SURUHANJAYA SYARIKAT MALAYSIA (SSM)

KENYATAAN TAWARAN

Pembekal adalah dipelawa daripada Syarikat/ Perniagaan/

Perkongsian Liabiliti Terhad (PLT) yang berdaftar dengan Suruhanjaya Syarikat Malaysia, berpengalaman dan menjalankan aktiviti perniagaan yang berkaitan serta masih dibenarkan membuat tawaran pada masa ini.

Keterangan Tawaran Cadangan Kerja-Kerja Ubahsuai dan Naik Taraf Stor Simpanan Di Auditorium Tun Siti Hasmah, Tingkat 10, Menara SSM@Sentral

Jenis Tawaran Terbuka

Tarikh Mula Tawaran 12 November 2019

Tarikh Tutup Tawaran 19 November 2019

Tempoh Sah Laku 90 Hari

(2)

Lampiran A

1 SURAT AKUAN PEMBIDA

BAGI

CADANGAN KERJA-KERJA UBAHSUAI DAN NAIK TARAF STOR SIMPANAN DI AUDITORIUM TUN SITI HASMAH, TINGKAT 10,

MENARA SSM@SENTRAL (SSM/QT/19/0003)

Saya, ……….… Nombor K.P. ……….………..………… yang mewakili ……….………...

Nombor Pendaftaran ……….………...…… dengan ini mengisytiharkan bahawa saya atau mana-mana individu yang mewakili syarikat ini tidak akan menawar atau memberi rasuah kepada mana-mana individu dalam Suruhanjaya Syarikat Malaysia atau mana-mana individu lain, sebagai ganjaran mendapatkan tender/sebutharga* seperti di atas.

Bersama-sama ini dilampirkan Surat Perwakilan Kuasa bagi saya mewakili syarikat seperti tercatat di atas untuk membuat pengisytiharan ini.

2. Sekiranya saya atau mana-mana individu yang mewakili syarikat ini didapati bersalah menawar atau memberi rasuah kepada mana-mana individu dalam Suruhanjaya Syarikat Malaysia atau mana-mana individu lain sebagai ganjaran mendapatkan tender/sebutharga* seperti di atas, maka saya sebagai wakil syarikat bersetuju tindakan-tindakan berikut diambil:

2.1 penarikan balik tawaran kontrak bagi tender/sebutharga* di atas; atau

2.2 penamatan kontrak bagi tender/sebutharga* di atas; dan 2.3 lain-lain tindakan tatatertib mengikut peraturan perolehan

Suruhanjaya Syarikat Malaysia.

3. Sekiranya terdapat mana-mana individu cuba meminta rasuah daripada saya atau mana-mana individu yang berkaitan dengan syarikat ini sebagai ganjaran mendapatkan tender/sebutharga* seperti di atas, maka saya berjanji akan dengan segera melaporkan perbuatan tersebut kepada pejabat Suruhanjaya Pencegahan Rasuah Malaysia (SPRM) atau balai polis yang berhampiran.

Yang Benar,

………

(Nama dan No. KP) Jawatan:

Cop Syarikat :

Catatan: * Potong mana yang tidak berkaitan

(3)

2 BORANG SEBUT HARGA CADANGAN KERJA-KERJA UBAHSUAI DAN NAIK TARAF STOR SIMPANAN DI AUDITORIUM TUN SITI

HASMAH, TINGKAT 10, MENARA SSM@SENTRAL (SSM/QT/19/0003)

Kepada : Seksyen Pengurusan Pentadbiran(Unit Perolehan) Suruhanjaya Syarikat Malaysia

Tingkat 25, Menara SSM@Sentral No. 7 Jalan Stesen Sentral 5 50623 Kuala Lumpur

Tuan,

2. Kami telah meneliti kandungan sebut harga dan dengan ini kami menawarkan untuk membekalkan perkhidmatan “Cadangan Kerja-Kerja Ubahsuai dan Naik Taraf Stor Simpanan Di Auditorium Tun Siti Hasmah, Tingkat 10, Menara SSM@Sentral” seperti yang telah dinyatakan di dalam dokumen Sebut Harga 2019 bagi jumlah harga

sebanyak Ringgit Malaysia:

____________________________________________________

(RM ____________________).

3. Kami bersetuju untuk memulakan perkhidmatan ini dalam tempoh ____________ hari dari tarikh Surat Setuju Terima (surat pelantikan) SSM. Kami juga bersetuju untuk memberi perkhidmatan yang paling memuaskan mengikut penentuan spesifikasi yang telah ditetapkan SSM.

4. Kami faham bahawa SSM tidak terikat untuk menerima tawaran terendah atau mana-mana tawaran. SSM juga berhak menerima mana- mana bahagian daripada tawaran dan tidak perlu memberikan apa-apa sebab kepada penyebut harga berhubung keputusan SSM.

Tandatangan

Penyebut Harga :

Nama :

Alamat :

Jawatan :

Tarikh :

Cop Syarikat :

(4)

Lampiran B

3 JADUAL HARGA

SEBUT HARGA “Cadangan Kerja-Kerja Ubahsuai dan Naik Taraf Stor Simpanan Di Auditorium Tun Siti Hasmah, Tingkat 10, Menara SSM@Sentral”

BIL DESCRIPTION UNIT QTY. RATE (RM) AMOUNT

(RM) A PRELIMINARIES

Notes:

The preliminary item included hereunder applying to the whole of the Works contained in this document and contractor must allow for complying with the same and for any cost incurred in connection therewith.

The rate inserted by the contractor in preliminary items shall be deemed to apply to the whole of the Works carried out under the contract.

1.00

1.00 Mobilisation & Demobilisation Works. L/S L/S 2.00 Holding & Safety Protection L/S L/S

3.00 CAR and WC insurances L/S L/S

4.00 SOCSO L/S L/S

5.00 General cleaning & removal of rubbish off site L/S L/S 6.00 Miscellaneous

Other related work not described herein but deemed necessary to complete the Works a.

b.

c.

Total carried forward B DISMANTLE WORKS

Notes: The contractor’s attention is drawn to the fact that breakdown of the Works given below are merely for contractor’s guidance. The contractor’s strongly advise to familiarise himself with the conditions of the proposed site with regards to the types of Works to be construct as no claims will later be entertained on the grounds on lack of knowledge on the extent of the Works. Prices for all Works are to include labour, plant and materials and for any temporary shoring, needing, strutting,

(5)

4

BIL DESCRIPTION UNIT QTY. RATE (RM) AMOUNT

(RM) scaffolding, screens etc. Before commencing of

the various sections of Works, the contractor must ensure the stability of the remaining sections by providing all necessary shores, supports, underpinning, etc. As the situation dictates, failing which the contractor shall bear all cost regards to any damage caused due to the above. For all construction Works, the contractor to include make good all Works disturbed including clearing all debris to contractor’s own dumping area.

1.00 To supply manpower and equipment to carefully dismantle existing gypsum board partition, timber plywood, glass and brick wall, doors and others related component affected the area as per S.O instruction.

L/S L/S

2.00 To supply manpower and equipment to carefully dismantle existing mechanical and electrical cabling, wiring, conduit, trunking, piping and equipment (fluorescent light, under floor wiring, etc), ELV systems wiring and others related component affected the area as per S.O instruction.

L/S L/S

Total carried forward

C CEILING WORKS/ WALL FINISHES 1.00

2.00

3.00

To supply and install 10mm thk. fibrous plaster board as per existing with plastering, skim coat and repainting as per S.O approval and indicated in drawing.

To supply and erect floor to ceiling height double skin 75mm thick gypsum board partition including all necessary work, all to S.O approval as per drawing shown.

To supply labour, prepare and apply one [1]

coat of alkali resisting primer and two [2] coats of 'ICI' paint or other equivalent and approved to general surfaces, columns, new and existing wall and partition as per drawing shown.

L/S

L/S

L/S L/S

L/S

L/S

Total carried forward

(6)

Lampiran B

5

BIL DESCRIPTION UNIT QTY. RATE (RM) AMOUNT

(RM) D FLOOR FINISHES

1.00 Supply and install selected 500mm x 500mm x 7mm thk 740gm/sq. m vinyl tile complete with approved underlay to the S.O.'s required pattern and colour and approval as indicated in drawing for store.

m2

Total carried forward E LOOSE/BUILT IN FURNITURE

1.00 To fabricate and construct full height cabinet overall size 3750mm x 2700mm x 500mm construct with 18mm thick block board to be clad with laminated formica c/w writing glass, door, adjustable shelves, hinges at auditorium backstage.

L/S

2.00 To fabricate and construct full height cabinet overall size 3750mm x 2700mm x500mm construct with 18mm thick block board to be clad with laminated formica c/w writing glass, door, adjustable shelves, hinges at AV Room Level 11.

L/S

Total carried forward F DOOR/GLASS PANEL

1.00 To supply and install single leaf door and timber frame complete with necessary ironmongery at auditorium backstage and new storeroom

Set 2

Total carried forward

TOTAL PRICE (RM)

Nota:

(i) Tawaran harga yang dinyatakan adalah termasuk Cukai Jualan dan Perkhidmatan (SST).

(7)

6

RINGKASAN HARGA

SEBUT HARGA “Cadangan Kerja-Kerja Ubahsuai dan Naik Taraf Stor Simpanan Di Auditorium Tun Siti Hasmah, Tingkat 10, Menara SSM@Sentral”

BIL KETERANGAN JUMLAH(RM)

1.0 Bill A - PRELIMINARIES 2.0 Bill B - DISMANTLE WORKS

3.0 Bill C - CEILING WORKS/WALL FINISHES 4.0 Bill D – FLOOR FINISHES

5.0 Bill E - LOOSE/BUILT IN FURNITURE 6.0 Bill F - DOOR

TOTAL PRICE SUM (RM)

Nota:

(i) Tawaran harga yang dinyatakan adalah termasuk Cukai Jualan dan Perkhidmatan (SST).

(RINGGIT MALAYSIA : _________________________________________________________________

_____________________________________________________________________________________)

Tempoh Masa Kontrak : ________________ Hari

1. Tandatangan Pembida : __________________________________________

Tarikh : __________________________________________

No Kad Pengenalan : __________________________________________

Jawatan : __________________________________________

Alamat : __________________________________________

__________________________________________

2. Tandatangan Saksi : _________________________________________

Tarikh : _________________________________________

No Kad Pengenalan : _________________________________________

Jawatan : _________________________________________

Alamat : _________________________________________

_________________________________________

(8)

Lampiran C

7 PROFIL SYARIKAT

Bagi

CADANGAN KERJA-KERJA UBAHSUAI DAN NAIK TARAF STOR SIMPANAN DI AUDITORIUM TUN SITI HASMAH, TINGKAT 10,

MENARA SSM@SENTRAL (SSM/QT/19/0003)

Perkara Maklumat Penyebut Harga Nama Perniagaan/Syarikat

Alamat Pejabat Berdaftar

Alamat Surat Menyurat (Jika berlainan)

No.Telefon Email

Ditubuhkan Dalam/ Luar Negeri

Nombor Pendaftaran

Perniagaan/Syarikat Tarikh Pendaftaran

No. Pendaftaran Kementerian Kewangan Malaysia (KKM)

Tarikh Pendaftaran KKM

Ekuiti Syarikat (jika berkaitan) Asing (%)

Tempatan

(a) % Bumiputra

(b) % Bukan Bumiputra

(9)

8 Modal Syarikat (jika berkaitan)

Modal dibenar/ Authorised capital (RM)

Modal berbayar/ Paid Capital (RM)

Bank

Nama Bank Alamat Bank No. akaun

Overdraft

Kemudahan overdraft Nilai (RM)

Nama Bank Alamat Bank

Lembaga Pengarah Syarikat / Pemilik Perniagaan

Bil. Nama No.K/P Warganegara

(10)

Lampiran C

9 Bilangan Pekerja

Kategori Ibu Pejabat Cawangan Jumlah Pengurus

Eksekutif Teknikal Pengkeranian Lain-lain

Bidang, Sub bidang dan pecahan bidang urusan/perniagaan

Kategori Kod Bidang

(Sila sediakan dan nyatakan rujukan lampiran sekiranya ruang tidak mencukupi)

Ikatan perniagaan dengan Syarikat lain (jika berkaitan)

Aktiviti Nama perkongsian

(Sila sediakan dan nyatakan rujukan lampiran sekiranya ruang tidak

mencukupi)

(11)

10 Lain-lain maklumat Syarikat (jika ada)

(Sila gunakan lampiran sekiranya ruang tidak mencukupi)

Adalah dengan ini saya memperakui bahawa segala keterangan di atas adalah benar

……….. ………..

(Tandatangan Penyebut Harga)

(Tandatangan Saksi)

……….. ………..

(Nama) (Nama)

……….. ………..

(Nombor Kad Pengenalan) (Nombor Kad Pengenalan)

……….. ………..

(Jawatan) (Jawatan)

……….. ………..

(Cop Perniagaan/Syarikat) (Cop Perniagaan/Syarikat)

……….. ………..

(Tarikh) (Tarikh)

(12)

Lampiran D

11 REKOD PENGALAMAN PERKHIDMATAN/BEKALAN BERKAITAN

(Senaraikan semua bekalan dan perkhidmatan yang yang mempunyai persamaan dengan sebut harga ini yang telah / sedang dilaksanakan dalam tempoh November 2014 – Oktober 2019)

Bil. Nama Perkhidmatan Skop Kerja

Perkhidmatan Nilai Kontrak

(RM)

Tarikh Tempoh

Kontrak Nama & Alamat Agensi Tarikh

Mula Tarikh Tamat

Nota: *Sila sertakan bersama salinan dokumen sokongan seperti surat pelantikan/pesanan belian tempatan/Certification of Project Completion/Project Closure Sign Off dan lain-lain.

**Sila gunakan lampiran tambahan sekiranya ruangan di atas tidak mencukupi.

Saya mengaku bahawa maklumat yang dinyatakan di atas adalah benar.

Tandatangan Nama

Jawatan

Cop Perniagaan / Syarikat Tarikh

:

:

:

: :

(13)

12 PEMATUHAN KEWANGAN

(PENYATA BANK)

Sila sertakan salinan penyata bank bagi Perniagaan/Syarikat/PLT untuk

tempoh tiga (3) bulan terkini (Ogos, September dan Oktober 2019)

Referensi

Dokumen terkait

Dalam pendidikan inklusi, pemenuhan kebutuhan anak luar biasa tidak dimulai dari penyesuaian-penyesuaian anak terhadap sistem pendidikan, metode, maupun lingkungannya,

..dengan ini mengisytiharkan bahawa saya atau mana-mana individu yang mewakili syarikat ini tidak akan menawar atau memberi rasuah kepada mana-mana individu dalam

Nombor Pendaftaran ……….………...…… dengan ini mengisytiharkan bahawa saya atau mana-mana individu yang mewakili syarikat ini tidak akan menawar atau memberi

Selanjutnya, dilihat dari nilai pvalue yaitu sebesar 0,015, karena nilai pvalue 0,015 < 0,05 berarti dapatlah disimpulkan ada pengaruh yang positif dan

Strategi komunikasi dalam pelaksanaan PNPM Mandiri Perdesaan di Kecamatan Konawe dilakukan melalui empat cara, yaitu mengenal khalayak, menyusun pesan, menetapkan metode,

Sistem Electric Fuel Injection (EFI) menentukan jumlah bahan bakar yang optimal (tepat) disesuaikan dengan jumlah dan temperatur udara yang masuk, kecepatan mesin,

Sekiranya saya atau mana-mana individu yang mewakili syarikat ini didapati bersalah menawar atau memberi rasuah kepada mana-mana individu dalam Suruhanjaya Syarikat

Pendaftaran…….………dengan ini mengisytiharkan bahawa saya atau mana-mana individu yang mewakili syarikat ini tidak akan menawar atau memberi rasuah kepada mana-mana individu