PT PJB UBJ O&M PLTU PACITAN PJB INTEGRATED MANAGEMENT SYSTEM FORMULIR LAPORAN HARIAN PRODUKSI. Hari, tanggal : RABU, 6 AGUST 2014 UNIT #1

N/A
N/A
Protected

Academic year: 2021

Membagikan "PT PJB UBJ O&M PLTU PACITAN PJB INTEGRATED MANAGEMENT SYSTEM FORMULIR LAPORAN HARIAN PRODUKSI. Hari, tanggal : RABU, 6 AGUST 2014 UNIT #1"

Copied!
8
0
0

Teks penuh

(1)

1

No. Dokumen

: FMN-17.1.1.22

Tanggal Terbit

: 18 April 2012

Revisi

: 01

Halaman

:

UNIT I BEBAN MAX 0.0 MW BEBAN MIN 0.0 MW BEBAN RATA2 ###### MW UNIT II BEBAN MAX 174.8 MW BEBAN MIN 165.9 MW BEBAN RATA2 171.4 MW 1 1 2 2 3 3 4 4 5 5 6 6 7 7 8 8 9 9 10 10 11 11 12 12 13 13 14 14 15 15 1 0 0 0 0 1 2 0 0 0 0 2 3 0 0 0 0 3 4 0 0 0 0 4 5 LEVEL HSD TANK #1 (DCS) 0 0 0 0 5 SOUNDING 0 0 0 0 6 6 LEVEL HSD TANK #2 (DCS) 0 0 0 0 7 SOUNDING 0 0 0 0 TOTAL

7 LEVEL HSD EDG #1 Coal Bidding Yard #1&#2

8 LEVEL HSD EDG #2 Cukup Untuk (x) Hari Operasi :

NO Kondisi Pembangkit #1 Beban M Steam Press;Temp;Flow Mode Operasi Mill Inservice Mill tidak standby Oil Gun Inservice Vacuum Condensor Kondisi Pembangkit #2 Beban M Steam Press;Temp;Flow Mode Operasi Mill Inservice Mill tidak standby Oil Gun Inservice Vacuum Condensor MED / / / Unit / / / Total produksi MIXED BED #1/#2 Unit / / / Total produksi Auxiliary Boiler Konsumsi HSD Aux. Boiler

CHLORINATION PLANT / / / Unit / / / 5 Status ton 1/2 1 2 1 2 1 2 1/2 1 2 1 2 1 2 6 Status OPERASI 4

Status STANDBY STANDBY

1/2 1 2 1 2 1 2 ton 573.96 Pa 95100 3 Status OPERASI TSB A/B/C/D/E B/D -2 ton 813.9 BASE MODE A/B/C/D/E A/C/D 175 1 Status FYI Mpa;°C;t/h 10.5 / 532 / 547 Pa Status OPERASI MW A/B/C/D/E ( mm,ton ) 45,996.85 ( mm,ton ) 18.46

KONDISI MAIN UNIT, BOP, & ALAT BERAT

( ton,liter )

( mm,liter ) 5,395.30 2,668.11 194,413.705

A/B/C/D/E MW Mpa;°C;t/h

PARAMETER CHECK UNIT OF MEASUREMENT 6:00 14:00 21:00

( ton,liter ) DGL -

-( mm,liter ) KDC - 22,821.232

LEVEL DEMIN TANK #2 ( mm,ton ) ART 2,668.06 43,870.441

LEVEL DEMIN TANK #1 ( mm,ton ) KPC 0.05 55,212.967

PLN BB 5,395.30 - 20,621.482

LEVEL RAW WATER RESERVOIR 2 ( mm,ton ) BA - 51,887.583

0:00 6:00 14:00 21:00

LEVEL RAW WATER RESERVOIR 1 ( mm,ton )

INFORMASI STOK BAHAN BAKAR DAN AIR

NO PARAMETER CHECK UNIT VALUE NO SUPLIER BATUBARA PENERIMAAN PEMAKAIAN STOCK

TOTALIZER SST KVARH kVarh 71,823,280 TOT HSD RETURN AUX BOILER ton

15,345.50

TOTALIZER SST KWH kWh 91,588,952 TOT HSD SUPPLY AUX BOILER ton

TOTALIZER MAKE UP WATER Ton TOTALIZER MAKE UP WATER Ton

240,532,280

COAL ACCUMULATION kg 564,790,500 COAL ACCUMULATION kg 803,987,700.0

TOTALIZER COAL FEEDER E kg 206,782,540 TOTALIZER COAL FEEDER E kg

277,091,835

TOTALIZER COAL FEEDER D kg 241,121,910 TOTALIZER COAL FEEDER D kg 292,624,370

TOTALIZER COAL FEEDER C kg 69,684,405 TOTALIZER COAL FEEDER C kg

247,493,150

TOTALIZER COAL FEEDER B kg 83,584,330 TOTALIZER COAL FEEDER B kg 152,192,350

TOTALIZER COAL FEEDER A kg 4,025,695 TOTALIZER COAL FEEDER A kg

104,811.29

TOTALIZER HSD RETURN Ton 61,947.379 TOTALIZER HSD RETURN Ton 113,969.49

TOTALIZER HSD SUPPLY Ton 69,565.438 TOTALIZER HSD SUPPLY Ton

5,639,700.00

TOTALIZER UAT KVARH kVarh - TOTALIZER UAT KVARH kVarh

TOTALIZER UAT KWH kWh 21,542,600 TOTALIZER UAT KWH kWh

545,717,056.00

PRODUKSI KVARH NETTO kVarh 123,466,360 PRODUKSI KVARH NETTO kVarh 49,831,640.00

3,234,000.00

PRODUKSI KWH NETTO kWh 503,083,640 PRODUKSI KWH NETTO kWh

80,972,000.00

TOTALIZER KVARH GROSS kVarh 239,060,000 TOTALIZER KVARH GROSS kVarh

TOTALIZER KWH GROSS kWh 1,134,616,000 TOTALIZER KWH GROSS kWh

UNIT VALUE

00:00 10:00 00:00 10:00

NO PARAMETER CHECK UNIT VALUE NO PARAMETER CHECK

INFORMASI PRODUKSI KWH, KVARH

UNIT #1 UNIT #2

Hari, tanggal : RABU,

6

AGUST 2014

PT PJB UBJ O&M PLTU PACITAN

PJB INTEGRATED MANAGEMENT SYSTEM

FORMULIR

LAPORAN HARIAN PRODUKSI

STANDBY 0 0.2 0.4 0.6 0.8 1 1.2 0 0 :0 0 0 0 :3 0 01 :00 01 :30 0 2 :0 0 0 2 :3 0 0 3 :0 0 03 :30 04 :00 0 4 :3 0 0 5 :0 0 0 5 :3 0 0 6 :0 0 06 :30 07 :00 0 7 :3 0 0 8 :0 0 0 8 :3 0 09 :00 09 :30 1 0 :0 0 1 0 :3 0 1 1 :0 0 11 :30 12 :00 1 2 :3 0 1 3 :0 0 1 3 :3 0 14 :00 14 :30 1 5 :0 0 1 5 :3 0 1 6 :0 0 1 6 :3 0 17 :00 17 :30 1 8 :0 0 1 8 :3 0 1 9 :0 0 19 :30 20 :00 2 0 :3 0 2 1 :0 0 2 1 :3 0 22 :00 22 :30 2 3 :0 0 2 3 :5 9

UNIT #1

ROH MW GROSS MVAR GROSS coal flow

-50 0 50 100 150 200 0 0 :0 0 0 0 :3 0 0 1 :0 0 0 1 :3 0 0 2 :0 0 0 2 :3 0 0 3 :0 0 0 3 :3 0 04 :00 04 :30 05 :00 05 :30 06 :00 06 :30 07 :00 07 :30 08 :00 08 :30 09 :00 09 :30 10 :00 10 :30 11 :00 11 :30 12 :00 12 :30 13 :00 13 :30 14 :00 14 :30 15 :00 15 :30 16 :00 16 :30 17 :00 17 :30 18 :00 18 :30 19 :00 19 :30 20 :00 20 :30 21 :00 21 :30 22 :00 22 :30 23 :00 23 :59

UNIT #2

ROH MW GROSS MVAR GROSS Coal flow

(2)

2

Tanggal Terbit

: 18 April 2012

Revisi

: 01

Halaman

:

Hari, tanggal : RABU,

6

AGUST 2014

PJB INTEGRATED MANAGEMENT SYSTEM

FORMULIR

LAPORAN HARIAN PRODUKSI

Flow Current H2 plant / / / Unit / / / Purrity O2 Containt Press. H2 Tank 1/2/3 COAL HANDLING SYSTEM

LOADING KE COAL BUNKER LEVEL LEVEL LEVEL LEVEL LEVEL LEVEL

COAL BUNKER A 2.6 11.5 COAL BUNKER B 0 0 COAL BUNKER C 0 10.2 COAL BUNKER D 0 11.6 COAL BUNKER E 0 2.6 TOTAL 9 Ship Unloader (SU) 10 Stacker Recklaimer (SR)

Fuel Oil Pump ( FOP ) Inservice Alat Berat Excavator Wheel Loader Buldozer 13 EDG #1 14 EDG #2

JAM JAM JAM

A1( 22.30 - 07.30 ) A1( 22.30 - 07.30 ) A1( 22.30 - 07.30 )

22.30 Serah terima dengan shift D 22.30 Serah terima dengan shift D 22.30 Serah terima dengan shift D

Load : 175 MW

Mode Operasi : Manual chcb

MS P/T/F : 10.4 Mpa / 531 °C / 552 t/h > patrol chek

fyi RH P/T : 1.9 Mpa / 533 t/h > direct unloading

FW Flow : 503 t/h >unloading finish : 5395.3 ton

Mill Inservice : A, C, D > loading to bunker via sr ( 1065.8 ton )

Coal Flow : 110 t/h

Air Flow : 1166 t/h nb : coal plugh c6a ( 2#d ) masih bocor

Cond vacump : -95 kPa

CBD : 0 % FLY ASH

> patrol check dan pyrite mill 07.00 Temperature carbon brush tertinggi A5 = 109 *C > level fly ash silo #1 :

#2 : > level bottom ash #1 :

#2 :

MED > patrol check

> pemakaian demin water 374.78 ton

02.08

> MIX BED B stop, level penuh 06.30 > MIX BED B //

> H2 #1 status sb by mesin

CWP > patrol check

B2 (07.30 - 15.30)

B2 (07.30 - 15.30)

B2 (07.30 - 15.30)

07.30 Serah terima dengan shift A CHCB

Load : 175 MW > patrol check

Mode Operasi : Manual > alat berat operasi exca dan dozer

MS P/T/F : 12.1 Mpa / 530 °C / 559.6 t/h 09.00 > Pengechekan C7 oleh M2 , rendal dan cina

RH P/T : 2.09 Mpa / 526 t/h NB : - returt headler tail pulli tidak berputar

FW Flow : 521.7 t/h - Beberapa rolling c7 bearingnya rusak

Mill Inservice : A, C,D - posisi conveyor tidak center

Coal Flow : 111.5 t/h

Air Flow : 1049 t/h 10.00 C7 // cleaning bb di conveyor

Cond vacump : -95 kPa Unloading direct to bunker ( 1126 T)

CBD : 0 % Unloading sementara 4442 T

11 Status OPERASI

A/B/C A

AKTIFITAS PRODUKSI

UNIT #1 UNIT# 2 COMMON / BOP

jam Status TSB Status STANDBY Status STANDBY Status TSB 12 Status STANDBY jam jam STANDBY Status OPERASI ton 1361 meter KPC KPC KPC 21:00 JAM #2 meter KPC ART JENIS BB JENIS BB 06.00 ART KPC

JENIS BB JENIS BB JENIS BB JENIS BB

#1 JAM 7 Status STANDBY TSB % meter KPC ART 8 KPC #2 #1 JAM meter meter 2 1 14.00 #2 #1 t/h 26/30 Ampere 2065 % Mpa 2.07/1.65/0.68 1/2 1 2 1 2 6

(3)

3

No. Dokumen

: FMN-17.1.1.22

Tanggal Terbit

: 18 April 2012

Revisi

: 01

Halaman

:

Hari, tanggal : RABU,

6

AGUST 2014

PT PJB UBJ O&M PLTU PACITAN

PJB INTEGRATED MANAGEMENT SYSTEM

FORMULIR

LAPORAN HARIAN PRODUKSI

Shift Sore (15:30 sd. 22:30)

TTD SPV. SHIFT

Shift Malam (22:30 sd. 07:30)

Shift Pagi (07:30 sd. 15:30)

KETERANGAN/DATA/FOTO/LAIN-LAIN

(4)

4

12:00 12:30 13:00 13:30 14:00 14:30 15:00 15:30 16:00 16:30 17:00 17:30 18:00 18:30 19:00 19:30 20:00 20:30 21:00 21:30 22:00 22:30 23:00 23:30 00:00 00:30 01:00 01:30 02:00 02:30 03:00 03:30 04:00 04:30 05:00 05:30 06:00 06:30 07:00 07:30 08:00 08:30 09:00 09:30 10:00 10:30 11:00 11:30 174.3 170.1 174.1 174.6 169.6 169.7 169.5 169.6 169.7 165.9 170.6 170.7 174.8 172.4 174.7 163.1 158.2

162.6 163.2 157.9 158.1 157.9 157.8 158.4 154.5 158.9 159.6 162.9 160.5 163.1

-10.4 -15.8 -10.5 -16.8 -21.3 -25.7 -24.7 -25.1 -24.6 -17.6 -3.3 8.6 4.5 -14.9 -17.2 -30.4 -34.9

-32.9 -36.1

-40 -45.2 -44.8 -45.8 -43.6 -35.9 -23.9 -10.4 -15.8 -34.2 -37.1

111.7 110.9 111.5 109.1 110.2 109.8 110.0 110.0 109.5 109.1 109.6 108.4 109.3 109.6 109.4 12:00 12:30 13:00 13:30 14:00 14:30 15:00 15:30 16:00 16:30 17:00 17:30 18:00 18:30 19:00 19:30 20:00 20:30 21:00 21:30 22:00 22:30 23:00 23:30 Coal flow (t/h) MW Gross Netto M V AR Gross Netto M V AR Gross Netto Coal flow (t/h) Unit II ROH Coal flow (t/h) Unit II ROH MW Gross Netto MW Gross Netto M V AR Gross Netto M V AR Gross Netto Coal flow (t/h) Unit I ROH MW Gross Netto

(5)

5

No. Dokumen

: FMN-17.1.1.23

Tanggal Terbit

: 18 April 2012

Revisi

: 00

Halaman

:

Gross DMN #1 315.0 280.0 #2 315.0 280.0 TOTAL 630 560 #1 #2 0.0 175.0

0.0 169.2 Harian Harian Harian Harian Harian Harian Harian Harian

0.0 174.0 - 24.0 24.0 - 10.1 24 24 - - - 10 - -0 175 0 109 A/C/D 0 B/D

A MRC LRC Harian Harian Harian Harian Harian Harian

B MRC MRC - ##### 100 - -C MRC LRC 57.4 57.43 58 42.0 -D MRC LRC 28.7 28.7 29 42.0 -E MRC MRC 1:00 2:00 3:00 4:00 5:00 6:00 7:00 8:00 9:00 10:00 11:00 12:00 13:00 14:00 15:00 16:00 17:00 18:00 19:00 20:00 21:00 22:00 23:00 24:00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 PLTU #1 - - - -PLTU #2 175 174 175 170 170 174 175 175 174 175 175 175 174 175 175 175 175 175 174 174 174 175 175 175 175 174 175 170 170 174 175 175 174 175 175 175 174 175 175 175 175 175 174 174 174 175 175 175 Drt ke- Jam awal Jam akhir Total Jam Drt Ke Beban Drt Equip ment Drt ke-Jam awal Jam akhir Total Jam Drt Ke Beban Drt Equip ment 1 0.00 0 1 0.00 0 2 0.00 0 2 0.00 0 3 0.00 0 3 0.00 0 4 0.00 0 4 0.00 0

cukup untuk (x) kali cold start up 4 0.00 0 4 0.00 0

cukup untuk (x) kali Warm start up 5 0.00 0 5 0.00 0

COAL BEDDING cukup untuk (x) kali Hot start up 6 0.00 0 6 0.00 0

TOTAL STOCK EFEKTIFE cukup untuk (x) kali Very Hot start up 7 0.00 0 7 0.00 0

CUKUP UNTUK (X) HARI OPERASI TOTAL DERATING 0.00 0 TOTAL DERATING 0.00 0

UNIT

#1 OPERASI #2 TSB Aux Boiler STANDBY m3 EDG #1 TSB #2 STANDBY #1 STANDBY #2 STANDBY H2 #1 STANDBY #2 TSB

m3 Press Ves 1/2/3 #1 #2 Chlorint#1 #2 No. Unit 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18

PERALATAN YANG PERLU MENDAPATKAN PERHATIAN KHUSUS (POTENSI TRIP ATAU DERATING)

Peralatan Jenis Kerusakan Penyebab Status No. Service Request Keterangan

WTP Total Produksi - 2.07/1.65/0.68 Total Konsumsi #2 UNIT COMMON MED Total Produksi 2,287.44 399.75 9842.9643 Total 1464.35627 #1 Reservoir 2 4557 4950.2691 Tank 2 0 0 Total Reservoir 1 4504 4892.6952 Tank 1 11038 1464.35627

EVALUASI PENCAPAIAN NPHR (HARIAN & KUMULATIF 1 SAMPAI HARI INI)

Raw Water level (m) Volume (m3) Demin Water Level (m) Volume (m3) PENCAPAIAN ALASAN 18.46

INFORMASI STOCK AIR 46,000 148,413.71 KDC - 22,821.23 DGL - -ART - 43,870.44 Total stock KPC - 55,212.97 Penerimaan

BA - 51,887.58 Tank 2 1270 180

Type Drt Type Drt

PLN BB 5,395.30 20,621.48 Tank 1 4253 604

INFORMASI STOCK BAHAN BAKAR DERATING #1 DERATING #2

Jenis Batubara Penerimaan Stock HSD Tank level Stock

174 24 -Total 174 24 24 2,682.81 1,052.96 ROH #2

PLTU #1 #DIV/0! #DIV/0! #DIV/0! #DIV/0!

- 24 REALISASI PEMBEBANAN

UNIT rata-rata Operasi Shutdown (jam)

ROH #1 29.08 (0.6) 41.2 Harian komulatif Mill Operasi UNIT NPHR (kCal/kg) GPHR (kCal/kg) Net Capacity (%)

Net Output Faktor (%) komulatif komulatif 400.0 Total 2,903.60 1,136.38 2,682.81 1,052.96 14.54 58.17 58.17 58.8 41.2 -#DIV/0! (60.0) - 400.0 PLTU #2 2,903.60 1,136.38 Daya Terakhir (06:00 WIB) Load (MW)

Coal Flow (T/H) INDIKATOR-INDIKATOR OPERASI SESUAI KONTRAK KINERJA TAHUN 2014 (KOMULATIF 1 SAMPAI HARI INI)

- 49.5 - -Total 240 120 24

-komulatif komulatif komulatif komulatif Make-up Water (m3) PLTU #2 120.0 120.0 -

-sDof (kali) KONKIN : 5 kali EAF (%) KONKIN : 83.27 % EFOR (%) KONKIN :4.26 % SOF (%) KONKIN : 12.60 % Mill tidak stand by

Operasi Dengan Batubara

Harian komulatif

komulatif komulatif komulatif Load Average (MW) PLTU #1 120.0 - 24.0 -

96 49 -

-EFDH EMDH EPDH

Load Min (MW) komulatif komulatif komulatif komulatif komulatif

PH SH FO_OMC FOH MOH POH

KONDISI MAIN UNIT PARAMETER OPERASI UNTUK PERHITUNGAN INDIKATOR OPERASI (KOMULATIF 1 SAMPAI HARI INI)

UNIT

Jam Tersedia Jam OMC Jam tidak Tersedia Jam Derating

Daya

Load Max (MW)

96.0

- -Harian komulatif Harian komulatif

2668.1 13135.9 0.00 0.0 0.64 0.62 0.64 0.62 4177.0 21092.0 3859.4 19543.7 307.0 1543.1 4177.0 21092.0 3859.4 19543.7 307.0 1543.1 0.0 0.0 0.0 0.0 0.00 0.0 Harian komulatif 0.0 0.0 0.0 0.0 0.0 0.0 28.8 132.3 Harian PRODUKSI

UNITKAPASITAS MW Produksi Gross Mwh Produksi Netto Mwh PS Mwh

komulatif

PT PJB UBJ O&M PLTU PACITAN

PJB INTEGRATED MANAGEMENT SYSTEM

FORMULIR

IKHTISAR LAPORAN PENGUSAHAAN

Hari, tanggal :

SELASA,

5

2014

SST Mwh Pemakaian HSD Pemakaian Batubara SFC HSD

AGUST

Harian komulatif Harian komulatif Harian komulatif Harian komulatif

SFC BB 0.0 0.0 0.0 0.0 2668.1 13135.9 0.00 0.0 0.00 0.00 100.00 -60.00 0.00- 0.00 0.00 0.00

Hari ini Kumulatif Bulanan

PLTU #1

EAF EFOR SOF NCF

57.98 58.78 42.02 41.22

-

-57.43 58.17

Hari ini Kumulatif Bulanan

PLTU #2

EAF EFOR SOF NCF

28.99 -0.61 42.02 41.22 -28.72 14.54

Hari ini Kumulatif Bulanan

PLTU Pacitan

EAF EFOR SOF NCF

(6)

6

: 18 April 2012

PERALATAN YANG PERLU MENDAPATKAN PERHATIAN KHUSUS (POTENSI TRIP ATAU DERATING)

Keterangan EVALUASI PENCAPAIAN NPHR (HARIAN & KUMULATIF 1 SAMPAI HARI INI)

ALASAN 400.0 400.0

INDIKATOR-INDIKATOR OPERASI SESUAI KONTRAK KINERJA TAHUN 2014 (KOMULATIF 1 SAMPAI HARI INI)

komulatif SOF (%) KONKIN : 12.60 % komulatif EPDH

PARAMETER OPERASI UNTUK PERHITUNGAN INDIKATOR OPERASI (KOMULATIF 1 SAMPAI HARI INI)

Jam Derating 0.62 0.62 komulatif PRODUKSI SFC BB 0.00

(7)

7

5 NO UNIT 1 2 3 4 5 NO UNIT 1 2 3 4 5

Suplier Batubara Pakai

PT. PEMBANGKITAN JAWA BALI No. Dokumen : LR-FM-AD-407

UBJ O&M PACITAN MANAGEMENT SYSTEM Tanggal Terbit : 1 April 2011

MONITORING HARIAN PEMBANGKIT Revisi : 0

Halaman : 1 dari 1

Hari, tanggal : SELASA, AGUST 2014

KONDISI MAIN UNIT

PLTU PACITAN Unit 1 Unit 2 Produksi Unit 1 Unit 2

Daya Terpasang (MW) 315.0 315.0 Gross 0.0 4177.0

Mampu (Netto) 280.0 280.0 Komulatif 0.0 21092.0

Daya Terakhir (06:00)

Load (MW) 0 175 Netto 0.0 3859.4

Coal Flow (T/H) 0 109 Komulatif 0.0 19543.7

Mill Operasi - A/C/D

Mill Tidak Stanby 0 B/D

Operasi Dengan Batubara MRC LRC

PEMAKAIAN BAHAN BAKAR

HSD Pemakaian Penerimaan Stock (Level) Keterangan

Unit 1

Tank 1 4,253.00 Stock Total (L) :

Unit 2 - Tank 2 1,270.00 1,077,025.63

Batubara Pemakaian Penerimaan Coal Beading Stock Gross Stock Efektife Cukup untuk Unit 1 - 5,395 46,000 194,413.71 148,413.71 18.46 Unit 2 2,668.11 STOCK AIR Unit 1 Unit 2 SFC HSD SFC BATUBARA Unit 1 -Unit 2 0.64 Unit 1 -Unit 2 ART, PLN BB

Raw Water level (m) Volume (m3) Demin Water Level (m) Volume (m3) Reservoir 1 4504 4892.6952 Tank 1 11038 1464.35627

Reservoir 2 4557 4950.2691 Tank 2 0 0

PERALATAN YANG PERLU MENDAPATKAN PERHATIAN KHUSUS (POTENSI TRIP ATAU DERATING)

PERALATAN JENIS KERUSAKAN

Total 9842.9643 Total 1464.35627

PERALATAN JENIS KERUSAKAN

100.00

-60.00 0.00- 0.00 0.000.00 Hari ini Kumulatif

Bulanan

PLTU #1

EAF EFOR SOF NCF

57.98 58.78 42.02 41.22

-

-57.43 58.17

Hari ini Kumulatif Bulanan

PLTU #2

EAF EFOR SOF NCF

28.99 -0.61 42.02 41.22 -28.72 14.54

Hari ini Kumulatif Bulanan

PLTU Pacitan

EAF EFOR SOF NCF

(8)

E (MT) 206,782.540 240,532 206,782.540 240,532 TOTAL PEMAKAIAN 662 (1,815,795) 0 21:00 UNIT 1 UNIT 2 0 83,584.330 152,192.350 C (MT) 69,684.405 277,092 69,684.405 277,358.300 D (MT) 241,121.910 292,624 241,121.910 292,898.915 B (MT) 83,584.330 152,192 14:00 18:00

UNIT 1 UNIT 2 UNIT 1 UNIT 2 UNIT 1 UNIT 2 UNIT 1 UNIT 2

A (MT) 4,025.695 247,493 4,025.695 247,613.920

COAL FEEDER 0:00 6:00

Referensi

Dokumen terkait

Escherichia coli ialah bakteri yang berbentuk batang pendek (Basil) tergolong dalam Gram negatif dan hidup dalam saluran pencernaan atau usus baik pada hewan dan

(2) Apabila PIHAK KEDUA melakukan kegiatan yang tidak termasuk dalam ruang lingkup dan pelaksanaan sebagaimana ditentukan dalam Perjanjian ini tanpa ada

Tekanan darah tinggi dapat menyebabkan kerusakan saraf serat optik, jadi bekerja sama dengan dokter Anda untuk menjaga tekanan darah dalam kisaran yang sehat sangat

Matrik profitabilitas Marakon sebagai salah satu alat dalam manajemen portofolio dapat digunakan untuk mengetahui unit bisnis mana yang benar-benar memberikan nilai

Dalam penelitian ini, dilakukan sebuah studi optimasi peletakan anjungan minyak lepas pantai (platform) dengan menggunakan data Multibeam Echosounder (MBES), Side

Mulai dari melakukan transaksi (membeli produk), pendaftaran keanggotaan, langganan Newsletter, download Software dan sebagainya. Tingkat konversi yang tinggi bergantung

Pengelolaan kelas memiliki peranan penting dalam proses pembelajaran. diperoleh data bahwa sebagian siswa mengalami kesulitan dalam menerima dan mempelajari materi

Berdasarkan analisis penelitian yang dilakukan dapat ditarik kesimpulan bahwa, kebijakan try out terhadap prestasi siswa sebagaimana hasil perhitungan koefisien