Nomor & Periode Invoice
: No. 26 Periode (September 2016)
Realisasi Invoice
: November 2016
Nomor Loan
: IBRD Loan No. 7866-ID, Ln. 7664-ID & No. 8213-ID
Nama Konsultan
: PT. Kogas Driyap Konsultan
Paket Pekerjaan
: Non Konsultan Service for Oversight Provider (OSP) Package-7
(Bali, West Nusa Tenggara and East Nusa Tenggara Province)
Nomor & Tanggal Kontrak
: HK.02.03/OSP-7/IBRD/SATKER-PKP/016//2013, Tanggal 25 Februari 2013
Periode Kontrak
: 25 Februari 2013 s/d 30 Septermber 2016
I.
REMUNERASI
19.274.759.175
18.446.757.976
464.575.300
18.911.333.276
363.425.899
1.1. Profesional Staff
15.269.065.000
14.612.567.398
367.000.000
14.979.567.398
289.497.602
1.2. Supporting Staff
2.495.690.000
2.389.052.857
61.180.000
2.450.232.857
45.457.143
1,3
Fee [...% x (1.1+1.2)]
II.
DIRECT REIMBURSABLE COST
12.496.403.005
7.947.541.447
153.784.465
8.101.325.912
4.395.077.093
2.1. Duty Travel Expenses Bali Province
839.290.000
216.534.090
7.919.000
224.453.090
614.836.910
a. Transport
591.090.000
152.147.812
3.919.000
156.066.812
435.023.188
b. Accomodation
132.900.000
27.336.278
2.800.000
30.136.278
102.763.722
c. OSA (fixed)
115.300.000
37.050.000
1.200.000
38.250.000
77.050.000
2,2
Duty Travel Expenses West Nusa Tenggara
1.287.456.000
239.291.500
0
239.291.500
1.048.164.500
a. Transport
1.032.611.000
186.351.500
0
186.351.500
846.259.500
b. Accomodation
121.005.000
20.010.000
0
20.010.000
100.995.000
c. OSA (fixed)
133.840.000
32.930.000
0
32.930.000
100.910.000
2,3
Duty Travel Expenses East Nusa Tenggara
2.705.607.400
533.772.593
0
533.772.593
2.171.834.807
a. Transport
2.357.037.400
479.386.593
0
479.386.593
1.877.650.807
b. Accomodation
184.310.000
21.786.000
0
21.786.000
162.524.000
c. OSA (fixed)
164.260.000
32.600.000
0
32.600.000
131.660.000
2,4
Office Operational Expenses
1.233.018.000
1.165.253.020
30.502.000
1.195.755.020
37.262.980
a. Office Running Cost
684.000.000
646.882.285
17.400.000
664.282.285
19.717.715
b. Office Supply and Consumable
266.800.000
257.592.985
6.310.000
263.902.985
2.897.015
c. Communication Cost
215.750.000
205.005.750
4.500.000
209.505.750
6.244.250
d. Internet
66.468.000
55.772.000
2.292.000
58.064.000
8.404.000
2,5
Office Equipment Expenses
539.918.566
516.854.000
1.050.000
517.904.000
22.014.566
a. Desktop Computer
176.000.000
176.000.000
0
176.000.000
0
b. Laptop
165.000.000
165.000.000
0
165.000.000
0
c. Printer Laser Jet
105.000.000
105.000.000
0
105.000.000
0
NO
KOMPOSISI BIAYA
CONTRACT AMAND-6
INVOICE LALU
INVOICE SAAT INI
INVOICE S/D SAAT INI
SISA KONTRAK
PROGRAM KOTA TANPA KUMUH (KOTAKU)
SATKER PENGEMBANGAN KAWASAN PERMUKIMAN BERBASIS MASYARAKAT (PKPBM) - TA 2016
PROYEK PENINGKATAN KUALITAS KAWASAN PERMUKIMAN
DIREKTORAT JENDERAL CIPTA KARYA
NO
KOMPOSISI BIAYA
CONTRACT AMAND-6
INVOICE LALU
INVOICE SAAT INI
INVOICE S/D SAAT INI
SISA KONTRAK
d. Printer Color A3
9.000.000
9.000.000
0
9.000.000
0
e. Digital Camera
5.250.000
5.250.000
0
5.250.000
0
f. GPS Tool;s
9.000.000
9.000.000
0
9.000.000
0
g. LCD Projector
10.500.000
10.500.000
0
10.500.000
0
h. Scanner
16.250.000
16.250.000
0
16.250.000
0
i. Equipment Maintenance (Incl. Existing Equipment)
43.918.566
20.854.000
1.050.000
21.904.000
22.014.566
2,6
Rental Expenses
5.304.970.000
5.070.840.000
111.250.000
5.182.090.000
122.880.000
a. Office Space
588.220.000
543.340.000
0
543.340.000
44.880.000
b. Vehicle
4.493.750.000
4.325.000.000
106.250.000
4.431.250.000
62.500.000
c. Motorcycle
223.000.000
202.500.000
5.000.000
207.500.000
15.500.000
2,7
Reporting Expenses
94.575.000
44.000.000
375.000
44.375.000
50.200.000
a. Reguler Report
54.825.000
31.250.000
0
31.250.000
23.575.000
b. Special Report
39.750.000
12.750.000
375.000
13.125.000
26.625.000
Fee [[...% x [ 2.1 + 2.2 + 2.3 + 2.4a + 2.4b ]]
III.
TOTAL TRAINING ACTIVITY EXPENSES
2.546.630.625
1.069.319.093
543.422.359
1.612.741.451
933.889.174
3,1
Training Activity 2013 (Fixed)
135.225.000
91.871.600
0
91.871.600
43.353.400
3,2
Training Activity 2014 (Fixed)
393.950.000
126.597.350
0
126.597.350
267.352.650
3,3
Training Activity 2015 (Fixed)
668.850.000
489.344.351
0
489.344.351
179.505.649
3,4
Training Activity 2016 (Fixed)
1.149.100.000
277.734.250
500.850.100
778.584.350
370.515.650
Fee [[... % x [ 3.1 + 3.2 + 3.3+3.4]]
IV.
TOTAL SOCIALIZATION ACTIVITY EXPENSES
2.415.155.750
1.166.579.026
325.239.600
1.491.818.626
923.337.124
4,1
Socilization Activity in Provincial Levels [ Fixed ]
792.950.000
512.696.600
194.000.000
706.696.600
86.253.400
4,2
Socilization Activity in City/Regency Levels [ Fixed ]
1.433.000.000
562.491.442
105.760.000
668.251.442
764.748.558
Fee [[... % x [ 4.1 + 4.2]]
V.
TOTAL [I + II + III + IV]
36.732.948.555
28.630.197.541
1.487.021.724
30.117.219.265
6.615.729.290
VI.
CONTIGENCIES [Fixed]
0
0
0
0
0
VII.
TOTAL [V + VI]
36.732.948.555
28.630.197.541
1.487.021.724
30.117.219.265
6.615.729.290
TAX 10%
3.673.294.856
2.863.019.753
148.702.172
3.011.721.925
661.572.930
GRAND TOTAL
40.406.243.411
31.493.217.294
1.635.723.896
33.128.941.190
7.277.302.220
VIII.
TEMUAN BPKP *
0
16.800.000
0
16.800.000
16.800.000
IX.
ADVANCE PAYMENT
1.832.045.085
1.832.045.085
0
1.832.045.085
0
I.
REMUNERASI
1.1. Profesional Staff
September 2016 (Amand-6)
NO NAMA POSISI
MM RATE TOTAL MM TOTAL MM RATE TOTAL MM TOTAL RATE TOTAL
A. OSP LEVEL 1.114.500.000 1.077.880.000 28.700.000 1.106.580.000 7.920.000 15,00 14.000.000 210.000.000 15,00 210.000.000 0,00 14.000.000 0 15,00 210.000.000 0,00 0 1,00 15.000.000 15.000.000 1,00 15.000.000 0,00 15.000.000 0 1,00 15.000.000 0,00 0 Nurhadi 18,00 15.000.000 270.000.000 18,00 270.000.000 0,00 15.000.000 0 18,00 270.000.000 0,00 0 9,00 16.100.000 144.900.000 8,00 128.800.000 1,00 16.100.000 16.100.000 9,00 144.900.000 0,00 0 15,00 4.900.000 73.500.000 15,00 73.500.000 0,00 4.900.000 0 15,00 73.500.000 0,00 0 3,50 5.200.000 18.200.000 3,50 18.200.000 0,00 5.200.000 0 3,50 18.200.000 0,00 0 Bramasto Aditya N. 15,50 5.200.000 80.600.000 15,50 80.600.000 0,00 5.200.000 0 15,50 80.600.000 0,00 0
Made Murah Redhana 9,00 5.200.000 46.800.000 7,90 41.080.000 1,00 5.200.000 5.200.000 8,90 46.280.000 0,10 520.000 15,00 6.500.000 97.500.000 15,00 97.500.000 0,00 6.500.000 0 15,00 97.500.000 0,00 0 12,00 7.000.000 84.000.000 12,00 84.000.000 0,00 7.000.000 0 12,00 84.000.000 0,00 0 1,00 7.400.000 7.400.000 1,00 7.400.000 0,00 7.400.000 0 1,00 7.400.000 0,00 0 Bramasto Aditya N. 9,00 7.400.000 66.600.000 7,00 51.800.000 1,00 7.400.000 7.400.000 8,00 59.200.000 1,00 7.400.000 B. BALI PROVINCE 3.990.350.000 3.867.149.091 95.300.000 3.962.449.091 27.900.909 Purnomo 10,00 11.500.000 115.000.000 10,00 115.000.000 0,00 11.500.000 0 10,00 115.000.000 0,00 0 Indro Budiono 18,00 11.500.000 207.000.000 18,00 207.000.000 0,00 11.500.000 0 18,00 207.000.000 0,00 0 9,00 12.300.000 110.700.000 8,00 98.400.000 1,00 12.300.000 12.300.000 9,00 110.700.000 0,00 0 Supriati R. 0,00 8.500.000 0 0,00 0 0,00 8.500.000 0 0,00 0 0,00 0 12,00 8.500.000 102.000.000 12,00 102.000.000 0,00 8.500.000 0 12,00 102.000.000 0,00 0 3,00 9.100.000 27.300.000 3,00 26.100.000 0,00 9.100.000 0 3,00 26.100.000 0,00 1.200.000 I Made Sudana 15,50 9.100.000 141.050.000 15,45 140.636.364 0,00 9.100.000 0 15,45 140.636.364 0,05 413.636 I Wayan Sukarsana 9,00 9.100.000 81.900.000 7,90 71.890.000 1,00 9.100.000 9.100.000 8,90 80.990.000 0,10 910.000
Tri Data Younatha 0,00 8.000.000 0 0,00 0 0,00 8.000.000 0 0,00 0 0,00 0
Burhanuddin 7,00 8.000.000 56.000.000 7,00 56.000.000 0,00 8.000.000 0 7,00 56.000.000 0,00 0
Dessy Indriasari 14,50 8.000.000 116.000.000 14,50 116.000.000 0,00 8.000.000 0 14,50 116.000.000 0,00 0
Darma Setya Wijaya 0,00 8.500.000 0 0,00 0 0,00 8.500.000 0 0,00 0 0,00 0
9,00 8.500.000 76.500.000 6,90 58.650.000 1,00 8.500.000 8.500.000 7,90 67.150.000 1,10 9.350.000 15,00 8.000.000 120.000.000 15,00 120.000.000 0,00 8.000.000 0 15,00 120.000.000 0,00 0 12,00 8.600.000 103.200.000 12,00 103.200.000 0,00 8.600.000 0 12,00 103.200.000 0,00 0 16,00 9.100.000 145.600.000 15,00 136.500.000 1,00 9.100.000 9.100.000 16,00 145.600.000 0,00 0 Sudarisman 0,00 8.000.000 0 0,00 0 0,00 8.000.000 0 0,00 0 0,00 0 Imam Baihaqi 14,00 8.000.000 112.000.000 14,00 112.000.000 0,00 8.000.000 0 14,00 112.000.000 0,00 0 12,00 8.600.000 103.200.000 12,00 103.200.000 0,00 8.600.000 0 12,00 103.200.000 0,00 0 16,00 9.100.000 145.600.000 15,00 136.500.000 1,00 9.100.000 9.100.000 16,00 145.600.000 0,00 0 15,00 6.500.000 97.500.000 15,00 97.500.000 0,00 6.500.000 0 15,00 97.500.000 0,00 0 12,00 7.000.000 84.000.000 12,00 84.000.000 0,00 7.000.000 0 12,00 84.000.000 0,00 0 16,00 7.400.000 118.400.000 15,00 111.000.000 1,00 7.400.000 7.400.000 16,00 118.400.000 0,00 0 Tetty Sriwanty 0,00 8.000.000 0 0,00 0 0,00 8.000.000 0 0,00 0 0,00 0 Akhmad Thoharuddin 14,00 8.000.000 112.000.000 14,00 112.000.000 0,00 8.000.000 0 14,00 112.000.000 0,00 0 12,00 8.600.000 103.200.000 12,00 103.200.000 0,00 8.600.000 0 12,00 103.200.000 0,00 0 16,00 9.100.000 145.600.000 15,00 136.500.000 1,00 9.100.000 9.100.000 16,00 145.600.000 0,00 0 15,00 8.000.000 120.000.000 15,00 120.000.000 0,00 8.000.000 0 15,00 120.000.000 0,00 0 12,00 8.600.000 103.200.000 12,00 103.200.000 0,00 8.600.000 0 12,00 103.200.000 0,00 0 16,00 9.100.000 145.600.000 15,00 136.500.000 1,00 9.100.000 9.100.000 16,00 145.600.000 0,00 0 Imam Baihaki 0,00 6.500.000 0 0,00 0 0,00 6.500.000 0 0,00 0 0,00 0
Komang Arie Krisdianta 14,00 6.500.000 91.000.000 14,00 91.000.000 0,00 6.500.000 0 14,00 91.000.000 0,00 0 12,00 7.000.000 84.000.000 12,00 84.000.000 0,00 7.000.000 0 12,00 84.000.000 0,00 0 16,00 7.400.000 118.400.000 15,00 111.000.000 1,00 7.400.000 7.400.000 16,00 118.400.000 0,00 0 15,00 8.000.000 120.000.000 15,00 120.000.000 0,00 8.000.000 0 15,00 120.000.000 0,00 0 4,00 8.600.000 34.400.000 3,14 26.972.727 0,00 8.600.000 0 3,14 26.972.727 0,86 7.427.273 Purnomo, S.Sos 7,00 8.600.000 60.200.000 7,00 60.200.000 0,00 8.600.000 0 7,00 60.200.000 0,00 0 I Made Sudana 9,00 8.600.000 77.400.000 7,00 60.200.000 1,00 8.600.000 8.600.000 8,00 68.800.000 1,00 8.600.000 Indra Wibawanto
Local Gov & Public Policy Specialist 2
1 Program Director OC
Bahtiar K. Pamungkas
Drs. Ivan Chudhori
Sub Spec. Legal & CHU
Provincial Team Leader 3
1
3 MIS Specialist
4 Ni Ketut Resmi Sri Nulus Socialization Specialist Asfan Syufainal
I Made Sudana/
2
SISA KONTRAK CONTRACT AMAND-6 INVOICE LALU INVOICE SAAT INI INVOICE S/D SAAT INI
Assisten OC Monev Specialist 5 Training Specialist 6 Sub Special.SME’s 7 Infrastructure Specialist 8 9
Micro Fin & Fin.Mgmt Specialist
Sub Specialist RLF
I Gusti Agung Karyawan Yeni Risnawati
11 Sentot Darminto Urban Planner Specialist 0,00 8.000.000 0 0,00 0 0,00 8.000.000 0 0,00 0 0,00 0 15,00 5.000.000 75.000.000 15,00 75.000.000 0,00 5.000.000 0 15,00 75.000.000 0,00 0 12,00 5.300.000 63.600.000 12,00 63.600.000 0,00 5.300.000 0 12,00 63.600.000 0,00 0 10,00 5.600.000 56.000.000 10,00 56.000.000 0,00 5.600.000 0 10,00 56.000.000 0,00 0
Nur Edi Winarno 0,00 5.000.000 0 0,00 0 0,00 5.000.000 0 0,00 0 0,00 0
Nuraeni Ziyad 14,00 5.000.000 70.000.000 14,00 70.000.000 0,00 5.000.000 0 14,00 70.000.000 0,00 0 12,00 5.300.000 63.600.000 12,00 63.600.000 0,00 5.300.000 0 12,00 63.600.000 0,00 0 10,00 5.600.000 56.000.000 10,00 56.000.000 0,00 5.600.000 0 10,00 56.000.000 0,00 0 15,00 5.000.000 75.000.000 15,00 75.000.000 0,00 5.000.000 0 15,00 75.000.000 0,00 0 12,00 5.300.000 63.600.000 12,00 63.600.000 0,00 5.300.000 0 12,00 63.600.000 0,00 0 16,00 5.600.000 89.600.000 15,00 84.000.000 1,00 5.600.000 5.600.000 16,00 89.600.000 0,00 0
C. WEST NUSA TENGGARA PROVINCE 4.700.840.000 4.540.733.306 110.200.000 4.650.933.306 49.906.694
15,00 11.500.000 172.500.000 15,00 172.500.000 0,00 11.500.000 0 15,00 172.500.000 0,00 0 12,00 12.300.000 147.600.000 12,00 147.600.000 0,00 12.300.000 0 12,00 147.600.000 0,00 0 16,00 13.000.000 208.000.000 11,87 154.266.666 1,00 13.000.000 11.500.000 12,87 165.766.666 3,13 42.233.334 15,00 8.500.000 127.500.000 15,00 127.500.000 0,00 8.500.000 0 15,00 127.500.000 0,00 0 12,00 9.100.000 109.200.000 12,00 109.200.000 0,00 9.100.000 0 12,00 109.200.000 0,00 0 16,00 9.600.000 153.600.000 15,00 144.000.000 1,00 9.600.000 9.600.000 16,00 153.600.000 0,00 0 Sarmin 7,00 8.000.000 56.000.000 7,00 56.000.000 0,00 8.000.000 0 7,00 56.000.000 0,00 0
Moh. Rudi Setyawan 17,33 8.000.000 138.666.640 17,33 138.666.640 0,00 8.000.000 0 17,33 138.666.640 0,00 0
0,90 8.000.000 7.173.360 0,00 0 0,00 8.000.000 0 0,00 0 0,90 7.173.360
17,00 8.500.000 144.500.000 16,00 135.500.000 1,00 8.500.000 8.500.000 17,00 144.000.000 0,00 500.000
Saharuddin 0,00 8.000.000 0 0,00 0 0,00 8.000.000 0 0,00 0 0,00 0
Lalu Tatus Fatmi Winata 14,00 8.000.000 112.000.000 14,00 112.000.000 0,00 8.000.000 0 14,00 112.000.000 0,00 0 12,00 8.600.000 103.200.000 12,00 103.200.000 0,00 8.600.000 0 12,00 103.200.000 0,00 0 16,00 9.100.000 145.600.000 15,00 136.500.000 1,00 9.100.000 9.100.000 16,00 145.600.000 0,00 0 15,00 8.000.000 120.000.000 15,00 120.000.000 0,00 8.000.000 0 15,00 120.000.000 0,00 0 12,00 8.600.000 103.200.000 12,00 103.200.000 0,00 8.600.000 0 12,00 103.200.000 0,00 0 16,00 9.100.000 145.600.000 15,00 136.500.000 1,00 9.100.000 9.100.000 16,00 145.600.000 0,00 0 15,00 6.500.000 97.500.000 15,00 97.500.000 0,00 6.500.000 0 15,00 97.500.000 0,00 0 12,00 7.000.000 84.000.000 12,00 84.000.000 0,00 7.000.000 0 12,00 84.000.000 0,00 0 16,00 7.400.000 118.400.000 15,00 111.000.000 1,00 7.400.000 7.400.000 16,00 118.400.000 0,00 0 15,00 8.000.000 120.000.000 15,00 120.000.000 0,00 8.000.000 0 15,00 120.000.000 0,00 0 12,00 8.600.000 103.200.000 12,00 103.200.000 0,00 8.600.000 0 12,00 103.200.000 0,00 0 16,00 9.100.000 145.600.000 15,00 136.500.000 1,00 9.100.000 9.100.000 16,00 145.600.000 0,00 0 14,00 8.000.000 112.000.000 14,00 112.000.000 0,00 8.000.000 0 14,00 112.000.000 0,00 0 12,00 8.600.000 103.200.000 12,00 103.200.000 0,00 8.600.000 0 12,00 103.200.000 0,00 0 16,00 9.100.000 145.600.000 15,00 136.500.000 1,00 9.100.000 9.100.000 16,00 145.600.000 0,00 0 Faisal Ismail 0,00 6.500.000 0 0,00 0 0,00 6.500.000 0 0,00 0 0,00 0 Indra Jaya 14,00 6.500.000 91.000.000 14,00 91.000.000 0,00 6.500.000 0 14,00 91.000.000 0,00 0 12,00 7.000.000 84.000.000 12,00 84.000.000 0,00 7.000.000 0 12,00 84.000.000 0,00 0 16,00 7.400.000 118.400.000 15,00 111.000.000 1,00 7.400.000 7.400.000 16,00 118.400.000 0,00 0 15,00 8.000.000 120.000.000 15,00 120.000.000 0,00 8.000.000 0 15,00 120.000.000 0,00 0 12,00 8.600.000 103.200.000 12,00 103.200.000 0,00 8.600.000 0 12,00 103.200.000 0,00 0 16,00 9.100.000 145.600.000 15,00 136.500.000 1,00 9.100.000 9.100.000 16,00 145.600.000 0,00 0 15,00 8.000.000 120.000.000 15,00 120.000.000 0,00 8.000.000 0 15,00 120.000.000 0,00 0 12,00 8.600.000 103.200.000 12,00 103.200.000 0,00 8.600.000 0 12,00 103.200.000 0,00 0 16,00 9.100.000 145.600.000 15,00 136.500.000 1,00 9.100.000 9.100.000 16,00 145.600.000 0,00 0 Indra Jaya 0,00 5.000.000 0 0,00 0 0,00 5.000.000 0 0,00 0 0,00 0 Nurhayatin Nufus 14,00 5.000.000 70.000.000 14,00 70.000.000 0,00 5.000.000 0 14,00 70.000.000 0,00 0 12,00 5.300.000 63.600.000 12,00 63.600.000 0,00 5.300.000 0 12,00 63.600.000 0,00 0 10,00 5.600.000 56.000.000 10,00 56.000.000 0,00 5.600.000 0 10,00 56.000.000 0,00 0 15,00 5.000.000 75.000.000 15,00 75.000.000 0,00 5.000.000 0 15,00 75.000.000 0,00 0 12,00 5.300.000 63.600.000 12,00 63.600.000 0,00 5.300.000 0 12,00 63.600.000 0,00 0 16,00 5.600.000 89.600.000 15,00 84.000.000 1,00 5.600.000 5.600.000 16,00 89.600.000 0,00 0 15,00 5.000.000 75.000.000 15,00 75.000.000 0,00 5.000.000 0 15,00 75.000.000 0,00 0 12,00 5.300.000 63.600.000 12,00 63.600.000 0,00 5.300.000 0 12,00 63.600.000 0,00 0 16,00 5.600.000 89.600.000 15,00 84.000.000 1,00 5.600.000 5.600.000 16,00 89.600.000 0,00 0 9 Sub Specialist RLF
10 Local Gov & Public Policy Specialist
11 Urban Planner Specialist
12 Sub Proff. Financial 1 (Comm.Grant)
13 M. Irsyad Sub Proff. Financial 2 (Comm.Grant) Rahardian Hendi Kuswoyo
Rohini Hasmi Agung Widya Wardhana
M. Yamin
Training Specialist
Sub Special.SME’s
7 Infrastructure Specialist
Sub Proff. Administration (Fix cost) Sub Proff. Administration (Fix cost)
8 Micro Fin & Fin.Mgmt Specialist Made Ari Diatmika
Nasri Adisa
Khaeri Sodikin Basuki Raharjo Baiq Fitri Miswaryuni
M. Ali Hanapiah / Lalu Martawijaya
1 Provincial Team Leader
2 Monev Specialist MIS Specialist 4 Socialization Specialist 5 3 14 6 14 13 12
Sub Proff. Financial 2
Sub Proff. Financial 1 (Comm.Grant) Faisol Afandi
D. EAST NUSA TENGGARA PROVINCE 5.463.375.000 5.126.805.000 132.800.000 5.259.605.000 203.770.000 15,00 13.250.000 198.750.000 15,00 198.750.000 0,00 13.250.000 0 15,00 198.750.000 0,00 0 1,00 14.200.000 14.200.000 1,00 14.200.000 0,00 14.200.000 0 1,00 14.200.000 0,00 0 Ivan Chudhory 18,00 14.200.000 255.600.000 18,00 255.600.000 0,00 14.200.000 0 18,00 255.600.000 0,00 0 9,00 15.200.000 136.800.000 8,00 121.600.000 1,00 15.200.000 15.200.000 9,00 136.800.000 0,00 0 15,00 10.000.000 150.000.000 15,00 150.000.000 0,00 10.000.000 0 15,00 150.000.000 0,00 0 12,00 10.700.000 128.400.000 12,00 128.400.000 0,00 10.700.000 0 12,00 128.400.000 0,00 0 16,00 11.300.000 180.800.000 15,00 169.500.000 1,00 11.300.000 11.300.000 16,00 180.800.000 0,00 0 15,00 9.750.000 146.250.000 15,00 146.250.000 0,00 9.750.000 0 15,00 146.250.000 0,00 0 12,00 10.500.000 126.000.000 12,00 126.000.000 0,00 10.500.000 0 12,00 126.000.000 0,00 0 16,00 11.100.000 177.600.000 15,00 166.500.000 1,00 11.100.000 11.100.000 16,00 177.600.000 0,00 0 Abdul Salam 0,00 9.750.000 0 0,00 0 0,00 9.750.000 0 0,00 0 0,00 0 Kuswantoro 14,00 9.750.000 136.500.000 14,00 136.500.000 0,00 9.750.000 0 14,00 136.500.000 0,00 0 12,00 10.500.000 126.000.000 12,00 126.000.000 0,00 10.500.000 0 12,00 126.000.000 0,00 0 7,00 11.100.000 77.700.000 0,00 0 0,00 11.100.000 0 0,00 0 7,00 77.700.000
Fanti Tolle Lege Nenohai 9,00 11.100.000 99.900.000 6,90 76.590.000 1,00 11.100.000 11.100.000 7,90 87.690.000 1,10 12.210.000 15,00 9.750.000 146.250.000 15,00 146.250.000 0,00 9.750.000 0 15,00 146.250.000 0,00 0 12,00 10.500.000 126.000.000 12,00 126.000.000 0,00 10.500.000 0 12,00 126.000.000 0,00 0 16,00 11.100.000 177.600.000 15,00 166.500.000 1,00 11.100.000 11.100.000 16,00 177.600.000 0,00 0
Askian Dedy Iskandar Baun 2,00 7.500.000 15.000.000 2,00 15.000.000 0,00 7.500.000 0 2,00 15.000.000 0,00 0
Askian D. Baun /Fanti Tolle Lege N. 25,00 7.500.000 187.500.000 25,00 187.500.000 0,00 7.500.000 0 25,00 187.500.000 0,00 0
7,00 8.500.000 59.500.000 7,00 59.500.000 0,00 8.500.000 0 7,00 59.500.000 0,00 0 Pilipus Kire 9,00 8.500.000 76.500.000 7,90 67.150.000 1,00 8.500.000 8.500.000 8,90 75.650.000 0,10 850.000 15,00 9.750.000 146.250.000 15,00 146.250.000 0,00 9.750.000 0 15,00 146.250.000 0,00 0 12,00 10.500.000 126.000.000 12,00 126.000.000 0,00 10.500.000 0 12,00 126.000.000 0,00 0 16,00 11.100.000 177.600.000 15,00 166.500.000 1,00 11.100.000 11.100.000 16,00 177.600.000 0,00 0 15,00 9.750.000 146.250.000 15,00 146.250.000 0,00 9.750.000 0 15,00 146.250.000 0,00 0 12,00 10.500.000 126.000.000 12,00 126.000.000 0,00 10.500.000 0 12,00 126.000.000 0,00 0 16,00 11.100.000 177.600.000 15,00 166.500.000 1,00 11.100.000 11.100.000 16,00 177.600.000 0,00 0 15,00 7.500.000 112.500.000 15,00 112.500.000 0,00 7.500.000 0 15,00 112.500.000 0,00 0 12,00 8.000.000 96.000.000 12,00 96.000.000 0,00 8.000.000 0 12,00 96.000.000 0,00 0 16,00 8.500.000 136.000.000 15,00 127.500.000 1,00 8.500.000 8.500.000 16,00 136.000.000 0,00 0 15,00 9.750.000 146.250.000 15,00 146.250.000 0,00 9.750.000 0 15,00 146.250.000 0,00 0 12,00 10.500.000 126.000.000 9,80 102.900.000 0,00 10.500.000 0 9,80 102.900.000 2,20 23.100.000 7,00 11.100.000 77.700.000 0,00 0 0,00 11.100.000 0 0,00 0 7,00 77.700.000 Ratnawati 9,00 11.100.000 99.900.000 6,90 76.590.000 1,00 11.100.000 11.100.000 7,90 87.690.000 1,10 12.210.000 Hengki Atmadji 0,00 9.750.000 0 0,00 0 0,00 9.750.000 0 0,00 0 0,00 0 Saiful Amin 14,50 9.750.000 141.375.000 14,50 141.375.000 0,00 9.750.000 0 14,50 141.375.000 0,00 0 16,00 10.300.000 164.800.000 15,00 154.500.000 1,00 10.300.000 10.300.000 16,00 164.800.000 0,00 0 15,00 5.500.000 82.500.000 15,00 82.500.000 0,00 5.500.000 0 15,00 82.500.000 0,00 0 12,00 5.900.000 70.800.000 12,00 70.800.000 0,00 5.900.000 0 12,00 70.800.000 0,00 0 16,00 6.200.000 99.200.000 15,00 93.000.000 1,00 6.200.000 6.200.000 16,00 99.200.000 0,00 0 15,00 5.500.000 82.500.000 15,00 82.500.000 0,00 5.500.000 0 15,00 82.500.000 0,00 0 12,00 5.900.000 70.800.000 12,00 70.800.000 0,00 5.900.000 0 12,00 70.800.000 0,00 0 16,00 6.200.000 99.200.000 15,00 93.000.000 1,00 6.200.000 6.200.000 16,00 99.200.000 0,00 0 15,00 5.500.000 82.500.000 15,00 82.500.000 0,00 5.500.000 0 15,00 82.500.000 0,00 0 12,00 5.900.000 70.800.000 12,00 70.800.000 0,00 5.900.000 0 12,00 70.800.000 0,00 0 10,00 6.200.000 62.000.000 10,00 62.000.000 0,00 6.200.000 0 10,00 62.000.000 0,00 0 15.269.065.000 14.612.567.398 367.000.000 14.979.567.398 289.497.602 4 Socialization Specialist
6 Sub Special. SME’s
10 Local Gov & Public Policy Specialist
1 Provincial Team Leader
Sub Proff. Administration (Fix cost) 14 Theresia Jebe Nogo Betan
Sub Total 1.1 Stely Loure Kos Paulus
Aprika Mira Sub Proff. Financial 2 (Comm.Grant) Sub Proff. Financial 1 (Comm.Grant) Urban Planner Specialist Hentje Orhem Sina
2 3 5 Training Specialist MIS Specialist Nurhadi 7 8 9 11 12 13 Monev Specialist Marlen Setiawati S. Bambang Winarno
Sherly Rosalin Adoe Sub Specialist RLF
Micro Fin & Fin.Mgmt Specialist Infrastructure Specialist Davidson Arison Penlaana
Jaury Alexander Titus Mamahit
1.2. Supporting Staff
September 2016 (Amand-6)
NO NAMA POSISI
MM RATE TOTAL MM TOTAL MM RATE TOTAL MM TOTAL RATE TOTAL
A. BALI PROVINCE 541.750.000 512.215.238 13.630.000 525.845.238 15.904.762 15,00 3.500.000 52.500.000 15,00 52.500.000 0,00 3.500.000 0 15,00 52.500.000 0,00 0 12,00 3.760.000 45.120.000 12,00 45.120.000 0,00 3.760.000 0 12,00 45.120.000 0,00 0 16,00 4.000.000 64.000.000 15,00 60.000.000 1,00 4.000.000 4.000.000 16,00 64.000.000 0,00 0 15,00 2.000.000 30.000.000 15,00 30.000.000 0,00 2.000.000 0 15,00 30.000.000 0,00 0 12,00 2.150.000 25.800.000 12,00 25.800.000 0,00 2.150.000 0 12,00 25.800.000 0,00 0 16,00 2.280.000 36.480.000 15,00 34.200.000 1,00 2.280.000 2.280.000 16,00 36.480.000 0,00 0 15,00 1.250.000 18.750.000 15,00 18.750.000 0,00 1.250.000 0 15,00 18.750.000 0,00 0 28,00 1.340.000 37.520.000 22,77 30.410.952 1,00 1.340.000 1.340.000 23,77 31.750.952 4,23 5.769.048 11,00 1.250.000 13.750.000 11,00 13.750.000 0,00 1.250.000 0 11,00 13.750.000 0,00 0 12,00 1.250.000 15.000.000 11,00 13.750.000 0,00 1.250.000 0 11,00 13.750.000 1,00 1.250.000 16,00 1.320.000 21.120.000 13,67 17.914.286 1,00 1.320.000 1.320.000 14,67 19.234.286 1,33 1.885.714 15,00 1.250.000 18.750.000 15,00 18.750.000 0,00 1.250.000 0 15,00 18.750.000 0,00 0 12,00 1.340.000 16.080.000 12,00 16.080.000 0,00 1.340.000 0 12,00 16.080.000 0,00 0 16,00 1.420.000 22.720.000 15,00 21.300.000 1,00 1.420.000 1.420.000 16,00 22.720.000 0,00 0 11,00 1.000.000 11.000.000 11,00 11.000.000 0,00 1.000.000 0 11,00 11.000.000 0,00 0 12,00 1.000.000 12.000.000 12,00 12.000.000 0,00 1.000.000 0 12,00 12.000.000 0,00 0 16,00 1.140.000 18.240.000 15,00 17.100.000 1,00 1.140.000 1.140.000 16,00 18.240.000 0,00 0 15,00 1.000.000 15.000.000 15,00 15.000.000 0,00 1.000.000 0 15,00 15.000.000 0,00 0 12,00 1.070.000 12.840.000 12,00 12.840.000 0,00 1.070.000 0 12,00 12.840.000 0,00 0 16,00 1.130.000 18.080.000 15,00 16.950.000 1,00 1.130.000 1.130.000 16,00 18.080.000 0,00 0 9,00 1.000.000 9.000.000 9,00 9.000.000 0,00 1.000.000 0 9,00 9.000.000 0,00 0 19,00 1.000.000 19.000.000 12,00 12.000.000 0,00 1.000.000 0 12,00 12.000.000 7,00 7.000.000 9,00 1.000.000 9.000.000 8,00 8.000.000 1,00 1.000.000 1.000.000 9,00 9.000.000 0,00 0
CITY COORDINATORS OFFICE 204.020.000 186.697.619 3.840.000 190.537.619 13.482.381
Kota Denpasar (Korkot Bali 1)
15,00 1.250.000 18.750.000 15,00 18.750.000 0,00 1.250.000 0 15,00 18.750.000 0,00 0 12,00 1.340.000 16.080.000 12,00 16.080.000 0,00 1.340.000 0 12,00 16.080.000 0,00 0 16,00 1.420.000 22.720.000 15,00 21.300.000 1,00 1.420.000 1.420.000 16,00 22.720.000 0,00 0 15,00 1.000.000 15.000.000 15,00 15.000.000 0,00 1.000.000 0 15,00 15.000.000 0,00 0 28,00 1.000.000 28.000.000 14,93 14.647.619 1,00 1.000.000 1.000.000 15,93 15.647.619 12,07 12.352.381 Klungkung (Korkot Bali 2)
15,00 1.250.000 18.750.000 15,00 18.750.000 0,00 1.250.000 0 15,00 18.750.000 0,00 0 12,00 1.340.000 16.080.000 12,00 16.080.000 0,00 1.340.000 0 12,00 16.080.000 0,00 0 16,00 1.420.000 22.720.000 15,00 21.300.000 1,00 1.420.000 1.420.000 16,00 22.720.000 0,00 0 15,00 1.000.000 15.000.000 15,00 15.000.000 0,00 1.000.000 0 15,00 15.000.000 0,00 0 12,00 1.070.000 12.840.000 12,00 12.840.000 0,00 1.070.000 0 12,00 12.840.000 0,00 0 16,00 1.130.000 18.080.000 15,00 16.950.000 0,00 1.130.000 0 15,00 16.950.000 1,00 1.130.000
B. WEST NUSA TENGGARA PROVINCE 443.510.000 432.600.000 10.910.000 443.510.000 0
15,00 2.000.000 30.000.000 15,00 30.000.000 0,00 2.000.000 0 15,00 30.000.000 0,00 0 12,00 2.150.000 25.800.000 12,00 25.800.000 0,00 2.150.000 0 12,00 25.800.000 0,00 0 16,00 2.280.000 36.480.000 15,00 34.200.000 1,00 2.280.000 2.280.000 16,00 36.480.000 0,00 0 15,00 1.750.000 26.250.000 15,00 26.250.000 0,00 1.750.000 0 15,00 26.250.000 0,00 0 12,00 1.880.000 22.560.000 12,00 22.560.000 0,00 1.880.000 0 12,00 22.560.000 0,00 0 16,00 2.000.000 32.000.000 15,00 30.000.000 1,00 2.000.000 2.000.000 16,00 32.000.000 0,00 0 14,00 1.500.000 21.000.000 14,00 21.000.000 0,00 1.500.000 0 14,00 21.000.000 0,00 0 12,00 1.500.000 18.000.000 12,00 18.000.000 0,00 1.500.000 0 12,00 18.000.000 0,00 0 16,00 1.590.000 25.440.000 15,00 23.850.000 1,00 1.590.000 1.590.000 16,00 25.440.000 0,00 0 Security 8
1 A. Wulan P./Ni Made Putri P. S/Ni
Made P. Prastika S. Computer Operator 1
1 Anak Agung Rai Semaradewi Computer Operator 2
2 I Made Karma/Tobe Name Office Boy 2 Office Boy 1 Ni Komang T./Ni Made/I Dewa A./
A. A. Gede Marnadi/ I Made Karma
3 Wahyu Arpan Computer Operator 1 2 Baiq Halimatussa'dyah
1 Kusmiati Ass Office Manager
7 Adi Sugianto Security
6 Ni Luh Negari Office Boy 5 Sony Prasetyo/I Gusti Ayu D. Mega /
Desak Putu S Computer Operator 4
Ni Made Nindy /Kadek Puspita D/ Putu Septian/Ni Putu P. Astuti/ Desak Putu S / I Gusti Ayu D. Mega
Computer Operator Ni Putu Emmy M/Ni Kadek Pony C.
Secretary
Secretary
CONTRACT AMAND-5 INVOICE LALU INVOICE SAAT INI INVOICE S/D SAAT INI SISA KONTRAK
3 Computer Operator
2
1 Office Manager
2 Ni Kadek Pony C./Luh Eka Ariningsih
Eko Setiawan/I Putu Gede P/ Ari Setiawan
M. Nawawi/I Ketut P. Suta / I Putu Dalbo M./Luh Eka A./I Putu Gede P.
NO NAMA POSISI
MM RATE TOTAL MM TOTAL MM RATE TOTAL MM TOTAL RATE TOTAL
CONTRACT AMAND-5 INVOICE LALU INVOICE SAAT INI INVOICE S/D SAAT INI SISA KONTRAK
15,00 1.500.000 22.500.000 15,00 22.500.000 0,00 1.500.000 0 15,00 22.500.000 0,00 0 12,00 1.610.000 19.320.000 12,00 19.320.000 0,00 1.610.000 0 12,00 19.320.000 0,00 0 16,00 1.710.000 27.360.000 15,00 25.650.000 1,00 1.710.000 1.710.000 16,00 27.360.000 0,00 0 15,00 1.000.000 15.000.000 15,00 15.000.000 0,00 1.000.000 0 15,00 15.000.000 0,00 0 12,00 1.070.000 12.840.000 12,00 12.840.000 0,00 1.070.000 0 12,00 12.840.000 0,00 0 16,00 1.130.000 18.080.000 15,00 16.950.000 1,00 1.130.000 1.130.000 16,00 18.080.000 0,00 0 15,00 1.000.000 15.000.000 15,00 15.000.000 0,00 1.000.000 0 15,00 15.000.000 0,00 0 12,00 1.070.000 12.840.000 12,00 12.840.000 0,00 1.070.000 0 12,00 12.840.000 0,00 0 16,00 1.130.000 18.080.000 15,00 16.950.000 1,00 1.130.000 1.130.000 16,00 18.080.000 0,00 0 15,00 1.000.000 15.000.000 15,00 15.000.000 0,00 1.000.000 0 15,00 15.000.000 0,00 0 19,00 1.070.000 20.330.000 19,00 20.330.000 0,00 1.070.000 0 19,00 20.330.000 0,00 0 9,00 1.070.000 9.630.000 8,00 8.560.000 1,00 1.070.000 1.070.000 9,00 9.630.000 0,00 0
CITY COORDINATORS OFFICE 473.640.000 449.130.000 12.310.000 461.440.000 12.200.000
Mataram 15,00 1.250.000 18.750.000 15,00 18.750.000 0,00 1.250.000 0 15,00 18.750.000 0,00 0 12,00 1.340.000 16.080.000 12,00 16.080.000 0,00 1.340.000 0 12,00 16.080.000 0,00 0 16,00 1.420.000 22.720.000 15,00 21.300.000 1,00 1.420.000 1.420.000 16,00 22.720.000 0,00 0 15,00 1.000.000 15.000.000 15,00 15.000.000 0,00 1.000.000 0 15,00 15.000.000 0,00 0 12,00 1.070.000 12.840.000 5,00 5.350.000 0,00 1.070.000 0 5,00 5.350.000 7,00 7.490.000 16,00 1.130.000 18.080.000 13,00 14.690.000 1,00 1.130.000 1.130.000 14,00 15.820.000 2,00 2.260.000 Lombok Tengah 15,00 1.250.000 18.750.000 15,00 18.750.000 0,00 1.250.000 0 15,00 18.750.000 0,00 0 12,00 1.340.000 16.080.000 12,00 16.080.000 0,00 1.340.000 0 12,00 16.080.000 0,00 0 16,00 1.420.000 22.720.000 15,00 21.300.000 1,00 1.420.000 1.420.000 16,00 22.720.000 0,00 0 15,00 1.000.000 15.000.000 15,00 15.000.000 0,00 1.000.000 0 15,00 15.000.000 0,00 0 12,00 1.070.000 12.840.000 12,00 12.840.000 0,00 1.070.000 0 12,00 12.840.000 0,00 0 16,00 1.130.000 18.080.000 15,00 16.950.000 1,00 1.130.000 1.130.000 16,00 18.080.000 0,00 0 Lombok Timur 14,00 1.250.000 17.500.000 14,00 17.500.000 0,00 1.250.000 0 14,00 17.500.000 0,00 0 12,00 1.250.000 15.000.000 12,00 15.000.000 0,00 1.250.000 0 12,00 15.000.000 0,00 0 16,00 1.320.000 21.120.000 15,00 19.800.000 1,00 1.320.000 1.320.000 16,00 21.120.000 0,00 0 15,00 1.000.000 15.000.000 15,00 15.000.000 0,00 1.000.000 0 15,00 15.000.000 0,00 0 12,00 1.000.000 12.000.000 12,00 12.000.000 0,00 1.000.000 0 12,00 12.000.000 0,00 0 16,00 1.060.000 16.960.000 14,00 14.840.000 1,00 1.060.000 1.060.000 15,00 15.900.000 1,00 1.060.000 Bima 14,00 1.250.000 17.500.000 14,00 17.500.000 0,00 1.250.000 0 14,00 17.500.000 0,00 0 12,00 1.250.000 15.000.000 12,00 15.000.000 0,00 1.250.000 0 12,00 15.000.000 0,00 0 16,00 1.320.000 21.120.000 14,00 18.410.000 1,00 1.320.000 1.320.000 15,00 19.730.000 1,00 1.390.000 15,00 1.000.000 15.000.000 15,00 15.000.000 0,00 1.000.000 0 15,00 15.000.000 0,00 0 12,00 1.070.000 12.840.000 12,00 12.840.000 0,00 1.070.000 0 12,00 12.840.000 0,00 0 16,00 1.130.000 18.080.000 15,00 16.950.000 1,00 1.130.000 1.130.000 16,00 18.080.000 0,00 0 Sumbawa 14,00 1.250.000 17.500.000 14,00 17.500.000 0,00 1.250.000 0 14,00 17.500.000 0,00 0 16,00 1.320.000 21.120.000 15,00 19.800.000 1,00 1.320.000 1.320.000 16,00 21.120.000 0,00 0 14,00 1.000.000 14.000.000 14,00 14.000.000 0,00 1.000.000 0 14,00 14.000.000 0,00 0 16,00 1.060.000 16.960.000 15,00 15.900.000 1,00 1.060.000 1.060.000 16,00 16.960.000 0,00 0 7 Security 2 Office Boy 3 Sumarjiono/Saleh Hawalani/Gusti L. Rai S. 2 Office Boy 4 Saleh Hawalani/Muh. Syafei
2
2 M. Syafi'i/Deni Yuliadi/Zaenul Muttaqin Office Boy 5
2 Ahmad Office Boy 6
Computer Operator 4
1 A.Junaidi/Syamsul Rizal/Khairil A. Computer Operator 5
1 Hairunnisyah/Nunik H./Nur Ayu R. Computer Operator 6 1 Baiq Mulyati Computer Operator 3
1 Zulkipli
2 M. Yasin Office Boy 10
1 Kalsum/Sukmayadi Computer Operator 10 6 L. Juni Harta Security 1
5 Nurhidayati Office Boy
4 Prasetyadiguna Computer Operator 2
NO NAMA POSISI
MM RATE TOTAL MM TOTAL MM RATE TOTAL MM TOTAL RATE TOTAL
CONTRACT AMAND-5 INVOICE LALU INVOICE SAAT INI INVOICE S/D SAAT INI SISA KONTRAK
C. EAST NUSA TENGGARA PROVINCE 526.160.000 510.410.000 13.010.000 523.420.000 2.740.000
15,00 2.300.000 34.500.000 15,00 34.500.000 0,00 2.300.000 0 15,00 34.500.000 0,00 0 12,00 2.470.000 29.640.000 12,00 29.640.000 0,00 2.470.000 0 12,00 29.640.000 0,00 0 16,00 2.620.000 41.920.000 15,00 39.300.000 1,00 2.620.000 2.620.000 16,00 41.920.000 0,00 0 15,00 2.000.000 30.000.000 15,00 30.000.000 0,00 2.000.000 0 15,00 30.000.000 0,00 0 12,00 2.150.000 25.800.000 12,00 25.800.000 0,00 2.150.000 0 12,00 25.800.000 0,00 0 16,00 2.280.000 36.480.000 15,00 34.200.000 1,00 2.280.000 2.280.000 16,00 36.480.000 0,00 0 15,00 1.750.000 26.250.000 15,00 26.250.000 0,00 1.750.000 0 15,00 26.250.000 0,00 0 12,00 1.880.000 22.560.000 12,00 22.560.000 0,00 1.880.000 0 12,00 22.560.000 0,00 0 16,00 2.000.000 32.000.000 15,00 30.000.000 1,00 2.000.000 2.000.000 16,00 32.000.000 0,00 0 15,00 1.750.000 26.250.000 15,00 26.250.000 0,00 1.750.000 0 15,00 26.250.000 0,00 0 12,00 1.880.000 22.560.000 12,00 22.560.000 0,00 1.880.000 0 12,00 22.560.000 0,00 0 16,00 2.000.000 32.000.000 15,00 30.000.000 1,00 2.000.000 2.000.000 16,00 32.000.000 0,00 0 15,00 1.200.000 18.000.000 15,00 18.000.000 0,00 1.200.000 0 15,00 18.000.000 0,00 0 12,00 1.290.000 15.480.000 12,00 15.480.000 0,00 1.290.000 0 12,00 15.480.000 0,00 0 16,00 1.370.000 21.920.000 13,00 17.810.000 1,00 1.370.000 1.370.000 14,00 19.180.000 2,00 2.740.000 15,00 1.200.000 18.000.000 15,00 18.000.000 0,00 1.200.000 0 15,00 18.000.000 0,00 0 12,00 1.290.000 15.480.000 12,00 15.480.000 0,00 1.290.000 0 12,00 15.480.000 0,00 0 16,00 1.370.000 21.920.000 15,00 20.550.000 1,00 1.370.000 1.370.000 16,00 21.920.000 0,00 0 15,00 1.200.000 18.000.000 15,00 18.000.000 0,00 1.200.000 0 15,00 18.000.000 0,00 0 12,00 1.290.000 15.480.000 12,00 15.480.000 0,00 1.290.000 0 12,00 15.480.000 0,00 0 16,00 1.370.000 21.920.000 15,00 20.550.000 1,00 1.370.000 1.370.000 16,00 21.920.000 0,00 0
CITY COORDINATORS OFFICE 306.610.000 298.000.000 7.480.000 305.480.000 1.130.000
Sumba Timur (P.Sumba)
15,00 1.250.000 18.750.000 15,00 18.750.000 0,00 1.250.000 0 15,00 18.750.000 0,00 0 12,00 1.340.000 16.080.000 12,00 16.080.000 0,00 1.340.000 0 12,00 16.080.000 0,00 0 16,00 1.420.000 22.720.000 15,00 21.300.000 1,00 1.420.000 1.420.000 16,00 22.720.000 0,00 0 15,00 1.000.000 15.000.000 15,00 15.000.000 0,00 1.000.000 0 15,00 15.000.000 0,00 0 12,00 1.070.000 12.840.000 12,00 12.840.000 0,00 1.070.000 0 12,00 12.840.000 0,00 0 16,00 1.130.000 18.080.000 15,00 16.950.000 1,00 1.130.000 1.130.000 16,00 18.080.000 0,00 0 Ende (P.Flores) 15,00 1.250.000 18.750.000 15,00 18.750.000 0,00 1.250.000 0 15,00 18.750.000 0,00 0 12,00 1.340.000 16.080.000 12,00 16.080.000 0,00 1.340.000 0 12,00 16.080.000 0,00 0 16,00 1.420.000 22.720.000 15,00 21.300.000 1,00 1.420.000 1.420.000 16,00 22.720.000 0,00 0 15,00 1.000.000 15.000.000 15,00 15.000.000 0,00 1.000.000 0 15,00 15.000.000 0,00 0 12,00 1.070.000 12.840.000 12,00 12.840.000 0,00 1.070.000 0 12,00 12.840.000 0,00 0 16,00 1.130.000 18.080.000 14,00 15.820.000 1,00 1.130.000 1.130.000 15,00 16.950.000 1,00 1.130.000 Kupang (P.Timor) 15,00 1.250.000 18.750.000 15,00 18.750.000 0,00 1.250.000 0 15,00 18.750.000 0,00 0 28,00 1.250.000 35.000.000 27,00 33.750.000 1,00 1.250.000 1.250.000 28,00 35.000.000 0,00 0 15,00 1.000.000 15.000.000 15,00 15.000.000 0,00 1.000.000 0 15,00 15.000.000 0,00 0 12,00 1.070.000 12.840.000 12,00 12.840.000 0,00 1.070.000 0 12,00 12.840.000 0,00 0 16,00 1.130.000 18.080.000 15,00 16.950.000 1,00 1.130.000 1.130.000 16,00 18.080.000 0,00 0 Sub Total 1.2 2.495.690.000 2.389.052.857 61.180.000 2.450.232.857 45.457.143
2 Marselinus R. T./Mikael Tiwu Office Boy 8
2 Albert R. Mahao Office Boy 9 1 Debora Adi Ina Computer Operator 7
Computer Operator 1
4 Devi Adriana Manafe Computer Operator 2
1 Maria Agustina Ina Computer Operator 8 2 Nikolas M. Mila/Noprianus Wole Office Boy 7
Security 1
7 Frans Nalle Security 2
3 Getreda Nawa
Krisanti Veronika Hidelilo Secretary Jim S. Amtiran Mauwilik Ass Office Manager
Selvi M./Yoan S./Maryani Kurnia N. Computer Operator 9 Jhoni Oktovianus Ludji/Randy
R./Dinorianto A. Office Boy
Abraham Thao / Frengkianus Ranggo 1
2
1 5
2.1.
Duty Travel Expenses Bali Province
September 2016 (Amand-6)
NOS RATE TOTAL NOS TOTAL NOS RATE TOTAL NOS TOTAL NOS TOTAL 2.1.1. IN PROVINCE 202.800.000 60.050.000 750.000 60.800.000 142.000.000 2.1.1.1. FOR SPOTCHECK PROVINCE TO KELURAHAN (10% x Number of Kelurahan) 16.400.000 6.475.000 750.000 7.225.000 9.175.000
a From Denpasar to Buleleng, Badung (40 kel x 10% = 4 kel)
Local Transport 4 time x 1 person 14 75.000 1.050.000 10 750.000 2 75.000 150.000 12 900.000 2 150.000
Hotel Acomodation 4 time x 1 person x 1 days 20 200.000 4.000.000 7 1.400.000 2 200.000 400.000 9 1.800.000 11 2.200.000
OSA [ Fixed ] 4 time x 1 person x 2 days 34 50.000 1.700.000 19 950.000 4 50.000 200.000 23 1.150.000 11 550.000
b From Denpasar to Gianyar & Klungkung (47 kel x 10% = 5 kel)
Local Transport 4 time x 2 person 22 75.000 1.650.000 13 975.000 0 75.000 0 13 975.000 9 675.000
Acomodation 4 time x 2 person x 1 days 22 200.000 4.400.000 3 600.000 0 200.000 0 3 600.000 19 3.800.000
OSA [ Fixed ] 4 time x 2 person x 2 days 44 50.000 2.200.000 21 1.050.000 0 50.000 0 21 1.050.000 23 1.150.000
c Denpasar (43 kel x 10% = 5 kel)
OSA [ Fixed ] 4 time x 2 person x 1 days 28 50.000 1.400.000 15 750.000 0 50.000 0 15 750.000 13 650.000
2.1.1.2. SPOOTCHECK KOTA/KAB FOR ASS. CITY COORDINATION INFRA AND FM 105.025.000 34.350.000 0 34.350.000 70.675.000
A. For City Coordinator and Assistance City Coordinator
Total 130 Kel x 50% x 4 4 time x 33 kelurahan 363 50.000 18.150.000 102 5.100.000 0 50.000 0 102 5.100.000 261 13.050.000
Cost / Day Rp. 50.000.- 1 Day cover 2 kel
B. For Ass. City Coordinator Infrastructure and FM in the city
(Total 130 Kel - 57 Kel luar kota) x 50% x 1212 time x 18 kelurahan 830 50.000 41.500.000 230 11.500.000 0 50.000 0 230 11.500.000 600 30.000.000 Cost / Day Rp. 50.000.- 1 Day cover 2 kel
C. For City Coordinator Infrastructure and FM out of the town From Denpasar to Buleleng
1 Local Transport 16 time x 2 person 81 75.000 6.075.000 52 3.900.000 0 75.000 0 52 3.900.000 29 2.175.000
2 Acomodation 16 time x 2 person x 1 days 132 200.000 26.400.000 43 8.600.000 0 200.000 0 43 8.600.000 89 17.800.000
3 OSA [ Fixed ] 16 time x 2 person x 2 days 192 50.000 9.600.000 92 4.600.000 0 50.000 0 92 4.600.000 100 5.000.000
4 Klungkung to Gianyar 16 time x 2 person x 1 days 66 50.000 3.300.000 13 650.000 0 50.000 0 13 650.000 53 2.650.000
2.1.1.3. FOR CB ACTIVITY BY ASKOT TO FASKEL 14.025.000 900.000 0 900.000 13.125.000
From Denpasar to Buleleng
1 Local Transport 8 time x 3 person 33 75.000 2.475.000 4 300.000 0 75.000 0 4 300.000 29 2.175.000
2 Acomodation 8 time x 3 person x 1 days 33 200.000 6.600.000 1 200.000 0 200.000 0 1 200.000 32 6.400.000
3 OSA [ Fixed ] 8 time x 3 person x 2 days 66 50.000 3.300.000 8 400.000 0 50.000 0 8 400.000 58 2.900.000
4 Klungkung to Gianyar 8 time x 3 person x 1 days 33 50.000 1.650.000 0 0 0 50.000 0 0 0 33 1.650.000
2.1.1.4. FROM KAB/KOTA TO TL OFFICE FOR COORDINATION MEETING 11.550.000 4.050.000 0 4.050.000 7.500.000
a From Buleleng to Denpasar
Local Transport 8 time x 2 person 22 75.000 1.650.000 13 975.000 0 75.000 0 13 975.000 9 675.000
Acomodation 8 time x 2 person x 1 days 22 200.000 4.400.000 4 800.000 0 200.000 0 4 800.000 18 3.600.000
OSA [ Fixed ] 8 time x 2 person x 2 days 44 50.000 2.200.000 20 1.000.000 0 50.000 0 20 1.000.000 24 1.200.000
b From Gianyar to Denpasar
Local Transport 8 time x 2 person 22 75.000 1.650.000 9 675.000 0 75.000 0 9 675.000 13 975.000
c From Klungkung to Denpasar
Local Transport 8 time x 2 person 22 75.000 1.650.000 8 600.000 0 75.000 0 8 600.000 14 1.050.000
NOS RATE TOTAL NOS TOTAL NOS RATE TOTAL NOS TOTAL NOS TOTAL NO URAIAN CONTRACT AMAND-6 INVOICE LALU INVOICE SAAT INI INVOICE S/D SAAT INI SISA KONTRAK
2.1.1.5. FOR SEVERAL TRAINING & SPECIAL EVENT FROM KAB. TO DENPASAR 55.800.000 14.275.000 0 14.275.000 41.525.000 Training for City Coordinators Assistants (Infrastructure, Economic,
Community Dev, MIS, Urban 2.250.000 0 0 0 2.250.000
a Buleleng to Denpasar
Local Tranport 3 time x 1 person 5 75.000 375.000 0 0 0 75.000 0 0 0 5 375.000
b Gianyar & Klungkung to Denpasar
Local Tranport 3 time x 5 person 25 75.000 1.875.000 0 0 0 75.000 0 0 0 25 1.875.000
For Training/Consolidation 40.550.000 14.275.000 0 14.275.000 26.275.000
a Local Transport for Korkot/Askot Buleleng on OSP Consolidation 10 75.000 750.000 3 225.000 0 75.000 0 3 225.000 7 525.000
b Local Transport for Korkot/Askot Gianyar & Klungkung on OSP Consolidation50 75.000 3.750.000 12 900.000 0 75.000 0 12 900.000 38 2.850.000
c Local Transport for SF, FK, FE, FS Badung & Denpasar 238 50.000 11.900.000 83 4.150.000 0 50.000 0 83 4.150.000 155 7.750.000
d Local Transport for SF, FK, FE, FS Gianyar & Klungkung 203 75.000 15.225.000 75 5.625.000 0 75.000 0 75 5.625.000 128 9.600.000
e Local Transport for SF, FK, FE, FS Buleleng 119 75.000 8.925.000 45 3.375.000 0 75.000 0 45 3.375.000 74 5.550.000
Special Event (by request) 13.000.000 0 0 0 13.000.000
Buleleng to Denpasar
Local Transport 2 time x 4 person 8 75.000 600.000 0 0 0 75.000 0 0 0 8 600.000
Acomodation 2 time x 4 person x 3 days 24 200.000 4.800.000 0 0 0 200.000 0 0 0 24 4.800.000
OSA [ Fixed ] 2 time x 4 person x 4 days 32 50.000 1.600.000 0 0 0 50.000 0 0 0 32 1.600.000
Gianyar & Klungkung to Denpasar
Tranport 2 time x 4 person 8 75.000 600.000 0 0 0 75.000 0 0 0 8 600.000
Acomodation 2 time x 4 person x 3 days 20 200.000 4.000.000 0 0 0 200.000 0 0 0 20 4.000.000
OSA [ Fixed ] 2 time x 4 person x 4 days 28 50.000 1.400.000 0 0 0 50.000 0 0 0 28 1.400.000
2.1.2. TO JAKARTA 636.490.000 156.484.090 7.169.000 163.653.090 472.836.910 2.1.2.1. FOR SEVERAL TRAINING TO JAKARTA BY REQUEST 103.550.000 13.095.400 0 13.095.400 90.454.600
Air Transport 6 time x 5 person 35 2.130.000 74.550.000 5 8.095.400 0 2.130.000 0 5 8.095.400 30 66.454.600
In land Transport in Jakarta 6 time x 5 person 35 200.000 7.000.000 5 1.000.000 0 200.000 0 5 1.000.000 30 6.000.000
OSA [ Fixed ] 6 time x 5 person x 4 days 220 100.000 22.000.000 40 4.000.000 0 100.000 0 40 4.000.000 180 18.000.000
2.1.2.2. FOR EGM TO JAKARTA etc. 336.760.000 68.051.012 0 68.051.012 268.708.988 Air Transport
Coordination Meeting for PD & TL 5 time x 2 person 18 2.130.000 38.340.000 3 6.342.266 0 2.130.000 0 3 6.342.266 15 31.997.734
EGM Spec [TA]/Sub Spec [Sub TA] Training5 time x 2 person 13 2.130.000 27.690.000 3 5.824.733 0 2.130.000 0 3 5.824.733 10 21.865.267
EGM Socilization Specialist 5 time x 1 person 9 2.130.000 19.170.000 2 3.711.233 0 2.130.000 0 2 3.711.233 7 15.458.767
EGM Spec [TA]/Sub Spec MK/Sub Spec RLF5 time x 3 person 13 2.130.000 27.690.000 3 5.282.633 0 2.130.000 0 3 5.282.633 10 22.407.367
EGM Spec [TA]/Sub Spec INFRA/Sub Spec Safeguard 17 2.130.000 36.210.000 4 7.412.633 0 2.130.000 0 4 7.412.633 13 28.797.367
EGM Spec [TA]/Sub Spec Monev /Sub Spec Legal HCU 17 2.130.000 36.210.000 6 9.221.839 0 2.130.000 0 6 9.221.839 11 26.988.161
EGM Spec [TA]/Sub Spec SIM 5 time x 2 person 13 2.130.000 27.690.000 3 5.372.275 0 2.130.000 0 3 5.372.275 10 22.317.725
EGM Spec [TA] Local Goverment 4 time x 1 person 6 2.130.000 12.780.000 2 3.483.400 0 2.130.000 0 2 3.483.400 4 9.296.600
EGM Spec [TA] Urban Planner 4 time x 1 person 6 2.130.000 12.780.000 0 0 0 2.130.000 0 0 0 6 12.780.000
In land Transport in Jakarta 78 time 82 200.000 16.400.000 25 5.000.000 0 200.000 0 25 5.000.000 57 11.400.000
Hotel Acomodation 5 time x 18 person x 4 days104 300.000 31.200.000 8 2.400.000 0 300.000 0 8 2.400.000 96 28.800.000
NOS RATE TOTAL NOS TOTAL NOS RATE TOTAL NOS TOTAL NOS TOTAL NO URAIAN CONTRACT AMAND-6 INVOICE LALU INVOICE SAAT INI INVOICE S/D SAAT INI SISA KONTRAK
2.1.2.3. FOR COORDINATION MEETING TO JAKARTA (by request) 101.760.000 29.137.000 0 29.137.000 72.623.000 FOR COORDINATION MEETING TO JAKARTA AND OTHER (by request)
Air Transport 8 time x 3 person 12 2.130.000 25.560.000 3 5.333.900 0 2.130.000 0 3 5.333.900 9 20.226.100
Air Transport to Jakarta and Other 8 time x 3 person 9 4.800.000 43.200.000 8 17.503.100 0 4.800.000 0 8 17.503.100 1 25.696.900
In land Transport 8 time x 3 person 21 200.000 4.200.000 11 2.200.000 0 200.000 0 11 2.200.000 10 2.000.000
Hotel Accommodation 8 time x 3 person x 4 days 69 300.000 20.700.000 0 0 0 300.000 0 0 0 69 20.700.000
OSA [ Fixed ] 8 time x 3 person x 4 days 81 100.000 8.100.000 41 4.100.000 0 100.000 0 41 4.100.000 40 4.000.000
2.1.2.4. FROM LEVEL OSP TO PROVINCE 79.100.000 44.087.778 7.169.000 51.256.778 27.843.222
Air Transport to NTT 11 3.300.000 36.300.000 7 18.702.500 1 3.300.000 2.569.000 8 21.271.500 3 15.028.500
Air Transport to NTB 9 800.000 7.200.000 6 3.549.000 1 800.000 800.000 7 4.349.000 2 2.851.000
In land Transport 20 200.000 4.000.000 13 2.600.000 2 200.000 400.000 15 3.000.000 5 1.000.000
Accommodation 74 300.000 22.200.000 46 13.336.278 8 300.000 2.400.000 54 15.736.278 20 6.463.722
OSA 94 100.000 9.400.000 59 5.900.000 10 100.000 1.000.000 69 6.900.000 25 2.500.000
2.1.2.5. KORKOT TO JAKARTA (by Request) 15.320.000 2.112.900 0 2.112.900 13.207.100
Air Transport 4 2.130.000 8.520.000 1 1.612.900 0 2.130.000 0 1 1.612.900 3 6.907.100
In land Transport In Jakarta 4 200.000 800.000 1 200.000 0 200.000 0 1 200.000 3 600.000
Hotel Accommodation 14 300.000 4.200.000 0 0 0 300.000 0 0 0 14 4.200.000
OSA [ Fixed ] 18 100.000 1.800.000 3 300.000 0 100.000 0 3 300.000 15 1.500.000
2.2.
DUTY TRAVEL EXPENSES PROVINCE WEST NUSA TENGGARA
September 2016 (Amand-6)
NOS RATE TOTAL NOS TOTAL NOS RATE TOTAL NOS TOTAL NOS TOTAL 2.2.1 IN PROVINCE 654.910.000 116.280.200 0 116.280.200 494.840.000 2.2.1.1 FOR SPOTCHECK PROVINCE TO KELURAHAN (10% x Number of Kelurahan) 40.400.000 18.500.000 0 18.500.000 21.900.000
a From Mataram to Lombok Timur (44 kel x 10% = 5 kel)
Local Transport 4 time x 2 person 70 100.000 7.000.000 22 2.200.000 0 100.000 0 22 2.200.000 48 4.800.000
b Mataram (50 kel x 10% = 5 kel)
OSA 4 time x 2 person 38 50.000 1.900.000 20 1.000.000 0 50.000 0 20 1.000.000 18 900.000
c From Mataram to Lombok Barat
Local Transport 4 time x 1 person 19 100.000 1.900.000 7 700.000 0 100.000 0 7 700.000 12 1.200.000
d From Mataram to Lombok Tengah
Local Transport 4 time x 1 person 19 100.000 1.900.000 14 1.400.000 0 100.000 0 14 1.400.000 5 500.000
e From Mataram to Sumbawa, Kab. Bima, Kota Bima (80 kel x 10% = 8 kel)
Various Transport 4 time x 2 person 26 600.000 15.600.000 12 7.200.000 0 600.000 0 12 7.200.000 14 8.400.000
Hotel Acomodation 4 time x 2 person x 2 days48 175.000 8.400.000 24 4.200.000 0 175.000 0 24 4.200.000 24 4.200.000
OSA [ Fixed ] 4 time x 2 person x 3 days74 50.000 3.700.000 36 1.800.000 0 50.000 0 36 1.800.000 38 1.900.000
2.2.1.2. SPOOTCHECK KOTA/KAB. FOR ASS. CITY COORDINATOR INFRA AND FM 108.000.000 6.200.000 0 6.200.000 101.800.000 A. For City Coordinator and Assistance City Coordinator
Total 215 Kel x 50% x 4 4 time x 54 kelurahan 378 50.000 18.900.000 11 550.000 0 50.000 0 11 550.000 367 18.350.000
Cost / Day Rp. 50.000.- 1 Day cover 2 kel
B. For Ass. City Coordinator Infrastructure and FM in the city
(Total 215 Kel - 60 Kel luar kota) x 50% x 12 12 time x 39 kelurahan819 50.000 40.950.000 8 400.000 0 50.000 0 8 400.000 811 40.550.000 Cost / Day Rp. 50.000.- 1 Day cover 2 kel
C. For City Coordinator Infrastructure and FM out of te town
Lombok Timur to Sumbawa
1 Various Transport 16 time x 2 person 50 600.000 30.000.000 6 3.600.000 0 600.000 0 6 3.600.000 44 26.400.000
2 Hotel Acomodation 16 time x 2 person x 1 days50 175.000 8.750.000 6 1.050.000 0 175.000 0 6 1.050.000 44 7.700.000
3 OSA [ Fixed ] 16 time x 2 person x 2 days100 50.000 5.000.000 12 600.000 0 50.000 0 12 600.000 88 4.400.000
4 Kota Bima to Kab. Bima (Local Transport) 16 time x 2 person 88 50.000 4.400.000 0 0 0 50.000 0 0 0 88 4.400.000
2.2.1.3 FOR CB ACTIVITY BY ASKOT TO FASKEL 19.425.000 0 0 0 19.425.000
From Lombok Timur to Sumbawa
1 Various Transport 8 time x 3 person 21 600.000 12.600.000 0 0 0 600.000 0 0 0 21 12.600.000
2 Hotel Acomodation 8 time x 3 person x 1 days21 175.000 3.675.000 0 0 0 175.000 0 0 0 21 3.675.000
3 OSA [ Fixed ] 8 time x 3 person x 2 days42 50.000 2.100.000 0 0 0 50.000 0 0 0 42 2.100.000
4 Kota Bima to Kab. Bima (Local Transport) 8 time x 3 person x 1 days21 50.000 1.050.000 0 0 0 50.000 0 0 0 21 1.050.000
2.2.1.4 FROM KAB/KOTA TO TL OFFICE FOR COORDINATION MEETING 82.100.000 30.100.000 0 30.100.000 52.000.000
a From Lombok Timur to Mataran
Local Transport 8 time x 2 person 25 100.000 2.500.000 11 1.100.000 0 100.000 0 11 1.100.000 14 1.400.000
Acomodation 8 time x 2 person x 1 days25 200.000 5.000.000 11 2.200.000 0 200.000 0 11 2.200.000 14 2.800.000
OSA [ Fixed ] 8 time x 2 person x 2 days50 50.000 2.500.000 22 1.100.000 0 50.000 0 22 1.100.000 28 1.400.000
b From Lombok Tengah to Mataran
Local Transport 8 time x 2 person 25 100.000 2.500.000 11 1.100.000 0 100.000 0 11 1.100.000 14 1.400.000
Acomodation 8 time x 2 person x 1 days25 200.000 5.000.000 11 2.200.000 0 200.000 0 11 2.200.000 14 2.800.000
OSA [ Fixed ] 8 time x 2 person x 2 days50 50.000 2.500.000 22 1.100.000 0 50.000 0 22 1.100.000 28 1.400.000
SISA KONTRAK NO URAIAN CONTRACT AMAND-6 INVOICE LALU INVOICE SAAT INI INVOICE S/D SAAT INI
NOS RATE TOTAL NOS TOTAL NOS RATE TOTAL NOS TOTAL NOS TOTAL SISA KONTRAK NO URAIAN CONTRACT AMAND-6 INVOICE LALU INVOICE SAAT INI INVOICE S/D SAAT INI
c From Sumbawa, Kab. Bima, Kota
Local Transport 8 time x 6 person 69 600.000 41.400.000 24 14.400.000 0 600.000 0 24 14.400.000 45 27.000.000
Acomodation 8 time x 6 person x 1 days69 200.000 13.800.000 23 4.600.000 0 200.000 0 23 4.600.000 46 9.200.000
OSA [ Fixed ] 8 time x 6 person x 2 days138 50.000 6.900.000 46 2.300.000 0 50.000 0 46 2.300.000 92 4.600.000
2.2.1.5 FROM PROVINCE TO REGIONAL FOR WORKSHOP & COOR. MEETING AT OSP 52.650.000 8.860.200 0 8.860.200 43.789.800 Workshop OC / Coordination Meeting at OC
From Mataram to Denpasar
Air Tranport 5 time x 9 person 61 750.000 45.750.000 11 7.610.200 0 750.000 0 11 7.610.200 50 38.139.800
OSA [ Fixed ] 5 time x 9 person x 2 days138 50.000 6.900.000 25 1.250.000 0 50.000 0 25 1.250.000 113 5.650.000
2.2.1.6 FOR SEVERAL TRAINING & SPECIAL EVENT FROM KAB. TO MATARAM 352.335.000 52.620.000 0 52.620.000 299.715.000 Training for City Coordinators Assistants (Infrastructure, Economic,
Community Dev, MIS, Urban 29.000.000 6.600.000 0 6.600.000 22.400.000
a For Askot Lombok Timur & Lombok Tengah to Mataram
Local Tranport 3 time x 10 person 50 100.000 5.000.000 12 1.200.000 0 100.000 0 12 1.200.000 38 3.800.000
b Various Tranport for Askot Sumbawa, Bima & Kota Bima to Mataram 40 600.000 24.000.000 9 5.400.000 0 600.000 0 9 5.400.000 31 18.600.000
Advance Training for PLPBK 7.000.000 0 0 0 7.000.000
a For Askot-UP Lombok Timur & Lombok Tengah to Mataram
Local Tranport 3 time x 2 person 10 100.000 1.000.000 0 0 0 100.000 0 0 0 10 1.000.000
b Tranport for Askot-UP Sumbawa, Bima & Kota Bima to Mataram 10 600.000 6.000.000 0 0 0 600.000 0 0 0 10 6.000.000
For Training/Consolidation 291.875.000 36.600.000 0 36.600.000 255.275.000
a For Korkot & Askot Lombok Timur & Lombok Tengah on OSP Consolidation
Local Tranport 14 time x 12 person 120 100.000 12.000.000 21 2.100.000 0 100.000 0 21 2.100.000 99 9.900.000
b For SF, FK, FE, FS Lombar & Mataram
Local Tranport 2 time x 43 person 280 50.000 13.975.000 46 2.300.000 0 50.000 0 46 2.300.000 234 11.675.000
c For SF, FK, FE, FS Lombok Timur dan Lombok Tengah
Local Tranport 2 time x 38 person 247 100.000 24.700.000 58 5.800.000 0 100.000 0 58 5.800.000 189 18.900.000
d For SF, FK, FE, FS Sumbawa, Bima & Kota Bima
Various Transport 2 time x 48 person 312 600.000 187.200.000 31 18.600.000 0 600.000 0 31 18.600.000 281 168.600.000
e For Korkot & Askot Sumbawa, Bima , Kota Bima on OSP Consolidation
Various Transport 14 time x 9 person 90 600.000 54.000.000 13 7.800.000 0 600.000 0 13 7.800.000 77 46.200.000
Special Event (by request) 24.460.000 9.420.000 0 9.420.000 15.040.000
a. From Lombok Timur to Mataran
Local Transport 2 time x 4 person 13 100.000 1.280.000 3 300.000 0 100.000 0 3 300.000 10 980.000
Acomodation 2 time x 4 person x 1 days13 200.000 2.560.000 3 600.000 0 200.000 0 3 600.000 10 1.960.000
OSA [ Fixed ] 2 time x 4 person x 2 days26 50.000 1.280.000 6 300.000 0 50.000 0 6 300.000 20 980.000
b. From Lombok Tengah to Mataram
Local Transport 2 time x 4 person 13 100.000 1.280.000 3 300.000 0 100.000 0 3 300.000 10 980.000
Acomodation 2 time x 4 person x 1 days13 200.000 2.560.000 3 600.000 0 200.000 0 3 600.000 10 1.960.000
OSA [ Fixed ] 2 time x 4 person x 2 days26 50.000 1.280.000 6 300.000 0 50.000 0 6 300.000 20 980.000
c. From Sumbawa, Kab. Bima, Kota Bima to Mataram
Various Tranport 2 time x 4 person 16 600.000 9.480.000 8 4.680.000 0 600.000 0 8 4.680.000 8 4.800.000
Acomodation 2 time x 4 person x 1 days16 200.000 3.160.000 8 1.560.000 0 200.000 0 8 1.560.000 8 1.600.000
OSA [ Fixed ] 2 time x 4 person x 2 days32 50.000 1.580.000 16 780.000 0 50.000 0 16 780.000 16 800.000
2.2.2. TO JAKARTA 632.546.000 123.011.300 0 123.011.300 509.534.700 2.2.2.1. FOR SEVERAL TRAINING TO JAKARTA BY REQUEST 124.769.000 34.467.600 0 34.467.600 90.301.400
NOS RATE TOTAL NOS TOTAL NOS RATE TOTAL NOS TOTAL NOS TOTAL SISA KONTRAK NO URAIAN CONTRACT AMAND-6 INVOICE LALU INVOICE SAAT INI INVOICE S/D SAAT INI
In land Travel in Jakarta 6 time x 5 person 43 200.000 8.600.000 12 2.400.000 0 200.000 0 12 2.400.000 31 6.200.000
OSA [ Fixed ] 6 time x 5 person x 4 days180 100.000 18.000.000 63 6.300.000 0 100.000 0 63 6.300.000 117 11.700.000
2.2.2.2. FOR EGM TO JAKARTA 327.053.000 74.066.100 0 74.066.100 252.986.900 Air Transport
Coordination Meeting for PD & TL 5 time x 1 person 9 2.283.000 20.547.000 3 5.519.000 0 2.283.000 0 3 5.519.000 6 15.028.000
EGM Spec [TA]/Sub Spec [Sub TA] Training 5 time x 4 person 12 2.283.000 27.396.000 2 4.557.000 0 2.283.000 0 2 4.557.000 10 22.839.000
EGM Socilization Specialist 5 time x 1 person 7 2.283.000 15.981.000 2 4.344.400 0 2.283.000 0 2 4.344.400 5 11.636.600
EGM Spec [TA]/Sub Spec MK/Sub Spec RLF 5 time x 3 person 13 2.283.000 29.679.000 3 6.239.900 0 2.283.000 0 3 6.239.900 10 23.439.100
EGM Spec [TA]/Sub Spec INFRA/Sub Spec Safeguard5 time x 3 person 13 2.283.000 29.679.000 3 6.452.500 0 2.283.000 0 3 6.452.500 10 23.226.500
EGM Spec [TA]/Sub Spec Monev /Sub Spec Legal HCU 13 2.283.000 29.679.000 2 4.557.000 0 2.283.000 0 2 4.557.000 11 25.122.000
EGM Spec [TA]/Sub Spec SIM 5 time x 2 person 12 2.283.000 27.396.000 4 7.810.300 0 2.283.000 0 4 7.810.300 8 19.585.700
EGM Spec [TA] Local Goverment 4 time x 1 person 6 2.283.000 13.698.000 3 6.033.500 0 2.283.000 0 3 6.033.500 3 7.664.500
EGM Spec [TA] Urban Planner 4 time x 1 person 6 2.283.000 13.698.000 3 6.452.500 0 2.283.000 0 3 6.452.500 3 7.245.500
In land Transport in Jakarta 88 time 107 200.000 21.400.000 25 5.000.000 0 200.000 0 25 5.000.000 82 16.400.000
Acomodation 5 time x 19 person x 3 days112 300.000 33.600.000 10 3.000.000 0 300.000 0 10 3.000.000 102 30.600.000
OSA [ Fixed ] 5 time x 19 person x 4 days643 100.000 64.300.000 141 14.100.000 0 100.000 0 141 14.100.000 502 50.200.000
2.2.2.3. FOR COORDINATION MEETING TO JAKARTA (by request) 140.894.000 12.363.200 0 12.363.200 128.530.800
Air Transport 8 time x 3 person 18 2.283.000 41.094.000 4 7.039.400 0 2.283.000 0 4 7.039.400 14 34.054.600
Air Transport to Jakarta and other 8 time x 3 person 12 4.800.000 57.600.000 1 2.623.800 0 4.800.000 0 1 2.623.800 11 54.976.200
In land Transport in Jakarta 8 time x 3 person 34 200.000 6.800.000 5 1.000.000 0 200.000 0 5 1.000.000 29 5.800.000
Hotel Accommodation 8 time x 3 person x 4 days80 300.000 24.000.000 0 0 0 300.000 0 0 0 80 24.000.000
OSA [ Fixed ] 8 time x 3 person x 4 days114 100.000 11.400.000 17 1.700.000 0 100.000 0 17 1.700.000 97 9.700.000
2.2.2.4. KORKOT TO JAKARTA (by request) 39.830.000 2.114.400 0 2.114.400 37.715.600
Air Transport 8 time x 3 person 10 2.283.000 22.830.000 1 1.614.400 0 2.283.000 0 1 1.614.400 9 21.215.600
In land Transport in Jakarta 8 time x 3 person 10 200.000 2.000.000 1 200.000 0 200.000 0 1 200.000 9 1.800.000
Hotel Accommodation 8 time x 3 person x 4 days35 300.000 10.500.000 0 0 0 300.000 0 0 0 35 10.500.000
OSA [ Fixed ] 8 time x 3 person x 4 days45 100.000 4.500.000 3 300.000 0 100.000 0 3 300.000 42 4.200.000
1.287.456.000 239.291.500 0 239.291.500 1.048.164.500 TOTAL DUTY TRAVEL WEST NUSA TENGGARA PROVINCE
2.3.
DUTY TRAVEL EXPENSES PROVINCE EAST NUSA TENGGARA
September 2016 (Amand-6)
NOS RATE TOTAL NOS TOTAL NOS RATE TOTAL NOS TOTAL NOS TOTAL 2.3.1. IN PROVINCE 1.858.627.400 384.836.193 0 384.836.193 1.473.791.207 2.3.1.1. FOR SPOTCHECK PROVINCE TO KELURAHAN (10% x Number of Kelurahan) 85.280.000 42.998.198 0 42.998.198 42.281.802
a From Kupang To Sumba Barat & Sumba Timur (18 kel x 10% = 2 kel)
Various Transport 4 time x 1 person 2 1.150.000 2.300.000 2 2.300.000 0 1.150.000 0 2 2.300.000 0 0
12 1.760.000 21.120.000 7 10.561.200 0 1.760.000 0 7 10.561.200 5 10.558.800
Hotel Acomodation 4 time x 1 person x 2 days 6 150.000 900.000 6 900.000 0 150.000 0 6 900.000 0 0
22 250.000 5.500.000 14 3.166.000 0 250.000 0 14 3.166.000 8 2.334.000
OSA [ Fixed ] 4 time x 1 person x 3 days 42 50.000 2.100.000 28 1.400.000 0 50.000 0 28 1.400.000 14 700.000
b From Kupang To Ende, Ngada & Manggarai (33 kel x 10% = 4 kel)
Various Transport 4 time x 1 person 4 1.150.000 4.600.000 4 4.600.000 0 1.150.000 0 4 4.600.000 0 0
12 1.760.000 21.120.000 5 7.037.998 0 1.760.000 0 5 7.037.998 7 14.082.002
Hotel Acomodation 4 time x 1 person x 2 days 8 150.000 1.200.000 8 1.200.000 0 150.000 0 8 1.200.000 0 0
20 250.000 5.000.000 10 2.500.000 0 250.000 0 10 2.500.000 10 2.500.000
OSA [ Fixed ] 4 time x 1 person x 3 days 42 50.000 2.100.000 27 1.350.000 0 50.000 0 27 1.350.000 15 750.000
c From Kupang To TTS & Belu (17 kel x 10% = 2 kel)
Local Transport 4 time x 1 person 14 200.000 2.800.000 8 1.420.000 0 200.000 0 8 1.420.000 6 1.380.000
Hotel Acomodation 4 time x 1 person x 1 days 4 150.000 600.000 4 570.000 0 150.000 0 4 570.000 0 30.000
10 250.000 2.500.000 4 1.000.000 0 250.000 0 4 1.000.000 6 1.500.000
OSA [ Fixed ] 4 time x 1 person x 2 days 28 50.000 1.400.000 16 800.000 0 50.000 0 16 800.000 12 600.000
d From Kupang To Sikka (7 kel x 10% = 2 kel)
Local Transport 4 time x 1 person 4 200.000 800.000 0 0 0 200.000 0 0 0 4 800.000
4 1.760.000 7.040.000 2 1.693.000 0 1.760.000 0 2 1.693.000 2 5.347.000
Hotel Acomodation 4 time x 1 person x 1 days 4 150.000 600.000 0 0 0 150.000 0 0 0 4 600.000
6 250.000 1.500.000 5 1.250.000 0 250.000 0 5 1.250.000 1 250.000
OSA [ Fixed ] 4 time x 1 person x 2 days 20 50.000 1.000.000 7 350.000 0 50.000 0 7 350.000 13 650.000
e Kupang (49 kel x 10% = 5 kel)
OSA [ Fixed ] 4 time x 2 person x 1 days 22 50.000 1.100.000 18 900.000 0 50.000 0 18 900.000 4 200.000
2.3.1.2. SPOOTCHECK KOTA/KAB FOR ASS. CITY COORDINATOR INFRA AND FM 139.075.000 21.405.000 0 21.405.000 117.670.000 A. For City Coordinator and Assistance City Coordinator
Total 124 Kel x 50% x 4 4 time x 31 kelurahan 217 50.000 10.850.000 98 4.900.000 0 50.000 0 98 4.900.000 119 5.950.000
Cost / Day Rp. 50.000.- 1 Day cover 2 kel
B. For Ass. City Coordinator Infrastructure and FM in the city
(Total 124 Kel - 60 Kel luar kota) x 50% x 1212 time x 16 kelurahan 463 50.000 23.150.000 54 2.700.000 0 50.000 0 54 2.700.000 409 20.450.000 Cost / Day Rp. 50.000.- 1 Day cover 2 kel
C. For City Coordinator Infrastructure and FM out of te town
1. From Sumba Timur to Sumba Barat
Local Tranport 16 time x 2 person 6 75.000 450.000 6 450.000 0 75.000 0 6 450.000 0 0
44 150.000 6.600.000 5 390.000 0 150.000 0 5 390.000 39 6.210.000
Hotel Acomodation 16 time x 2 person x 1 days 6 100.000 600.000 6 600.000 0 100.000 0 6 600.000 0 0
44 150.000 6.600.000 5 500.000 0 150.000 0 5 500.000 39 6.100.000
OSA [ Fixed ] 16 time x 2 person x 2 days 100 50.000 5.000.000 22 1.100.000 0 50.000 0 22 1.100.000 78 3.900.000
2. From Ende to Sikka
Local Tranport 16 time x 2 person 0 75.000 0 0 0 0 75.000 0 0 0 0 0
50 240.000 12.000.000 4 465.000 0 240.000 0 4 465.000 46 11.535.000
Hotel Acomodation 16 time x 2 person x 1 days 0 100.000 0 0 0 0 100.000 0 0 0 0 0
50 150.000 7.500.000 5 500.000 0 150.000 0 5 500.000 45 7.000.000
OSA [ Fixed ] 16 time x 2 person x 2 days 100 50.000 5.000.000 9 450.000 0 50.000 0 9 450.000 91 4.550.000
SISA KONTRAK NO KOMPOSISI BIAYA CONTRACT AMAND-6 INVOICE LALU INVOICE SAAT INI INVOICE S/D SAAT INI