Block Island Wind Farm

(2)

Project Permitting

Environmental permits

received in 2014

Permitting was based, in part, on pre-construction

avian and bat use surveys to inform potential risk

Post-construction monitoring plan developed

(3)

Pre-Construction Surveys

Surveys

conducted

2009-2011

Evaluated potential impacts to birds and bats

Surveys included:

• 

Onshore Sea Watch Avian Surveys

• 

Onshore Raptor Migration Surveys

• 

Onshore Beached Bird Survey

• 

Bat Acoustic Monitoring

• 

Avian Acoustic Monitoring

• 

Offshore Boat-Based Avian Survey

• 

Offshore Aerial High Definition Videography

(4)

Post-Construction Surveys

Year 1 Surveys

nearing

completion

Reports available spring 2018

Surveys include:

• 

Bat Acoustic Monitoring on Construction Vessels

• 

Onshore Beached Bird Survey

• 

Offshore Boat-Based Avian Survey

• 

Turbine-mounted Radar/Camera Collision

Monitoring

(5)

Acoustic Monitoring

Bat acoustic detectors on jack up barges

during 2016 installation

(6)

Onshore Beached

Bird

Monitoring of 3 beach areas on BIWF

(7)

Offshore Boat-Based

Avian

Protocol same as pre-construction

Once/month during years 1 and 3

(8)

Collision Monitoring/

Avian Radar

Multi Sensor wildlife

detection system (MUSE)

Next-generation of Thermal Animal

Detection System (TADS) deployed at European offshore projects

(9)

Collision Monitoring/

Avian Radar

Radar data also

(10)

Lessons Learned

Deployment

Weather

Platforms of opportunity

Referensi

Dokumen terkait

This chapter surveys the legacy of political and economic aspects of pre- colonial Indonesia, Dutch colonialism and post-colonial Indonesia (1 949-1 965), the nature of both the

Hasil Observasi Keterlaksanaan Pembelajaran Membaca Pemahaman dengan Menggunakan Pre Reading Plan (PReP) Technique .... Data Hasil Pelaksanaan Post Test... Analisis Statistik

ENVIRONMENTAL MANAGEMENT PLAN Timing Area of Management Objective Action Responsible Party Advice Pre-Construction Aboriginal heritage Ensure that there is no unauthorised

After surgical incision, children of pre-incisional and control groups received an intravenous bolus of 1 ml normal saline, while children of post-incisional group received an

Yield monitoring a useful tool to inform harvest best practice Using a yield monitor is delivering potential to improve harvesting practices, as well as for lifting productivity

PHILIPPINE RICE RESEARCH INSTITUTE Central Experiment Station Procurement Monitoring Report covering January to June 2017 Pre-Proc Conference Ads/Post of IB Pre-bid Conf

My thesis aimed to investigate the distribution dynamics of post-settlement juvenile toheroa on Ripiro Beach and the potential applications for aquaculture.. Population surveys were