PERHITUNGAN DAYA DUKUNG PONDASI

BORED

PILE

DI TITIK P4-07 DAN P6-01 MENGGUNAKAN DATA SPT

DAN METODE PELAKSANAAN

PADA PROYEK

FLY OVER

SIMPANG POS

LAPORAN

Ditulis untuk Menyelesaikan Mata Kuliah Tugas Akhir Semester VI

Pendidikan Program Diploma III

oleh:

ANDREAS P. SILABAN TIRA SEPRINA MANIHURUK NIM. 1005021010 NIM. 1005021070

PROGRAM STUDI TEKNIK SIPIL

JURUSAN TEKNIK SIPIL

POLITEKNIK NEGERI MEDAN

MEDAN

(2)

iv

KATA PENGANTAR

Puji dan syukur penulis ucapkan kepada Tuhan Yang Maha Esa atas segala rahmat dan berkah-Nya penulis dapat menyelesaikan Laporan Tugas Akhir ini dengan baik dan selesai hingga batas waktu yang telah ditentukan.

Laporan yang berjudul “Perhitungan Daya Dukung Pondasi Bored Pile di Titik P4-07 dan P6-01 menggunakan Data SPT dan Metode Pelaksanaan pada Proyek F ly Over Simpang Pos” ini dimaksudkan adalah sebagai syarat untuk menyelesaikan mata kuliah Tugas Akhir semester VI, pendidikan program Diploma III Jurusan Teknik Sipil, Politeknik Negeri Medan Tahun Akademik 2012 - 2013.

Dalam laporan ini penulis membahas mengenai perhitungan daya dukung pondasi bored pile di titik P4-07 dan P6-01 dengan menggunakan data SPT dan metode pelaksanaan pada proyek Fly Over simpang pos.

Dalam proses pembuatan laporan ini, penulis telah mendapatkan bimbingan dan bantuan dari berbagai pihak, baik materi maupun non materi. Oleh karena itu, sudah selayaknya penulis mengucapkan terima kasih kepada :

1. Bapak M. Syahruddin, S.T., M.T., Direktur Politeknik Negeri Medan; 2. Bapak Drs. Syaiful Hazmi, M.T., Ketua Jurusan Teknik Sipil Politeknik

Negeri Medan;

3. Bapak Ir. Sudarto, M.T., Kepala Program Studi;

4. Bapak Drs. Tarbiyatno, M.T., Dosen Pembimbing penulis yang telah banyak memberikan arahan dan saran dalam menyelesaikan Laporan Tugas Akhir ini;

5. Ibu Efri Debby Ekinola Ritonga, M.T., Wali kelas SI – 6C;

6. Bapak Wahyu Candra Prasetya, S.T., Pembimbing Lapangan di proyek yang telah banyak membantu dalam pengumpulan data dan memberi penjelasan tentang proyek;

(3)

v

8. Orang Tua tercinta dan seluruh keluarga yang telah memberi dukungan dan doa yang tulus kepada penulis;

9. Para pekerja dan seluruh staf di proyek Pembangunan Fly Over Simpang Pos;

10.Rekan-rekan mahasiswa, baik di kampus maupun di kost yang turut membantu dan mendukung penulis dalam penyelesaian Laporan Tugas Akhir ini;

11.Serta semua pihak yang tidak dapat disebutkan namanya satu per satu, yang turut membantu penulis dalam menyelesaikan Laporan Tugas Akhir ini.

Laporan ini merupakan hasil karya penulis dan bukan merupakan plagiat. Penulis sudah berupaya semaksimal mungkin dalam penulisan Laporan Tugas Akhir ini, penulis menyadari kemungkinan terdapat kekurangan dan kesilapan didalam laporan ini. Oleh sebab itu, penulis dengan senang hati menerima kritik dan saran guna penyempurnaan laporan ini nantinya.

Akhir kata semoga laporan ini dapat bermanfaat bagi penulis dan siapapun yang membacanya.

Medan, September 2013

Hormat kami:

Mahasiswa I, Mahasiswa II,

(4)

vii ABSTRAK

PERHITUNGAN DAYA DUKUNG PONDASI BORED PILE DI TITIK P4-07 DAN P6-01 MENGGUNAKAN DATA SPT DAN METODE PELAKSANAAN PADA PROYEK FLY OVER SIMPANG POS

oleh: Andreas P. Silaban Tira Seprina Manihuruk (1005021010) (1005021070)

Pondasi tiang atau disebut juga pondasi dalam berfungsi untuk memikul dan meneruskan beban struktur ke lapisan tanah keras yang mempunyai kapasitas daya dukung tinggi dimana letaknya cukup dalam di dalam tanah sehingga bangunan mampu memberikan dukungan yang cukup untuk mendukung beban tersebut. Setiap pondasi harus mampu mendukung beban sampai batas keamanan yang telah ditentukan, termasuk mendukung beban maksimum yang mungkin terjadi.

Tujuan dari Tugas Akhir ini adalah untuk menghitung kapasitas daya dukung tiang bor pada titik P4-07 dan P6-01 berdasarkan data SPT dan mengetahui metode pelaksanaan tiang bor pada proyek Fly Over Simpang Pos. Metodologi pengumpulan data adalah dengan metode observasi, pengambilan data dari kontraktor pelaksana dan melakukan studi keperpustakaan.

Hasil perhitungan daya dukung pondasi berdasarkan data SPT ini memiliki perbedaan dengan hasil output dari program All Pile. Berdasarkan hasil perhitungan menggunakan data SPT, didapat daya dukung ijin sebesar 206,90 ton pada titik P4-07 dan 176,022 ton pada titik P6-01. Berdasarkan hasil output dari program All Pile, didapat daya dukung ijin sebesar 466,67 ton pada titik P4-07 dan 500 ton pada titik P6-01.

Metode pelaksanaan pondasi tiang bor pada proyek ini yakni menggunakan metode basah dan memakai casing.

(5)

viii ABSTRACT

THE ESTIMATION OF DRILLED-SHAFT FOUNDATION LOAD-BEARING CAPACITY AT P4-07 AND P6-01 POINT BASED ON SPT DATA AND THE OPERATIONAL METHOD ON SIMPANG POS FLY OVER PROJECT.

By: Andreas P. Silaban TiraSeprinaManihuruk

(1005021010) (1005021070)

Pile foundation also called Deep foundation is used to carry and to

continue payload from structural part to rock soil layer which has a high

load-bearing capacity where it’s located deep enough in the ground so that the

building is able to provide sufficient support to support the load. Each foundation

must be capable of supporting load until the predetermined safety limits including

supporting the maximum load that may occured.

The purpose of this final project is to estimate the load-bearing capacity

of drilled shaft foundation at P4-07 and P6-01 point based on SPT data and to

find out the drilled shaft operational method on Simpang Pos Fly Over Project.

The data collection methodology is the observation method, the collection data

get from the contractor and conduct studies librarianship.

The load-bearing capacity result based on SPT data has a different result

with the All Pile output. Based on the estimation result by using SPT data,

obtained the allowable load-bearing capacity is about 206,90 tons at P4-07 point

and 176,022 tons at P6-01 point. Based on the All Pile output result, obtained the

allowable load-bearing capacity is about 466,67 tons at P4-07 point and 500 tons

at P6-01 point.

The operational method of drilled shaft foundation at this project which is

using the wet method and casing.

(6)

ix

G. Jadwal Persiapan, Pelaksanaan dan Penulisan Laporan Tugas Akhir ... 4

(7)

x

BAB II. TINJAUAN UMUM PERUSAHAAN ... 6

A. Latar Belakang Proyek ... 6

B. Data Umum Mengenai Proyek ... 8

C. Data Khusus ... 8

D. Latar Belakang Perusahaan ... 9

E. Struktur Organisasi ... 10

BAB III. TINJAUAN KEPUSTAKAAN ... 11

A. Penyelidikan Tanah ... 11 Data SPT (Standard Penetration Test) ... 16

(8)

xi

E. Output Daya Dukung Tiang Bor berdasarkan Proram All pile ... 34

F. Metode Pelaksanaan Pondasi Bored Pile ... 36

1. Penentuan Koordinat Bored Pile ... 37

7. Pemasangan Tulangan dan Pipa Tremie ... 41

(9)

xii

DAFTAR GAMBAR

Hal

II.1 Peta Lokasi Proyek Pembangunan Fly Over Jamin Ginting ... 6

II.2 Lokasi Proyek Pembangunan Fly Over Jamin Ginting ... 7

II.3 Logo Perusahaan ... 9

II.4 Struktur Organisasi Proyek... 10

III.1 Jenis-jenis pondasi tiang yang dibor ... 14

III.2 Model Bidang Keruntuhan pada Pondasi Tiang ... 15

III.3 Daya Dukung Ujung Tiang dan Tahanan Geser Dinding Tiang ... 16

III.4 Skema Alat-alat Bor ... 18

III.5 Alat-alat Bantu Pemboran ... 19

III.6 Pelaksanaan dengan cara kering (dry method) ... 20

III.7 Pelaksanaan dengan cara basah (water method) ... 21

III.8 Pekerjaan Penulangan Pondasi Tiang Bor ... 23

IV.1 Grafik Daya Dukung P4 ... 34

IV.2 Grafik Daya Dukung P6 ... 34

IV.3 Metode Pelaksanaan Pondasi Bored Pile ... 36

IV.4 Kolam penampungan air ... 37

IV.5 Fabrikasi besi tulangan bored pile ... 38

IV.6 Pemasangan casing/stand pipe ... 38

IV.7 Proses sirkulasi air pada proses pengeboran ... 40

IV.8 Proses Pengeboran ... 40

IV.9 Instal besi bore pile ... 41

IV.10 Pemasangan pipa tremie ... 42

IV.11Pengecoran Bored Pile ... 43

(10)

xiii

DAFTAR TABEL

Hal I.1 Jadwal Persiapan, Pelaksanaan dan Penulisan Laporan Tugas Akhir .... 4

III.1 Jenis-jenis tiang ... 13 IV.1 Kondisi Pelapisan Tanah Berdasarkan korelasi empiris

dengan N-SPT P4 ... 25 IV.2 Kondisi Pelapisan Tanah Berdasarkan korelasi empiris

(11)

xiv

DAFTAR LAMPIRAN

(12)

xv

DAFTAR NOTASI

Qu = daya dukung ultimit tiang bor Qp = daya dukung tahanan ujung Qs = daya dukung tahanan selimut Ap = luas penampang ujung tiang qp = daya dukung per satuan luas

NF = nilai SPT pada jarak 2D di bawah ujung pondasi fi = gesekan selimut tiang

P = keliling penampang tiang

∆Li = panjang tiang

σ' vZi = tegangan vertikal efektif tanah pada pertengahan layer

= 1,5 – 0,135. Zi0,5 ; (0,β5 ≤ ≤ 1,β) Zi = panjang setengah layer

Referensi

Dokumen terkait

Berdasarkan latar belakang di atas, penting dilakukan uji aktivitas antibakteri pada komplek kitosan-monosakarida pada matriks pangan surimi ikan gabus untuk

bahwa sehubungan dengan huruf a di atas dipandang perlu melengkapi sistem pengendalian manajemen yang tertuang dalam Peraturan Menteri Pekerjaan Umum Nomor 603/PRT/M/2005

Prav tako je namen diplomske naloge osvetliti faze postopka javnega naročanja in opozoriti na primere, kjer lahko pride do korupcije v postopkih javnih naročil.. Predstaviti želim

Sarung tangan yang kuat, tahan bahan kimia yang sesuai dengan standar yang disahkan, harus dipakai setiap saat bila menangani produk kimia, jika penilaian risiko menunjukkan,

perempuan antara lain: terdorong oleh kebutuhan hidup, kemudian rasa senang mengikuti kegiatan, senang berkumpul bersama, bersosialisasi, berpenghasilan sendiri dan dari

Ketua RT setelah mendapatkan informasi tentang adanya warga yang kurang mampu menderita sakit yang cukup parah baik di opname atau tidak, akan disampaikan hal tersebut

Setiap atasan dalam suatu departemen harus menilai kinerja pegawai yang berada dibawahnya untuk mendapatkan suatu gambaran hasil kerja nyata pegawai

Generally, the anther primordium that emerges from the floral meristem consists of three meristematic layers: the first layer forms the epidermis, the third layer forms the