DAFTAR PUSTAKA
Adugna, Tamene. 2004. Optimization of Small Hydropower in the Abbay Basin. Tesis, tidak diterbitkan. Ethiopia. Addis Ababa University.
Badan Pusat Statistik, Seksi Integrasi Pengolahan dan Diseminasi Statistik, Kabupaten Samosir 2014
CV. BNE Hydro Consult. 2013. Laporan Hidrologi PLTA Kombih 3. Bandung.CV. BNE Hydro Consult.
CV. BNE Hydro Consult. 2013. Laporan Interim PLTA Kombih 3. Bandung. CV.BNE Hydro Consult.
DOE/GO-102001-1173 FS217. July 2001. Energy Efficiency and Renewable Energy:Small Hydropower System.
European Small Hydropower Association-ESHA. 2004. Guide on how To Develop a Small Hydropower Plant. Inggris. European Small
HydropowerAssociation-ESHA.
Ridho, Sanjaya,Tamba., 2015. Studi Prakiraan Potensi PLTA Pumped Storage Danau Sidihoni Kabupaten Samosir. Skripi, tidak diterbitkan.
Medan: Fakultas Teknik Universitas Sumatera Utara.
Harvey, Adam.1993.Micro-Hydro Design Manual, A Guide to Small-Scale Water Power Schemes.London. Intermediate Technology Development Group.
Mosonyi, Emil. 1991. Water Power Development. Akademi Kiado. Budapest
Soemarto, C.D. 1986. Hidrologi. Jakarta: Erlangga.
Peraturan Menteri Energi dan Sumber Daya Mineral Republik Indonesia No. 04 Tahun 2012 tentang Harga Pembelian Tenaga Listrik oleh PT. PLN (Persero)dari Pembangkit Tenaga Listrik Yang Menggunakan Energi Terbarukan Skala Kecil dan Menengah atau Kelebihan Tenaga Listrik.
PT. Bangun Nusantara Engineering. 2013. Nota Desain Pekerjaan Elektrikal Mekanikal PLTM Toblong. Bandung. PT. Bangun Nusantara Engineering.