• Tidak ada hasil yang ditemukan

Optimasi Kapasitas Baterai Dinamis Asam Timbal (Redox Flow Battery)

N/A
N/A
Protected

Academic year: 2023

Membagikan "Optimasi Kapasitas Baterai Dinamis Asam Timbal (Redox Flow Battery)"

Copied!
10
0
0

Teks penuh

(1)

by Kurriawan Pranata

Submission date: 06-Oct-2021 05:14PM (UTC+0700) Submission ID: 1666735908

File name: 2666-Article_Text-6640-2-10-20190402.pdf (373.24K) Word count: 2676

Character count: 16383

(2)

1 15

19 22

(3)

1

1

2

(4)

1

9 16

17

25

(5)

2

3 4

5

7

8 10

11

12

13

15 23

24

(6)

6 14

18

(7)

21

%

SIMILARITY INDEX

19

%

INTERNET SOURCES

10

%

PUBLICATIONS

9

%

STUDENT PAPERS

1

3

%

2

2

%

3

2

%

4

1

%

5

1

%

6

1

%

PRIMARY SOURCES

repository.ub.ac.id

Internet Source

repository.unikama.ac.id

Internet Source

Submitted to IIT Delhi

Student Paper

S. Selverston, E. Nagelli, J. S. Wainright, R. F.

Savinell. "All-Iron Hybrid Flow Batteries with In-Tank Rebalancing", Journal of The

Electrochemical Society, 2019

Publication

E.J. Fraser, K.K.J. Ranga Dinesh, R.G.A. Wills.

"Development of a two-dimensional, moving mesh treatment for modelling the reaction chamber of the soluble lead flow battery as a function of state of charge for Pb and PbO2 deposition and dissolution", Journal of Energy Storage, 2020

Publication

www.oalib.com

Internet Source

(8)

7

1

%

8

1

%

9

1

%

10

1

%

11

1

%

12

1

%

13

1

%

14

1

%

15

1

%

16

1

%

17

1

%

journal.unj.ac.id

Internet Source

Submitted to Edith Cowan University

Student Paper

Submitted to Sriwijaya University

Student Paper

elib.suub.uni-bremen.de

Internet Source

Submitted to Monash University

Student Paper

jurnal.fkip.uns.ac.id

Internet Source

Submitted to Queensland University of Technology

Student Paper

A.G. Olabi. "Renewable energy and energy storage systems", Energy, 2017

Publication

jurnal.unej.ac.id

Internet Source

text-id.123dok.com

Internet Source

Submitted to Universitas Negeri Surabaya The State University of Surabaya

(9)

19

< 1

%

20

< 1

%

21

< 1

%

22

< 1

%

23

< 1

%

24

< 1

%

Design Considering Wake Effect", 2021 IEEE 1st International Maghreb Meeting of the Conference on Sciences and Techniques of Automatic Control and Computer Engineering MI-STA, 2021

Publication

Yusril Afandi, Jamaaluddin Jamaaluddin.

"Android-Based Remote Control Solar Power Plant Panels with Direct Current System

Installation", Procedia of Engineering and Life Science, 2021

Publication

eprints.uty.ac.id

Internet Source

sinta.ristekbrin.go.id

Internet Source

123dok.com

Internet Source

de.mintonline.de

Internet Source

Liza Octriana, Mizu Istianto. "Efektivitas

Minyak Sereh Wangi dalam Mengendalikan Kutu Putih Pepaya Paracoccus marginatus L.", JURNAL BUDIDAYA PERTANIAN, 2021

Publication

(10)

25

< 1

%

Exclude quotes Off Exclude bibliography On

Exclude matches Off

fr.scribd.com

Internet Source

Referensi

Dokumen terkait

Estimasi Jangka Panjang Model Koreksi Kesalahan Engle Granger (EG-ECM) LNPMA = -33. Angka dalam kurung adalah besaran t hitung. Dari hasil tersebut dapat dikemuka- kan

Di bidang akademik :meningkatkan pengetahuan peneliti di bidang emergensi dan rawatan intensif anak, khususnya mengenai korelasi jumlah asupan kalori dan protein dengan

Temuan ini meng- indikasikan bahwa kemungkinan infor- masi right issue sudah terserap pada hari-hari sebelum pengumuman, sehingga terjadi perubahan return yang

kendaraan dinas/kendaraan perorangan dinas yang telah berumur 5 (lima) tahun lebih sampai dengan 7 ( tujuh) tahun. lebih, harga jualnya adalah 40 % (empat puluh persen

Dari hasil observasi yang sudah dilakukan penulis PT Surya Sentra Sarana sudah memiliki kegiatan supply chain management yang tersusun dengan baik, hal itu penulis dapat

Hasil Peringkat Teknis untuk Pekerjaan Penyusunan Kajian Potensi CSR di Kabupaten Cianjur

Berdasarkan Surat Penetapan Pemenang Pengadaan Barang/Jasa Nomor : 071.7/PPBJ- PENG/DIKMEN/2013 tanggal 27 Nopember 2013, maka Pejabat Pengadaan Barang/Jasa Bidang Pendidikan

2016, kami panitia pengadaan jasa konsultansi pekerjaan Perencanaan Pembangunan Satpas Type 455 M2 Polres Tanjung Balai telah melaksanakan Evaluasi Penawaran yang