INDONESIA PSC DEVELOPMENT

1 Kontrak Karya Before 1966

2 First Generation PSC 1966 – 1975

3 Second Generation PSC 1976 – 1988

Incentive Package Î 31/8/1988

Incentive Package Î 23/2/1989

Incentive Package Î Aug 1992

Incentive Package Î Dec 1993

4 Third Generation PSC (1989

-present)

(3)

E& M R E& M R

©DJMIGAS 070109

POST UU NO.22/2001

THIRD GENERATION PSC

1 Legal Base

Contract Legalization

Management Authority

Tax

5 Business Doers BUSINESS ENTITIES / PERMANENT ESTABLISHMENT

Participating Interest

UU No.22/2001

2 Minister of EMR

3 BPMIGAS

4 44% and 40,5 % (30% + Devident Tax)

(4)

PRODUCTI ON

COST RECOVERY

CONT’S TAKE

FTP

EQUI TY TO BE SPLI T

GOVERNMENT CONTRACTOR

TAX

GOVT‘S TAKE

(5)

E& M R E& M R

©DJMIGAS 070109

Referensi

Dokumen terkait

Trade loading Trade loading and channel and channel stuffing stuffing Installment-sales Installment-sales method method Cost-recovery Cost-recovery method method Deposit

Pengembalian Biaya (Cost Recovery) adalah pengembalian biaya operasi dari hasil produksi yang dihasilkan.Biaya operasi adalah biaya yang dikeluarkan oleh kontraktor dalam

PSC skema cost recovery merupakan sistem kontrak bagi hasil dimana terdapat pengembalian atas biaya operasi yang telah dikeluarkan oleh kontraktor dalam rangka

Excluding the depreciation, amortization and impact of recovery in provision for decline in inventory value, the cash cost of revenue per metric ton of nickel matte sold in

PPP STRUCTURE : RECENT DEVELOPMENT Road Users Toll Road Company Operation & Maintenance Equity Sponsor LOAN Government Construction Lender. CONSTRUCTION COST

iv ACRONYMS AC: Actual Cost S/SCSC: Cost/Schedule Control System Criteria CIA: Capital Investment Appraisal CPM Critical Path Method DEDT: Department of Economic

Introduction Context invariant control systems on 3D Lie groups invariant optimal control problems with quadratic cost Problem classify cost-extended systems determine extremal

dan bobot  Mahasiswa mencari sumber belajar diinternet 5 Mengetahui dan memahami tentang evaluasi kelayakan proyek Non Cost Recovery Evaluasi kelayakan proyek non Cost Recovery