CHECK LIST

OF

BUSINESS PROCESS FOR DESIGN, ENGINEERING, PROTOTYPING & PRODUCTION

N

O

DESCRIPTION

PIC

1.

PROJECT MANAGEMENT

a

Cost

b

Permit & project administrations

c

Schedule planning and controls

 Project planning and scheduling

 Project quality plan, inspection and test plan

 Safety, health & environment

 Project management

 Construction planning

 Local and global procurement capability

Statutory submission and approval

d

Temporary Facilities

e

Mobilization

f

Progress reporting

g

Subcontractor management

h

Document management and controls

2.

FRONT END ENGINEERING AND DESIGN (FEED)

Basic design

Level 2 – and 3 detail drawing design

Bill of Quantity & cost estimating

Facility layouts

Process design layouts

Operations and control philosophy

Project execution plans

3.

DETAILED DESIGN

a

Process Design Engineering

 Environmental Impact Data

 Hazard & Operability Studies

 P & I Diagrams ( Piping & Installation )

 Process Design Calculations

 Process Design Specifications

 Process Flow Diagrams

 Technical Feasibility Studies

 Utilities Specifications

 Waste Water Treatment Systems

 etc

b

Mechanical ( Charcoal Machine & support/utilities

equipment )

 Boilers, Incinerators and Flare Systems

 Cranes, Hoists and Conveyor Systems

 Compressors and Air Receivers/Dryers/Filters

 Drum Filling Equipment

(4)

 Fire Fighting Equipment and Systems

 Heat Exchangers and Columns

 HVAC Systems

 Marine and Truck Loading Equipment

 Pumps

 Sizing and Selection of Static and Rotating Equipment

 etc

c

Piping

 Equipment Layouts and Plot Plans

 Pipe Spool Sheets for Shop-Fabrication

 Pipe Support Design

 Piping Classification and Material specification

 Piping Isometric Drawings

 Piping System Layouts - Products, Utilities and Fire-Fighting

 Product, Utility and Fire-Fighting Piping Design/Stress Analysis

d

Electrical – Instrumentation, Automation and

controls

 Analyzers

 Building Electrical Services

 Cathodic Protection Systems

 Communication Systems

 Control Room / Remote Instrument Enclosure Design

 Earthing and Lightning protection Systems

 Emergency Shutdown and Safeguarding Systems

 Electrical Equipment and Material Specifications

 Electrical Hazardous Area Classification

 Electrical Protection Device and System Protection Coordination

 Electrical Substation and Switchroom Design

 Electricity Supply Distribution and Utilization Systems

 Electrical System and Equipment Layouts

 Electrical System Design and Computer Analysis/Calculation

 Fire and Gas Detection & Protection Systems

 Leak Detection

 Lighting Systems

 Metering Skids

 Process and TUV certified Programmable Logic Controllers

 Security Systems (closed circuit cameras and intrusion detectors)

 Sizing and Selection of Electrical Equipment and Material

 Sizing and Selection of Instrumentation Equipment

 Specification and requisition of Instrumentation Equipment

 Tank Instruments and Gauging Systems

 Truck and Railcar (Un)loading Systems

 Uninterruptible Power Supply and Emergency Standby Supply Systems

e

Architectural

(5)

 Construction Specifications

 Design Calculations and Analysis

 Design Specifications

 Drainage Systems for Oily and Product Waste Water

 Infrastructures

 Reinforced Concrete Structures

 Steel Detailing

 Steel Structures for all purpose

 Wide range foundations

 etc

4.

PROCUREMENT

a

Request for Quotation & Tendering

b

Purchasing Orders

c

Expediting

d

Shipping, logistics, and warehousing

5.

FABRICATION AND CONSTRUCTION SUPPORT

a

Constructability reviews

b

Field engineering and audits

c

Subcontractor supervision

6.

OPERATIONS SUPPORT

a

Operational Manual Document

b

Maintenance manual Document

c

Training operation & Maintenance

d

Testing, Commissioning & start-up

c

Start up assistance

d

Troubleshooting

7.

AS BUILT DRAWING

a

Process Design Engineering

b

Mechanical ( Charcoal Machine & support/utilities

equipment )

c

Piping

d

Electrical – Instrumentation, Automation and

controls

e

Architectural

F

Civil & Structural Engineering ( Building )

8.

1

st

PROJECT HAND OVER

a

Trial Run & Commissioning

b

Project Quality Assurance & Audit

c

Record of Project capabilities

d

Troubleshooting

9.

INITIAL MASS PRODUCTON & ASSISTANCE

a

Trial Run & commissioning

b

Machine Quality Assurance & Audit

c

Record of Machine eficiency & performance

d

Troubleshooting

10

Referensi

Dokumen terkait

A report submitted in partial fulfJ.llment of the requirements for the degree of Electrical Engineering (Control, Instrumentation and Automation). Faculty of

1- Weak passwords ˘ By far the first and most used method used by hackers to try penetrating a Linux system is cracking a password, preferently of the user root.. Usually

T H E I T S G R O U P PROJECT HIERARCHY The Client ITS Science Indonesia Laboratory Equipment Laboratory Furniture Civil Contractor Mechanical and Mechanical and Electrical

In this study we explored the potential of handmade paper from jute as packaging material by introducing internal sizing materials rosin alum,wax emulsion and external sizing material

DN001027_0622 DRAINAGE - QUICK SIZING The selection and sizing illustration is based on an inner diameter of a 2” pipe and secure a self cleaning velocity inside the pipe.. *The pumps

Department of Electrical and Electronic Engineering Advisor: Dr... Department of Electrical and Electronic Engineering Advisor:

Inspection check sheet and register for various types of lifting

List of equipment and installation materials for Continuous Emission Monitoring Systems (CEMS) in a 2×25MW coal-fired steam power plant