• Tidak ada hasil yang ditemukan

Analisa Harga Satuan1

N/A
N/A
Protected

Academic year: 2021

Membagikan "Analisa Harga Satuan1"

Copied!
22
0
0

Teks penuh

(1)

U

Urraaiiaan n KKeeggiiaattaann KoKoeeffiissiieenn SSaattuuaann Pemasangan Konektor Kabel

Pemasangan Konektor Kabel Upah : Upah : T TuukkaannggLLiissttrriikk 00..0011 Bahan / Material Bahan / Material K KoonneekkttoorrKKaabbeell 11

Pemasangan Servis Kabel Pemasangan Servis Kabel Upah : Upah : T TuukkaannggLLiissttrriikk 00..0011 Bahan / Material Bahan / Material S

Seerrvviicce e KKaabbeel l / / SuSussppeennssiioon n KKlleemm 11

Pemasangan / Penarikan Kabel Twisted 2 x 16 mm Pemasangan / Penarikan Kabel Twisted 2 x 16 mm Upah :

Upah : P

Peemmaassaannggaan n ddaan n PPeennaarriikkaan n KKaabbeell 11

Bahan / Material Bahan / Material K

KaabbeellTTwwiissttee22xx1166mmmm 11

Instalasi 1 titik Lampu PJU (Tarikan Udara 2.5 m) Instalasi 1 titik Lampu PJU (Tarikan Udara 2.5 m) Upah :

Upah : P

Peemmaassaannggaan n ddaan n PePennaarriikkaan n KKaabbeell 22..55

Bahan / Material Bahan / Material K

KaabbeellNNYYMM22xx22..55mmmm 22..55

Instalasi 1 titik Lampu PJU (Tarikan Udara 3 m) Instalasi 1 titik Lampu PJU (Tarikan Udara 3 m) Upah :

Upah : P

Peemmaassaannggaan n ddaan n PPeennaarriikkaan n KKaabbeell 33

Bahan / Material Bahan / Material K

KaabbeellNNYYMM22xx22..55mmmm 33

Instalasi 1 titik Lampu PJU (Tarikan Udara 4 m) Instalasi 1 titik Lampu PJU (Tarikan Udara 4 m) Upah :

(2)

P

Peemmaassaannggaan n ddaan n PPeennaarriikkaan n KKaabbeell 44

Bahan / Material Bahan / Material K

KaabbeellNNYYMM22xx22..55mmmm 44

Instalasi 1 titik Lampu PJU (Tarikan Udara 7 m) Instalasi 1 titik Lampu PJU (Tarikan Udara 7 m) Upah :

Upah : P

Peemmaassaannggaan n ddaan n PPeennaarriikkaan n KKaabbeell 77

Bahan / Material Bahan / Material K

KaabbeellNNYYMM22xx22..55mmmm 77

Instalasi 1 titik Lampu PJU (Tarikan Udara 10 m) Instalasi 1 titik Lampu PJU (Tarikan Udara 10 m) Upah :

Upah : P

Peemmaassaannggaan n ddaan n PePennaarriikkaan n KKaabbeell 1100

Bahan / Material Bahan / Material K

KaabbeellNNYYMM22xx22..55mmmm 1100

Pemasangan Ornamen Lampu PJU Panjang 1.5 m Pemasangan Ornamen Lampu PJU Panjang 1.5 m Upah : Upah : M Maannddoorr 00..112255 T TuukkaannggLLiissttrriikk 00..22 P

PeekkeerrjjaaTTeerraammppiill 00..66

Bahan / Material Bahan / Material P

Piippa a GGaallvvaanniissh h DDiimm. . 22'''' 11..55 B

Beessi i BBeeuuggeell//BBaauut t ( ( oorrnnaammeen n )) 22 S

SttiikkeerrRReefflleekkttiivvee 00..00550088 R

RoollllPPiippaa22"" 11

Sewa Peralatan Sewa Peralatan S

Seewwa a AAllaat t BBaannttu u PPeenneerraannggaan n JJaallaan n UUmmuum m ((PPJJUU)) 22

Pemasangan Ornamen Lampu PJU panjang 3 m Pemasangan Ornamen Lampu PJU panjang 3 m Upah : Upah : M Maannddoorr 00..112255 T TuukkaannggLLiissttrriikk 00..22 P

PeekkeerrjjaaTTeerraammppiill 00..66

Bahan / Material Bahan / Material

(3)

Besi Beugel/Baut ( ornamen ) 2

PlatBesiTb.5mm 2.3815

PapanNama 2

RollPipa 2" 1

Sewa Peralatan

Sewa Alat Bantu Penerangan Jalan Umum (PJU) 2

Pemasangan Panel Lampu PJU - 1 Phase 2.200 VA Upah :

PerakitanPanelPJU 1

PemasanganPanelPJU 1

Bahan/Material:

Panel PJU 1

MCB C60N 6 A 1 Phase 4

MCB C60N 16 A 1 Phase 2

Magnet Kontaktor LC-1 D12 1

Time Switch (Sul 181 h/Sul 181 d) 1

Kabel Glen / Water Mur (PG-7) 1

Kabel Glen / Water Mur (PG-21) 4

Pipa PVC Pelaluan Arde Dim. 1/2" (Putih) 3

Keni Pipa PVC 1/2" (Putih) 2

Stenless Tie + Clip (Yuke) + Ring 3

Kabel 10 mm 3

Grounding Roud (Arde) 16 mm 1

Besi Beugel + Mur + Baut + Ring 1

Pemasangan Panel Lampu PJU - 1 Phase 3.500 VA Upah :

PerakitanPanelPJU 1

PemasanganPanelPJU 1

Bahan/Material: Panel PJU 1 MCB C60N 6 A 1 Phase 1 MCBC60N10A1Phase 3 MCB C60N 40 A 1 Phase 2 Magnet Kontaktor LC-1 D12 1

Time Switch (Sul 181 h/Sul 181 d) 1

Kabel Glen / Water Mur (PG-7) 1

Kabel Glen / Water Mur (PG-21) 4

Pipa PVC Pelaluan Arde Dim. 1/2" (Putih) 3

(4)

Stenless Tie + Clip (Yuke) + Ring 3

Kabel 10 mm 3

Grounding Roud (Arde) 16 mm 1

Besi Beugel + Mur + Baut + Ring 1

Pemasangan Panel Lampu PJU - 1 Phase 5.500 VA Upah :

PerakitanPanelPJU 1

PemasanganPanelPJU 1

Bahan/Material: Panel PJU 1 MCB C60N 6 A 1 Phase 1 MCB C60N 16 A 1 Phase 3 MCB C60N 40 A 1 Phase 2 Magnet Kontaktor LC-1 D40 1

Time Switch (Sul 181 h/Sul 181 d) 1

Kabel Glen / Water Mur (PG-7) 1

Kabel Glen / Water Mur (PG-21) 4

Pipa PVC Pelaluan Arde Dim. 1/2" (Putih) 3

Keni Pipa PVC 1/2" (Putih) 2

Stenless Tie + Clip (Yuke) + Ring 3

Kabel 10 mm 3

Grounding Roud (Arde) 16 mm 1

Besi Beugel + Mur + Baut + Ring 1

Pemasangan Panel Meter 1 Phase Upah :

PemasanganPanel 1

Bahan/Material:

Box Panel Meter 1 Phase 1

Kabel Glen / Water Mur PG-7 1

Kabel Glen / Water Mur PG-21 2

Besi Beugel + Mur + Baut + Ring 1

Pemasangan Instalasi Pelaluan Arde Panel Meter Upah:

Pekerja / Buruh Tak Terampil 0.036

Bahan/Material:

(5)

Kabel10mm 2

Pemasangan Lampu HPS 150 W/220 V Lengkap Armateur, Balast, Ignitor & Capasitor

Upah:

Mandor 0.25

Tukang Listrik 0.25

Pekerja / Buruh Tak Terampil 0.75

Bahan/Material:

Lampu HPS 150 W/220 V Lengkap Armateur, Balast,

Ignitor & Capasitor 18 - 20 μf  1

Sewa Peralatan :

Sewa Alat Bantu Penerangan Jalan Umum (PJU) 1

Pondasi PJU Upah:

Mandor 0.065

Kepala Tukang Batu 0.03

Tukang Las 1.03

Tukang Batu 0.125

Pekerja / Buruh Tak Terampil 0.25

Bahan/Material:

Angker Besi Dim. 19 mm 15.1271

Besi Beton Polos Dim. 10 mm 2.3663

Kayu Meranti Bekesting 0.0144

Paku Reng 0.125

Galian Tanah Keras 0.24

Pekerjaan beton (1 pc : 2 ps : 3 kr) 0.24

Pasir Cor/Beton 0.024

Mur + Ring u/ Angker 4

Sewa Peralatan :

Sewa Alat Bantu (1 Set @ 3 Alat ) 0.1767

Sewa Vibrator Roller 0.0076

Sewa Concrete Mixer 0.0076

Pemasangan Tiang Tanam Upah :

Mandor 0.13

(6)

Pekerja Terampil 0.25

Pekerja / Buruh Tak Terampil 0.75

Bahan/Material:

Tiang tanam 1

Sewa Peralatan :

SewaCrane 0.5

Pemasangan Tiang Biasa 7 m Upah :

Mandor 0.13

Tukang Listrik 0.25

Pekerja Terampil 0.25

Pekerja / Buruh Tak Terampil 0.75

Bahan/Material:

Tiang Biasa 5 m Cab. 2 1

(7)

Harga Satuan (Rp.) Jumlah Harga (Rp.) 58,000 580.00 Jumlah 580.00 18,000 18,000.00 Jumlah 18,000.00 Nilai Total 18,580.00 58,000 580.00 Jumlah 580.00 22,000 22,000.00 Jumlah 22,000.00 Nilai Total 22,580.00 5,000 5,000.00 Jumlah 5,000.00 10,000 10,000.00 Jumlah 10,000.00 Nilai Total 15,000.00 50,000 125,000.00 Jumlah 125,000.00 19,000 47,500.00 Jumlah 47,500.00 Nilai Total 172,500.00 50,000 150,000.00 Jumlah 150,000.00 19,000 57,000.00 Jumlah 57,000.00 Nilai Total 207,000.00 1.1 11.1

(8)

50,000 200,000.00 Jumlah 200,000.00 19,000 76,000.00 Jumlah 76,000.00 Nilai Total 276,000.00 50,000 350,000.00 Jumlah 350,000.00 19,000 133,000.00 Jumlah 133,000.00 Nilai Total 483,000.00 50,000 500,000.00 Jumlah 500,000.00 19,000 190,000.00 Jumlah 190,000.00 Nilai Total 690,000.00 100,000 12,500.00 58,000 11,600.00 45,000 27,000.00 Jumlah 51,100.00 220,000 330,000.00 32,000 64,000.00 350,000 17,780.00 60,000 60,000.00 Jumlah 471,780.00 100,000 200,000.00 Jumlah 200,000.00 Nilai Total 722,880.00 100,000 12,500.00 58,000 11,600.00 45,000 27,000.00 Jumlah 51,100.00 5.1 12.1 13.1 14.1

(9)

32,000 64,000.00 22,000 52,393.00 75,000 150,000.00 60,000 60,000.00 Jumlah 986,393.00 100,000 200,000.00 Jumlah 200,000.00 Nilai Total 1,237,493.00 300,000 300,000.00 510,000 510,000.00 Jumlah 810,000.00 2,000,000 2,000,000.00 74,000 296,000.00 74,000 148,000.00 1,000,000 1,000,000.00 442,000 442,000.00 25,000 25,000.00 30,000 120,000.00 17,500 52,500.00 6,000 12,000.00 7,500 22,500.00 11,000 33,000.00 150,000 150,000.00 32,000 32,000.00 Jumlah 4,333,000.00 Nilai Total 5,143,000.00 300,000 300,000.00 510,000 510,000.00 Jumlah 810,000.00 2,000,000 2,000,000.00 74,000 74,000.00 74,000 222,000.00 240,000 480,000.00 1,000,000 1,000,000.00 442,000 442,000.00 25,000 25,000.00 30,000 120,000.00 17,500 52,500.00 6,000 12,000.00 6.1 7.1 8.1

(10)

7,500 22,500.00 16,000 48,000.00 30,000 30,000.00 32,000 32,000.00 Jumlah 4,560,000.00 Nilai Total 5,370,000.00 300,000 300,000.00 510,000 510,000.00 Jumlah 810,000.00 2,000,000 2,000,000.00 74,000 74,000.00 74,000 222,000.00 240,000 480,000.00 1,000,000 1,000,000.00 442,000 442,000.00 25,000 25,000.00 30,000 120,000.00 17,500 52,500.00 6,000 12,000.00 7,500 22,500.00 16,000 48,000.00 30,000 30,000.00 32,000 32,000.00 Jumlah 4,560,000.00 Nilai Total 5,370,000.00 510,000 510,000.00 Jumlah 510,000.00 480,000 480,000.00 25,000 25,000.00 30,000 60,000.00 32,000 32,000.00 Jumlah 597,000.00 Nilai Total 1,107,000.00 40,000 1,440.00 Jumlah 1,440.00 17,500 35,000.00 7.c 5.c 6.c

(11)

11,000 22,000.00 Jumlah 69,000.00 Nilai Total 70,440.00 100,000 25,000.00 58,000 14,500.00 40,000 30,000.00 Jumlah 69,500.00 1,250,000 1,250,000.00 Jumlah 1,250,000.00 100,000 100,000.00 Jumlah 100,000.00 Nilai Total 1,419,500.00 100,000 6,500.00 67,000 2,010.00 58,000 59,740.00 58,000 7,250.00 40,000 10,000.00 Jumlah 85,500.00 30,000 453,813.00 28,000 66,256.40 3,200,000 46,080.00 24,000 3,000.00 50,000 12,000.00 40,000 9,600.00 175,000 4,200.00 15,000 60,000.00 Jumlah 654,949.40 20,000 3,534.00 350,000 2,660.00 325,000 2,470.00 Jumlah 8,664.00 Nilai Total 749,113.40 100,000 13,000.00 58,000 14,500.00 2.b,2.c 3.II.B

(12)

45,000 11,250.00 40,000 30,000.00 Jumlah 68,750.00 750,000 750,000.00 Jumlah 750,000.00 200,000 100,000.00 Jumlah 100,000.00 Nilai Total 918,750.00 100,000 13,000.00 58,000 14,500.00 45,000 11,250.00 40,000 30,000.00 Jumlah 68,750.00 1,670,000 1,670,000.00 Jumlah 1,670,000.00 250,000 125,000.00 Jumlah 125,000.00 1,863,750.00 1.2.B 2.2.b

(13)

Uraian Kegiatan Koefisien Satuan Pemasangan Konektor Kabel

Upah :

TukangListrik 0.01

Bahan / Material

KonektorKabel 1

Pemasangan Servis Kabel Upah :

TukangListrik 0.01

Bahan / Material

Service Kabel / Suspension Klem 1

Pemasangan / Penarikan Kabel Twisted 2 x 16 mm Upah :

Pemasangan dan Penarikan Kabel 1

Bahan / Material

KabelNYM2x2.5mm 1

Instalasi 1 titik Lampu PJU (Tarikan Udara 2.5 m) Upah :

Pemasangan dan Penarikan Kabel 2.5

Bahan / Material

KabelNYM2x2.5mm 2.5

Instalasi 1 titik Lampu PJU (Tarikan Udara 3 m) Upah :

Pemasangan dan Penarikan Kabel 3

Bahan / Material

KabelNYM2x2.5mm 3

Instalasi 1 titik Lampu PJU (Tarikan Udara 4 m) Upah :

Pemasangan dan Penarikan Kabel 4

Bahan / Material

KabelNYM2x2.5mm 4

Instalasi 1 titik Lampu PJU (Tarikan Udara 7 m) Upah :

Pemasangan dan Penarikan Kabel 7

Bahan / Material

KabelNYM2x2.5mm 7

Instalasi 1 titik Lampu PJU (Tarikan Udara 10 m) Upah :

Pemasangan dan Penarikan Kabel 10

Bahan / Material

KabelNYM2x2.5mm 10

Pemasangan Ornamen Lampu PJU Panjang 1.5 m Upah :

(14)

Mandor 0.125

TukangListrik 0.2

PekerjaTerampil 0.6

Bahan / Material

Pipa Galvanish Dim. 2'' 1.5

Besi Beugel/Baut ( ornamen ) 2

StikerReflektive 0.0508

RollPipa 2" 1

Sewa Peralatan

Sewa Alat Bantu Penerangan Jalan Umum (PJU) 2 Pemasangan Ornamen Lampu PJU panjang 3 m

Upah :

Mandor 0.125

TukangListrik 0.2

PekerjaTerampil 0.6

Bahan / Material

PipaGalvanishDim.2'' 3

Besi Beugel/Baut ( ornamen ) 2

PlatBesiTb.5mm 2.3815

PapanNama 2

RollPipa 2" 1

Sewa Peralatan

Sewa Alat Bantu Penerangan Jalan Umum (PJU) 2 Pemasangan Panel Lampu PJU - 1 Phase 2.200 VA

Upah :

PerakitanPanelPJU 1

PemasanganPanelPJU 1

Bahan/Material:

Panel PJU 1

MCB C60N 6 A 1 Phase 4

MCB C60N 16 A 1 Phase 2

Magnet Kontaktor LC-1 D12 1

Time Switch (Sul 181 h/Sul 181 d) 1

Kabel Glen / Water Mur (PG-7) 1

Kabel Glen / Water Mur (PG-21) 4

Pipa PVC Pelaluan Arde Dim. 1/2" (Putih) 3

Keni Pipa PVC 1/2" (Putih) 2

Stenless Tie + Clip (Yuke) + Ring 3

Kabel 10 mm 3

Grounding Roud (Arde) 16 mm 1

Besi Beugel + Mur + Baut + Ring 1 Pemasangan Panel Lampu PJU - 1 Phase 3.500 VA

Upah :

PerakitanPanelPJU 1

PemasanganPanelPJU 1

(15)

MCB C60N 6 A 1 Phase 1

MCBC60N10A1Phase 3

MCB C60N 40 A 1 Phase 2

Magnet Kontaktor LC-1 D12 1

Time Switch (Sul 181 h/Sul 181 d) 1

Kabel Glen / Water Mur (PG-7) 1

Kabel Glen / Water Mur (PG-21) 4

Pipa PVC Pelaluan Arde Dim. 1/2" (Putih) 3

Keni Pipa PVC 1/2" (Putih) 2

Stenless Tie + Clip (Yuke) + Ring 3

Kabel 10 mm 3

Grounding Roud (Arde) 16 mm 1

Besi Beugel + Mur + Baut + Ring 1 Pemasangan Panel Lampu PJU - 1 Phase 5.500 VA

Upah :

PerakitanPanelPJU 1

PemasanganPanelPJU 1

Bahan/Material: Panel PJU 1 MCB C60N 6 A 1 Phase 1 MCB C60N 16 A 1 Phase 3 MCB C60N 40 A 1 Phase 2 Magnet Kontaktor LC-1 D40 1

Time Switch (Sul 181 h/Sul 181 d) 1

Kabel Glen / Water Mur (PG-7) 1

Kabel Glen / Water Mur (PG-21) 4

Pipa PVC Pelaluan Arde Dim. 1/2" (Putih) 3

Keni Pipa PVC 1/2" (Putih) 2

Stenless Tie + Clip (Yuke) + Ring 3

Kabel 10 mm 3

Grounding Roud (Arde) 16 mm 1

Besi Beugel + Mur + Baut + Ring 1 Pemasangan Panel Meter 1 Phase

Upah :

PemasanganPanel 1

Bahan/Material:

Box Panel Meter 1 Phase 1

Kabel Glen / Water Mur PG-7 1

Kabel Glen / Water Mur PG-21 2

Besi Beugel + Mur + Baut + Ring 1 Pemasangan Instalasi Pelaluan Arde Panel Meter

Upah:

Pekerja / Buruh Tak Terampil 0.036

Bahan/Material:

Pipa PVC Pelaluan Arde Dim. 1/2" (Putih) 2

Keni Pipa PVC 1/2" (Putih) 2

(16)

Pemasangan Lampu HPS 150 W/220 V Lengkap Armateur, Balast, Ignitor & Capasitor

Upah:

Mandor 0.25

Tukang Listrik 0.25

Pekerja / Buruh Tak Terampil 0.75

Bahan/Material:

Lampu HPS 150 W/220 V Lengkap Armateur, Balast,

Ignitor & Capasitor 18 - 20 μf  1

Sewa Peralatan :

Sewa Alat Bantu Penerangan Jalan Umum (PJU) 1 Pondasi PJU Buah

Upah:

Mandor 0.065

Kepala Tukang Batu 0.03

Tukang Las 1.03

Tukang Batu 0.125

Pekerja / Buruh Tak Terampil 0.25

Bahan/Material:

Angker Besi Dim. 19 mm 15.1271

Besi Beton Polos Dim. 10 mm 2.3663

Kayu Meranti Bekesting 0.0144

Paku Reng 0.125

Galian Tanah Keras 0.24

Pekerjaan beton (1 pc : 2 ps : 3 kr) 0.24

Pasir Cor/Beton 0.024

Mur + Ring u/ Angker 4

Sewa Peralatan :

Sewa Alat Bantu (1 Set @ 3 Alat ) 0.1767

Sewa Vibrator Roller 0.0076

Sewa Concrete Mixer 0.0076

Pemasangan Tiang Tanam Buah Upah :

Mandor 0.13

Tukang Listrik 0.25

Pekerja Terampil 0.25

Pekerja / Buruh Tak Terampil 0.75

Bahan/Material:

Tiang tanam 1

Sewa Peralatan :

SewaCrane 0.5

Pemasangan Tiang Biasa 7 m Upah :

Mandor 0.13

Tukang Listrik 0.25

(17)

Bahan/Material:

Tiang Biasa 5 m Cab. 2 1

Sewa Peralatan :

(18)

Harga Satuan (Rp.) Jumlah Harga (Rp.) 70000 700.00 -19000 19,000.00

(19)

-74000 296,000.00 74000 148,000.00 -150000 150,000.00

(20)

(21)

(22)

Referensi

Dokumen terkait

KODE URAIAN KOEF.. SATUAN HARGA SATUAN

KODE URAIAN KOEF.. SATUAN HARGA SATUAN

I1087 Pintu Triplex Rangka Kamper Samarinda Kwalitet Cat/bh I1088 Pintu Triplex Rangka Kamper Medan Kwalitet Cat/bh I1089 Pintu Triplex Rangka Meranti Kwalitet Cat/bh I1090

[r]

1 m' Pasang plint ubin teralux kerang ukuran 10x40 cm Dibulatkan Rp. 1 m' Pasang plint ubin teralux kerang ukuran 10x30 cm

Pasangan Batako tebal 1/2

MU-270 Acian Putih MU-300 Pasangan Bata MU-301 Pas Bata & Plester MU-301 Pas Bata & Plester MU-380 Perekat Bata Ringan MU-380 Perekat Bata Ringan MU-400 Perekat Keramik

Bahan: semen kupang Kg 7.776 Rp 1,175 Rp 9,137 pasir pasang m³ 0.023 Rp 171,400 Rp 3,942 32,319 Rp JUMLAH HARGA SATUAN KOEFISIEN HARGA SATUAN Jumlah harga per satuan pekerjaan 1 m3