RECLAMATION AND REVEGETATION

N/A
N/A
Protected

Academic year: 2021

Membagikan "RECLAMATION AND REVEGETATION"

Copied!
20
0
0

Teks penuh

(1)

RECLAMATION AND

REVEGETATION

(AFTER COAL MINING OPERATION

)

(PROBLEMS AND SOLUTION )

Dr. Yadi Setiadi

Dr. Yadi Setiadi

Mined Land Rehabilitation Specialist

Faculty of Forestry, Bogor Agricultural University

Kampus IPB, Darmaga, Bogor

(2)

Tropical Rain Forest Function

Conserve soil and water

Supporting biodiversity

N

atural resources

Control climatic conditions

Water cycle processes

Carbon sequestration

Genetic resources

Habitat for flora and fauna

Illegal logging

Forest

fires

Agriculture

development

Timber plantations

Estate crops

plantations

Shifting cultivation

Transmigration

Mining Operations

(3)

Character Degraded Mined Land

Loss of vegetation

Disturbed ecosystem

Erosion and run-off (sedimentation,

contamination)

Reduce native species biodiversity

Damages to wildlife habitat

Damages of watershed area

Changes natural landscape

Exposed

Loss of root and crown function

No vegetation

Loss of supporting biodiversity

No top soil and sub-soil

Loss of land productivity

Land stability

Land slides and erosion

Poor soil

poor survival and poor growth

p

erformance

(4)

Government Regulation for Mined Land

Reclamation and Revegetation

FORESTRY DEPT

NO change the structure and function of the forest

Conduct reclamation and reforestation

Protect the forest from illegal logging, and land occupancy

ENVIRONMENTAL DEPT

Conduct mitigation measures for the significant impacts :

(

contamination of heavy metals, aggressive occupation of alien species

)

Minimize forest destruction (foot print)

Conduct Biological conservation

ENERGY AND MINERAL RESOURCES DEPT

Land stability and Erosion control

(5)

Successful Standard Criteria for Reclamation and Revegetation

No. Kegiatan Reklamasi / Obyek Kegiatan Parameter Rencana Standar Keberhasilan Pelaksanaan

1. Luas area yang ditata (Ha) > 80 %

2. Stabilitas timbunan (%) tidak ada longsoran

1. Luas area yang ditimbun (Ha) > 80 %

2. Stabilitas timbunan (%) tidak ada longsoran

1. Luas area yang ditebar (Ha) > 75 %

2. pH tanah 5 - 6

1. Saluran drainase (%) tidak terjadi erosi

2. Bangunan pengendali erosi (%) tidak terjadi alur erosi

3. Kolam pengendap sedimen (%) sesuai BML

1. Pengelolaan material (% Volume) sesuai rencana

2. Pengelolaan AAT (%) sesuai BML

1. Luas area penanaman (Ha) > 80 %

2. Jenis tanaman sesuai rencana

- Cover crop sesuai rencana

- Fast growing sesuai rencana

- Tanaman lokal sesuai rencana

3. Pertumbuhan tanaman (%) > 80 %

a. Penutupan tajuk > 80 %

1. Pemupukan sesuai kebutuhan

2. Pengendalian gulam, hama&penyakit sesuai kebutuhan

3. Penyulaman sesuai kebutuhan

b. Penimbunan kembali lahan bekas tambang

d. Pengendalian erosi dan pengelolaan air

b. Penanaman

b. Pemeliharaan

Revegetasi dan Pekerjaan Sipil

Penyelesaian Akhir 1.

2.

3.

c. Penebaran tanah zona pengakaran

a. Pengelolaan material pembangkit AAT a. Penataan permukaan lahan

Penatagunaan Lahan

(6)

Standard Criteria for Revegetation success

a. Pengisian kembali lubang bekas tambang > 80% sesuai rencana sesuai document b. Luas areal yang ditata > 80% sesuai rencana sesuai document c. Kestabilan longsor (< 5%) tidak ada longsoran presentase kejadian longsor d. Penaburan tanah pucuk > 80% > 75% sesuai document e. pH Tanah - - - > 5-6 sesuai analisis tanah a. Bangunan konservasi tanah ≥ 90% tidak terjadi erosi

- Jumlah fisik bangunan sesuai document - - - Kondisi bangunan berfungsi - -

b. Penanaman cover crop > 80% sesuai rencana sesuai document c. Erosi dan sedimentasi erosi ≤ 5% tidak terjadi erosi persentase luas erosi d. Pengelolaan Material Pembangkit AAT - - -

- Pengelolaan Material - - - sesuai rencana sesuai document - Kolam Pengendap Sedimen - - - kualitas air sesuai BML pH, TSS, Al, Fe, Mn a. Luas penanaman > 80 % > 80 % sesuai document b. Persentase tumbuh > 80 % > 80% secara sampling c. Jumlah tanaman ≥ 625 phn/Ha sesuai document sesuai document d. Komposisi jenis jenis lokal ≥ 40% Tanaman lokal ≥ 40% sesuai document

- Tanaman fast growing - - - sesuai rencana Model 1 {hanya Pioner (Lokal Potensial)} - Tanaman lokal - - - sesuai rencana Model 2 {Pioneer dan Primer (lokal)} e. Kesehatan tanaman > 80 % > 80% secara sampling

f. Penutupan tajuk - - - > 80% secara sampling

g. Pemeliharaan - - - sesuai kebutuhan pemupukan ; pengendalian gulma, hama&penyakit ; penyulaman

Penataaan Permukaan Lahan

Pengendalian Erosi dan Sedimentasi

Revegetasi

No. PerMenESDM N0. 07 Tahun 2014 Standar keberhasilan M TM

Checklist : M = Memenuhi ; TM = Tidak Memenuhi

1

Saluran drainase, checkdam, beronjong, turap, dll. (Kesesuaian dalam jumlah

dan spesifikasi) & fungsi

2

3

Keterangan TM

Standar keberhasilan

Kriteria / Indikator / Parameter PerMenHut No. 60 Tahun 2009 M

(7)

Planning Consideration

Land conditions

(

derelict

)

Status of forest function

(Forestry or APL )

Government regulations

(Revegetation Planning, Guide line, Criteria)

Post mining land use

(multi stakeholde, AMDAL)

Planting strategies

(8)

FIELD SURVEY

Trees species

selection and

propagation

• Suitable, potential local

species, regulasi

Nursery and

Planting stock

• Planting size, seedling

quality, compacted and

activated root

Land-reconstruction

and site preparation

• Land stabilization, leveling , top

soiling, and prevent erosion,

Soil amendments

• Balance nutrients,

improve CEC,

Bio-organic, control toxic

Planting

techniques

• Timing , root ball

position

• Planting

Model

Maintenance

• Re-panting,

re-fertilizer, weeding,

Lateral root

manipulation

Monitoring and Evaluation

• Schedule, data collection, reporting, frequency

and improvement

• Practical-Guideline and SOP

(9)

01) Species Selection

Complying Regulation

• Composition : Shaded trees, Main tress, MPTS, Conservation tress

and endanger (protected tress)

Planting Design

• To minimize the competition effect

• To arrange for beauty performance

Adapted on soil and environmental Conditions

• Approved can be survive on certain condition

The planting stocks

• The number of species are available

• Seedling planting stock available

(10)

02)

Nursery, Seedling Quality and Transportation

Nursery conditions affected on

seedling quality :

• Light intensity

• Temperature , Humidity, and air

circulation

• Water quality

Seedling quality

• Medium composition

• Healthy performance

• Root ball compaction

Seedling Transportation

• Transfer from nursery to field

• Seedling placement in the field

• Planting operation

(11)

Nursery

03) Potential Gully Erosion and Exposed OB

Potential Impact :

Exposed OB and Generated AMD

Physically destroying plants

Control gully erosion

:

• Filled up top soil

• Establish trenching

• Planting LCC

(12)

Nursery

04)

.

Soil Compaction and Water Log

Content silt and clay

Water permeability

Root not well develop

Tress performance :

Yellowish, stagnant

Solution :

Pre-soil analysis

Vertical ripping,

LRM (Lateral Root Manipulation)

Select adaptive species

(13)

05)Top Soiling Problems

Top soil thickness <10cm

Soil compacted

Eroded

• Accelerate gully development

• Exposed to compacted clay

and toxic materials

• Plant performances

– Stagnant

– Dying

– Costly for repairing

– Can not meet standard

(14)

Nursery

06)

Over Shaded Condition

Effect over shaded :

Main tress meranti are dying

Condition is not condusive for

natural colonization

Lack for biodiversity development

Improvement :

Improve light condition by teres

treaments

(15)
(16)

6) Species Selection

Complying Regulation

• Composition : Shaded trees, Main tress, MPTS, Conservation tress

and endanger (protected tress)

Planting Design

• To minimize the competition effect

• To arrange for beauty performance

Adapted on soil and environmental Conditions

• Approved can be survive on certain condition

The planting stocks

• The number of species are available

• Seedling planting stock available

(17)

8) Soil Problems

Soil compaction

Water log

Low in pH and Soil toxic

• (Al and Phyrite)

Lack of soil macro and

micro

Un-balance nutrients ( Ca

(18)

9) Planting Operation and Maitenance

Seedling transportation

• Sources of plant failure

• Temporary seedling nurse

Planting operation

• Ensure seedling healthy

• Step Planting operation

– Planting hole

– Based fertilizer

– Planting

(19)

10) Tress Maintenance and Monitoring

Maintenance

• Re-planting

• Weeding

• Fertilizer

• Pest-control

Monitoring

• Evaluate plant survival

• Evaluate plant performance

(20)

Thank you !!

Good and Responsible Mine Closure

PT. Akar Langitbumi

Cyber 2 Tower, 18

th

Floor

JL.H.R Rasuna Said Blok x-5 kav 13

Jakarta 12950 Indonesia

EMAIL : [email protected]

Phone : +62-2170521925, 08111102302

T

Referensi

Dokumen terkait

Dengan ini diberitahukan setelah diadakan penelitian/ evaluasi oleh Panitia Pengadaan Barang/ Jasa Kegiatan Pembangunan/ Peningkatan Infrastruktur Kab. Indragiri

Sebelum era perkembangan sistem informasi dan teknologi informasi seperti sekarang ini, Indonesia telah melaksanakan sistem informasi penggunaan lahan secara konvensional,

Tidak hanya jelas tetapi juga menantang dengan demikian siswa bisa mengekpresikan kemampuannya dalam mengerjakan tugas yang guru berikan.... Guru mengukur dengan hati,

menyusun kebijakan teknis di bidang penyusunan rencana, program, dan kegiatan serta pengelolaan administrasi keuangan dan penyusunan laporan penyelenggaraan

Berdasarkan hasil pengolahan data diperoleh bahwa nilai hambatan jenis lapisan yang mengandung air panas adalah zona rekahan tersaturasi air dengan nilai hambatan

 untuk mengomunikasikan antara lain dapat menggunakan model presentasi gagasan di depan publik (public hearing). Dalam konteks lain, misalnya model yang diterapkan

This paper examines socio-historical roots of the emergence of the idea of “Islamic Protestantism” within Iranian Shi’i tradition. The central focus of this study is to

Panitia Pengadaan Barang/Jasa pekerjaan Pengadaan Konstruksi/Rehabilitasi Gedung Kantor kegiatan Rehabilitasi Sedang/Berat Gedung Kantor dengan ini mengumumkan Pemenang