E 1

PA RT NO T AC K TIM E 600 DA TE 19/08/2008

Gambar

TABEL STANDAR KERJA KOMBINASI ( TSKK )                Standardized Work Combination Table (SWCT)
TABEL STANDAR KERJA KOMBINASI ( TSKK )                Standardized Work Combination Table (SWCT)
TABEL STANDAR KERJA KOMBINASI ( TSKK )                Standardized Work Combination Table (SWCT)
TABEL STANDAR KERJA KOMBINASI ( TSKK )                Standardized Work Combination Table (SWCT)
+5

Referensi

Dokumen terkait

Number of Area Harvested and Production of Peanuts, Soybeans, and Small Green Pea in Lamandau by Type and Status, 2013 5.1.4 Jumlah Luas Panen dan Produksi Sayuran

Total Eksposur, termasuk dampak dari penyesuaian terhadap pengecualian sementara atas penempatan giro pada Bank Indonesia dalam rangka memenuhi ketentuan giro wajib minimum (jika

[r]

Berdasarkan hasil perhitungan Maturity Level nilai yang diperoleh pada proses 6 tentang manajemen operasi dan komunikasi berada pada tingkat Optimized pada posisi

Dapat dilihat bahwa faktor keamanan pile yang terjadi untuk seluruh pile besarnya >1.5 seperti yang disyaratkan API RP2A untuk kondisi storm, artinya beban yang bekerja

kayu/ kayu kayu/ kertas kayu/ tekstil kayu/ logam kayu/ serat alam kayu/ cat logam/ logam logam/ kain logam/ kertas logam/ cat logam/ kulit logam/ plaster logam/ ancur. Tabel

untuk kombinasi bisnis yang dilakukan secara bertahap (41 dan 42), nilai wajar pada tanggal akuisisi kepentingan ekuitas yang sebelumnya dimiliki oleh pihak pengakuisisi

Sources: National Labor Force Survey (Sakernas) 2011, Statistic Boureau Department of Bangka Regency.6. Pertanian, Perkebunan, Perikanan & Peternakan/ Agriculture,