• Tidak ada hasil yang ditemukan

116756 T 24458 Identifikasi faktor faktor Bibliografi

N/A
N/A
Protected

Academic year: 2017

Membagikan "116756 T 24458 Identifikasi faktor faktor Bibliografi"

Copied!
3
0
0

Teks penuh

(1)

DAFTAR PUSTAKA

1. AACE, AACE International’s Risk Management Dictionary, Cost Engineering, AACE, 2000, 42(4), hal.28-31

2. Abidin Ismeth S., Ph.D, Risk Management: Identification, Assessment, Evaluation, Analysis and Mitigation, part 1: Introducing Risk, Bahan Kuliah Risiko, Fakultas Teknik Universitas Indonesia, 12 Februari 2007 3. Alexander Carol, The Handbook of Risk Management and Analysis, John

Wiley & Son, 1996

4. Arisman, M., Identifikasi sumber risiko pada proyek EPC (study kasus proyek ABC, PT X), Thesis, Fakultas Teknik Universitas Indonesia, 2005 5. Bent, J.A and Humphreys, K.K, Effective Project Management Through

Applied Cost & Schedule Control, Marcel Dekker, 1996

6. Brealey, Richard A., Myers, Stewart C., Allen, Franklin, Principal of Corporate Finance, Eight Edtion, McGraw-Hill, 2006

7. Byars Lloyd L, and Rue Lesley W, Human Resources Management, Richard D Irwin Inc, 1991

8. Christopher Wade, Presentation Notes on Overview of the New Major Contract, Fidic Condition of Contract IBC Conference 2003,

http://wwwl.fidic.org dated 26 Maret 2005

9. Ciccarelli John J., The Real Cost of Mitigating Delays, AACE International Transaction, 2004, hal. CDR.11.1 – CDR.11.9

10.Cleland, D.I and Ireland, L.R, Project Management Startegic Design and Implementation,, Fourth Edition, McGraw Hill, 2002

11.Cleland, D.I and King, W.R, Project Management Hand Book, Second Edition, Van Nostrand Reinhold, 1988

12.CMAA, Time Management Procedures, International Journals of CMAA 13.Cornelius Trihendardi, Step by Step SPSS 13, Analisis Data Statistik,

Penerbit Andi Yogyakarta, 2005

14.Cooper, Donald R. and Emory, C. William., Metode Penelitian Bisnis, Erlangga, Edisi Kelima, 1996

15.Djohanputro Bramantyo, Manajemen Risiko Korporat Terintegrasi, PPM, 2006

16.Duffield Colin, International Project Management, UI, 2003

17.Davidson Jeff, Ten Minutes Guide Project Management, Alpha Books, 2000

18.Evans, J. R, and Olson, D.L., Introduction to Simulation and Risk Analysis, Prentice Hall, 1998

19.Flanagan R. and Norman G., Risk Management and Construction, Oxford, 1993

20.Furqon, Ph.D., Statistik Terapan untuk Penelitian, Alfabeta Bandung, 1999 21.Grant Kevin P, et.all, Delivering Projects on Time, Research Technology

Management, Nov/Dec 2006, hal. 52-58

22.Grey Stephen, Practical Risk Assessment for Project Management, John Wiley & Sons, 1995

23.Haimes Y.Y, Risk Modeling, Assessment, and Management, John Wiley & Son, 1998

135

(2)

24.Harper Jerry, Earned Value Management, Presentation, Department of Commerce, United States of America, 2004

25.Heerkens, Gary R., Project Management, McGraw-Hill Companies, Inc. 2005

26.Hessler, Peter G., Power Plant Construction Management, A Survival Guide, Penn Well Corporation USA 2005

27.Huston Charles L., Management of Project Procurement, The McGraw-Hill Companies

28.Hasan, Iqbal., Metodologi Penelitian dan Aplikasinya, Ghalia Indonesia, 2004

29.Husein Umar, Metode Penelitian untuk Skripsi dan Tesis Bisnis, Erlangga 2003

30.Johnson B.P and Liberatore M.J., Project Planning Under Uncertainty Using Scenario Analysis, Project Management Journal, Mar 2005, hal. 15-26

31.Kaplan, Robert S. & Norton, David P., Strategy Maps, Converting Intangible Assets Into Tangible Outcomes, Harvard Business School Press USA, 2004

32.Kerridge, A. E, and Vervalin, C.H, Engineering & Construction Project Management, Gulf Publishing Company, 1986

33.Kerzner Harold, Project Management: A System to Planning, Scheduling and Controlling, Ninth Edition , John Wiley & Sons, 2006

34.Khan, M. Fouzul Kabir, Parra, Robert J., Financing Large Project, Pearson Prentice Hall, 2003

35.Kog, Y.C., Chua, D.K.H., Loh, P.K., Jaselskis, E.J., Key Determinants for Construction Schedule Performance, International Journal of Project Management Vol. 17, No.6, pp. 351-359, 1999

36.Kuncoro Mudrajad, Metode Riset untuk Bisnis dan Ekonomi, Erlangga, 2003

37.Lifson M.W. and Shaifer E. F., Decision and Risk Analysis for Construction Management, John Wiley & Son, 1982

38.Makridakis, S., at all, Metode dan Aplikasi Peramalan, Erlangga, 1999 39.Medenhall, W., dan Terry S., A Second Course in Statistics, Regression

Analysis, Prentice Hall, 1996

40.Michaels J.V., Technical Risk Management, Prectice Hall, 1996

41.Migus Nancy, Alpha Teach Yourself: Project Management in 24 Hours, Alpha Books, 2002

42.Mulcahy, Rita, PMP Exam Prep, Rita’s Course in a Book for Passing the PMP Exam, RMC Publications, Inc, 2005

43.Mulholland B. and Christian J., Risk Assessment in Construction Schedule, Journal of Construction Engineering and Management, February 1999 44.Nazir, M., Metode Penelitian. Ghalia Indonesia, 1999

45.Nasution S., Metode Research, Erlangga, 2004

46.Pauner Edward, Identifikasi Risiko guna Peningkatan Kinerja Waktu Pelaksanaan Pengadaan Lahan untuk Pembangunan Jalan, Tesis, Fakultas Teknik Universitas Indonesia, 2003

47.PMI, A Guide to Project Management Body of Knowledge, (PMBOK@ Guide), Third Edition, Project Management Institute, 2004

136

(3)

48.Poage Waller S., The Building Professionals Guide to Contract Documents, R.S. Means Company Inc, 1990

49.Roozbeh, Kangari. Risk Management Perception And Trends of U.S. Construction. Journal of Construction Engineering and Management (ASCE), Vol. 121 No. 4, December, 1995, hal 422

50.Saaty & Vargas. Decision Making With The Analityc Hierarchy Process. RWS Publications, 1994

51.Sadgrove Kit, The Complete Guide to Business Risk Management, Gower Publishing, 1996

52.Santoso, S., Statistik Multivariat, Elex Media Komputindo, 2002

53.Santoso, S., Menguasai statistik di Era Informasi dengan SPSS 12, Elex Media Komputindo, 2005

54.Shen, L. Y., George W. C. Wu., Catherine S. K. Ng. Risk Assessment For Construction Joint Ventures In China. Journal of Construction Engineering And Management. ASCE. Vol 127, No. 1, January/february 2001

55.Singarimbun, Masri dan Effendi, Sofian., Metode Penelitian Survai, LP3ES, Edisi Revisi, 1995

56.Soeharto Iman, Manajemen Proyek (dari Konseptual sampai Operasional), Jilid 1, Erlangga, 1999

57.Soeharto Iman, Manajemen Proyek (dari Konseptual sampai Operasional), Jilid 2, Erlangga, 2001

58.Sriyantono Henky Eko, Pengaruh Kualitas Identifikasi Risiko terhadap Kinerja Waktu Pelaksanaan Pembangunan/Peningkatan Jalan Tol di Indonesia, Thesis, Fakultas Teknik Universitas Indonesia, 2003

59.Sugiono, Statistika untuk Penelitian, Alfabeta Bandung, 2006 60.Suharsimi Arikunto, Manajemen Penelitian, Rineka Cipta, 2003

61.Sulhaemi, Penanganan Risiko Kecelakaan Kerja pada Bangunan Bertingkat di Jabotabek, Thesis, Fakultas Teknik Universitas Indonesia, 2002

62.Sullivan, William G., Bontadelli James A., Wicks, Elin M., Engineering Economy, Eleventh Edition, Prentice Hall International, Inc, 2000

63.Supranto, J., Statistik Teori dan Aplikasi, Erlangga, Edisi Kelima, 1998 64.Tobing, Tohom L. (2003). Critical Success Factor Pembangunan Proyek

Jalan di Indonesia. Tesis Program Pasca Sarjana Bidang Ilmu Teknik Program Studi Teknik Sipil, Universitas Indonesia.

65.Trigunarsyah Bambang and Duffield C., Project Management-Conception to Completion, Engineering Education Australia Pty Ltd, 1999

66.Wideman Max, Project and Program Risk Management, A Guide to Managing Risk and Opportunities, PMI, 1992

67.Walpole Ronald E. et all., Probability & Statistics for Engineers and Scientist, International Edition, Seventh Edition, Prentice Hall

68.Yasin, Nazarkhan, Mengenal Kontrak Konstruksi di Indonesia, PT. Gramedia Pustaka Utama, Jakarta 2003

69.Yasin, Nazarkhan, Mengenal Klaim Konstruksi & Penyelesaian Sengketa Konstruksi, PT. Gramedia Pustaka Utama, Jakarta 2004

70.Yin, R.K, Case Study Research Design & Method, Second Edition, Sage Publications, 1994

71.Yudhistira Soedarsono, SA, Kamus Istilah Proyek, Elex Media Komputindo, hal.98

137

Referensi

Dokumen terkait

Tugas Akhir dengan judul Evaluasi Penilaian Risiko Pekerja Dengan Menggunakan Pendekatan Job Safety Analysis (Jsa) Dan Hazard Identification Risk Assessment And

Tugas Akhir ini berjudul “Manajemen Risiko Keselamatan dan Kesehatan Kerja dengan Metode Hazard Identification Risk Assessment and Risk Control (HIRARC) dalam Upaya

Evaluasi Penilaian Risiko Pekerja Dengan Menggunakan Pendekatan Job Safety Analysis (JSA) Dan Hazard Identification Risk Assessment And Risk Control (HIRARC)..

Tugas Akhir ini berjudul “Manajemen Risiko Keselamatan dan Kesehatan Kerja dengan Metode Hazard Identification Risk Assessment and Risk Control (HIRARC) dalam Upaya

Analisis Risiko Keselamatan Kerja dengan Metode HIRARC (Hazard Identification, Risk Assessment, and Risk Control) pada Alat Suspension Preheater Bagian Produksi di

Implementasi K3 dimulai dengan perencanaan yang baik dimulai dengan identifikasi bahaya, penilaian dan pengendalian risiko HIRARC (Hazard Identification, Risk

Dokumen ini membahas analisis risiko kejadian kerja dengan menggunakan metode HIRARC (Hazard Identification Risk Assessment And Risk Control) di PT Ciptaunggul Karya

Analisis yang digunakan yaitu menggunakan pendekatan metode HIRARC Hazard Identification Risk Assessment and Risk Control dengan tahapan dimulai dari identifikasi risiko dengan cara