• Tidak ada hasil yang ditemukan

CHECK LIST PROJECT

N/A
N/A
Protected

Academic year: 2018

Membagikan "CHECK LIST PROJECT"

Copied!
5
0
0

Teks penuh

(1)
(2)
(3)

CHECK LIST

OF

BUSINESS PROCESS FOR DESIGN, ENGINEERING, PROTOTYPING & PRODUCTION

N

O

DESCRIPTION

PIC

1.

PROJECT MANAGEMENT

a

Cost

b

Permit & project administrations

c

Schedule planning and controls

 Project planning and scheduling

 Project quality plan, inspection and test plan

 Safety, health & environment

 Project management

 Construction planning

 Local and global procurement capability

Statutory submission and approval

d

Temporary Facilities

e

Mobilization

f

Progress reporting

g

Subcontractor management

h

Document management and controls

2.

FRONT END ENGINEERING AND DESIGN (FEED)

Basic design

Level 2 – and 3 detail drawing design

Bill of Quantity & cost estimating

Facility layouts

Process design layouts

Operations and control philosophy

Project execution plans

3.

DETAILED DESIGN

a

Process Design Engineering

 Environmental Impact Data

 Hazard & Operability Studies

 P & I Diagrams ( Piping & Installation )

 Process Design Calculations

 Process Design Specifications

 Process Flow Diagrams

 Technical Feasibility Studies

 Utilities Specifications

 Waste Water Treatment Systems

 etc

b

Mechanical ( Charcoal Machine & support/utilities

equipment )

 Boilers, Incinerators and Flare Systems

 Cranes, Hoists and Conveyor Systems

 Compressors and Air Receivers/Dryers/Filters

 Drum Filling Equipment

(4)

 Fire Fighting Equipment and Systems

 Heat Exchangers and Columns

 HVAC Systems

 Marine and Truck Loading Equipment

 Pumps

 Sizing and Selection of Static and Rotating Equipment

 etc

c

Piping

 Equipment Layouts and Plot Plans

 Pipe Spool Sheets for Shop-Fabrication

 Pipe Support Design

 Piping Classification and Material specification

 Piping Isometric Drawings

 Piping System Layouts - Products, Utilities and Fire-Fighting

 Product, Utility and Fire-Fighting Piping Design/Stress Analysis

d

Electrical – Instrumentation, Automation and

controls

 Analyzers

 Building Electrical Services

 Cathodic Protection Systems

 Communication Systems

 Control Room / Remote Instrument Enclosure Design

 Earthing and Lightning protection Systems

 Emergency Shutdown and Safeguarding Systems

 Electrical Equipment and Material Specifications

 Electrical Hazardous Area Classification

 Electrical Protection Device and System Protection Coordination

 Electrical Substation and Switchroom Design

 Electricity Supply Distribution and Utilization Systems

 Electrical System and Equipment Layouts

 Electrical System Design and Computer Analysis/Calculation

 Fire and Gas Detection & Protection Systems

 Leak Detection

 Lighting Systems

 Metering Skids

 Process and TUV certified Programmable Logic Controllers

 Security Systems (closed circuit cameras and intrusion detectors)

 Sizing and Selection of Electrical Equipment and Material

 Sizing and Selection of Instrumentation Equipment

 Specification and requisition of Instrumentation Equipment

 Tank Instruments and Gauging Systems

 Truck and Railcar (Un)loading Systems

 Uninterruptible Power Supply and Emergency Standby Supply Systems

e

Architectural

(5)

 Construction Specifications

 Design Calculations and Analysis

 Design Specifications

 Drainage Systems for Oily and Product Waste Water

 Infrastructures

 Reinforced Concrete Structures

 Steel Detailing

 Steel Structures for all purpose

 Wide range foundations

 etc

4.

PROCUREMENT

a

Request for Quotation & Tendering

b

Purchasing Orders

c

Expediting

d

Shipping, logistics, and warehousing

5.

FABRICATION AND CONSTRUCTION SUPPORT

a

Constructability reviews

b

Field engineering and audits

c

Subcontractor supervision

6.

OPERATIONS SUPPORT

a

Operational Manual Document

b

Maintenance manual Document

c

Training operation & Maintenance

d

Testing, Commissioning & start-up

c

Start up assistance

d

Troubleshooting

7.

AS BUILT DRAWING

a

Process Design Engineering

b

Mechanical ( Charcoal Machine & support/utilities

equipment )

c

Piping

d

Electrical – Instrumentation, Automation and

controls

e

Architectural

F

Civil & Structural Engineering ( Building )

8.

1

st

PROJECT HAND OVER

a

Trial Run & Commissioning

b

Project Quality Assurance & Audit

c

Record of Project capabilities

d

Troubleshooting

9.

INITIAL MASS PRODUCTON & ASSISTANCE

a

Trial Run & commissioning

b

Machine Quality Assurance & Audit

c

Record of Machine eficiency & performance

d

Troubleshooting

10

Referensi

Dokumen terkait

[r]

Adanya perpustakaan sekolah juga bertujuan supaya siswa lebih mudah dalam mencari informasi baik itu terkait dengan tugas sekolah maupun sebagai tempat untuk

Pengaruh Pemberian Tepung Daun Pepaya (Carica papaya) terhadap Kadar Protein dan Lemak pada Telur Puyuh (Urip Santoso dan Yosi Fenita) 7l-76.. Evaluasi Nutrisi

To make the prediction sensitive to inter- actions, we propose a new covariance function, which takes a pair of motion trajectories as input and computes a measure of simi- larity

Kepada Penyedia untuk dapat membawa daftar gaji Tahun 2015 yang telah diaudit dan/atau bukti setor pajak /audit payrol penghasilan tenaga ahli konsultan

Sehubungan dengan Berita Acara Hasil Pelelangan Panitia Pengadaan Barang/Jasa Dinas Pendidikan Kota Sabang Nomor : 012/003/PAN-APBK-DISDIK/VIII/2011 tanggal 25 Agustus 2011

In summary, we have identified and character- ized the acquired thermotolerance system of the DT1BS ditelosomic line of ‘Chinese Spring’ wheat which has a demonstrable ability

Penelitian ini bertujuan untuk menganalisis faktor-faktor dalam teori struktur modal seperti : Tangibility, Size, Growth Opportunity, dan Profitability yang berpengaruh