Environmental Monitoring Report
# Semiannual Report January-June 2020 July 2020
INO: West Kalimantan Power Grid Strengthening Project – Part 3
Prepared by Pusat Manajemen Proyek (Pusmanpro) for the PT PLN and the Asian Development
Bank.
CURRENCY EQUIVALENTS (as of 30 June 2020)
Currency unit – Indonesian rupiah (Rp) Rp1.00 = $0.0000697253
$1.00 = Rp14,342
NOTE (i) In this report, "$" refers to US dollars.
This environmental monitoring report is a document of the borrower. The views expressed herein do not necessarily represent those of ADB's Board of Directors, Management, or staff, and may be preliminary in nature.
In preparing any country program or strategy, financing any project, or by making any designation
of or reference to a particular territory or geographic area in this document, the Asian
Development Bank does not intend to make any judgments as to the legal or other status of any
territory or area.
APPENDIX 4
ENVIRONMENTAL MONITORING RESULT
4.a Drainage
Drainage cleaning periodically in the Sekadau Substation (June 2020)
Drainage cleaning periodically in the Sanggau Substation (February 2020)
4.b Water Quality
Water Quality Monitoring for Package 5 (Sanggau SS) in Collaboration with Tanjung Pura
Univerity
4.c Air Quality
Air Quality Monitoring for Package 5 in Collaboration with Tanjung Pura University
4.d Encroachment
Supervisor Monitoring
PT PLN (PERSERO) PUSAT MANAJEMEN KONSTRUKSI SISTEM MANAJEMEN K3
FORMULIR CHECK LIST INSPEKSI LINGKUNGAN TEMPAT KERJA - PROYEK GARDU INDUK
Tgl. Berlaku : No. Dok. : Edisi : Hal :15 dari 2
9A Perburuan, ekstraksi oleh pekerja dari hasil hutan seperti kayu bakar, dan pemeliharaan senjata api di Proyek, akan dilarang. Untuk menghindari dampak pada situs, habitat, hutan alam, ekologis flora dan fauna yang bernilai, risiko ini harus dipantau secara khusus selama pembangunan jalur Transmisi untuk melindungi ekologis sensitif: sepanjang 35 km antara Tayan dan Sosok di mana penyelarasan melewati dekat hutan sekunder. dalam cadangan hutan produksi; sepanjang penjajaran yang membentang (3,5 dan 11 km) ke hutan primer di Gunung Tiong Kandang dan Gunung Sanggau; dan sepanjang penjajaran yang melewati (1,5 km jauh) ke hutan primer dari Cagar Rekreasi Hutan Pancur Aji.
(Transmisi)
√ G ard u In d u k S a n g g a u Langkah mitigasi yang dilakukan ialah memberikan pengarahan kepada pekerja untuk tidak melakukan perburuan dan penebangan kayu secara ilegal yang disampaikan saat toolbox meeting dan memberikan banner larangan terkait hal tersebut di area kegiatan yang dilakukan.
G ard u In d u k S e k a d a u
Langkah mitigasi yang
dilakukan ialah memberikan
pengarahan kepada pekerja
untuk tidak melakukan
perburuan dan penebangan
kayu secara ilegal yang
disampaikan saat toolbox
meeting dan memberikan
banner larangan terkait hal
tersebut di area kegiatan yang
dilakukan.
4.e Soil Erosion
Supervisor Monitoring
PT PLN (PERSERO) PUSAT MANAJEMEN PROYEK SISTEM MANAJEMEN K3L
FORMULIR CHECK LIST INSPEKSI LINGKUNGAN TEMPAT KERJA - PROYEK JARINGAN
Tgl. Berlaku : No. Dok. : Edisi : Q2 Hal :4 dari 26
2B Mitigasi telah dirancang mengikuti pedoman dan praktik konstruksi yang baik yang disesuaikan untuk setiap Lokasi, misalnya:
a) Jalur transmisi:
(1) Pada kemiringan yang curam:
• meminimalkan luas dan durasi gangguan lahan
• menggunakan karung pasir, bank atau saluran untuk mengalihkan aliran air dari lereng di sekitar area yang terganggu;
• menggunakan potongan vegetasi atau dedaunan untuk melindungi tanah yang terganggu secara sementara
(2) Pada daerah datar kering, menggunakan potongan vegetasi atau dedaunan untuk melindungi tanah yang terganggu dari dampak air hujan untuk sementara
(3) Sawah dan lahan basah tidak ada
erosi yang signifikan
diantisipasi.(Tra n s misi)
√ Penggunaan rekayasa desain
kaki tower dengan cara
menyesuaikan panjang kaki
tower mengikuti kontur tanah di
T. 06 Desa Cempedak,
Kecamatan Tayan Hilir,
Kabupaten Sanggau. Di bagian
bawah tower, masih terdapat
sisa tanaman yang digunakan
untuk mengurangi resiko erosi
tanah.
4.f Air Quality
Air Quality Monitoring for Package 6 in Collaboration with Tanjung Pura University
Air Quality Monitoring for Package 7 in Collaboration with Tanjung Pura University
4.g Occupational and Community Health and Safety
Data Statistic in PT Krakatau Engineering HSE Monthly Report
A P P E N DIX 5
Mis sio n F in din g s
5.a ROW Monitoring
Tree Growth Monitoring along the ROW Transmission Line
UNIT UP3B SISTEM KALBAR
GARDU INDUK -
JENIS PERALATAN -
PENGHANTAR TRS 150 KV BENGKAYANG - NGABANG
TOWER / JOINT -
GROUNDPATROL -
JENIS FORMULIR FORMULIR TEGAKKAN
PILIHAN WAKTU RENTANG WAKTU
DARI TANGGAL 16-12-2019
SAMPAI TANGGAL 23-12-2019
LAPORAN INSPEKSI INTERNAL
No. PENGHANTAR TANGGAL PELAPOR LOKASI OBJEK JML X Y Z U KATEGORI KET. PHOTO
1 TOWER BENGKAYANG - NGABANG 170 23-DEC-19 GP BKY - NGABANG OBJEK DIBAWAH JALUR POHON - PRODUKTIF KAYU 5 15 12 3 BAHAYA I 171-172
2 TOWER BENGKAYANG - NGABANG 170 23-DEC-19 GP BKY - NGABANG OBJEK DILUAR JALUR POHON - PRODUKTIF KAYU 3 15 3 13 2.3 BAHAYA I 171-172
3 TOWER BENGKAYANG - NGABANG 171 23-DEC-19 GP BKY - NGABANG OBJEK DILUAR JALUR POHON - PRODUKTIF BUAH 3 15 3 13 2.3 BAHAYA I 172-173
4 TOWER BENGKAYANG - NGABANG 171 23-DEC-19 GP BKY - NGABANG OBJEK DIBAWAH JALUR POHON - PRODUKTIF KAYU 5 15 8 7 NORMAL 173-174
5 TOWER BENGKAYANG - NGABANG 172 23-DEC-19 GP BKY - NGABANG OBJEK DILUAR JALUR POHON - PRODUKTIF KAYU 3 15 3 13 2.3 BAHAYA I 174-175
6 TOWER BENGKAYANG - NGABANG 172 23-DEC-19 GP BKY - NGABANG OBJEK DIBAWAH JALUR POHON - PRODUKTIF KAYU 5 15 15 0 - 173-174
7 TOWER BENGKAYANG - NGABANG 173 23-DEC-19 GP BKY - NGABANG OBJEK DILUAR JALUR POHON - PRODUKTIF KAYU 1 15 3 14 1.3 KRITIS 174-175
8 TOWER BENGKAYANG - NGABANG 173 23-DEC-19 GP BKY - NGABANG OBJEK DIBAWAH JALUR POHON - PRODUKTIF KAYU 5 15 7 8 NORMAL 174-175
9 TOWER BENGKAYANG - NGABANG 05A 23-DEC-19 GP BKY - NGABANG OBJEK DILUAR JALUR POHON - LAINNYA 3 15 3 13 2.3 BAHAYA I pohon kayu span 05-06
10 TOWER BENGKAYANG - NGABANG 04A 23-DEC-19 GP BKY - NGABANG OBJEK DILUAR JALUR POHON - LAINNYA 3 15 3 13 2.3 BAHAYA I pohon kayu span 04-05
LAPORAN INSPEKSI INTERNAL
No. PENGHANTAR TANGGAL PELAPOR LOKASI OBJEK JML X Y Z U KATEGORI KET. PHOTO
11 TOWER BENGKAYANG - NGABANG 109 23-DEC-19 GP BKY - NGABANG OBJEK DILUAR JALUR POHON - PRODUKTIF BUAH 5 13 3 8 5.34 NORMAL pohon sawit. kayu lokal
12 TOWER BENGKAYANG - NGABANG 109 23-DEC-19 GP BKY - NGABANG OBJEK DIBAWAH JALUR POHON - PRODUKTIF KAYU 3 15 3 13 2.3 BAHAYA I pohon karet
13 TOWER BENGKAYANG - NGABANG 107 23-DEC-19 GP BKY - NGABANG OBJEK DIBAWAH JALUR POHON - PRODUKTIF BUAH 5 13 8 5 NORMAL pohon sawit
14 TOWER BENGKAYANG - NGABANG 055 23-DEC-19 GP BKY - NGABANG OBJEK DILUAR JALUR POHON - PRODUKTIF KAYU 3 8.5 3 5.5 3.51 BAHAYA II belum di ketahui
15 TOWER BENGKAYANG - NGABANG 055 23-DEC-19 GP BKY - NGABANG OBJEK DILUAR JALUR POHON - PRODUKTIF KAYU 3 8.5 3 5.5 3.51 BAHAYA II belum diketahui
16 TOWER BENGKAYANG - NGABANG 051 23-DEC-19 GP BKY - NGABANG OBJEK DILUAR JALUR POHON - PRODUKTIF KAYU 3 8.5 3 5.5 3.51 BAHAYA II pohon karet
17 TOWER BENGKAYANG - NGABANG 051 23-DEC-19 GP BKY - NGABANG OBJEK DILUAR JALUR POHON - PRODUKTIF KAYU 3 8.5 3 5.5 3.51 BAHAYA II pohon karet
18 TOWER BENGKAYANG - NGABANG 173 21-DEC-19 GP BKY - NGABANG OBJEK DILUAR JALUR POHON - PRODUKTIF KAYU 3 15 3 13 2.3 BAHAYA I 174-175
19 TOWER BENGKAYANG - NGABANG 173 21-DEC-19 GP BKY - NGABANG OBJEK DIBAWAH JALUR POHON - PRODUKTIF KAYU 5 15 8 7 NORMAL 174-175
20 TOWER BENGKAYANG - NGABANG 175 21-DEC-19 GP BKY - NGABANG OBJEK DILUAR JALUR POHON - PRODUKTIF KAYU 3 15 3 13 2.3 BAHAYA I 177-178
21 TOWER BENGKAYANG - NGABANG 175 21-DEC-19 GP BKY - NGABANG OBJEK DIBAWAH JALUR POHON - PRODUKTIF KAYU 3 15 16 - 177-178
22 TOWER BENGKAYANG - NGABANG 174 21-DEC-19 GP BKY - NGABANG OBJEK DIBAWAH JALUR POHON - BAMBU 3 15 3 13 2.3 BAHAYA I 175-176
LAPORAN INSPEKSI INTERNAL
No. PENGHANTAR TANGGAL PELAPOR LOKASI OBJEK JML X Y Z U KATEGORI KET. PHOTO
23 TOWER BENGKAYANG - NGABANG 174 21-DEC-19 GP BKY - NGABANG OBJEK DILUAR JALUR POHON - PRODUKTIF KAYU 3 15 3 13 2.3 BAHAYA I 175-176
24 TOWER BENGKAYANG - NGABANG 176 21-DEC-19 GP BKY - NGABANG OBJEK DILUAR JALUR POHON - PRODUKTIF KAYU 3 15 3 13 2.3 BAHAYA I 177-178
25 TOWER BENGKAYANG - NGABANG 176 21-DEC-19 GP BKY - NGABANG OBJEK DIBAWAH JALUR POHON - BAMBU 5 15 7 8 NORMAL 178-179
26 TOWER BENGKAYANG - NGABANG 177 21-DEC-19 GP BKY - NGABANG OBJEK DIBAWAH JALUR POHON - PRODUKTIF KAYU 5 15 12 3 BAHAYA I 179-180
27 TOWER BENGKAYANG - NGABANG 177 21-DEC-19 GP BKY - NGABANG OBJEK DILUAR JALUR POHON - PRODUKTIF KAYU 3 15 3 13 2.3 BAHAYA I 179-180
28 TOWER BENGKAYANG - NGABANG 178 21-DEC-19 GP BKY - NGABANG OBJEK DIBAWAH JALUR POHON - PRODUKTIF KAYU 5 15 12 3 BAHAYA I 179-180
29 TOWER BENGKAYANG - NGABANG 178 21-DEC-19 GP BKY - NGABANG OBJEK DILUAR JALUR POHON - PRODUKTIF KAYU 6 15 2 13 2.13 BAHAYA I 179-180
30 TOWER BENGKAYANG - NGABANG 191 19-DEC-19 GP BKY - NGABANG OBJEK DILUAR JALUR POHON - PRODUKTIF KAYU 2 15 1 14 1.03 KRITIS jengkol
31 TOWER BENGKAYANG - NGABANG 191 19-DEC-19 GP BKY - NGABANG OBJEK DIBAWAH JALUR POHON - PRODUKTIF KAYU 3 15 3 13 2.3 BAHAYA I tanaman liar
32 TOWER BENGKAYANG - NGABANG 190 19-DEC-19 GP BKY - NGABANG OBJEK DILUAR JALUR POHON - PRODUKTIF BUAH 6 15 8 7 10 NORMAL kelapa sawit
33 TOWER BENGKAYANG - NGABANG 190 19-DEC-19 GP BKY - NGABANG OBJEK DIBAWAH JALUR POHON - PRODUKTIF BUAH 3 15 7 8 NORMAL kelapa sawit
34 TOWER BENGKAYANG - NGABANG 189 19-DEC-19 GP BKY - NGABANG OBJEK DIBAWAH JALUR POHON - PRODUKTIF KAYU 17 10 6 4 BAHAYA II tanaman liar
LAPORAN INSPEKSI INTERNAL
No. PENGHANTAR TANGGAL PELAPOR LOKASI OBJEK JML X Y Z U KATEGORI KET. PHOTO
35 TOWER BENGKAYANG - NGABANG 189 19-DEC-19 GP BKY - NGABANG OBJEK DILUAR JALUR POHON - PRODUKTIF KAYU 2 10 4 6 4.77 NORMAL tanaman liar
36 TOWER BENGKAYANG - NGABANG 116A/276 19-DEC-19 GP BKY - NGABANG OBJEK DILUAR JALUR POHON - PRODUKTIF KAYU 3 13 4 9 4.6 NORMAL ada pohon kayu diluar jalur line 1 dan 2 pak jarak kayu tersebut ke konduktor sekitar 4 meter no span 278 ke 279 terima kasih.
37 TOWER BENGKAYANG - NGABANG 117/274 19-DEC-19 GP BKY - NGABANG OBJEK DILUAR JALUR POHON - PRODUKTIF KAYU 2 13 3 10 3.34 BAHAYA II ada pohon di luar jalur line 1 pak jarak pohon ke konduktor sekitar 3 meter.no span 276 ke 277
38 TOWER BENGKAYANG - NGABANG 117/274 19-DEC-19 GP BKY - NGABANG OBJEK DIBAWAH JALUR POHON - PRODUKTIF KAYU 1 13 10 3 BAHAYA I ada pohon di luar jalur line 2 pak.jarak pohon ke konduktor sekitar 3 meter no span 276 ke 277
39 TOWER BENGKAYANG - NGABANG 051 19-DEC-19 GP BKY - NGABANG OBJEK DILUAR JALUR POHON - PRODUKTIF KAYU 3 8.5 2 6.5 2.23 BAHAYA I pohon karet
40 TOWER BENGKAYANG - NGABANG 051 19-DEC-19 GP BKY - NGABANG OBJEK DILUAR JALUR POHON - PRODUKTIF KAYU 3 8.5 2 6.5 2.23 BAHAYA I pohon karet
41 TOWER BENGKAYANG - NGABANG 133 18-DEC-19 GP BKY - NGABANG OBJEK DILUAR JALUR POHON - PRODUKTIF KAYU 5 13 3 10 3.34 BAHAYA II kayu lokal
42 TOWER BENGKAYANG - NGABANG 133 18-DEC-19 GP BKY - NGABANG OBJEK DIBAWAH JALUR POHON - BAMBU 5 13 10 3 BAHAYA I bambu
43 TOWER BENGKAYANG - NGABANG 132 18-DEC-19 GP BKY - NGABANG OBJEK DILUAR JALUR POHON - PRODUKTIF BUAH 10 13 3 10 3.34 BAHAYA II pohon durian. nangka. kayu lokal
44 TOWER BENGKAYANG - NGABANG 132 18-DEC-19 GP BKY - NGABANG OBJEK DIBAWAH JALUR POHON - BAMBU 3 15 3 13 2.3 BAHAYA I pohon sagu. jengkol karet
45 TOWER BENGKAYANG - NGABANG 131 18-DEC-19 GP BKY - NGABANG OBJEK DILUAR JALUR POHON - PRODUKTIF BUAH 1 13 3 9 4.34 NORMAL pohon langsat
46 TOWER BENGKAYANG - NGABANG 186 18-DEC-19 GP BKY - NGABANG OBJEK DILUAR JALUR POHON - PRODUKTIF KAYU 3 15 3 13 2.3 BAHAYA I pohon liar
LAPORAN INSPEKSI INTERNAL
No. PENGHANTAR TANGGAL PELAPOR LOKASI OBJEK JML X Y Z U KATEGORI KET. PHOTO
47 TOWER BENGKAYANG - NGABANG 186 18-DEC-19 GP BKY - NGABANG OBJEK DIBAWAH JALUR POHON - BAMBU 3 15 3 13 2.3 BAHAYA I bambu
48 TOWER BENGKAYANG - NGABANG 078 18-DEC-19 GP BKY - NGABANG OBJEK DIBAWAH JALUR POHON - BAMBU 3 15 3 13 2.3 BAHAYA I kritis
49 TOWER BENGKAYANG - NGABANG 078 18-DEC-19 GP BKY - NGABANG OBJEK DILUAR JALUR POHON - PRODUKTIF KAYU 3 15 3 13 2.3 BAHAYA I kritis
50 TOWER BENGKAYANG - NGABANG 077 18-DEC-19 GP BKY - NGABANG OBJEK DILUAR JALUR POHON - PRODUKTIF KAYU 4 8.5 3 5.5 3.51 BAHAYA II rawan
51 TOWER BENGKAYANG - NGABANG 077 18-DEC-19 GP BKY - NGABANG OBJEK DILUAR JALUR POHON - PRODUKTIF KAYU 4 8.5 3 5.5 3.51 BAHAYA II rawan
52 TOWER BENGKAYANG - NGABANG 185 18-DEC-19 GP BKY - NGABANG OBJEK DIBAWAH JALUR POHON - PRODUKTIF KAYU 20 15 5 10 NORMAL tanaman liar
53 TOWER BENGKAYANG - NGABANG 185 18-DEC-19 GP BKY - NGABANG OBJEK DILUAR JALUR POHON - PRODUKTIF KAYU 3 15 3 13 2.3 BAHAYA I pohon liar
54 TOWER BENGKAYANG - NGABANG 184 18-DEC-19 GP BKY - NGABANG OBJEK DILUAR JALUR POHON - PRODUKTIF BUAH 1 15 3 13 2.3 BAHAYA I pohon durian
55 TOWER BENGKAYANG - NGABANG 184 18-DEC-19 GP BKY - NGABANG OBJEK DIBAWAH JALUR POHON - PRODUKTIF KAYU 30 15 5 10 NORMAL tanaman liat
56 TOWER BENGKAYANG - NGABANG 074 18-DEC-19 GP BKY - NGABANG OBJEK DILUAR JALUR POHON - PRODUKTIF KAYU 3 8.5 2 6.5 2.23 BAHAYA I rawan
57 TOWER BENGKAYANG - NGABANG 074 18-DEC-19 GP BKY - NGABANG OBJEK DILUAR JALUR POHON - PRODUKTIF KAYU 3 8.5 2 6.5 2.23 BAHAYA I rawan
58 TOWER BENGKAYANG - NGABANG 049 18-DEC-19 GP BKY - NGABANG OBJEK DILUAR JALUR POHON - BAMBU 3 15 3 13 2.3 BAHAYA I span 54 ke 55
LAPORAN INSPEKSI INTERNAL
No. PENGHANTAR TANGGAL PELAPOR LOKASI OBJEK JML X Y Z U KATEGORI KET. PHOTO
59 TOWER BENGKAYANG - NGABANG 045 18-DEC-19 GP BKY - NGABANG OBJEK DILUAR JALUR POHON - LAINNYA 3 15 3 13 2.3 BAHAYA I span 50 ke 51
60 TOWER BENGKAYANG - NGABANG 124 18-DEC-19 GP BKY - NGABANG OBJEK DILUAR JALUR POHON - PRODUKTIF KAYU 4 13 3 10 3.34 BAHAYA II pohon karet
61 TOWER BENGKAYANG - NGABANG 046 18-DEC-19 GP BKY - NGABANG OBJEK DIBAWAH JALUR POHON - PRODUKTIF KAYU 3 15 3 13 2.3 BAHAYA I span 51 ke 52
62 TOWER BENGKAYANG - NGABANG 064 18-DEC-19 GP BKY - NGABANG OBJEK DILUAR JALUR POHON - PRODUKTIF KAYU 1 8.5 3 5.5 3.51 BAHAYA II pohon karet
63 TOWER BENGKAYANG - NGABANG 064 18-DEC-19 GP BKY - NGABANG OBJEK DILUAR JALUR POHON - PRODUKTIF KAYU 1 8.5 3 5.5 3.51 BAHAYA II pohon karet
64 TOWER BENGKAYANG - NGABANG 061 18-DEC-19 GP BKY - NGABANG OBJEK DILUAR JALUR POHON - PRODUKTIF KAYU 3 8.5 2 6.5 2.23 BAHAYA I rawan
65 TOWER BENGKAYANG - NGABANG 061 18-DEC-19 GP BKY - NGABANG OBJEK DIBAWAH JALUR POHON - PRODUKTIF KAYU 3 15 3 13 2.3 BAHAYA I rawan
66 TOWER BENGKAYANG - NGABANG 061 18-DEC-19 GP BKY - NGABANG OBJEK DILUAR JALUR POHON - PRODUKTIF KAYU 3 8.5 2 6.5 2.23 BAHAYA I rawan
67 TOWER BENGKAYANG - NGABANG 061 18-DEC-19 GP BKY - NGABANG OBJEK DIBAWAH JALUR POHON - PRODUKTIF KAYU 3 15 3 13 2.3 BAHAYA I rawan
68 TOWER BENGKAYANG - NGABANG 121 17-DEC-19 GP BKY - NGABANG OBJEK DILUAR JALUR POHON - PRODUKTIF BUAH 7 15 3 10 5.3 NORMAL pohon karet, durian, langsat
69 TOWER BENGKAYANG - NGABANG 121 17-DEC-19 GP BKY - NGABANG OBJEK DIBAWAH JALUR POHON - PRODUKTIF BUAH 5 15 9 6 NORMAL pohon manggis, langsat, durian
70 TOWER BENGKAYANG - NGABANG 120 17-DEC-19 GP BKY - NGABANG OBJEK DIBAWAH JALUR POHON - PRODUKTIF KAYU 7 13 7 6 NORMAL pohon kayu lokal, karet
LAPORAN INSPEKSI INTERNAL
No. PENGHANTAR TANGGAL PELAPOR LOKASI OBJEK JML X Y Z U KATEGORI KET. PHOTO
71 TOWER BENGKAYANG - NGABANG 119 17-DEC-19 GP BKY - NGABANG OBJEK DILUAR JALUR POHON - PRODUKTIF KAYU 10 15 5 12 3.81 BAHAYA II pohon karet
72 TOWER BENGKAYANG - NGABANG 207 17-DEC-19 GP BKY - NGABANG OBJEK DILUAR JALUR POHON - PRODUKTIF KAYU 3 15 3 13 2.3 BAHAYA I pohon mati mendekati kabel
73 TOWER BENGKAYANG - NGABANG 118 17-DEC-19 GP BKY - NGABANG OBJEK DILUAR JALUR POHON - PRODUKTIF KAYU 3 13 5 10 3.93 BAHAYA II pohon kayu lokal
74 TOWER BENGKAYANG - NGABANG 118 17-DEC-19 GP BKY - NGABANG OBJEK DIBAWAH JALUR POHON - BAMBU 5 13 8 5 NORMAL bambu
75 TOWER BENGKAYANG - NGABANG 256 17-DEC-19 GP BKY - NGABANG OBJEK DILUAR JALUR POHON - PRODUKTIF KAYU 1 13 4 9 4.6 NORMAL ada pohon akasia di luar jalur line 1 pak.no span 258 ke 259.
76 TOWER BENGKAYANG - NGABANG 117 17-DEC-19 GP BKY - NGABANG OBJEK DILUAR JALUR POHON - PRODUKTIF KAYU 5 13 3 10 3.34 BAHAYA II pohon karet. kayu lokal
77 TOWER BENGKAYANG - NGABANG 117 17-DEC-19 GP BKY - NGABANG OBJEK DIBAWAH JALUR POHON - PRODUKTIF BUAH 5 13 10 3 BAHAYA I pohon jengkol. sawit. karet
78 TOWER BENGKAYANG - NGABANG 203 17-DEC-19 GP BKY - NGABANG OBJEK DIBAWAH JALUR POHON - PRODUKTIF KAYU 3 15 3 13 2.3 BAHAYA I pohon mendekati kabel
79 TOWER BENGKAYANG - NGABANG 202 17-DEC-19 GP BKY - NGABANG OBJEK DILUAR JALUR POHON - PRODUKTIF KAYU 3 15 3 13 2.3 BAHAYA I pohon di luar jalur
80 TOWER BENGKAYANG - NGABANG 201 17-DEC-19 GP BKY - NGABANG OBJEK DILUAR JALUR POHON - PRODUKTIF KAYU 3 15 3 13 2.3 BAHAYA I pohon di luar jalur
81 TOWER BENGKAYANG - NGABANG 115 17-DEC-19 GP BKY - NGABANG OBJEK DILUAR JALUR POHON - PRODUKTIF KAYU 1 13 3 10 3.34 BAHAYA II pohon kayu lokal
82 TOWER BENGKAYANG - NGABANG 114 17-DEC-19 GP BKY - NGABANG OBJEK DILUAR JALUR POHON - PRODUKTIF KAYU 3 13 3 8 5.34 NORMAL pohon kayu lokal
LAPORAN INSPEKSI INTERNAL
No. PENGHANTAR TANGGAL PELAPOR LOKASI OBJEK JML X Y Z U KATEGORI KET. PHOTO
83 TOWER BENGKAYANG - NGABANG 06A 17-DEC-19 GP BKY - NGABANG OBJEK DILUAR JALUR POHON - LAINNYA 3 12 3 10 2.37 BAHAYA I akasia
84 TOWER BENGKAYANG - NGABANG 05A 17-DEC-19 GP BKY - NGABANG OBJEK DILUAR JALUR POHON - LAINNYA 3 12 8 10 4.42 NORMAL pohon _ayu
85 TOWER BENGKAYANG - NGABANG 169 17-DEC-19 GP BKY - NGABANG OBJEK DILUAR JALUR POHON - PRODUKTIF KAYU 11 15 2 13 2.13 BAHAYA I 171-172
86 TOWER BENGKAYANG - NGABANG 169 17-DEC-19 GP BKY - NGABANG OBJEK DIBAWAH JALUR POHON - PRODUKTIF KAYU 3 15 3 13 2.3 BAHAYA I 171-172
87 TOWER BENGKAYANG - NGABANG 196 17-DEC-19 GP BKY - NGABANG OBJEK DIBAWAH JALUR POHON - PRODUKTIF KAYU 3 15 3 13 2.3 BAHAYA I tower ke 198 mau ke 199
88 TOWER BENGKAYANG - NGABANG 168 17-DEC-19 GP BKY - NGABANG OBJEK DILUAR JALUR POHON - PRODUKTIF KAYU 6 15 3 13 2.3 BAHAYA I 169-170
89 TOWER BENGKAYANG - NGABANG 168 17-DEC-19 GP BKY - NGABANG OBJEK DIBAWAH JALUR POHON - PRODUKTIF KAYU 5 15 12 3 BAHAYA I 170-171
90 TOWER BENGKAYANG - NGABANG 170 17-DEC-19 GP BKY - NGABANG OBJEK DILUAR JALUR POHON - PRODUKTIF KAYU 3 15 3 13 2.3 BAHAYA I 172-173
91 TOWER BENGKAYANG - NGABANG 170 17-DEC-19 GP BKY - NGABANG OBJEK DIBAWAH JALUR POHON - PRODUKTIF KAYU 5 15 3 13 2.3 BAHAYA I 172-173
92 TOWER BENGKAYANG - NGABANG 171 17-DEC-19 GP BKY - NGABANG OBJEK DILUAR JALUR POHON - PRODUKTIF BUAH 3 15 3 13 2.3 BAHAYA I 172-173
93 TOWER BENGKAYANG - NGABANG 171 17-DEC-19 GP BKY - NGABANG OBJEK DIBAWAH JALUR POHON - PRODUKTIF KAYU 5 15 7 8 NORMAL 173-174
94 TOWER BENGKAYANG - NGABANG 109 17-DEC-19 GP BKY - NGABANG OBJEK DIBAWAH JALUR POHON - PRODUKTIF KAYU 7 13 12 1 KRITIS pohon karet
LAPORAN INSPEKSI INTERNAL
No. PENGHANTAR TANGGAL PELAPOR LOKASI OBJEK JML X Y Z U KATEGORI KET. PHOTO
95 TOWER BENGKAYANG - NGABANG 109 17-DEC-19 GP BKY - NGABANG OBJEK DILUAR JALUR POHON - PRODUKTIF BUAH 4 13 3 8 5.34 NORMAL pohon sawit
96 TOWER BENGKAYANG - NGABANG 172 17-DEC-19 GP BKY - NGABANG OBJEK DILUAR JALUR POHON - PRODUKTIF KAYU 3 15 2 13 2.13 BAHAYA I 174-175
97 TOWER BENGKAYANG - NGABANG 172 17-DEC-19 GP BKY - NGABANG OBJEK DIBAWAH JALUR POHON - PRODUKTIF KAYU 2 15 15 0 - 173-174
98 TOWER BENGKAYANG - NGABANG 107 17-DEC-19 GP BKY - NGABANG OBJEK DIBAWAH JALUR POHON - PRODUKTIF BUAH 5 13 8 5 NORMAL pohon sawit
99 TOWER BENGKAYANG - NGABANG 034 16-DEC-19 GP BKY - NGABANG OBJEK DILUAR JALUR POHON - PRODUKTIF KAYU 6 15 3 13 2.3 BAHAYA I span 39-40 kayu
100 TOWER BENGKAYANG - NGABANG 034 16-DEC-19 GP BKY - NGABANG OBJEK DILUAR JALUR POHON - PRODUKTIF KAYU 3 15 3 13 2.3 BAHAYA I span 39-38 pohon karet
101 TOWER BENGKAYANG - NGABANG 016 16-DEC-19 GP BKY - NGABANG OBJEK DILUAR JALUR POHON - LAINNYA 2 12 8 10 4.42 NORMAL pohon kayu
102 TOWER BENGKAYANG - NGABANG 032 16-DEC-19 GP BKY - NGABANG OBJEK DILUAR JALUR POHON - PRODUKTIF KAYU 6 15 3 13 2.3 BAHAYA I span 37-36 pohon karet
103 TOWER BENGKAYANG - NGABANG 030 16-DEC-19 GP BKY - NGABANG OBJEK DILUAR JALUR POHON - PRODUKTIF KAYU 10 15 3 13 2.3 BAHAYA I span 35-35 pohon karet
104 TOWER BENGKAYANG - NGABANG 022 16-DEC-19 GP BKY - NGABANG OBJEK DILUAR JALUR POHON - LAINNYA 2 15 3 13 2.3 BAHAYA I phn kayu