KEGIATAN : PENATAAN HALAMAN GEDUNG KANTOR
PEKERJAAN : PENATAAN HALAMAN KANTOR BAPPEDA - PMS KAB. BOLMONG LOKASI : KABUPATEN BOLAANG MONGONDOW
Nilai HPS : Rp 550.000.000
1 CV. GITA SAFIRA JAYA 396.298.000,00 72,05 GUGUR TELL TELL TELL TELL TELL TELL TELL TELL GUGUR
2 CV. SINAR MOLI JAYA 435.573.000,00 79,20 GUGUR TELL TELL TELL TELL TELL TELL TELL TELL GUGUR
3 CV. POGOGUL JAYA 442.677.000,00 80,49 LULUS HP/K < HPS WAJAR ADA YA TIDAK TIDAK TIDAK TIDAK LULUS 4 CV. BANGUN SARANA 445.112.000,00 80,93 LULUS HP/K < HPS WAJAR TIDAK TIDAK TIDAK TIDAK TIDAK TIDAK LULUS 5 CV. PUTRA TOTABUAN 460.677.000,00 83,76 LULUS HP/K < HPS WAJAR ADA YA TIDAK TIDAK TIDAK TIDAK LULUS
6 CV. FITRAH ABADI 493.350.000,00 89,70 TELL TELL TELL TELL TELL TELL TELL TELL TELL TELL
Ket. : Lolak, 30 Mei 2013
TELL = Tidak di Evaluasi Lebih Lanjut POKJA JASA KONSTRUKSI ULP
NO
1 HARIS DILAPANGA, ST TTD
2 RUDY RACHMANTO,ST TTD
3 PRIDEY RININTA M. NUR, SE TTD
4 SAHNUDIN BELENEHU,ST TTD
5 ASRAP J. BONDE, ST TTD
6 ARMAN DALI, ST TTD
7 FAINAL MOKOGINTA TTD
8 VENNY TEREIMA, ST TTD
9 CENDY DEWI RANTUNG, ST TTD
10 FANNY I. POPITOD, SST TTD
11 ASRUL PAPUTUNGAN, SST TTD
EVALUASI KEWAJARAN HARGA
No. NAMA PERUSAHAAN
HARGA PENAWARAN / PENAWARAN TERKOREKSI
E
V
AL
U
ASI
T
E
KN
IS EVALUASI HARGA
KESIMPULAN (LULUS/GUGUR) NILAI
(Rp)
% THD.
HPS
TOTAL HARGA PENAWARAN ATAU PENAWARAN TERKOREKSI
TERHADAP HPS (WAJAR/GUGUR)
HARGA SATUAN TIMPANG HARGA SATUAN NOL ATAU TIDAK DITULIS
TOTAL HARGA PENA- WARAN < 80% HPS HARGA
SATUAN > 110% HPS (ADA/TIDAK)
KLARIFIKASI
(YA/TIDAK) (ADA/TIDAK)
KLARIFIKASI
(YA/TIDAK) (ADA/TIDAK)
KLARIFIKASI (YA/TIDAK)
NAMA JABATAN TANDA TANGAN
KETUA
SEKERTARIS
ANGGOTA
ANGGOTA
ANGGOTA ANGGOTA
ANGGOTA
ANGGOTA
ANGGOTA
ANGGOTA